# Jains Aashraya — Jain Housing, Bannerghatta Road / JP Nagar / Arekere, Bengaluru

Source: https://property-lens.ai/p/jains-aashraya-001672 (PropertyLens). Analysis generated 2026-10-18 from Karnataka RERA filings, quarterly promoter updates, public ratings and dated locality evidence. Figures marked "assumed" are model estimates that visitors can edit on the page; "observed" figures come from a named source.

## Summary
- Investment score: 52/100 (50 = the average analysed Bengaluru project, 12 points = one standard deviation). Evidence confidence 52%.
- Projected price growth: 10.9% per year over 5 years (likely range 7.4%–14.3%); 9.2% per year over 10 years.
- Net-wealth CAGR: 5.6% per year over an 8-year hold with a 75% loan at 8.5%, interiors fitted. Cash-flow IRR: 7.0% (all-cash 7.8%). Gross rental yield: 3.3%.
- Status: under construction, RERA handover 2021-01-20. Type: apartment, mid segment. Developer: Jain Housing (#200 in Bengaluru by RERA registrations).
- Address: Basavanapura Village, Begur Hobli, Bannerughatta Main Road, Bengaluru South Taluk. Homes: 142. Land: 1.27 acres. Launched: 2017.
- RERA registrations: PRM/KA/RERA/1251/310/PR/180507/001672.

## Homes on offer

| Home | Carpet (sq ft) | Super built-up (sq ft) | Price per sq ft | Price | Rent per month |
|---|---|---|---|---|---|
| 3 BHK | 1,111 | 1,500 | ₹8,000 (assumed) | ₹1.20 Cr | ₹34,500 (assumed) |

## Score factors (this home vs the Bengaluru average)
- Price vs comparables: 5.9/10 (city average 6.2, −0.2 points), confidence 30%. ₹8,000 psf vs mid comps ₹8,500 (-6%; under-construction should price ~8% below ready). Price is a model estimate, so this factor carries a third of its normal weight until a listed price is observed.
- Rental demand & yield: 7.1/10 (city average 6.0, +2.2 points), confidence 34%. Gross yield 3.5% (₹23 psf/month); locality rental demand 9/10.
- Resale liquidity: 8.0/10 (city average 7.6, +0.6 points), confidence 50%. Locality resale depth 8/10; ticket ₹1.20 Cr narrows the buyer pool; UC resale needs builder NOC; 142-home project.
- Employment access: 5.3/10 (city average 5.2, +0.1 points), confidence 85%. Drive times now (Google Maps, 2026-09-16): Electronic City Ph-1 25 min, Koramangala (Forum) 31 min, ORR Bellandur (Ecospace) 39 min, MG Road (CBD) 43 min; 1 of 7 major hubs within 30 min; 3 msf office pipeline (3 yr).
- Metro, bus, rail & airport: 5.8/10 (city average 4.8, +1.9 points), confidence 60%. Green Line JP Nagar / Yelachenahalli; Pink Line Bannerghatta Road stations ~2027; airport ~112 min by road now (Google Maps); .
- Schools, hospitals, daily needs: 8.5/10 (city average 7.0, +1.6 points), confidence 50%. Locality social-infrastructure index (interim, expert-set; POI distances pending Maps integration).
- Builder delivery & handover risk: 0.0/10 (city average 3.7, −9.5 points), confidence 35%. Jain Housing: 1+ projects, on-time 60% (assumed); handover 2021-01-20 (RERA); 68 months past the RERA completion date, 1 extension, work behind schedule (-60 pts).
- Layout, size, age, amenities, maintenance: 6.3/10 (city average 7.3, −1.3 points), confidence 50%. 112 units/acre; carpet/SBA ~72%; maintenance ~₹3.5 psf/month (assumed).
- Water, flooding, noise, infrastructure: 6.8/10 (city average 5.8, +2.1 points), confidence 50%. Bannerghatta Road congestion; good BWSSB coverage in JP Nagar
- Legal, title & approvals: 5.4/10 (city average 7.4, −4.1 points), confidence 55%. RERA registered; litigation: none reported; approvals: RERA registered; title: not verified. Due-diligence report lists 2 red flags (−3.1 pts).
- Expected price growth (5-yr CAGR model): 7.3/10 (city average 6.0, +8.2 points), confidence 56%. Model 5-yr price CAGR 10.9% (range 7.4–14.3%).

## Why prices should grow about 10.9% a year
- + 6.0%: Start with 6.0% a year: the normal long-run growth of Bengaluru home prices.
- + 0.9%: Add 0.9%: prices here rose 11.9% a year recently (2023-06 to 2026-06). Some of that pace continues, but it fades each year.
- + 0.0%: Prices are still affordable enough that this does not slow growth.
- + 1.2%: Add 1.2%: 3 million sq ft of new offices nearby means more people wanting homes here.
- + 0.9%: Add 0.9%: few unsold homes in the area (9 months of stock), so sellers have the upper hand.
- + 0.2%: Add 0.2% for new roads, metro and water lines, weighted by how likely they are to actually finish: Pink Line Kalena Agrahara–Nagawara (construction, 2027); Phase 3 (Orange/Red lines: JP Nagar–Kempapura, Hosahalli–Kadabagere) (construction, 2029).
- + 1.9%: Add 1.9% for this project itself: unfinished homes are worth more once they are complete.
- = 10.9%: Result: about 10.9% a year, so a home worth ₹1.24 Cr today would be worth about ₹2.08 Cr in 5 years. We are 56% confident in the evidence behind this.

## Returns over 8 years
- Cash put in: ₹1.12 Cr. Exit value in year 8: ₹2.59 Cr. Net sale after loan and costs: ₹1.79 Cr. Net rent after running costs: ₹22.3 L. Loan: ₹97.8 L (EMI ₹0.8 L per month). All-in cost: ₹1.57 Cr (other charges ₹4.2 L, GST ₹6.2 L, stamp duty and registration ₹8.2 L, interiors ₹18.0 L).

## Exit plans compared
- Sell at handover, no interiors (1 years): IRR 1.0%, net-wealth CAGR 1.0%, cash in ₹41.3 L, net rent ₹1.0 L, net sale ₹50.9 L.
- Hold bare, rent unfurnished (8 years): IRR 9.8%, net-wealth CAGR 7.3%, cash in ₹97.0 L, net rent ₹18.6 L, net sale ₹1.78 Cr. Best IRR.
- Hold, do interiors, rent & sell fitted (8 years): IRR 7.0%, net-wealth CAGR 5.6%, cash in ₹1.12 Cr, net rent ₹22.3 L, net sale ₹1.79 Cr.

## Financial and legal due diligence (public record)
Automated from the Karnataka RERA file PRM/KA/RERA/1251/310/PR/180507/001672. Prices and rents are locality estimates, not verified listings.

### At a glance
- [RED FLAG] Registration extended 1× — from 2020-01-20 to 2021-01-20 (already passed)
- 40% built per the latest filing
- [RED FLAG] 13 RERA complaints on this project (5 open); 13 on the promoter overall
- [POSITIVE] No litigation declared in RERA filings

### Risk meters (rule-based)
- Delivery timeline: 5/10. 1 extension on the registration (−2); a registration completion date has already passed (−2)
- Legal & complaints: 6/10. 13 RERA complaints on the project (−3); 5 still open
- Money to finish: 8/10. finance cost is 0% of the registered budget
- Developer strength: 5/10. no public credit rating for the promoter

### Red flags to resolve in writing
1. RERA completion date 2021-01-20 has passed without a completion application.
2. 13 K-RERA complaints on this registration.

### Complaints and disputes
- 13 complaints on this project at K-RERA (5 open); 13 on the promoter entity across projects. Subjects raised: Not yet received Parking allotment Letter; Refund of 2 Years' Advance Maintenance and Corpus Fund; Illegal Double Maintenance Recover; Complaint against arbitrary cancellation of allotment and failure to execute and register ; Complaint against arbitrary cancellation of allotment and failure to register the allotted; Complaint under RERA Sec. 31 against Jain Housing over Flat 4C, Jains Aashraya, challengin; Delay period interest & registration of sale agreement.

### Credit ratings
- Jain Housing & Construction Ltd.: no public rating located

### Questions to put to the developer
1. Share the latest CA Form 4 and architect Form 5 with the escrow deposit ratio.
2. Confirm the price list, floor-rise and other charges for the exact unit.
3. Which date is contractual — 2021-01-20 — and what is the per-month delay compensation?
4. Confirm there is no litigation on the land or approvals beyond the RERA declaration.
5. Is the land freehold with the developer, and is any part mortgaged?

### Filed record
**RERA file · Registration**
- Registration: PRM/KA/RERA/1251/310/PR/180507/001672 · promoter Jain Housing & Construction Ltd. (Company) · EX/PRM/KA/RERA/1251/310/PR/220712/001672
- Dates: Start 2017-08-16 · original completion 2020-01-20 · 1 extension: Section 6 Extension → 2021-01-20 · current date has passed [red]
- Progress: 40% complete per registration-time status
- Registered cost: Total ₹53.04 cr · land ₹9.12 cr · construction ₹44.00 cr
- RERA bank account: ICICI Bank, Tnagar (70% construction account)
- Money at registration: collected ₹12.38 cr · used ₹13.31 cr · balance ₹0.00 cr · delay declared: Reason For Delay : (0)
- Land & towers: 1.27 acres (5,134 sq m) · Block A 142 homes, 19 floors
- Litigation declared: None declared in filings [green]
- K-RERA complaints: 13 on this registration (5 open) · 13 on the promoter entity across all its projects [red]
- Completion applied: 19/12/2020

**Complaint log (K-RERA) · 13 on this project**
- 2026-09-15 · 01125/2026: Not yet received Parking allotment Letter — SCRUTINY COMPLETED [amber]
- 2026-08-05 · 00958/2026: Refund of 2 Years' Advance Maintenance and Corpus Fund; Illegal Double Maintenance Recovery. — POSTED FOR ORDERS AUTHORITY FULLBENCH [amber]
- 2026-06-24 · 00734/2026: Complaint against arbitrary cancellation of allotment and failure to execute and register the Sale Deed despite acceptance of consideration and repeated assurances by the Respondent. — POSTED FOR ORDERS AUTHORITY FULLBENCH [amber]
- 2026-06-24 · 00735/2026: Complaint against arbitrary cancellation of allotment and failure to register the allotted flat despite acceptance of consideration, repeated assurances and the Complainant's readiness to perform. — POSTED FOR ORDERS AUTHORITY FULLBENCH [amber]
- 2026-06-22 · 00715/2026: Complaint under RERA Sec. 31 against Jain Housing over Flat 4C, Jains Aashraya, challenging cancellation, seeking protection of allotment rights, sale registration, and status quo pending adjudication — POSTED FOR ORDERS AUTHORITY FULLBENCH [amber]
- 2023-05-16 · 00741/2023: Delay period interest & registration of sale agreement — DISPOSED AUTHORITY FULLBENCH (AUTHORITY)
- 2022-11-15 · CMP/221115/0010334: Delay in delivery of Project and Return of amount and compensation — DISPOSED AUTHORITY FULLBENCH (AUTHORITY)
- 2022-11-15 · CMP/221115/0010337: Delay in delivery of Project and Return of amount and compensation — DISPOSED AUTHORITY FULLBENCH (AUTHORITY)
- 2022-06-29 · CMP/220629/0009703: Refund was promised on 31st October 2019, yet not received — DISPOSED AUTHORITY BENCH4 (AUTHORITY)
- 2021-11-09 · CMP/211109/0008530: Delay Compensation — DISPOSED AUTHORITY BENCH4 (AUTHORITY)
- 2021-08-25 · CMP/210825/0008272: Delay in Delivery of Project and Change in the plan and No Communication — DISPOSED AUTHORITY BENCH4 (AUTHORITY)
- 2021-08-01 · CMP/210801/0008194: Builder not acknowledging, responding to Termination notice. — DISPOSED AUTHORITY BENCH4 (AUTHORITY)
- 2021-02-10 · CMP/210210/0007605: Construction entering 6th year and not completed — DISPOSED AUTHORITY BENCH4 (AUTHORITY)

### Sources and caveats
- Karnataka RERA project record PRM/KA/RERA/1251/310/PR/180507/001672 (registration file, quarterly updates, complaint register), fetched 2026-09-15
- PropertyLens locality model (market-level estimates)
- Caveats: Automated analysis: prices, rents and travel times are estimates until listings and Maps data are verified. RERA figures are the promoter’s own filings. Nothing here is legal, tax or investment advice.

## Assumptions used
- Price ₹8,000 per sq ft × 1,500 sq ft; other charges 3.5%; GST 5%; stamp duty + registration 6.6%; loan 75% at 8.5% for 20 years; rent ₹34,500 per month growing 5.0% a year with 5% vacancy; maintenance ₹3.5 per sq ft per month; hold 8 years; selling costs 1.5%.

Related: index of all analysed projects at https://property-lens.ai/llms.txt; JSON for this project at https://property-lens.ai/data/p/jains-aashraya-001672.json; printable due-diligence report at https://property-lens.ai/dd/jains-aashraya-001672.

PropertyLens scores and projections are model outputs built from dated public evidence and stated assumptions; they are not investment advice.