# Arihant Avanti Phase II — Arihant Superstructures, Dombivli / Palava / Kalyan–Shil Road, Mumbai

Source: https://property-lens.ai/p/arihant-avanti-phase-ii-p51700078840 (PropertyLens). Analysis generated 2026-11-10 from MahaRERA filings, public ratings and dated locality evidence. Figures marked "assumed" are model estimates that visitors can edit on the page; "observed" figures come from a named source.

## Summary
- Investment score: 44/100 (50 = the average analysed Mumbai project, 12 points = one standard deviation). Evidence confidence 55%.
- Projected price growth: 8.2% per year over 5 years (likely range 4.7%–11.7%); 7.9% per year over 10 years.
- Net-wealth CAGR: 3.7% per year over an 8-year hold with a 75% loan at 8.5%, interiors fitted. Cash-flow IRR: 7.3% (all-cash 8.5%). Gross rental yield: 3.1%.
- Status: under construction, RERA handover 2031-12-31. Type: apartment, mid segment. Developer: Arihant Superstructures (#44 in Bengaluru by RERA registrations).
- Address: Thane, Thane, 421204. Homes: not filed. Land: not filed. Launched: 2025.
- RERA registrations: P51700078840.

## Homes on offer

| Home | Carpet (sq ft) | Super built-up (sq ft) | Price per sq ft | Price | Rent per month |
|---|---|---|---|---|---|
| 2 BHK | 650 | 650 | ₹6,600 (assumed) | ₹42.9 L | ₹11,500 (assumed) |
| 1 BHK | 420 | 420 | ₹6,600 (assumed) | ₹27.7 L | ₹8,500 (assumed) |
| 3 BHK | 950 | 950 | ₹6,600 (assumed) | ₹62.7 L | ₹15,500 (assumed) |

## Score factors (this home vs the Mumbai average)
- Price vs comparables: 5.9/10 (city average 6.0, −0.0 points), confidence 30%. ₹6,600 psf vs mid comps ₹7,000 (-6%; under-construction should price ~8% below ready). Price is a model estimate, so this factor carries a third of its normal weight until a listed price is observed.
- Rental demand & yield: 6.2/10 (city average 6.2, +0.0 points), confidence 34%. Gross yield 3.2% (₹18 psf/month); locality rental demand 7/10.
- Resale liquidity: 6.9/10 (city average 7.4, −0.9 points), confidence 50%. Locality resale depth 7/10; ticket ₹0.43 Cr narrows the buyer pool; UC resale needs builder NOC.
- Employment access: 1.3/10 (city average 4.4, −5.9 points), confidence 85%. Drive times now (Google Maps, 2026-11-11): Thane (Wagle Estate) 42 min, Powai (Hiranandani) 56 min, Andheri SEEPZ 64 min, BKC 72 min; 0 of 7 major hubs within 30 min; 3 msf office pipeline (3 yr).
- Metro, bus, rail & airport: 3.9/10 (city average 5.5, −2.6 points), confidence 60%. none; Line 12 Kalyan–Taloja stations ~2029; airport ~56 min by road now (Google Maps); .
- Schools, hospitals, daily needs: 7.0/10 (city average 7.8, −0.8 points), confidence 50%. Locality social-infrastructure index (interim, expert-set; POI distances pending Maps integration).
- Builder delivery & handover risk: 4.8/10 (city average 5.5, −1.7 points), confidence 60%. Arihant Superstructures: 10+ projects, on-time 91% (derived); handover 2031-12-31 (reported); within the RERA timeline.
- Layout, size, age, amenities, maintenance: 7.8/10 (city average 7.9, −0.1 points), confidence 50%. 60 units/acre; carpet/SBA ~100%; maintenance ~₹3.5 psf/month (assumed).
- Water, flooding, noise, infrastructure: 5.6/10 (city average 5.8, −0.6 points), confidence 50%. Large township supply (Palava); Airoli–Katai tunnel to cut travel
- Legal, title & approvals: 6.0/10 (city average 5.9, +0.2 points), confidence 55%. RERA registered; litigation: not published on the public register; approvals: MahaRERA registered; title: not verified. Due-diligence report lists 0 red flags (−0.0 pts).
- Expected price growth (5-yr CAGR model): 3.8/10 (city average 2.7, +6.4 points), confidence 56%. Model 5-yr price CAGR 8.2% (range 4.7–11.7%).

## Why prices should grow about 8.2% a year
- + 5.5%: Start with 5.5% a year: the normal long-run growth of Mumbai home prices.
- + 0.4%: Add 0.4%: prices here rose 8.5% a year recently (2023-06 to 2026-06). Some of that pace continues, but it fades each year.
- + 0.0%: Prices are still affordable enough that this does not slow growth.
- + 2.4%: Add 2.4%: 3 million sq ft of new offices nearby means more people wanting homes here.
- − 1.7%: Subtract 1.7%: many new homes are being built here (28 months of unsold stock), which keeps prices in check.
- + 0.1%: Add 0.1% for new roads, metro and water lines, weighted by how likely they are to actually finish: Metro Line 12 Kalyan–Taloja (planned, 2029); Airoli–Katai Naka elevated road and tunnel (construction, 2027).
- + 1.4%: Add 1.4% for this project itself: unfinished homes are worth more once they are complete.
- = 8.2%: Result: about 8.2% a year, so a home worth ₹44.4 L today would be worth about ₹65.8 L in 5 years. We are 56% confident in the evidence behind this.

## Returns over 8 years
- Cash put in: ₹35.3 L. Exit value in year 8: ₹82.2 L. Net sale after loan and costs: ₹49.9 L. Net rent after running costs: ₹1.8 L. Loan: ₹35.0 L (EMI ₹0.3 L per month). All-in cost: ₹57.6 L (other charges ₹1.5 L, GST ₹2.2 L, stamp duty and registration ₹3.2 L, interiors ₹7.8 L).

## Exit plans compared
- Sell at handover, no interiors (6 years): IRR 12.4%, net-wealth CAGR 7.3%, cash in ₹20.3 L, net rent ₹0.2 L, net sale ₹35.4 L. Best IRR.
- Hold bare, rent unfurnished (8 years): IRR 10.6%, net-wealth CAGR 6.1%, cash in ₹27.7 L, net rent ₹1.4 L, net sale ₹47.4 L.
- Hold, do interiors, rent & sell fitted (8 years): IRR 7.3%, net-wealth CAGR 3.7%, cash in ₹35.3 L, net rent ₹1.8 L, net sale ₹49.9 L.

## Financial and legal due diligence (public record)
Automated from MahaRERA's public register entry and registration certificate for P51700078840. Prices and rents are locality estimates, not verified listings.

### At a glance
- [POSITIVE] On its original RERA completion date: 2031-12-31
- [POSITIVE] No RERA complaints on this project; 0 on the promoter overall
- [POSITIVE] No litigation declared in RERA filings

### Risk meters (rule-based)
- Delivery timeline: 9/10. no extensions, no overdue dates on the RERA file
- Legal & complaints: 9/10. no litigation and no complaints on the RERA file
- Money to finish: 8/10. 
- Developer strength: 5/10. no public credit rating for the promoter

### Red flags to resolve in writing
None recorded.

### Complaints and disputes
- 0 complaints on this project at K-RERA (0 open); 0 on the promoter entity across projects.

### Credit ratings
- ARIHANT SUPERSTRUCTURES LIMITED: credit rating not yet checked by PropertyLens

### Questions to put to the developer
1. Share the latest quarterly progress filing and the architect and engineer certificates.
2. Confirm the price list, floor-rise, parking and other charges for the exact unit.
3. Which date is contractual, 2031-12-31 or the agreement's, and what is the delay compensation?
4. Confirm there is no litigation on the land or approvals beyond the RERA declaration.
5. Is the land owned by the promoter, or is this a joint development, and is any part mortgaged?

### Filed record
**RERA file · Registration**
- Registration: P51700078840 · promoter ARIHANT SUPERSTRUCTURES LIMITED
- Dates: Start 2025-01-15 · original completion 2031-12-31 · no extensions [green]
- Litigation declared: None declared in filings [green]

### Sources and caveats
- MahaRERA project record P51700078840, fetched 2026-11-10
- PropertyLens Mumbai locality model (market-level estimates)
- Caveats: Automated analysis: prices, rents and travel times are estimates until listings and Maps data are verified. RERA figures are the promoter’s own filings. Nothing here is legal, tax or investment advice.

## Assumptions used
- Price ₹6,600 per sq ft × 650 sq ft; other charges 3.5%; GST 5%; stamp duty + registration 7.2%; loan 75% at 8.5% for 20 years; rent ₹11,500 per month growing 5.0% a year with 5% vacancy; maintenance ₹3.5 per sq ft per month; hold 8 years; selling costs 1.5%.

Related: index of all analysed projects at https://property-lens.ai/llms.txt; JSON for this project at https://property-lens.ai/data/p/arihant-avanti-phase-ii-p51700078840.json; printable due-diligence report at https://property-lens.ai/dd/arihant-avanti-phase-ii-p51700078840.

PropertyLens scores and projections are model outputs built from dated public evidence and stated assumptions; they are not investment advice.