# Sanjeevini — Sanjeevini, Marathahalli / Kundalahalli / Varthur, Bengaluru

Source: https://property-lens.ai/p/sanjeevini-002892 (PropertyLens). Analysis generated 2026-10-18 from Karnataka RERA filings, quarterly promoter updates, public ratings and dated locality evidence. Figures marked "assumed" are model estimates that visitors can edit on the page; "observed" figures come from a named source.

## Summary
- Investment score: 70/100 (50 = the average analysed Bengaluru project, 12 points = one standard deviation). Evidence confidence 55%.
- Projected price growth: 10.3% per year over 5 years (likely range 6.9%–13.8%); 9.6% per year over 10 years.
- Net-wealth CAGR: 5.7% per year over an 8-year hold with a 75% loan at 8.5%. Cash-flow IRR: 8.1% (all-cash 8.4%). Gross rental yield: 0.0%.
- Status: ready to move in. Type: plot, mid segment. Developer: Sanjeevini (#30 in Bengaluru by RERA registrations).
- Address: 28/5 Solivara Village,Tavarekere hobli, Bangalore south taluk. Homes: not filed. Land: 2.8 acres. Launched: 2019.
- RERA registrations: PRM/KA/RERA/1251/310/PR/190919/002892.

## Homes on offer

| Home | Carpet (sq ft) | Super built-up (sq ft) | Price per sq ft | Price | Rent per month |
|---|---|---|---|---|---|
| Plot | 889 | 1,200 | ₹5,050 (assumed) | ₹60.6 L | — |

## Score factors (this home vs the Bengaluru average)
- Price vs comparables: 7.4/10 (city average 6.2, +1.0 points), confidence 30%. ₹5,050 psf vs mid comps ₹9,200 (-45%). Price is a model estimate, so this factor carries a third of its normal weight until a listed price is observed.
- Rental demand & yield: 3.9/10 (city average 6.0, −4.1 points), confidence 34%. Gross yield 0.0% (₹0 psf/month); locality rental demand 9/10.
- Resale liquidity: 8.7/10 (city average 7.6, +1.9 points), confidence 50%. Locality resale depth 8/10; ticket ₹0.61 Cr narrows the buyer pool.
- Employment access: 8.7/10 (city average 5.2, +7.1 points), confidence 85%. Drive times now (Google Maps, 2026-09-16): ITPL Whitefield 16 min, ORR Bellandur (Ecospace) 19 min, MG Road (CBD) 29 min, Koramangala (Forum) 30 min; 4 of 7 major hubs within 30 min; 7 msf office pipeline (3 yr).
- Metro, bus, rail & airport: 6.1/10 (city average 4.8, +2.4 points), confidence 60%. Purple Line Kundalahalli / Nallurhalli; ORR Blue Line stations ~2027; airport ~69 min by road now (Google Maps); .
- Schools, hospitals, daily needs: 8.5/10 (city average 7.0, +1.6 points), confidence 50%. Locality social-infrastructure index (interim, expert-set; POI distances pending Maps integration).
- Builder delivery & handover risk: 6.1/10 (city average 3.7, +5.9 points), confidence 60%. Sanjeevini: 15+ projects, on-time 71% (derived); ready.
- Layout, size, age, amenities, maintenance: 6.4/10 (city average 7.3, −1.2 points), confidence 50%. 60 units/acre; carpet/SBA ~72%; maintenance ~₹3.5 psf/month (assumed).
- Water, flooding, noise, infrastructure: 5.3/10 (city average 5.8, −0.9 points), confidence 50%. Varthur lake catchment; ORR congestion
- Legal, title & approvals: 8.8/10 (city average 7.4, +2.9 points), confidence 55%. RERA registered; litigation: none reported; approvals: RERA registered; title: not verified. Due-diligence report lists 0 red flags (−0.0 pts).
- Expected price growth (5-yr CAGR model): 6.6/10 (city average 6.0, +3.7 points), confidence 56%. Model 5-yr price CAGR 10.3% (range 6.9–13.8%).

## Why prices should grow about 10.3% a year
- + 6.0%: Start with 6.0% a year: the normal long-run growth of Bengaluru home prices.
- + 0.8%: Add 0.8%: prices here rose 11.6% a year recently (2023-06 to 2026-06). Some of that pace continues, but it fades each year.
- + 0.0%: Prices are still affordable enough that this does not slow growth.
- + 1.3%: Add 1.3%: 7 million sq ft of new offices nearby means more people wanting homes here.
- + 0.5%: Add 0.5%: few unsold homes in the area (12 months of stock), so sellers have the upper hand.
- + 0.2%: Add 0.2% for new roads, metro and water lines, weighted by how likely they are to actually finish: Blue Line KR Puram–Hebbal–Airport (construction, 2027); Purple Line Whitefield extension (2023) (operational, 2023); Peripheral Ring Road (planned, 2030).
- + 1.5%: No extra project-level adjustment.
- = 10.3%: Result: about 10.3% a year, so a home worth ₹61.8 L today would be worth about ₹1.01 Cr in 5 years. We are 56% confident in the evidence behind this.

## Returns over 8 years
- Cash put in: ₹55.8 L. Exit value in year 8: ₹1.31 Cr. Net sale after loan and costs: ₹92.2 L. Net rent after running costs: ₹-1.9 L. Loan: ₹46.4 L (EMI ₹0.4 L per month). All-in cost: ₹66.5 L (other charges ₹1.2 L, GST ₹0.0 L, stamp duty and registration ₹4.1 L).

## Financial and legal due diligence (public record)
Automated from the Karnataka RERA file PRM/KA/RERA/1251/310/PR/190919/002892. Prices and rents are locality estimates, not verified listings.

### At a glance
- [POSITIVE] Delivered. RERA registration ran 2019-03-13 → 2021-12-12 after 1 extension (original 2021-03-12)
- [POSITIVE] No RERA complaints on this project; 0 on the promoter overall
- [POSITIVE] No litigation declared in RERA filings

### Risk meters (rule-based)
- Delivery timeline: 8/10. delivered; the registration was extended 1× before completion
- Legal & complaints: 9/10. no litigation and no complaints on the RERA file
- Money to finish: 8/10. finance cost is 0% of the registered budget
- Developer strength: 5/10. no public credit rating for the promoter

### Red flags to resolve in writing
None recorded.

### Complaints and disputes
- 0 complaints on this project at K-RERA (0 open); 0 on the promoter entity across projects.

### Credit ratings
- MBSR Infrastructure pvt ltd: no public rating located

### Questions to put to the developer
1. Share the latest CA Form 4 and architect Form 5 with the escrow deposit ratio.
2. Confirm the price list, floor-rise and other charges for the exact unit.
3. Provide the occupancy certificate, khata and title chain for the unit.
4. Confirm there is no litigation on the land or approvals beyond the RERA declaration.
5. Is the land freehold with the developer, and is any part mortgaged?

### Filed record
**RERA file · Registration**
- Registration: PRM/KA/RERA/1251/310/PR/190919/002892 · promoter MBSR Infrastructure pvt ltd (Company) · Proposed Project End Date at the time of registration :
- Dates: Start 2019-03-13 · original completion 2021-03-12 · 1 extension: Covid Extension → 2021-12-12 [amber]
- Status: Completed and occupied (per project status); RERA progress fields below are historical [green]
- Registered cost: Total ₹4.00 cr · land ₹2.90 cr · construction ₹1.05 cr
- RERA bank account: Karnataka Bank Ltd., Cnandra Layout (70% construction account)
- Land & towers: 2.80 acres (11,331 sq m)
- Litigation declared: None declared in filings [green]
- K-RERA complaints: 0 on this registration (0 open) · 0 on the promoter entity across all its projects [green]

### Sources and caveats
- Karnataka RERA project record PRM/KA/RERA/1251/310/PR/190919/002892 (registration file, quarterly updates, complaint register), fetched 2026-09-15
- PropertyLens locality model (market-level estimates)
- Caveats: Automated analysis: prices, rents and travel times are estimates until listings and Maps data are verified. RERA figures are the promoter’s own filings. Nothing here is legal, tax or investment advice.

## Assumptions used
- Price ₹5,050 per sq ft × 1,200 sq ft; other charges 2.0%; GST 0%; stamp duty + registration 6.6%; loan 75% at 8.5% for 20 years; rent ₹0 per month growing 5.0% a year with 5% vacancy; maintenance ₹0.3 per sq ft per month; hold 8 years; selling costs 1.5%.

Related: index of all analysed projects at https://property-lens.ai/llms.txt; JSON for this project at https://property-lens.ai/data/p/sanjeevini-002892.json; printable due-diligence report at https://property-lens.ai/dd/sanjeevini-002892.

PropertyLens scores and projections are model outputs built from dated public evidence and stated assumptions; they are not investment advice.