Financial & legal due diligence · public record · 18 Oct 2026

Trifecta Veranza

Trifecta · Sarjapur Road (Carmelaram / Dommasandra) · Sy No 96, Sy No 97/3, Khata Number 150200100101122194, Yamare Village, , Sarjapura Hobli, Anekal Taluk, Bengaluru District

Promoter entityTRIFECTA PROJECTS PRIVATE LIMITED
Entity type · PANCompany · AACCE9717F
Developer brandTrifecta · #42 in Bengaluru by RERA registrations
RERA registrationsRegistration: PRM/KA/RERA/1251/308/PR/210126/008418
Planning authorityAnekal Planning Authority
Sanctioned planAnekal Planning Authority/CC/971/2025-26 · 2026-01-03
Escrow bankSTATE BANK OF INDIA, Mahadevapura SME
Land6.47 acres · 1 land owner on record
Court cases declared0
Complaints at K-RERA0 on this project · 2 on the promoter
Record fetchedSep 2026
0 red flags1 to watch6 positive

Automated from the Karnataka RERA file PRM/KA/RERA/1251/308/PR/210126/008418 and 2 quarterly filings. Prices and rents are locality estimates, not verified listings. This report records what the Karnataka RERA file, the promoter’s quarterly filings, the complaint register, public credit ratings and company filings say. It states facts and flags them; it does not judge the investment. Prices, returns and the investment score live in the separate full report.

Financial & legal due diligence

What the public record says

Automated from the Karnataka RERA file PRM/KA/RERA/1251/308/PR/210126/008418 and 2 quarterly filings. Prices and rents are locality estimates, not verified listings. Compiled Sep 2026 from the Karnataka RERA file, company registers, rating agencies, tribunal records and press. Facts only; anything that deserves a written answer before signing is flagged.

0 red1 watch6 positive
Delivery timeline9/10
no extensions, no overdue dates on the RERA file
Legal & complaints9/10
no litigation and no complaints on the RERA file
Money to finish7/10
finance cost is 5% of the registered budget; last quarter: collected ₹1.49 cr, withdrew ₹1.49 cr; only 7% of homes booked (−1)
Developer strength5/10
no public credit rating for the promoter

Meters are rule-based from the RERA file and public ratings (rules shown under each), not opinions.

Registration
PRM/KA/RERA/1251/308/PR/210126/008418 · TRIFECTA PROJECTS PRIVATE LIMITED
On original date
RegisteredJan 2026TodaySep 2026Original completionDec 2029
Construction15%
quarterly filing Q1 2026-27 (submitted 2026-07-15)
Homes booked30 / 444
414 still available
Sold vs built7% vs 15%
Sales and construction are broadly in step.
Money through the RERA account
Collected ₹25.5 LWithdrawn ₹25.5 LQ4 2025-2625.5 L25.5 LCollected ₹1.49 CrWithdrawn ₹1.49 CrQ1 2026-271.49 Cr1.49 Cr
Collected from buyersWithdrawn for construction
Latest milestones
  • Plastering inside , outside & Ceiling
    0%
  • Joinery: Doors, Windows, Ventilators etc
    0%
  • Basic work of Water supply, Sanitary and E
    0%
  • Dadoing, Skirting, Flooring, Tiles work
    0%
  • Railing and Grill fixing
    0%
  • Electrification, Water supply and Sanitary
    0%
No litigation declaredNo complaintsEscrow: STATE BANK OF INDIAJoint-development land
Credit ratings of the people behind it

No public credit rating located for the promoter.

TRIFECTA PROJECTS PRIVATE LIMITED: no public rating located

Complaints & disputes on record
On this project00 open
On the promoter entity2all projects
Court cases declared0no stay recorded
At a glance
On its original RERA date

On its original RERA completion date: 2029-12-31

15% built, 7% booked

15% built per the latest filing; 30/444 homes booked

No complaints on this project

No RERA complaints on this project; 2 on the promoter overall

No litigation declared

No litigation declared in RERA filings

The record, in pictures

RERA file · Registration

Registered project cost ₹304 cr — where it goes
Land ₹0 cr · 0%Approvals ₹8.8 cr · 3%Construction & on-site ₹248 cr · 82%Finance (bank) ₹16.5 cr · 5%Other / taxes ₹30.7 cr · 10%
Construction programme as filed (quarterly filing Q1 2026-27 (submitted 2026-07-15))
202720282029Earth work and other leveling preparat60%Foundation footing work35%Upto Plinth Level30%Sub-structure flooring10%Retaining wall30%RCC or MS Framed structure15%Masonry Construction5%Plastering inside , outside & Ceiling0%Joinery: Doors, Windows, Ventilators e0%Basic work of Water supply, Sanitary a0%Dadoing, Skirting, Flooring, Tiles wor0%Railing and Grill fixing0%Electrification, Water supply and Sani0%Painting0%Fire prevention and fire fighting fitt0%Weather Proof work0%Elevation work0%Internal and External work including l0%today
Bars are the filed schedule; filled part is reported progress. Red = past its scheduled end and not complete.
No litigation declaredBorrowing declared: NoEscrow at STATE BANK OF INDIA1 recorded land-owner shareOwners’ association: not formed

Red flags to resolve in writing

1
Legal

Joint-development land: confirm which units fall in the owners’ share.

Questions to put to the developer before you sign

  1. Share the latest CA Form 4 and architect Form 5 with the escrow deposit ratio.
  2. Confirm the price list, floor-rise and other charges for the exact unit.
  3. Which date is contractual — 2029-12-31 — and what is the per-month delay compensation?
  4. Confirm there is no litigation on the land or approvals beyond the RERA declaration.
  5. What is the land owners’ share of built area and is the unit in the developer’s share?
Full record: every filed number, line by line1 sections · 13 items

RERA file · Registration

Registration
PRM/KA/RERA/1251/308/PR/210126/008418 · promoter TRIFECTA PROJECTS PRIVATE LIMITED (Company) · U45200KA2012PTC062831
Dates
Start 2026-01-03 · original completion 2029-12-31 · no extensions
Progress
15% complete per quarterly filing Q1 2026-27 (submitted 2026-07-15) · 30 of 444 homes booked (414 available)
Registered cost
Total ₹304 cr · land ₹0.00 cr · construction ₹248 cr · bank principal+interest ₹16.50 cr
Borrowing / mortgage declared
Borrowing: No
RERA bank account
STATE BANK OF INDIA, Mahadevapura SME (70% construction account)
Plan sanction
Anekal Planning Authority/CC/971/2025-26 dated 2026-01-03 · Anekal Planning Authority
Land & towers
6.47 acres (26,203 sq m) · A 222 homes, 36 floors; B 222 homes, 36 floors
Land owners / co-promoters
L Shankar (100.0%, Sy 97/3)
Litigation declared
None declared in filings
K-RERA complaints
0 on this registration (0 open) · 2 on the promoter entity across all its projects
Owners’ association
Not yet formed
Completion applied
19/12/2020

Source: Karnataka RERA project record PRM/KA/RERA/1251/308/PR/210126/008418, fetched 2026-09-15. Figures are the promoter’s own filings.

Sources & caveats2 sources
  • Karnataka RERA project record PRM/KA/RERA/1251/308/PR/210126/008418 (registration file, quarterly updates, complaint register), fetched 2026-09-15
  • PropertyLens locality model (market-level estimates)
  • Karnataka RERA project records PRM/KA/RERA/1251/308/PR/210126/008418 (registration file, quarterly updates, complaint register), fetched Sep 2026.

Caveats. Automated analysis: prices, rents and travel times are estimates until listings and Maps data are verified. RERA figures are the promoter’s own filings. Nothing here is legal, tax or investment advice.

PropertyLens · property-lens.ai · Facts are transcribed from public records as filed by the promoter and the regulator; figures on RERA certificates are promoter numbers certified on unaudited books. Absence of a court case or insolvency filing in these sources is not proof that none exists. Verify title, approvals and encumbrances with a lawyer before you sign. Nothing here is legal, tax or investment advice.