PropertyLensBengaluru · invest
Bren Corporation · Hoskote / Budigere Cross / Old Madras Road

Bren Starlight

Sy.No. 28/1A, 28/1B, 28/2 Bandapura Village, Old Madras Road, Bidarahalli Hobli
Ready · rent from todayapartment · premiumRERA registered+ CompareFull report ↗
1 · Which home?
2 · Which exit plan?

Score, growth and returns below are for the highlighted home and plan. Prices, rent and possession never mix across phases.

41
Investment score
41/100
Evidence confidence56%
1 BHK · ~1,380 sq ft (971 carpet)
Price growth per year, next 5 yrs model
8.9%
likely range 5.4%–12.3% · over 10 yrs 8.4%/yr
Net-wealth CAGR, 8-yr hold
4.8%
your cash in → cash back incl. sale, per year
Cash-flow IRR, 8-yr hold
6.3%
with 75% loan · all-cash 7.4% · with interiors
Three numbers, three questions. Price growth: what will the home be worth? Net-wealth CAGR: what will my money have earned after every cost? Cash-flow IRR: the same, but counting when each rupee moves. Tap i on any of them.
Price · edit here or below assumed
₹Cr
₹ psf × 1,380 sq ft · as of Sep 2026
Price edits apply to ·
All-in cost
₹1.31 Cr
+ other charges 3.8 L, GST 0.0 L, stamp/reg 7.4 L, interiors 11.0 L
Gross rental yield assumed
3.0%
rent starts in ~0.3 yr

All-in cost sheet this home, default assumptions

ItemBasisAmount
Base price₹7,800 per sq ft × 1,380 sq ft super built-up1.08 Cr
Other charges3.5% of base: floor-rise, preferred-location, car park, club, maintenance deposit, legal, corpus (edit in Assumptions)3.8 L
GST0.0% on an under-construction home — none is due on a ready home with an occupancy certificate, set GST to 0 if buying after OC0.0 L
Stamp duty and registration6.6% in Karnataka: 5% stamp duty + 1% registration + cess and surcharge on the agreement value7.4 L
Interiors₹800 per sq ft, needed before the home can be let11.0 L
All-in costwhat leaves your pocket and the bank's, before rent or resale₹1.31 Cr
Your own money75.0% loan at 8.5% for 20 years covers the rest; EMI 0.7 L a month₹95.5 L

Carpet area 971 sq ft against 1,380 sq ft super built-up: you pay for 30% that is common area and walls. Price per sq ft of carpet ≈ ₹11,085. Every percentage above is editable in Assumptions; the defaults are Karnataka rates as of 2026-09.

In plain words

Why 41 out of 100

Each home is marked on 11 things a careful buyer checks, then compared with every project we analyse in Bengaluru: 50 is the average project, 62 beats about five in six. Here is what lifts this one and what drags it:

  • +
    Builder delivery & handover risk · 4/16 pts
    Bren Corporation has finished 13+ projects and delivered on time about 49% of the time. This home is ready, so there is no waiting risk.
  • +
    Legal, title & approvals · 1/5 pts
    Registered with Karnataka RERA; no court cases reported; land title not yet verified by us, so get a lawyer to check. The due-diligence report below flags 0 items in red.
  • +
    Resale liquidity · 1/4 pts
    Plenty of buyers can afford a ₹1.08 Cr home, and homes in Hoskote / Budigere Cross / Old Madras Road resell at a normal pace.
  • −
    Schools, hospitals, daily needs · -1/3 pts
    Schools, hospitals and daily shopping are limited in this area.
  • −
    Layout, size, age, amenities, maintenance · -1/3 pts
    Dense layout (111 homes per acre); about 72% of the area you pay for is usable carpet area. Maintenance ~₹4.5 per sq ft a month.
  • −
    Expected price growth (5-yr CAGR model) · -8/26 pts
    We expect prices here to rise about 8.9% a year for the next 5 years (explained below).
All 11 checks
  • •
    Price vs comparables · -0/3 pts
    Priced about the same as similar premium homes nearby (₹7,800 vs ~₹7,800 per sq ft).
  • •
    Rental demand & yield · -1/8 pts
    Rent pays back 3.0% of the price every year, close to the usual 3% in Bengaluru. Tenant demand here is decent.
  • +
    Resale liquidity · 1/4 pts
    Plenty of buyers can afford a ₹1.08 Cr home, and homes in Hoskote / Budigere Cross / Old Madras Road resell at a normal pace.
  • •
    Employment access · 0/10 pts
    Drive times right now: ITPL Whitefield 19 min, Manyata Tech Park 37 min, ORR Bellandur (Ecospace) 41 min; Electronic City Ph-1 64 min. About 3 million sq ft of new offices are planned nearby in 3 years.
  • −
    Metro, bus, rail & airport · -2/9 pts
    No working metro nearby (nearest 8 km). Airport is about 51 minutes by road right now.
  • •
    Schools, hospitals, daily needs · -1/3 pts
    Schools, hospitals and daily shopping are limited in this area.
  • •
    Builder delivery & handover risk · 4/16 pts
    Bren Corporation has finished 13+ projects and delivered on time about 49% of the time. This home is ready, so there is no waiting risk.
  • •
    Layout, size, age, amenities, maintenance · -1/3 pts
    Dense layout (111 homes per acre); about 72% of the area you pay for is usable carpet area. Maintenance ~₹4.5 per sq ft a month.
  • •
    Water, flooding, noise, infrastructure · -1/9 pts
    Low flood risk; water supply is mostly borewell or tankers; noise is manageable.
  • +
    Legal, title & approvals · 1/5 pts
    Registered with Karnataka RERA; no court cases reported; land title not yet verified by us, so get a lawyer to check. The due-diligence report below flags 0 items in red.
  • •
    Expected price growth (5-yr CAGR model) · -8/26 pts
    We expect prices here to rise about 8.9% a year for the next 5 years (explained below).
Why prices should grow ~8.9% a year for the next 5 years

We build the forecast step by step, starting from what Bengaluru homes normally do and adjusting for this area and this project:

  1. + 6.0%Start with 6.0% a year: the normal long-run growth of Bengaluru home prices.
  2. + 0.9%Add 0.9%: prices here rose 12.1% a year recently (2023-06 to 2026-06). Some of that pace continues, but it fades each year.
  3. − 0.0%Prices are still affordable enough that this does not slow growth.
  4. + 1.9%Add 1.9%: 3 million sq ft of new offices nearby means more people wanting homes here.
  5. + 0.0%Supply and demand are balanced here (17 months of unsold stock).
  6. + 0.1%Add 0.1% for new roads, metro and water lines, weighted by how likely they are to actually finish: Peripheral Ring Road (planned, 2030); Bengaluru suburban rail (K-RIDE) (construction, 2029).
  7. + 0.0%No extra project-level adjustment.
  8. = 8.9%Result: about 8.9% a year, so a home worth ₹1.11 Cr today would be worth about ₹1.70 Cr in 5 years. We are 56% confident in the evidence behind this.

Which exit suits you?

Interiors change both the rent you get and what you recover at sale. Same price, same loan; only the strategy changes:

StrategyHoldIRR / yrWealth CAGR / yrCash you put inNet rentNet saleApply
No interiors, rent unfurnished best IRR
Skip interiors; rent 12% lower than a fitted home; sell after 8 yrs with no interiors value.
8 yrs8.1%6.0%₹86.9 L₹12.8 L₹1.45 Cr
Do interiors, rent & sell fitted selected
Spend ₹800/sq ft on interiors, earn full rent, recover ~40% of interiors cost at sale (fading over 10 yrs).
8 yrs6.3%4.8%₹95.5 L₹15.7 L₹1.46 Cr

IRR and CAGR are per year over the hold shown. A short hold can show a high IRR on a small absolute gain; compare the net-sale column too. Selling before registration usually needs the builder’s transfer NOC and a fee.

Highlights

  • Bren Corporation · Hoskote / Budigere Cross / Old Madras Road · 194 homes on 1.7 acres
  • Marked completed on RERA (completion date 2020-09-30) after 1 extension
  • No litigation declared · 3 complaints on this registration

Assumptions editable

Purchase

₹/sq ft
₹ Cr
sq ft
% of base
%
%
%
₹/sq ft

FinancingLoan 75% · cash 25% · EMI ₹72,511/mo

% loan
% p.a.
years
%

Rent & running costs

₹
% p.a.
%
months
months
₹/sq ft/mo
% of rent
% of rent
% of value

Interiors & exit

%
%
years
% p.a. (blank = model)
%
%

Returns over 8 years · with interiors

Cash you put in₹95.5 L
Exit value (yr 8)₹2.14 Cr
Net sale after loan & costs₹1.46 Cr
Net rent after opex₹15.7 L
Loan (75% of price)₹83.6 L
EMI / month₹72,511
Year 0: ₹-47.8 L0Year 1: ₹-7.9 L1Year 2: ₹-6.9 L2Year 3: ₹-6.8 L3Year 4: ₹-6.7 L4Year 5: ₹-6.6 L5Year 6: ₹-6.4 L6Year 7: ₹-6.3 L7Year 8: ₹1.39 Cr8
YearPurchaseLoan inRent (net of vacancy)OpexDebt serviceSale − loanNet cash
Today-1.31 Cr83.6 L0.0 L0.0 L0.0 L0.0 L-47.8 L
Yr 10.0 L0.0 L2.1 L-1.3 L-8.7 L0.0 L-7.9 L
Yr 20.0 L0.0 L3.3 L-1.5 L-8.7 L0.0 L-6.9 L
Yr 30.0 L0.0 L3.5 L-1.6 L-8.7 L0.0 L-6.8 L
Yr 40.0 L0.0 L3.6 L-1.6 L-8.7 L0.0 L-6.7 L
Yr 50.0 L0.0 L3.8 L-1.7 L-8.7 L0.0 L-6.6 L
Yr 60.0 L0.0 L4.0 L-1.7 L-8.7 L0.0 L-6.4 L
Yr 70.0 L0.0 L4.2 L-1.8 L-8.7 L0.0 L-6.3 L
Yr 80.0 L0.0 L4.4 L-1.9 L-8.7 L1.46 Cr1.39 Cr

Pre-tax unless capital-gains tax is set. Rent enters the cash flows once. Net-wealth CAGR = (cash returned incl. sale ÷ cash put in)^(1/years) − 1. IRR uses the dated cash flows.

Score factors

Bars show points added or taken away versus the average analysed Bengaluru project (score 50).

Price vs comparables
−0.2 pts vs avg
this home 6.0/10 · Bengaluru average 6.2 · confidence 35%
₹7,800 psf vs premium comps ₹7,800 (0%). Price is a model estimate, so this factor carries a third of its normal weight until a listed price is observed.
Rental demand & yield
−0.5 pts vs avg
this home 5.7/10 · Bengaluru average 6.0 · confidence 38%
Gross yield 3.1% (₹20 psf/month); locality rental demand 6/10.
Resale liquidity
+0.6 pts vs avg
this home 8.0/10 · Bengaluru average 7.6 · confidence 50%
Locality resale depth 6/10; ticket ₹1.08 Cr narrows the buyer pool; 194-home project.
Employment access
+0.1 pts vs avg
this home 5.3/10 · Bengaluru average 5.2 · confidence 85%
Drive times now (Google Maps, 2026-09-16): ITPL Whitefield 19 min, Manyata Tech Park 37 min, ORR Bellandur (Ecospace) 41 min, Hebbal (Kirloskar) 44 min; 1 of 7 major hubs within 30 min; 3 msf office pipeline (3 yr).
Metro, bus, rail & airport
−1.7 pts vs avg
this home 3.8/10 · Bengaluru average 4.8 · confidence 60%
Purple Line Kadugodi terminus (6–10 km); no planned station within 2 km; airport ~51 min by road now (Google Maps); .
Schools, hospitals, daily needs
−1.5 pts vs avg
this home 5.5/10 · Bengaluru average 7.0 · confidence 50%
Locality social-infrastructure index (interim, expert-set; POI distances pending Maps integration).
Builder delivery & handover risk
+3.7 pts vs avg
this home 5.2/10 · Bengaluru average 3.7 · confidence 60%
Bren Corporation: 13+ projects, on-time 49% (derived); ready.
Layout, size, age, amenities, maintenance
−1.2 pts vs avg
this home 6.4/10 · Bengaluru average 7.3 · confidence 55%
111 units/acre; carpet/SBA ~72%; maintenance ~₹4.5 psf/month (assumed); filed construction cost ₹3,381 per sq ft (standard spec).
Water, flooding, noise, infrastructure
−1.1 pts vs avg
this home 5.3/10 · Bengaluru average 5.8 · confidence 50%
Borewell/tanker dependence; NH-75 access
Legal, title & approvals
+1.1 pts vs avg
this home 7.9/10 · Bengaluru average 7.4 · confidence 55%
RERA registered; litigation: none reported; approvals: RERA registered; title: not verified. Due-diligence report lists 0 red flags (−0.9 pts).
Expected price growth (5-yr CAGR model)
−8.2 pts vs avg
this home 4.7/10 · Bengaluru average 6.0 · confidence 56%
Model 5-yr price CAGR 8.9% (range 5.4–12.3%).

Price growth model, year by year

Nominal growth per year. Parts add up; momentum fades, infrastructure is weighted by delivery probability and dated.

ComponentYr 1Yr 2Yr 3Yr 4Yr 5Yr 6Confidence
Bengaluru long-run nominal trend6.06.06.06.06.06.080%
Locality momentum (mean-reverting)2.11.20.60.40.20.145%
Affordability ceiling-0.0-0.0-0.0-0.0-0.0-0.060%
Employment access & office pipeline1.91.91.91.91.91.955%
Supply–demand balance0.00.00.00.00.00.050%
Infrastructure delivery (probability-weighted)0.00.10.20.20.10.055%
Project-specific adjustments0.00.00.00.00.00.050%
Total growth10.0%9.1%8.7%8.4%8.1%8.0%56%

Bengaluru long-run nominal trend: City-wide 2013-25 nominal residential trend ≈ inflation + real income growth.

Locality momentum (mean-reverting): Trailing 3.0-yr locality CAGR 12.1% vs 6.0% trend; 35% carried forward, halving each year.

Affordability ceiling: Ticket at ₹7,800 psf vs city median ₹9,500; buyer pool thins above ₹15k/₹20k psf and after >6pp excess growth.

Employment access & office pipeline: 3 msf office pipeline (3 yr) on 8 msf stock; 30-min jobs index 0.50.

Supply–demand balance: 17 months of unsold inventory; new-launch/absorption ratio 1.09 (from 41 under-construction RERA filings in this locality: 8,263 unsold homes, 1169.6 sold per month).

Infrastructure delivery (probability-weighted): Peripheral Ring Road (planned, 2030, p=0.4); Bengaluru suburban rail (K-RIDE) (construction, 2029, p=0.5)

Project-specific adjustments: Building age 6 yrs.

Locality evidence: ₹5,400 (Jun 2023) → ₹7,600 (Jun 2026) = 12.1% p.a. Sources: Platform estimate (interim, not observed).

Financial & legal due diligence

What the public record says

Automated from the Karnataka RERA file PRM/KA/RERA/1251/446/PR/170907/000368. Prices and rents are locality estimates, not verified listings. Compiled Sep 2026 from the Karnataka RERA file, company registers, rating agencies, tribunal records and press. Facts only; anything that deserves a written answer before signing is flagged.

Delivery timeline8/10
delivered; the registration was extended 1× before completion
Legal & complaints7.5/10
3 RERA complaints on the project (−1.5)
Money to finish8/10
finance cost is 0% of the registered budget
Developer strength5/10
no public credit rating for the promoter

Meters are rule-based from the RERA file and public ratings (rules shown under each), not opinions.

Registration
PRM/KA/RERA/1251/446/PR/170907/000368 · BREN Corporation
Delivered
RegisteredOct 2015Original completionMar 2020Covid ext.Sep 2020TodaySep 2026
No litigation declared3 complaintsEscrow: HDFC
Credit ratings of the people behind it

No public credit rating located for the promoter.

BREN Corporation: no public rating located

Complaints & disputes on record
On this project3– open
On the promoter entity5all projects
Court cases declared0no stay recorded
At a glance
Delivered

Delivered. RERA registration ran 2015-10-17 → 2020-09-30 after 1 extension (original 2020-03-31)

3 RERA complaints

3 RERA complaints on this project; 5 on the promoter overall

No litigation declared

No litigation declared in RERA filings

The record, in pictures

RERA file · Registration

Registered project cost ₹103 cr — where it goes
Land ₹25 cr · 24%Construction & on-site ₹78 cr · 76%
No litigation declaredBorrowing declared: not statedEscrow at HDFC

Red flags to resolve in writing

Questions to put to the developer before you sign

  1. Share the latest CA Form 4 and architect Form 5 with the escrow deposit ratio.
  2. Confirm the price list, floor-rise and other charges for the exact unit.
  3. Provide the occupancy certificate, khata and title chain for the unit.
  4. Confirm there is no litigation on the land or approvals beyond the RERA declaration.
  5. Is the land freehold with the developer, and is any part mortgaged?
Full record: every filed number, line by line1 sections · 9 items

RERA file · Registration

Registration
PRM/KA/RERA/1251/446/PR/170907/000368 · promoter BREN Corporation (Proprietorship Firm) · Proposed Project End Date at the time of registration :
Dates
Start 2015-10-17 · original completion 2020-03-31 · 1 extension: Covid Extension → 2020-09-30
Status
Completed and occupied (per project status); RERA progress fields below are historical
Registered cost
Total ₹103 cr · land ₹25.00 cr · construction ₹78.00 cr
RERA bank account
HDFC, Richmond Road (70% construction account)
Land & towers
1.75 acres (7,069 sq m) · WING 1 96 homes, 19 floors; Wing 2 98 homes, 19 floors
Litigation declared
None declared in filings
K-RERA complaints
3 on this registration · 5 on the promoter entity across all its projects
Completion applied
19/12/2020

Source: Karnataka RERA project record PRM/KA/RERA/1251/446/PR/170907/000368, fetched 2026-09-15. Figures are the promoter’s own filings.

Sources & caveats2 sources
  • Karnataka RERA project record PRM/KA/RERA/1251/446/PR/170907/000368 (registration file, quarterly updates, complaint register), fetched 2026-09-15
  • PropertyLens locality model (market-level estimates)
  • Karnataka RERA project records PRM/KA/RERA/1251/446/PR/170907/000368 (registration file, quarterly updates, complaint register), fetched Sep 2026.

Caveats. Automated analysis: prices, rents and travel times are estimates until listings and Maps data are verified. RERA figures are the promoter’s own filings. Nothing here is legal, tax or investment advice.

Evidence

Location, jobs & transit3 hubs · metro none nearby
Job hubs nearby
ITPL / Whitefield 10 kmHoskote industrialKR Puram 10 km
Measured drive times below
Office space
Existing8 msf
Coming in 3 yrs3 msf
Jobs within 30 min5/10
Getting around
Metro today
Purple Line Kadugodi terminus (6–10 km)
none within 5 km
Metro planned
No station planned within 2 km
Rail
—
estimate
Airport
51 min by road now · 18.1 km
Google Maps
Buses
7/10 coverage
estimate
Drive times to job hubs
DestinationDrive nowRoad km
ITPL Whitefield19 min5.9
Manyata Tech Park37 min12.8
ORR Bellandur (Ecospace)41 min14.3
Hebbal (Kirloskar)44 min15.4
MG Road (CBD)46 min16
Kempegowda Airport (KIA)51 min18.1
Koramangala (Forum)51 min18.1
Electronic City Ph-164 min23.2

Google Maps driving time with live traffic, measured Sep 2026. Refreshed monthly.

Location used: Google Maps match “”. Bus coverage and planned-station distances are still interim estimates.

Price historylocality 12.1%/yr

No dated project-level price series yet; only the latest observation is on file.

Locality · average ₹/sq ft
Date₹ psfSourceConfidenceKind
Jun 20214,200Platform estimate (interim, not observed)40%derived
Jun 20235,400Platform estimate (interim, not observed)45%derived
Jun 20256,800Platform estimate (interim, not observed)50%derived
Jun 20267,600Platform estimate (interim, not observed)50%derived
Luxury comps₹9,500
Premium comps₹7,800
Mid comps₹6,000
Unsold stock17 months

Model backtest on this locality: 1-yr hold-out (Jun 2025→Jun 2026): predicted ₹7,478 vs actual ₹7,600 (-1.6%). Longer 3-yr hold-out (Jun 2023→Jun 2026): predicted 9.1% p.a. vs actual 12.1% p.a. — the model is deliberately mean-reverting and under-predicted the 2021–26 boom.

Environment, legal & productflood ok · water risk · RERA yes
Flood risklow
Water supplytankers/borewell
Quietok
Roads & drainspatchy

Borewell/tanker dependence; NH-75 access

Legal & approvals
Registration 000368
RERA PRM/KA/RERA/1251/446/PR/170907/000368
ready
Litigation
none reported
observed
Approvals
RERA registered
observed
Title
not verified
assumed
Product
Land1.75 acres
Homes194
Density111/acre
Launched2015
Sources & data gapswhat we know, from where, and what is missing

Automated analysis: unit mix and carpet areas come from the RERA inventory table; prices and rents are locality-model estimates until listings are verified.

FieldValueSource classDateConf.KindConflicting values
AddressSy.No. 28/1A, 28/1B, 28/2 Bandapura Village, Old Madras Road, Bidarahalli HobliKarnataka RERA (number as reported; registry lookup pending)Sep 202680%observed
Land area (acres)1.75Karnataka RERA (number as reported; registry lookup pending)Sep 202680%observed
Total units194Karnataka RERA (number as reported; registry lookup pending)Sep 202680%observed
Launch year2015Karnataka RERA (number as reported; registry lookup pending)Sep 202670%observed
Possession · Registration 0003682020-09-30Karnataka RERA (number as reported; registry lookup pending)Sep 202670%observed
Price psf · 1 BHK · ~1,380 sq ft (971 carpet)7800Platform estimate (interim, not observed)Sep 202635%assumed
Ticket · 1 BHK · ~1,380 sq ft (971 carpet)10764000Platform estimate (interim, not observed)Sep 202635%derived
Rent · 1 BHK · ~1,380 sq ft (971 carpet)27500Platform estimate (interim, not observed)Sep 202635%assumed
Carpet area971Karnataka RERA (number as reported; registry lookup pending)Sep 202660%observed
Builder on-time rate0.49Karnataka RERA (number as reported; registry lookup pending)Sep 202660%derived
Litigationnone reportedKarnataka RERA (number as reported; registry lookup pending)Sep 202670%observed
ApprovalsRERA registeredKarnataka RERA (number as reported; registry lookup pending)Sep 202660%observed

Commercial listing portals are shown as “Listing portal (aggregated)”; full provenance is retained internally. Official developer and Karnataka RERA sources are named.

Other projects worth comparing

Same model, same date. Scores are out of 100, where 50 is the average analysed Bengaluru project.

Questions people ask about Bren Starlight

Is Bren Starlight a good investment?

On PropertyLens's evidence-based model Bren Starlight scores 41/100, below the average analysed Bengaluru project (50 = average, 12 points = one standard deviation). The model projects price growth of about 8.9% a year over five years and a net-wealth CAGR of 4.8% after every cost on an 8-year hold with a 75.0% loan. That is research on public filings, not advice; the factor breakdown on this page shows what drives the score.

What is the price per sq ft at Bren Starlight?

About ₹7,800 per sq ft of super built-up area, a model estimate from Hoskote / Budigere Cross / Old Madras Road comparables that you can edit. The 1 BHK home costs about ₹1.08 Cr before other charges, GST and stamp duty, and ₹1.31 Cr all-in.

When is Bren Starlight ready for possession?

The project is marked ready to move in; confirm the occupancy certificate before paying.

Is Bren Starlight RERA registered?

Yes. Karnataka RERA registration: PRM/KA/RERA/1251/446/PR/170907/000368. 3 complaints on this registration and 5 on the promoter across projects at K-RERA as of 2026-09-15.

How reliable is Bren Corporation on delivery?

49% of Bren Corporation's crawled Bengaluru registrations needed no extension (6 of 13 crawled Bengaluru registrations needed no extension). 13 registrations analysed. The developer scorecard compares this with every other Bengaluru developer.

What rent can Bren Starlight earn?

About ₹27,500 a month for this home (a model estimate from Hoskote / Budigere Cross / Old Madras Road rents), a gross yield of 3.0% on the all-in cost. Rent covers 38% of the EMI at the default loan.

Answers are generated from the filings and the model for this home and change when you edit the assumptions above. See the Bren Corporation scorecard and the Hoskote / Budigere Cross / Old Madras Road area page.

Go deeper

Share on WhatsApp