PropertyLensBengaluru · invest
Brigade Group · KR Puram / Mahadevapura / Hoskote Road

Brigade Lakecrest

Survey nos. 4, 5/1, 5/2, 6/1… · KR Puram / Mahadevapura / Hoskote Road
Handover Mar 2030 · no rent beforeapartment · premiumRERA registered+ CompareFull report ↗
1 · Which home?
2 · Which exit plan?

Score, growth and returns below are for the highlighted home and plan. Prices, rent and possession never mix across phases.

75
Investment score
75/100
Evidence confidence57%
1 BHK · ~475 sq ft (334 carpet)
Price growth per year, next 5 yrs model
10.6%
likely range 7.1%–14.0% · over 10 yrs 8.9%/yr
Net-wealth CAGR, 8-yr hold
6.6%
your cash in → cash back incl. sale, per year
Cash-flow IRR, 8-yr hold
10.9%
with 75% loan · all-cash 10.2% · with interiors
Three numbers, three questions. Price growth: what will the home be worth? Net-wealth CAGR: what will my money have earned after every cost? Cash-flow IRR: the same, but counting when each rupee moves. Tap i on any of them.
Price · edit here or below assumed
₹Cr
₹ psf × 475 sq ft · as of Sep 2026
Price edits apply to ·
All-in cost
₹59.7 L
+ other charges 1.6 L, GST 2.4 L, stamp/reg 3.2 L, interiors 5.7 L
Gross rental yield assumed
4.1%
rent starts in ~3.8 yr

All-in cost sheet this home, default assumptions

ItemBasisAmount
Base price₹9,850 per sq ft × 475 sq ft super built-up46.8 L
Other charges3.5% of base: floor-rise, preferred-location, car park, club, maintenance deposit, legal, corpus (edit in Assumptions)1.6 L
GST5.0% on an under-construction home2.4 L
Stamp duty and registration6.6% in Karnataka: 5% stamp duty + 1% registration + cess and surcharge on the agreement value3.2 L
Interiors₹1,200 per sq ft, needed before the home can be let5.7 L
All-in costwhat leaves your pocket and the bank's, before rent or resale₹59.7 L
Your own money75.0% loan at 8.5% for 20 years covers the rest; EMI 0.3 L a month₹36.8 L

Carpet area 334 sq ft against 475 sq ft super built-up: you pay for 30% that is common area and walls. Price per sq ft of carpet ≈ ₹14,008. Every percentage above is editable in Assumptions; the defaults are Karnataka rates as of 2026.

In plain words

Why 75 out of 100

Each home is marked on 11 things a careful buyer checks, then compared with every project we analyse in Bengaluru: 50 is the average project, 62 beats about five in six. Here is what lifts this one and what drags it:

  • +
    Rental demand & yield · 6/8 pts
    Rent pays back 4.1% of the price every year, better than the usual 3% in Bengaluru. Tenant demand here is very strong.
  • +
    Resale liquidity · 3/4 pts
    Plenty of buyers can afford a ₹46.8 L home, and homes in KR Puram / Mahadevapura / Hoskote Road resell at a normal pace. Reselling before handover needs the builder’s permission.
  • +
    Employment access · 5/10 pts
    Drive times right now: ITPL Whitefield 16 min, Manyata Tech Park 32 min, ORR Bellandur (Ecospace) 34 min; Electronic City Ph-1 58 min. About 6 million sq ft of new offices are planned nearby in 3 years.
  • −
    Legal, title & approvals · -4/5 pts
    Registered with Karnataka RERA; litigation reported; land title not yet verified by us, so get a lawyer to check. The due-diligence report below flags 1 item in red.
  • −
    Price vs comparables · -0/3 pts
    Priced about the same as similar premium homes nearby (₹9,850 vs ~₹10,500 per sq ft).
  • •
    Layout, size, age, amenities, maintenance · -0/3 pts
    Dense layout (87 homes per acre); about 72% of the area you pay for is usable carpet area. Maintenance ~₹4.5 per sq ft a month.
All 11 checks
  • •
    Price vs comparables · -0/3 pts
    Priced about the same as similar premium homes nearby (₹9,850 vs ~₹10,500 per sq ft).
  • +
    Rental demand & yield · 6/8 pts
    Rent pays back 4.1% of the price every year, better than the usual 3% in Bengaluru. Tenant demand here is very strong.
  • +
    Resale liquidity · 3/4 pts
    Plenty of buyers can afford a ₹46.8 L home, and homes in KR Puram / Mahadevapura / Hoskote Road resell at a normal pace. Reselling before handover needs the builder’s permission.
  • +
    Employment access · 5/10 pts
    Drive times right now: ITPL Whitefield 16 min, Manyata Tech Park 32 min, ORR Bellandur (Ecospace) 34 min; Electronic City Ph-1 58 min. About 6 million sq ft of new offices are planned nearby in 3 years.
  • •
    Metro, bus, rail & airport · 4/9 pts
    The nearest working metro is ~1.5 km away; KR Puram (Blue Line interchange) is planned for ~2027. Airport is about 55 minutes by road right now.
  • +
    Schools, hospitals, daily needs · 1/3 pts
    Schools, hospitals and daily shopping are good in this area.
  • •
    Builder delivery & handover risk · 7/16 pts
    Brigade Group has finished 250+ projects and delivered on time about 80% of the time. This phase is 18% built, with handover promised for 2030-03-31: delays would push your rent start back.
  • +
    Layout, size, age, amenities, maintenance · -0/3 pts
    Dense layout (87 homes per acre); about 72% of the area you pay for is usable carpet area. Maintenance ~₹4.5 per sq ft a month.
  • •
    Water, flooding, noise, infrastructure · -0/9 pts
    Some flood risk in heavy rain; water supply is partly piped, partly tankers; noticeable traffic or aircraft noise.
  • •
    Legal, title & approvals · -4/5 pts
    Registered with Karnataka RERA; litigation reported; land title not yet verified by us, so get a lawyer to check. The due-diligence report below flags 1 item in red.
  • •
    Expected price growth (5-yr CAGR model) · 6/26 pts
    We expect prices here to rise about 10.6% a year for the next 5 years (explained below).
Why prices should grow ~10.6% a year for the next 5 years

We build the forecast step by step, starting from what Bengaluru homes normally do and adjusting for this area and this project:

  1. + 6.0%Start with 6.0% a year: the normal long-run growth of Bengaluru home prices.
  2. + 0.9%Add 0.9%: prices here rose 12.4% a year recently (2023-06 to 2026-06). Some of that pace continues, but it fades each year.
  3. − 0.1%Prices are still affordable enough that this does not slow growth.
  4. + 1.3%Add 1.3%: 6 million sq ft of new offices nearby means more people wanting homes here.
  5. + 0.0%Supply and demand are balanced here (16 months of unsold stock).
  6. + 0.2%Add 0.2% for new roads, metro and water lines, weighted by how likely they are to actually finish: Blue Line KR Puram–Hebbal–Airport (construction, 2027); Purple Line Whitefield extension (2023) (operational, 2023); Bengaluru suburban rail (K-RIDE) (construction, 2029).
  7. + 2.2%Add 2.2% for this project itself: unfinished homes are worth more once they are complete.
  8. = 10.6%Result: about 10.6% a year, so a home worth ₹48.4 L today would be worth about ₹80.0 L in 5 years. We are 56% confident in the evidence behind this.

Which exit suits you?

For an unfinished flat the answer depends on whether you sell at handover or hold, and whether you spend on interiors. Same price, same loan; only the strategy changes:

StrategyHoldIRR / yrWealth CAGR / yrCash you put inNet rentNet saleApply
Sell at handover, no interiors best IRR
Take delivery in 2030-03-31 and sell the bare flat (4 yr hold). Needs builder NOC or registration first; no rent.
4 yrs22.4%13.9%₹17.5 L₹2,962₹35.2 L
Hold bare, rent unfurnished
Skip interiors; rent 12% lower than a fitted home; sell after 8 yrs with no interiors value.
8 yrs13.2%8.2%₹31.8 L₹4.6 L₹62.6 L
Hold, do interiors, rent & sell fitted selected
Spend ₹1,200/sq ft on interiors, earn full rent, recover ~40% of interiors cost at sale (fading over 10 yrs).
8 yrs10.9%6.6%₹36.8 L₹5.5 L₹63.9 L

IRR and CAGR are per year over the hold shown. A short hold can show a high IRR on a small absolute gain; compare the net-sale column too. Selling before registration usually needs the builder’s transfer NOC and a fee.

Highlights

  • Brigade · KR Puram / Mahadevapura / Hoskote Road · 604 homes on 6.9 acres
  • Under construction: 18% complete, RERA completion 2030-03-31
  • 2 court case(s) declared · 0 complaints on this registration

Assumptions editable

Purchase

₹/sq ft
₹ Cr
sq ft
% of base
%
%
%
₹/sq ft

FinancingLoan 75% · cash 25% · EMI ₹33,094/mo

% loan
% p.a.
years
%

Rent & running costs

₹
% p.a.
%
months
months
₹/sq ft/mo
% of rent
% of rent
% of value

Interiors & exit

%
%
years
% p.a. (blank = model)
%
%

Returns over 8 years · with interiors

Cash you put in₹36.8 L
Exit value (yr 8)₹98.9 L
Net sale after loan & costs₹63.9 L
Net rent after opex₹5.5 L
Loan (75% of price)₹38.1 L
EMI / month₹33,094
Year 0: ₹-4.7 L0Year 1: ₹-3.5 L1Year 2: ₹-4.3 L2Year 3: ₹-5.0 L3Year 4: ₹-11.4 L4Year 5: ₹-2.7 L5Year 6: ₹-2.7 L6Year 7: ₹-2.6 L7Year 8: ₹61.4 L8
YearPurchaseLoan inRent (net of vacancy)OpexDebt serviceSale − loanNet cash
Today-8.5 L3.8 L0.0 L0.0 L0.0 L0.0 L-4.7 L
Yr 1-11.4 L8.6 L0.0 L0.0 L-0.7 L0.0 L-3.5 L
Yr 2-11.4 L8.6 L0.0 L0.0 L-1.4 L0.0 L-4.3 L
Yr 3-11.4 L8.6 L0.0 L0.0 L-2.1 L0.0 L-5.0 L
Yr 4-17.1 L8.6 L0.3 L-0.3 L-2.9 L0.0 L-11.4 L
Yr 50.0 L0.0 L2.0 L-0.7 L-4.0 L0.0 L-2.7 L
Yr 60.0 L0.0 L2.1 L-0.8 L-4.0 L0.0 L-2.7 L
Yr 70.0 L0.0 L2.2 L-0.8 L-4.0 L0.0 L-2.6 L
Yr 80.0 L0.0 L2.3 L-0.8 L-4.0 L63.9 L61.4 L

Pre-tax unless capital-gains tax is set. Rent enters the cash flows once. Net-wealth CAGR = (cash returned incl. sale ÷ cash put in)^(1/years) − 1. IRR uses the dated cash flows.

Score factors

Bars show points added or taken away versus the average analysed Bengaluru project (score 50).

Price vs comparables
−0.2 pts vs avg
this home 5.9/10 · Bengaluru average 6.2 · confidence 35%
₹9,850 psf vs premium comps ₹10,500 (-6%; under-construction should price ~8% below ready). Price is a model estimate, so this factor carries a third of its normal weight until a listed price is observed.
Rental demand & yield
+6.1 pts vs avg
this home 9.0/10 · Bengaluru average 6.0 · confidence 38%
Gross yield 4.2% (₹35 psf/month); locality rental demand 8/10.
Resale liquidity
+2.9 pts vs avg
this home 9.2/10 · Bengaluru average 7.6 · confidence 60%
Locality resale depth 8/10; ticket ₹0.47 Cr narrows the buyer pool; UC resale needs builder NOC; 604-home project gives deep resale comps; RERA sales pace ratio 2.29.
Employment access
+4.8 pts vs avg
this home 7.6/10 · Bengaluru average 5.2 · confidence 85%
Drive times now (Google Maps, 2026-09-16): ITPL Whitefield 16 min, Manyata Tech Park 32 min, ORR Bellandur (Ecospace) 34 min, MG Road (CBD) 38 min; 1 of 7 major hubs within 30 min; 6 msf office pipeline (3 yr).
Metro, bus, rail & airport
+3.8 pts vs avg
this home 6.9/10 · Bengaluru average 4.8 · confidence 60%
KR Puram / Mahadevapura (Purple Line); KR Puram (Blue Line interchange) ~2027; airport ~55 min by road now (Google Maps); .
Schools, hospitals, daily needs
+0.5 pts vs avg
this home 7.5/10 · Bengaluru average 7.0 · confidence 50%
Locality social-infrastructure index (interim, expert-set; POI distances pending Maps integration).
Builder delivery & handover risk
+6.5 pts vs avg
this home 6.3/10 · Bengaluru average 3.7 · confidence 70%
Brigade Group: 250+ projects, on-time 80% (observed); handover 2030-03-31 (RERA); within the RERA timeline, work on schedule (-7 pts).
Layout, size, age, amenities, maintenance
−0.2 pts vs avg
this home 7.1/10 · Bengaluru average 7.3 · confidence 55%
87 units/acre; carpet/SBA ~72%; maintenance ~₹4.5 psf/month (assumed); filed construction cost ₹3,625 per sq ft (premium spec).
Water, flooding, noise, infrastructure
−0.4 pts vs avg
this home 5.6/10 · Bengaluru average 5.8 · confidence 50%
Old Madras Road traffic and rail noise; borewell dependence east of KR Puram
Legal, title & approvals
−4.5 pts vs avg
this home 5.2/10 · Bengaluru average 7.4 · confidence 55%
RERA registered; litigation: 2 case(s) declared; approvals: Plan BBMP/Addl.Dir/JDNORTH/0094/24-25 dated 2025-06-04; title: not verified. Due-diligence report lists 1 red flag (−0.8 pts).
Expected price growth (5-yr CAGR model)
+5.7 pts vs avg
this home 6.9/10 · Bengaluru average 6.0 · confidence 56%
Model 5-yr price CAGR 10.6% (range 7.1–14.0%).

Price growth model, year by year

Nominal growth per year. Parts add up; momentum fades, infrastructure is weighted by delivery probability and dated.

ComponentYr 1Yr 2Yr 3Yr 4Yr 5Yr 6Confidence
Bengaluru long-run nominal trend6.06.06.06.06.06.080%
Locality momentum (mean-reverting)2.21.20.70.40.20.145%
Affordability ceiling-0.1-0.1-0.1-0.1-0.0-0.060%
Employment access & office pipeline1.31.31.31.31.31.355%
Supply–demand balance0.00.00.00.00.00.050%
Infrastructure delivery (probability-weighted)0.40.50.10.10.00.055%
Project-specific adjustments3.13.13.11.90.00.050%
Total growth12.8%12.0%11.1%9.6%7.4%7.4%56%

Bengaluru long-run nominal trend: City-wide 2013-25 nominal residential trend ≈ inflation + real income growth.

Locality momentum (mean-reverting): Trailing 3.0-yr locality CAGR 12.4% vs 6.0% trend; 35% carried forward, halving each year.

Affordability ceiling: Ticket at ₹9,850 psf vs city median ₹9,500; buyer pool thins above ₹15k/₹20k psf and after >6pp excess growth.

Employment access & office pipeline: 6 msf office pipeline (3 yr) on 35 msf stock; 30-min jobs index 0.80.

Supply–demand balance: 16 months of unsold inventory; new-launch/absorption ratio 1.1.

Infrastructure delivery (probability-weighted): Blue Line KR Puram–Hebbal–Airport (construction, 2027, p=0.65); Purple Line Whitefield extension (2023) (operational, 2023, p=1); Bengaluru suburban rail (K-RIDE) (construction, 2029, p=0.5)

Project-specific adjustments: Remaining construction risk (82% work left) re-rates toward ready comps by handover (~6.6% over 3.5 yr). Sales pace from RERA filings: 58% of 604 homes booked with 25% of the build timeline elapsed (pace ratio 2.29); fast sellers re-rate, slow sellers discount.

Locality evidence: ₹7,600 (Jun 2023) → ₹10,800 (Jun 2026) = 12.4% p.a. Sources: Platform estimate (interim, not observed).

Financial & legal due diligence

What the public record says

Automated from the Karnataka RERA file PRM/KA/RERA/1251/446/PR/240625/007866 and 3 quarterly filings. Prices and rents are locality estimates, not verified listings. Compiled Sep 2026 from the Karnataka RERA file, company registers, rating agencies, tribunal records and press. Facts only; anything that deserves a written answer before signing is flagged.

Delivery timeline9/10
no extensions, no overdue dates on the RERA file
Legal & complaints6.5/10
1 court case declared in filings (−1.5); land litigation declared “Yes” on a registration (−1)
Money to finish8/10
finance cost is 2% of the registered budget; last quarter: collected ₹50.08 cr, withdrew ₹11.17 cr
Developer strength9/10
ICRA AA/Stable (Brigade Enterprises Ltd)

Meters are rule-based from the RERA file and public ratings (rules shown under each), not opinions.

Registration
PRM/KA/RERA/1251/446/PR/240625/007866 · Brigade Enterprises Ltd
On original date
RegisteredJul 2025TodaySep 2026Original completionMar 2030
Construction18%
quarterly filing Q1 2026-27 (submitted 2026-07-15)
Homes booked352 / 604
252 still available
Sold vs built58% vs 18%
Buyers are well ahead of construction: most money is in, delivery risk sits with the developer.
Money through the RERA account
Collected ₹44.36 CrWithdrawn ₹0Q3 2025-2644.36 Cr0.0 LCollected ₹45.88 CrWithdrawn ₹30.68 CrQ4 2025-2645.88 Cr30.68 CrCollected ₹50.08 CrWithdrawn ₹11.17 CrQ1 2026-2750.08 Cr11.17 Cr
Collected from buyersWithdrawn for construction
Latest milestones
  • Upto Plinth Level
    0%
  • Sub-structure flooring
    0%
  • RCC or MS Framed structure
    0%
  • Masonry Construction
    0%
  • Plastering inside , outside & Ceiling
    0%
  • Joinery: Doors, Windows, Ventilators etc
    0%
1 court case declaredNo complaintsEscrow: KOTAK MAHINDRA BANKJoint-development land
Credit ratings of the people behind it
AAAAAABBBBBBCDinvestment grade ◀▶ speculative gradeICRA AA / Stable ▲ · Brigade Enterprises Ltd · Jul 2025
Complaints & disputes on record
On this project00 open
On the promoter entity43all projects
Court cases declared1no stay recorded
At a glance
On its original RERA date

On its original RERA completion date: 2030-03-31

18% built, 58% booked

18% built per the latest filing; 352/604 homes booked

No complaints on this project

No RERA complaints on this project; 43 on the promoter overall

1 court case declared

1 court case declared in RERA filings (no stay recorded)

The record, in pictures

RERA file · Registration

Registered project cost ₹673 cr — where it goes
Approvals ₹7.6 cr · 1%Construction & on-site ₹399.3 cr · 59%Finance (bank) ₹14 cr · 2%Other / taxes ₹252 cr · 37%
Construction programme as filed (quarterly filing Q1 2026-27 (submitted 2026-07-15))
20262027202820292030Earth work and other leveling preparat95%Foundation footing work70%Upto Plinth Level0%Sub-structure flooring0%Retaining wall15%RCC or MS Framed structure0%Masonry Construction0%Plastering inside , outside & Ceiling0%Joinery: Doors, Windows, Ventilators e0%Basic work of Water supply, Sanitary a0%Dadoing, Skirting, Flooring, Tiles wor0%Railing and Grill fixing0%Electrification, Water supply and Sani0%Painting0%Fire prevention and fire fighting fitt0%Weather Proof work0%Elevation work0%Internal and External work including l0%today
Bars are the filed schedule; filled part is reported progress. Red = past its scheduled end and not complete.
OS 34/2025 · Civil Judge & JMFC, KR Puram · no stayBorrowing declared: NoEscrow at KOTAK MAHINDRA BANK15 recorded land-owner sharesOwners’ association: not formed

Red flags to resolve in writing

1
Legal

2 court cases declared in RERA filings (34/2025, 34/2025); check for stays and title impact.

Questions to put to the developer before you sign

  1. Share the latest CA Form 4 and architect Form 5 with the escrow deposit ratio.
  2. Confirm the price list, floor-rise and other charges for the exact unit.
  3. Which date is contractual — 2030-03-31 — and what is the per-month delay compensation?
  4. What do the declared cases (34/2025, 34/2025) concern and is any stay in force?
  5. Is the land freehold with the developer, and is any part mortgaged?
Full record: every filed number, line by line1 sections · 13 items

RERA file · Registration

Registration
PRM/KA/RERA/1251/446/PR/240625/007866 · promoter Brigade Enterprises Ltd (Company) · L85110KA1995PLC019126
Dates
Start 2025-07-01 · original completion 2030-03-31 · no extensions
Progress
18% complete per quarterly filing Q1 2026-27 (submitted 2026-07-15) · 352 of 604 homes booked (252 available)
Registered cost
Total ₹673 cr · construction ₹399 cr · bank principal+interest ₹14.00 cr
Borrowing / mortgage declared
Borrowing: No
RERA bank account
KOTAK MAHINDRA BANK, Lavelle Road (70% construction account)
Plan sanction
BBMP/Addl.Dir/JDNORTH/0094/24-25 dated 2025-06-04 · BBMP - Bruhat Bengaluru Mahanagara Palike
Land & towers
6.92 acres (28,024 sq m) · Wing A 128 homes, 21 floors; Wing B 146 homes, 21 floors; Wing C 163 homes, 21 floors; Wing D 167 homes, 22 floors
Land owners / co-promoters
Lily Realty Private Limited (30.0%, Sy 5/2); Lily Realty Private Limited (30.0%, Sy 4); Lily Realty Private Limited (30.0%, Sy 6/1); Lily Realty Private Limited (30.0%, Sy 6/2); Lily Realty Private Limited (30.0%, Sy 6/3); Lily Realty Private Limited (30.0%, Sy 6/4); Lily Realty Private Limited (30.0%, Sy 7/1); Lily Realty Private Limited (30.0%, Sy 7/2) +7 more
Litigation declared
OS 34/2025, Civil Judge & JMFC, KR Puram — no stay
K-RERA complaints
0 on this registration (0 open) · 43 on the promoter entity across all its projects
Owners’ association
Not yet formed
Completion applied
19/12/2020

Source: Karnataka RERA project record PRM/KA/RERA/1251/446/PR/240625/007866, fetched 2026-09-15. Figures are the promoter’s own filings.

Sources & caveats2 sources
  • Karnataka RERA project record PRM/KA/RERA/1251/446/PR/240625/007866 (registration file, quarterly updates, complaint register), fetched 2026-09-15
  • PropertyLens locality model (market-level estimates)
  • Karnataka RERA project records PRM/KA/RERA/1251/446/PR/240625/007866 (registration file, quarterly updates, complaint register), fetched Sep 2026.

Caveats. Automated analysis: prices, rents and travel times are estimates until listings and Maps data are verified. RERA figures are the promoter’s own filings. Nothing here is legal, tax or investment advice.

Evidence

Location, jobs & transit3 hubs · metro 1.5 km
Job hubs nearby
ITPL 6 kmBagmane Tech ParkKR Puram–Hebbal ORR offices
Measured drive times below
Office space
Existing35 msf
Coming in 3 yrs6 msf
Jobs within 30 min8/10
Getting around
Metro today
KR Puram / Mahadevapura (Purple Line)
~1,500 m estimate
Metro planned
KR Puram (Blue Line interchange)
~2027 65% likely ~1,500 m estimate
Rail
—
estimate
Airport
55 min by road now · 19.5 km
Google Maps
Buses
7/10 coverage
estimate
Drive times to job hubs
DestinationDrive nowRoad km
ITPL Whitefield16 min4.6
Manyata Tech Park32 min10.6
ORR Bellandur (Ecospace)34 min11.6
MG Road (CBD)38 min13
Hebbal (Kirloskar)38 min13
Koramangala (Forum)43 min15.1
Kempegowda Airport (KIA)55 min19.5
Electronic City Ph-158 min20.7

Google Maps driving time with live traffic, measured Sep 2026. Refreshed monthly.

Location used: Google Maps match “”. Bus coverage and planned-station distances are still interim estimates.

Price historylocality 12.4%/yr

No dated project-level price series yet; only the latest observation is on file.

Locality · average ₹/sq ft
Date₹ psfSourceConfidenceKind
Jun 20215,600Platform estimate (interim, not observed)40%derived
Jun 20237,600Platform estimate (interim, not observed)45%derived
Jun 20259,500Platform estimate (interim, not observed)50%derived
Jun 202610,800Platform estimate (interim, not observed)50%derived
Luxury comps₹13,000
Premium comps₹10,500
Mid comps₹8,200
Unsold stock16 months

Model backtest on this locality: 1-yr hold-out (Jun 2025→Jun 2026): predicted ₹10,421 vs actual ₹10,800 (-3.5%). Longer 3-yr hold-out (Jun 2023→Jun 2026): predicted 8.7% p.a. vs actual 12.4% p.a. — the model is deliberately mean-reverting and under-predicted the 2021–26 boom.

Environment, legal & productflood ok · water risk · RERA yes
Flood risksome risk
Water supplymixed
Quietnoisy
Roads & drainspatchy

Old Madras Road traffic and rail noise; borewell dependence east of KR Puram

Legal & approvals
Registration 007866
RERA PRM/KA/RERA/1251/446/PR/240625/007866
possession Mar 2030
Litigation
2 case(s) declared
observed
Approvals
Plan BBMP/Addl.Dir/JDNORTH/0094/24-25 dated 2025-06-04
observed
Title
not verified
assumed
Product
Land6.92 acres
Homes604
Density87/acre
Launched2025
Sources & data gapswhat we know, from where, and what is missing

Automated analysis: unit mix and carpet areas come from the RERA inventory table; prices and rents are locality-model estimates until listings are verified.

FieldValueSource classDateConf.KindConflicting values
AddressSy Nos. 4, 5/1, 5/2, 6/1, 6/2, 6/3, 6/4, 7/1, 7/2, 7/3, 7/4, 7/5, 7/6, 8/1, 8/3, 8/4, 9/2, 9/3, 9/4, 9/5, 10/1, 10/2, 10/3, 10/4, 12/2, 16/1, 16/2, 16 , BBMP khata No. 149, Ward No 52, situated at Bhattarahalli Village, Bidarahalli Hobli, Bangalore East Taluk, Bangalore.Karnataka RERA (number as reported; registry lookup pending)Sep 202680%observed
Land area (acres)6.92Karnataka RERA (number as reported; registry lookup pending)Sep 202680%observed
Total units604Karnataka RERA (number as reported; registry lookup pending)Sep 202680%observed
Launch year2025Karnataka RERA (number as reported; registry lookup pending)Sep 202670%observed
Possession · Registration 0078662030-03-31Karnataka RERA (number as reported; registry lookup pending)Sep 202670%observed
Price psf · 1 BHK · ~475 sq ft (334 carpet)9850Platform estimate (interim, not observed)Sep 202635%assumed
Ticket · 1 BHK · ~475 sq ft (334 carpet)4678750Platform estimate (interim, not observed)Sep 202635%derived
Rent · 1 BHK · ~475 sq ft (334 carpet)16500Platform estimate (interim, not observed)Sep 202635%assumed
Carpet area334Karnataka RERA (number as reported; registry lookup pending)Sep 202660%observed
Builder on-time rate0.8Brigade Group (developer website)Aug 202670%observed
Litigation2 case(s) declaredKarnataka RERA (number as reported; registry lookup pending)Sep 202670%observed
ApprovalsPlan BBMP/Addl.Dir/JDNORTH/0094/24-25 dated 2025-06-04Karnataka RERA (number as reported; registry lookup pending)Sep 202660%observed

Commercial listing portals are shown as “Listing portal (aggregated)”; full provenance is retained internally. Official developer and Karnataka RERA sources are named.

Other projects worth comparing

Same model, same date. Scores are out of 100, where 50 is the average analysed Bengaluru project.

Questions people ask about Brigade Lakecrest

Is Brigade Lakecrest a good investment?

On PropertyLens's evidence-based model Brigade Lakecrest scores 75/100, well above the average analysed Bengaluru project (50 = average, 12 points = one standard deviation). The model projects price growth of about 10.6% a year over five years and a net-wealth CAGR of 6.6% after every cost on an 8-year hold with a 75.0% loan. That is research on public filings, not advice; the factor breakdown on this page shows what drives the score.

What is the price per sq ft at Brigade Lakecrest?

About ₹9,850 per sq ft of super built-up area, a model estimate from KR Puram / Mahadevapura / Hoskote Road comparables that you can edit. The 1 BHK home costs about ₹46.8 L before other charges, GST and stamp duty, and ₹59.7 L all-in.

When is Brigade Lakecrest ready for possession?

The RERA registration commits to Mar 2030. Latest filing: 25% of the schedule elapsed, 58% of homes booked.

Is Brigade Lakecrest RERA registered?

Yes. Karnataka RERA registration: PRM/KA/RERA/1251/446/PR/240625/007866. No complaints on this registration and 43 on the promoter across projects at K-RERA as of 2026-09-15.

How reliable is Brigade Group on delivery?

80% of Brigade Group's crawled Bengaluru registrations needed no extension (Listed developer; strong delivery record). 250 registrations analysed. The developer scorecard compares this with every other Bengaluru developer.

What rent can Brigade Lakecrest earn?

About ₹16,500 a month for this home (a model estimate from KR Puram / Mahadevapura / Hoskote Road rents), a gross yield of 4.1% on the all-in cost. Nothing is earned before handover. Rent covers 50% of the EMI at the default loan.

Answers are generated from the filings and the model for this home and change when you edit the assumptions above. See the Brigade Group scorecard and the KR Puram / Mahadevapura / Hoskote Road area page.

Go deeper

Share on WhatsApp