Belmont Residences
Score, growth and returns below are for the highlighted home and plan. Prices, rent and possession never mix across phases.
Price edits apply to ·
All-in cost sheet this home, default assumptions
| Item | Basis | Amount |
|---|---|---|
| Base price | ₹4,800 per sq ft × 1,280 sq ft super built-up | 61.4 L |
| Other charges | 3.5% of base: floor-rise, preferred-location, car park, club, maintenance deposit, legal, corpus (edit in Assumptions) | 2.2 L |
| GST | 5.0% on an under-construction home | 3.2 L |
| Stamp duty and registration | 9.0% in Tamil Nadu: 7% stamp duty plus 2% registration on the higher of the agreement value and the guideline value | 5.7 L |
| Interiors | ₹1,200 per sq ft, needed before the home can be let | 15.4 L |
| All-in cost | what leaves your pocket and the bank's, before rent or resale | ₹87.9 L |
| Your own money | 75.0% loan at 8.5% for 20 years covers the rest; EMI 0.4 L a month | ₹64.0 L |
Carpet area 1,023 sq ft against 1,280 sq ft super built-up: you pay for 20% that is common area and walls. Price per sq ft of carpet ≈ ₹6,006. Every percentage above is editable in Assumptions; the defaults are Tamil Nadu rates as of 2026.
In plain words
Each home is marked on 11 things a careful buyer checks, then compared with every project we analyse in Chennai: 50 is the average project, 62 beats about five in six. Here is what lifts this one and what drags it:
- +Employment access · 2/6 pts
Drive times right now: DLF Ramapuram 20 min, Chennai airport 21 min, Ambattur industrial estate 28 min; SIPCOT Siruseri 67 min. About 2 million sq ft of new offices are planned nearby in 3 years. - +Builder delivery & handover risk · 2/16 pts
Sas Hotels And Enterprises has finished 1+ projects and delivered on time about 60% of the time. This phase is still under construction, with handover promised for 2027-03-31: delays would push your rent start back. - +Expected price growth (5-yr CAGR model) · 2/50 pts
We expect prices here to rise about 7.5% a year for the next 5 years (explained below). - −Schools, hospitals, daily needs · -2/2 pts
Schools, hospitals and daily shopping are good in this area. - −Metro, bus, rail & airport · -2/7 pts
The nearest working metro is ~3.0 km away; Phase 2 Poonamallee is planned for ~2026. Airport is about 60 minutes by road. - −Water, flooding, noise, infrastructure · -2/9 pts
Some flood risk in heavy rain; water supply is mostly borewell or tankers; noise is manageable.
All 11 checks
- •Price vs comparables · -0/4 pts
Priced about the same as similar mid homes nearby (₹4,800 vs ~₹5,100 per sq ft). - •Rental demand & yield · -1/7 pts
Rent pays back 3.3% of the price every year, close to the usual 3% in Chennai. Tenant demand here is decent. - •Resale liquidity · -1/6 pts
Plenty of buyers can afford a ₹61.4 L home, and homes in Poonamallee / Iyyapanthangal / Mangadu / Thirumazhisai resell at a normal pace. Reselling before handover needs the builder’s permission. - +Employment access · 2/6 pts
Drive times right now: DLF Ramapuram 20 min, Chennai airport 21 min, Ambattur industrial estate 28 min; SIPCOT Siruseri 67 min. About 2 million sq ft of new offices are planned nearby in 3 years. - •Metro, bus, rail & airport · -2/7 pts
The nearest working metro is ~3.0 km away; Phase 2 Poonamallee is planned for ~2026. Airport is about 60 minutes by road. - •Schools, hospitals, daily needs · -2/2 pts
Schools, hospitals and daily shopping are good in this area. - •Builder delivery & handover risk · 2/16 pts
Sas Hotels And Enterprises has finished 1+ projects and delivered on time about 60% of the time. This phase is still under construction, with handover promised for 2027-03-31: delays would push your rent start back. - +Layout, size, age, amenities, maintenance · -0/3 pts
Moderately dense layout (60 homes per acre); about 80% of the area you pay for is usable carpet area. Maintenance ~₹3.5 per sq ft a month. - •Water, flooding, noise, infrastructure · -2/9 pts
Some flood risk in heavy rain; water supply is mostly borewell or tankers; noise is manageable. - •Legal, title & approvals · 0/9 pts
Registered with Tamil Nadu RERA; court cases not disclosed on the public register; land title not yet verified by us, so get a lawyer to check. The due-diligence report below flags 0 items in red. - −Expected price growth (5-yr CAGR model) · 2/50 pts
We expect prices here to rise about 7.5% a year for the next 5 years (explained below).
We build the forecast step by step, starting from what Chennai homes normally do and adjusting for this area and this project:
- + 5.0%Start with 5.0% a year: the normal long-run growth of Chennai home prices.
- + 0.5%Add 0.5%: prices here rose 8.1% a year recently (2023-06 to 2026-06). Some of that pace continues, but it fades each year.
- + 0.0%Prices are still affordable enough that this does not slow growth.
- + 2.1%Add 2.1%: 2 million sq ft of new offices nearby means more people wanting homes here.
- − 0.7%Subtract 0.7%: many new homes are being built here (22 months of unsold stock), which keeps prices in check.
- + 0.2%Add 0.2% for new roads, metro and water lines, weighted by how likely they are to actually finish: Chennai Metro Phase 2 (Corridors 3, 4, 5: Madhavaram–SIPCOT, Light House–Poonamallee, Madhavaram–Sholinganallur) (construction, 2027); Chennai Peripheral Ring Road (construction, 2028); Parandur greenfield airport (planned, 2030).
- + 0.4%Add 0.4% for this project itself: unfinished homes are worth more once they are complete.
- = 7.5%Result: about 7.5% a year, so a home worth ₹63.6 L today would be worth about ₹91.4 L in 5 years. We are 56% confident in the evidence behind this.
Which exit suits you?
For an unfinished flat the answer depends on whether you sell at handover or hold, and whether you spend on interiors. Same price, same loan; only the strategy changes:
| Strategy | Hold | IRR / yr | Wealth CAGR / yr | Cash you put in | Net rent | Net sale | Apply |
|---|---|---|---|---|---|---|---|
| Sell at handover, no interiors Take delivery in 2027-03-31 and sell the bare flat (1 yr hold). Needs builder NOC or registration first; no rent. | 1 yrs | -85.6% | -85.6% | ₹7.6 L | ₹-9,208 | ₹18.6 L | |
| Hold bare, rent unfurnished best IRR Skip interiors; rent 12% lower than a fitted home; sell after 8 yrs with no interiors value. | 8 yrs | 4.7% | 3.2% | ₹50.1 L | ₹7.5 L | ₹68.6 L | |
| Hold, do interiors, rent & sell fitted selected Spend ₹1,200/sq ft on interiors, earn full rent, recover ~40% of interiors cost at sale (fading over 10 yrs). | 8 yrs | 0.7% | 0.5% | ₹64.0 L | ₹9.3 L | ₹70.4 L |
IRR and CAGR are per year over the hold shown. A short hold can show a high IRR on a small absolute gain; compare the net-sale column too. Selling before registration usually needs the builder’s transfer NOC and a fee.
Highlights
- Sas Hotels And Enterprises · Poonamallee / Iyyapanthangal / Mangadu / Thirumazhisai · 43 homes
- Under construction: progress not on the public register, TNRERA completion 2027-03-31
- Registered with Tamil Nadu RERA as TN/29/Building/0554/2024
Assumptions editable
Purchase
FinancingLoan 75% · cash 25% · EMI ₹43,458/mo
Rent & running costs
Interiors & exit
Returns over 8 years · with interiors
| Year | Purchase | Loan in | Rent (net of vacancy) | Opex | Debt service | Sale − loan | Net cash |
|---|---|---|---|---|---|---|---|
| Today | -12.7 L | 5.0 L | 0.0 L | 0.0 L | 0.0 L | 0.0 L | -7.6 L |
| Yr 1 | -75.5 L | 45.1 L | 0.3 L | -0.4 L | -2.3 L | 0.0 L | -32.8 L |
| Yr 2 | 0.0 L | 0.0 L | 2.1 L | -1.0 L | -5.2 L | 0.0 L | -4.1 L |
| Yr 3 | 0.0 L | 0.0 L | 2.2 L | -1.0 L | -5.2 L | 0.0 L | -4.1 L |
| Yr 4 | 0.0 L | 0.0 L | 2.3 L | -1.1 L | -5.2 L | 0.0 L | -4.0 L |
| Yr 5 | 0.0 L | 0.0 L | 2.4 L | -1.1 L | -5.2 L | 0.0 L | -3.9 L |
| Yr 6 | 0.0 L | 0.0 L | 2.5 L | -1.1 L | -5.2 L | 0.0 L | -3.8 L |
| Yr 7 | 0.0 L | 0.0 L | 2.7 L | -1.2 L | -5.2 L | 0.0 L | -3.7 L |
| Yr 8 | 0.0 L | 0.0 L | 2.8 L | -1.2 L | -5.2 L | 70.4 L | 66.8 L |
Pre-tax unless capital-gains tax is set. Rent enters the cash flows once. Net-wealth CAGR = (cash returned incl. sale ÷ cash put in)^(1/years) − 1. IRR uses the dated cash flows.
Score factors
Bars show points added or taken away versus the average analysed Chennai project (score 50).
Price growth model, year by year
Nominal growth per year. Parts add up; momentum fades, infrastructure is weighted by delivery probability and dated.
| Component | Yr 1 | Yr 2 | Yr 3 | Yr 4 | Yr 5 | Yr 6 | Confidence |
|---|---|---|---|---|---|---|---|
| Chennai long-run nominal trend | 5.0 | 5.0 | 5.0 | 5.0 | 5.0 | 5.0 | 80% |
| Locality momentum (mean-reverting) | 1.1 | 0.6 | 0.3 | 0.2 | 0.1 | 0.1 | 45% |
| Affordability ceiling | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 60% |
| Employment access & office pipeline | 2.1 | 2.1 | 2.1 | 2.1 | 2.1 | 2.1 | 55% |
| Supply–demand balance | -1.0 | -0.8 | -0.6 | -0.5 | -0.4 | -0.3 | 50% |
| Infrastructure delivery (probability-weighted) | 0.3 | 0.3 | 0.2 | 0.1 | 0.1 | 0.0 | 55% |
| Project-specific adjustments | 2.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 50% |
| Total growth | 9.6% | 7.3% | 7.0% | 6.9% | 6.9% | 6.9% | 56% |
Chennai long-run nominal trend: City-wide 2013-25 nominal residential trend ≈ inflation + real income growth.
Locality momentum (mean-reverting): Trailing 3.0-yr locality CAGR 8.1% vs 5.0% trend; 35% carried forward, halving each year.
Affordability ceiling: Ticket at ₹4,800 psf vs city median ₹7,300; buyer pool thins above ₹15k/₹20k psf and after >6pp excess growth.
Employment access & office pipeline: 2 msf office pipeline (3 yr) on 5 msf stock; 30-min jobs index 0.60.
Supply–demand balance: 22 months of unsold inventory; new-launch/absorption ratio 1.4.
Infrastructure delivery (probability-weighted): Chennai Metro Phase 2 (Corridors 3, 4, 5: Madhavaram–SIPCOT, Light House–Poonamallee, Madhavaram–Sholinganallur) (construction, 2027, p=0.6); Chennai Peripheral Ring Road (construction, 2028, p=0.5); Parandur greenfield airport (planned, 2030, p=0.35)
Project-specific adjustments: Remaining construction risk (13% work left) re-rates toward ready comps by handover (~1.0% over 0.5 yr).
Locality evidence: ₹5,300 (Jun 2023) → ₹6,700 (Jun 2026) = 8.1% p.a. Sources: Platform estimate (interim, not observed).
What the public record says
Automated from the Tamil Nadu RERA registration TN/29/Building/0554/2024. Prices and rents are locality estimates, not verified listings. Compiled Nov 2026 from the Tamil Nadu RERA file, company registers, rating agencies, tribunal records and press. Facts only; anything that deserves a written answer before signing is flagged.
Meters are rule-based from the RERA file and public ratings (rules shown under each), not opinions.
No public credit rating located for the promoter.
SAS HOTELS AND ENTERPRISES LIMITED: credit rating not yet checked by PropertyLens
On its original RERA completion date: 2027-03-31
No RERA complaints on this project; 0 on the promoter overall
No litigation declared in RERA filings
RERA file · Registration
Red flags to resolve in writing
Questions to put to the developer before you sign
- Share the latest quarterly progress filing and the architect and engineer certificates.
- Confirm the price list, floor-rise, parking and other charges for the exact unit.
- Which date is contractual, 2027-03-31 or the agreement's, and what is the delay compensation?
- Confirm there is no litigation on the land or approvals beyond the RERA declaration.
- Is the land owned by the promoter, or is this a joint development, and is any part mortgaged?
Full record: every filed number, line by line1 sections · 5 items
RERA file · Registration
Source: Tamil Nadu RERA project record TN/29/Building/0554/2024, fetched 2026-11-10. Figures are the promoter’s own filings.
Sources & caveats2 sources
- Tamil Nadu RERA project record TN/29/Building/0554/2024, fetched 2026-11-10
- PropertyLens Chennai locality model (market-level estimates)
- Tamil Nadu RERA project records TN/29/Building/0554/2024 (registration file, quarterly updates, complaint register), fetched Sep 2026.
Caveats. Automated analysis: prices, rents and travel times are estimates until listings and Maps data are verified. RERA figures are the promoter’s own filings. Nothing here is legal, tax or investment advice.
Evidence
Location, jobs & transit2 hubs · metro 3.0 km
| Destination | Drive now | Road km |
|---|---|---|
| DLF Ramapuram | 20 min | 6.1 |
| Chennai airport | 21 min | 6.4 |
| Ambattur industrial estate | 28 min | 9.1 |
| Guindy | 29 min | 9.7 |
| Anna Salai (CBD) | 44 min | 15.2 |
| OMR (Sholinganallur) | 51 min | 18 |
| Sriperumbudur | 56 min | 19.9 |
| SIPCOT Siruseri | 67 min | 24.1 |
Google Maps driving time with live traffic, measured Nov 2026. Refreshed monthly.
Location used: Google Maps match “”. Bus coverage and planned-station distances are still interim estimates.
Price historylocality 8.1%/yr
No dated project-level price series yet; only the latest observation is on file.
| Date | ₹ psf | Source | Confidence | Kind |
|---|---|---|---|---|
| Jun 2021 | 4,800 | Platform estimate (interim, not observed) | 40% | derived |
| Jun 2023 | 5,300 | Platform estimate (interim, not observed) | 45% | derived |
| Jun 2025 | 6,200 | Platform estimate (interim, not observed) | 50% | derived |
| Jun 2026 | 6,700 | Platform estimate (interim, not observed) | 50% | derived |
Model backtest on this locality: 1-yr hold-out (Jun 2025→Jun 2026): predicted ₹6,616 vs actual ₹6,700 (-1.3%). Longer 3-yr hold-out (Jun 2023→Jun 2026): predicted 6.3% p.a. vs actual 8.1% p.a. — the model is deliberately mean-reverting and under-predicted the 2021–26 boom.
Environment, legal & productflood ok · water risk · RERA yes
Affordable western belt; Chembarambakkam lake overflow zone
Sources & data gapswhat we know, from where, and what is missing
Automated analysis: unit mix and carpet areas come from the RERA unit table where filed; prices and rents are locality-model estimates until listings are verified.
| Field | Value | Source class | Date | Conf. | Kind | Conflicting values |
|---|---|---|---|---|---|---|
| Address | Poonamallee / Iyyapanthangal / Mangadu / Thirumazhisai, Chennai | Platform estimate (interim, not observed) | Nov 2026 | 30% | assumed | |
| Land area (acres) | Platform estimate (interim, not observed) | Nov 2026 | 20% | assumed | ||
| Total units | 43 | Tamil Nadu RERA | Nov 2026 | 80% | observed | |
| Launch year | 2024 | Tamil Nadu RERA | Nov 2026 | 70% | observed | |
| Possession · Registration TN/29/Building/0554/2024 | 2027-03-31 | Tamil Nadu RERA | Nov 2026 | 70% | observed | |
| Price psf · 3 BHK · ~1,280 sq ft (assumed) | 4800 | Platform estimate (interim, not observed) | Nov 2026 | 35% | assumed | |
| Ticket · 3 BHK · ~1,280 sq ft (assumed) | 6144000 | Platform estimate (interim, not observed) | Nov 2026 | 35% | derived | |
| Rent · 3 BHK · ~1,280 sq ft (assumed) | 17500 | Platform estimate (interim, not observed) | Nov 2026 | 35% | assumed | |
| Carpet area | 1023 | Platform estimate (interim, not observed) | Nov 2026 | 30% | assumed | |
| Builder on-time rate | 0.6 | Platform estimate (interim, not observed) | Nov 2026 | 35% | assumed | |
| Litigation | not published on the public register | Tamil Nadu RERA | Nov 2026 | 30% | assumed | |
| Approvals | CMDA/PP/HRB/S/0757/2023 | Tamil Nadu RERA | Nov 2026 | 60% | observed |
Commercial listing portals are shown as “Listing portal (aggregated)”; full provenance is retained internally. Official developer and Tamil Nadu RERA sources are named.
Other projects worth comparing
Same model, same date. Scores are out of 100, where 50 is the average analysed Chennai project.
More in Poonamallee / Iyyapanthangal / Mangadu / Thirumazhisai All Poonamallee / Iyyapanthangal / Mangadu / Thirumazhisai →
Around ₹61.4 L elsewhere in Chennai All projects →
Questions people ask about Belmont Residences
Is Belmont Residences a good investment?
On PropertyLens's evidence-based model Belmont Residences scores 49/100, below the average analysed Chennai project (50 = average, 12 points = one standard deviation). The model projects price growth of about 7.5% a year over five years and a net-wealth CAGR of 0.5% after every cost on an 8-year hold with a 75.0% loan. That is research on public filings, not advice; the factor breakdown on this page shows what drives the score.
What is the price per sq ft at Belmont Residences?
About ₹4,800 per sq ft of super built-up area, a model estimate from Poonamallee / Iyyapanthangal / Mangadu / Thirumazhisai comparables that you can edit. The 3 BHK home costs about ₹61.4 L before other charges, GST and stamp duty, and ₹87.9 L all-in.
When is Belmont Residences ready for possession?
The RERA registration commits to Mar 2027.
Is Belmont Residences RERA registered?
Yes. Tamil Nadu RERA registration: TN/29/Building/0554/2024. No complaints on this registration at TNRERA as of 2026-11-10.
How reliable is Sas Hotels And Enterprises on delivery?
60% of Sas Hotels And Enterprises's crawled Chennai registrations needed no extension (too few registrations analysed to derive). 1 registrations analysed. The developer scorecard compares this with every other Chennai developer.
What rent can Belmont Residences earn?
About ₹17,500 a month for this home (a model estimate from Poonamallee / Iyyapanthangal / Mangadu / Thirumazhisai rents), a gross yield of 3.3% on the all-in cost. Nothing is earned before handover. Rent covers 40% of the EMI at the default loan.
Answers are generated from the filings and the model for this home and change when you edit the assumptions above. See the Poonamallee / Iyyapanthangal / Mangadu / Thirumazhisai area page.