PropertyLensBengaluru · invest
Century Dwellings · Devanahalli / Airport Road / Bagalur

Century OneWorld Seraya Phase 2

Survey nos. 26/3B, 26/3C, 32, 33/1… · Devanahalli / Airport Road / Bagalur
Handover Aug 2029 · no rent beforeplot · midRERA registered+ CompareFull report ↗
1 · Which home?
2 · Which exit plan?

Score, growth and returns below are for the highlighted home and plan. Prices, rent and possession never mix across phases.

57
Investment score
57/100
Evidence confidence55%
Plot · 1200 sq ft
Price growth per year, next 5 yrs model
12.1%
likely range 8.6%–15.5% · over 10 yrs 11.0%/yr
Net-wealth CAGR, 8-yr hold
9.5%
your cash in → cash back incl. sale, per year
Cash-flow IRR, 8-yr hold
15.5%
with 75% loan · all-cash 12.6% · no interiors
Three numbers, three questions. Price growth: what will the home be worth? Net-wealth CAGR: what will my money have earned after every cost? Cash-flow IRR: the same, but counting when each rupee moves. Tap i on any of them.
Price · edit here or below assumed
₹Cr
₹ psf × 1,200 sq ft · as of Sep 2026
Price edits apply to ·
All-in cost
₹43.7 L
+ other charges 0.8 L, GST 0.0 L, stamp/reg 2.7 L
Gross rental yield assumed
0.0%
vacant plot: no rent assumed

All-in cost sheet this home, default assumptions

ItemBasisAmount
Base price₹3,350 per sq ft × 1,200 sq ft super built-up40.2 L
Other charges2.0% of base: floor-rise, preferred-location, car park, club, maintenance deposit, legal, corpus (edit in Assumptions)0.8 L
GST0.0% on an under-construction home0.0 L
Stamp duty and registration6.6% in Karnataka: 5% stamp duty + 1% registration + cess and surcharge on the agreement value2.7 L
All-in costwhat leaves your pocket and the bank's, before rent or resale₹43.7 L
Your own money75.0% loan at 8.5% for 20 years covers the rest; EMI 0.3 L a month₹31.1 L

Carpet area 1,200 sq ft against 1,200 sq ft super built-up: you pay for 0% that is common area and walls. Price per sq ft of carpet ≈ ₹3,350. Every percentage above is editable in Assumptions; the defaults are Karnataka rates as of 2026-09.

In plain words

Why 57 out of 100

Each home is marked on 11 things a careful buyer checks, then compared with every project we analyse in Bengaluru: 50 is the average project, 62 beats about five in six. Here is what lifts this one and what drags it:

  • +
    Expected price growth (5-yr CAGR model) · 18/26 pts
    We expect prices here to rise about 12.1% a year for the next 5 years (explained below).
  • +
    Legal, title & approvals · 2/5 pts
    Registered with Karnataka RERA; no court cases reported; land title not yet verified by us, so get a lawyer to check. The due-diligence report below flags 0 items in red.
  • +
    Price vs comparables · 1/3 pts
    Cheaper than similar mid homes nearby: ₹3,350 vs about ₹6,500 per sq ft.
  • −
    Rental demand & yield · -6/8 pts
    A plot earns no rent, so this scores low by design.
  • −
    Schools, hospitals, daily needs · -2/3 pts
    Schools, hospitals and daily shopping are limited in this area.
  • −
    Employment access · -6/10 pts
    Drive times right now: Manyata Tech Park 43 min, Hebbal (Kirloskar) 47 min, MG Road (CBD) 64 min; Electronic City Ph-1 101 min. About 15 million sq ft of new offices are planned nearby in 3 years.
All 11 checks
  • +
    Price vs comparables · 1/3 pts
    Cheaper than similar mid homes nearby: ₹3,350 vs about ₹6,500 per sq ft.
  • −
    Rental demand & yield · -6/8 pts
    A plot earns no rent, so this scores low by design.
  • •
    Resale liquidity · -2/4 pts
    Plenty of buyers can afford a ₹40.2 L home, and homes in Devanahalli / Airport Road / Bagalur take time to resell. Reselling before handover needs the builder’s permission.
  • −
    Employment access · -6/10 pts
    Drive times right now: Manyata Tech Park 43 min, Hebbal (Kirloskar) 47 min, MG Road (CBD) 64 min; Electronic City Ph-1 101 min. About 15 million sq ft of new offices are planned nearby in 3 years.
  • −
    Metro, bus, rail & airport · -1/9 pts
    No working metro nearby (nearest 15 km). Airport is about 26 minutes by road right now.
  • •
    Schools, hospitals, daily needs · -2/3 pts
    Schools, hospitals and daily shopping are limited in this area.
  • •
    Builder delivery & handover risk · 3/16 pts
    Century Dwellings has finished 3+ projects and delivered on time about 80% of the time. This phase is 35% built, with handover promised for 2029-08-31: delays would push your rent start back.
  • •
    Layout, size, age, amenities, maintenance · -0/3 pts
    Moderately dense layout (60 homes per acre); about 72% of the area you pay for is usable carpet area. Maintenance ~₹3.5 per sq ft a month.
  • •
    Water, flooding, noise, infrastructure · -0/9 pts
    Low flood risk; water supply is mostly borewell or tankers; noise is manageable.
  • +
    Legal, title & approvals · 2/5 pts
    Registered with Karnataka RERA; no court cases reported; land title not yet verified by us, so get a lawyer to check. The due-diligence report below flags 0 items in red.
  • +
    Expected price growth (5-yr CAGR model) · 18/26 pts
    We expect prices here to rise about 12.1% a year for the next 5 years (explained below).
Why prices should grow ~12.1% a year for the next 5 years

We build the forecast step by step, starting from what Bengaluru homes normally do and adjusting for this area and this project:

  1. + 6.0%Start with 6.0% a year: the normal long-run growth of Bengaluru home prices.
  2. + 1.2%Add 1.2%: prices here rose 14.0% a year recently (2023-06 to 2026-06). Some of that pace continues, but it fades each year.
  3. − 0.4%Subtract 0.4%: at ₹3,350 per sq ft, fewer families can afford to buy here, which slows further rises.
  4. + 2.4%Add 2.4%: 15 million sq ft of new offices nearby means more people wanting homes here.
  5. + 0.0%Supply and demand are balanced here (17 months of unsold stock).
  6. + 0.3%Add 0.3% for new roads, metro and water lines, weighted by how likely they are to actually finish: Blue Line KR Puram–Hebbal–Airport (construction, 2027); Satellite Town Ring Road (construction, 2028); Bagalur ITIR / Aerospace expansion (planned, 2030).
  7. + 2.6%Add 2.6% for this project itself: unfinished homes are worth more once they are complete.
  8. = 12.1%Result: about 12.1% a year, so a home worth ₹41.0 L today would be worth about ₹72.5 L in 5 years. We are 56% confident in the evidence behind this.

Highlights

  • Century Dwellings · Devanahalli / Airport Road / Bagalur · unit count not filed
  • Under construction: 35% complete, RERA completion 2029-08-31
  • No litigation declared · 0 complaints on this registration

Assumptions editable

Purchase

₹/sq ft
₹ Cr
sq ft
% of base
%
%
%
₹/sq ft

FinancingLoan 75% · cash 25% · EMI ₹26,688/mo

% loan
% p.a.
years
%

Rent & running costs

₹/sq ft/mo
% of rent
% of value

Interiors & exit

%
%
years
% p.a. (blank = model)
%
%

Returns over 8 years · no interiors

Cash you put in₹31.1 L
Exit value (yr 8)₹96.3 L
Net sale after loan & costs₹67.5 L
Net rent after opex₹-1.1 L
Loan (75% of price)₹30.8 L
EMI / month₹26,688
Year 0: ₹-3.9 L0Year 1: ₹-3.7 L1Year 2: ₹-4.5 L2Year 3: ₹-5.4 L3Year 4: ₹-3.4 L4Year 5: ₹-3.4 L5Year 6: ₹-3.4 L6Year 7: ₹-3.4 L7Year 8: ₹64.1 L8
YearPurchaseLoan inRent (net of vacancy)OpexDebt serviceSale − loanNet cash
Today-7.0 L3.1 L0.0 L0.0 L0.0 L0.0 L-3.9 L
Yr 1-12.3 L9.2 L0.0 L0.0 L-0.7 L0.0 L-3.7 L
Yr 2-12.3 L9.2 L0.0 L0.0 L-1.4 L0.0 L-4.5 L
Yr 3-12.3 L9.2 L0.0 L-0.1 L-2.2 L0.0 L-5.4 L
Yr 40.0 L0.0 L0.0 L-0.2 L-3.2 L0.0 L-3.4 L
Yr 50.0 L0.0 L0.0 L-0.2 L-3.2 L0.0 L-3.4 L
Yr 60.0 L0.0 L0.0 L-0.2 L-3.2 L0.0 L-3.4 L
Yr 70.0 L0.0 L0.0 L-0.2 L-3.2 L0.0 L-3.4 L
Yr 80.0 L0.0 L0.0 L-0.2 L-3.2 L67.5 L64.1 L

Pre-tax unless capital-gains tax is set. Rent enters the cash flows once. Net-wealth CAGR = (cash returned incl. sale ÷ cash put in)^(1/years) − 1. IRR uses the dated cash flows.

Score factors

Bars show points added or taken away versus the average analysed Bengaluru project (score 50).

Price vs comparables
+0.8 pts vs avg
this home 7.2/10 · Bengaluru average 6.2 · confidence 35%
₹3,350 psf vs mid comps ₹6,500 (-48%; under-construction should price ~8% below ready). Price is a model estimate, so this factor carries a third of its normal weight until a listed price is observed.
Rental demand & yield
−5.9 pts vs avg
this home 3.0/10 · Bengaluru average 6.0 · confidence 38%
Gross yield 0.0% (₹0 psf/month); locality rental demand 6/10.
Resale liquidity
−2.1 pts vs avg
this home 6.4/10 · Bengaluru average 7.6 · confidence 50%
Locality resale depth 6/10; ticket ₹0.40 Cr narrows the buyer pool; UC resale needs builder NOC.
Employment access
−5.6 pts vs avg
this home 2.5/10 · Bengaluru average 5.2 · confidence 85%
Drive times now (Google Maps, 2026-09-16): Manyata Tech Park 43 min, Hebbal (Kirloskar) 47 min, MG Road (CBD) 64 min, ITPL Whitefield 67 min; 0 of 7 major hubs within 30 min; 15 msf office pipeline (3 yr).
Metro, bus, rail & airport
−0.8 pts vs avg
this home 4.3/10 · Bengaluru average 4.8 · confidence 60%
none; Blue Line airport terminal station under construction; Airport City (Blue Line) ~2027; airport ~26 min by road now (Google Maps); .
Schools, hospitals, daily needs
−2.0 pts vs avg
this home 5.0/10 · Bengaluru average 7.0 · confidence 50%
Locality social-infrastructure index (interim, expert-set; POI distances pending Maps integration).
Builder delivery & handover risk
+3.1 pts vs avg
this home 5.0/10 · Bengaluru average 3.7 · confidence 60%
Century Dwellings: 3+ projects, on-time 80% (derived); handover 2029-08-31 (RERA); within the RERA timeline, work on schedule (9 pts).
Layout, size, age, amenities, maintenance
−0.4 pts vs avg
this home 7.0/10 · Bengaluru average 7.3 · confidence 50%
60 units/acre; carpet/SBA ~72%; maintenance ~₹3.5 psf/month (assumed).
Water, flooding, noise, infrastructure
−0.1 pts vs avg
this home 5.8/10 · Bengaluru average 5.8 · confidence 50%
Plotted-development heavy; social infrastructure still thin
Legal, title & approvals
+2.3 pts vs avg
this home 8.5/10 · Bengaluru average 7.4 · confidence 55%
RERA registered; litigation: none reported; approvals: Plan BIAAPA/TPA/LAO/36/2024-25 dated 2025-03-01; title: not verified. Due-diligence report lists 0 red flags (−0.0 pts).
Expected price growth (5-yr CAGR model)
+17.9 pts vs avg
this home 8.8/10 · Bengaluru average 6.0 · confidence 56%
Model 5-yr price CAGR 12.1% (range 8.6–15.5%).

Price growth model, year by year

Nominal growth per year. Parts add up; momentum fades, infrastructure is weighted by delivery probability and dated.

ComponentYr 1Yr 2Yr 3Yr 4Yr 5Yr 6Confidence
Bengaluru long-run nominal trend6.06.06.06.06.06.080%
Locality momentum (mean-reverting)2.81.50.80.50.30.145%
Affordability ceiling-0.7-0.5-0.3-0.2-0.2-0.160%
Employment access & office pipeline2.42.42.42.42.42.455%
Supply–demand balance0.00.00.00.00.00.050%
Infrastructure delivery (probability-weighted)0.40.40.30.20.20.055%
Project-specific adjustments3.33.33.31.51.51.550%
Total growth14.2%13.1%12.5%10.3%10.2%10.0%56%

Bengaluru long-run nominal trend: City-wide 2013-25 nominal residential trend ≈ inflation + real income growth.

Locality momentum (mean-reverting): Trailing 3.0-yr locality CAGR 14.0% vs 6.0% trend; 35% carried forward, halving each year.

Affordability ceiling: Ticket at ₹3,350 psf vs city median ₹9,500; buyer pool thins above ₹15k/₹20k psf and after >6pp excess growth.

Employment access & office pipeline: 15 msf office pipeline (3 yr) on 8 msf stock; 30-min jobs index 0.45.

Supply–demand balance: 17 months of unsold inventory; new-launch/absorption ratio 1.36 (from 45 under-construction RERA filings in this locality: 7,627 unsold homes, 1616.1 sold per month).

Infrastructure delivery (probability-weighted): Blue Line KR Puram–Hebbal–Airport (construction, 2027, p=0.65); Satellite Town Ring Road (construction, 2028, p=0.6); Bagalur ITIR / Aerospace expansion (planned, 2030, p=0.5)

Project-specific adjustments: Remaining construction risk (65% work left) re-rates toward ready comps by handover (~5.2% over 2.9 yr). Land in expansion corridors historically outpaces built stock; no depreciation.

Locality evidence: ₹5,400 (Jun 2023) → ₹8,000 (Jun 2026) = 14.0% p.a. Sources: Platform estimate (interim, not observed).

Financial & legal due diligence

What the public record says

Automated from the Karnataka RERA file PRM/KA/RERA/1251/309/PR/250925/008121 and 3 quarterly filings. Prices and rents are locality estimates, not verified listings. Compiled Sep 2026 from the Karnataka RERA file, company registers, rating agencies, tribunal records and press. Facts only; anything that deserves a written answer before signing is flagged.

Delivery timeline9/10
no extensions, no overdue dates on the RERA file
Legal & complaints9/10
no litigation and no complaints on the RERA file
Money to finish8/10
finance cost is 0% of the registered budget; last quarter: collected ₹61.54 cr, withdrew ₹14.65 cr
Developer strength5/10
no public credit rating for the promoter

Meters are rule-based from the RERA file and public ratings (rules shown under each), not opinions.

Registration
PRM/KA/RERA/1251/309/PR/250925/008121 · Century Dwellings Private Limited
On original date
RegisteredSep 2025TodaySep 2026Original completionAug 2029
Construction35%
quarterly filing Q1 2026-27 (submitted 2026-07-13)
Money through the RERA account
Collected ₹48.75 CrWithdrawn ₹20.00 CrQ3 2025-2648.75 Cr20.00 CrCollected ₹64.98 CrWithdrawn ₹8.35 CrQ4 2025-2664.98 Cr8.35 CrCollected ₹61.54 CrWithdrawn ₹14.65 CrQ1 2026-2761.54 Cr14.65 Cr
Collected from buyersWithdrawn for construction
Latest milestones
  • Power Supply Work
    0%
  • Other Miscellaneous Work
    0%
  • Formation Of Plots
    5%
  • Plantation Work
    5%
  • Formation Of Road, Footpath, drainange, er
    25%
No litigation declaredNo complaintsEscrow: HDFCJoint-development land
Credit ratings of the people behind it

No public credit rating located for the promoter.

Century Dwellings Private Limited: no public rating located

Complaints & disputes on record
On this project00 open
On the promoter entity0all projects
Court cases declared0no stay recorded
At a glance
On its original RERA date

On its original RERA completion date: 2029-08-31

35% built, NaN% booked

35% built per the latest filing; 0/0 homes booked

No complaints on this project

No RERA complaints on this project; 0 on the promoter overall

No litigation declared

No litigation declared in RERA filings

The record, in pictures

RERA file · Registration

Registered project cost ₹518 cr — where it goes
Approvals ₹0.9 cr · 0%Construction & on-site ₹369.3 cr · 71%Other / taxes ₹148.3 cr · 29%
Construction programme as filed (quarterly filing Q1 2026-27 (submitted 2026-07-13))
2026202720282029Formation Of Plots5%Formation Of Road, Footpath, drainange25%Power Supply Work0%Plantation Work5%Other Miscellaneous Work0%today
Bars are the filed schedule; filled part is reported progress. Red = past its scheduled end and not complete.
No litigation declaredBorrowing declared: NoEscrow at HDFC22 recorded land-owner sharesOwners’ association: not formed

Red flags to resolve in writing

Questions to put to the developer before you sign

  1. Share the latest CA Form 4 and architect Form 5 with the escrow deposit ratio.
  2. Confirm the price list, floor-rise and other charges for the exact unit.
  3. Which date is contractual — 2029-08-31 — and what is the per-month delay compensation?
  4. Confirm there is no litigation on the land or approvals beyond the RERA declaration.
  5. Is the land freehold with the developer, and is any part mortgaged?
Full record: every filed number, line by line1 sections · 11 items

RERA file · Registration

Registration
PRM/KA/RERA/1251/309/PR/250925/008121 · promoter Century Dwellings Private Limited (Company) · U68200KA2024PTC184214
Dates
Start 2025-09-01 · original completion 2029-08-31 · no extensions
Progress
35% complete per quarterly filing Q1 2026-27 (submitted 2026-07-13) · 0 of 0 homes booked (0 available)
Registered cost
Total ₹518 cr · construction ₹369 cr
Borrowing / mortgage declared
Borrowing: No
RERA bank account
HDFC, Vasanthnagar Branch (70% construction account)
Plan sanction
BIAAPA/TPA/LAO/36/2024-25 dated 2025-03-01 · BIAPPA - Bangalore Airport Area Planning Authority
Land owners / co-promoters
Century Dwellings Pvt Ltd (100.0%, Sy 7); Century Dwellings Pvt Ltd (100.0%, Sy 9); Century Dwellings Pvt Ltd (100.0%, Sy 10/1); Century Dwellings Pvt Ltd (100.0%, Sy 10/2); Century Dwellings Pvt Ltd (100.0%, Sy 11/1); Century Dwellings Pvt Ltd (100.0%, Sy 12/1); Century Dwellings Pvt Ltd (100.0%, Sy 13/1); Century Dwellings Pvt Ltd (100.0%, Sy 13/2) +14 more
Litigation declared
None declared in filings
Owners’ association
Not yet formed
Completion applied
19/12/2020

Source: Karnataka RERA project record PRM/KA/RERA/1251/309/PR/250925/008121, fetched 2026-09-15. Figures are the promoter’s own filings.

Sources & caveats2 sources
  • Karnataka RERA project record PRM/KA/RERA/1251/309/PR/250925/008121 (registration file, quarterly updates, complaint register), fetched 2026-09-15
  • PropertyLens locality model (market-level estimates)
  • Karnataka RERA project records PRM/KA/RERA/1251/309/PR/250925/008121 (registration file, quarterly updates, complaint register), fetched Sep 2026.

Caveats. Automated analysis: prices, rents and travel times are estimates until listings and Maps data are verified. RERA figures are the promoter’s own filings. Nothing here is legal, tax or investment advice.

Evidence

Location, jobs & transit3 hubs · metro none nearby
Job hubs nearby
Airport city / KIADB aerospace parkBagalur ITIR plannedManyata 25 km
Measured drive times below
Office space
Existing8 msf
Coming in 3 yrs15 msf
Jobs within 30 min5/10
Getting around
Metro today
none; Blue Line airport terminal station under construction
none within 5 km
Metro planned
Airport City (Blue Line)
~2027 70% likely ~4,000 m estimate
Rail
—
estimate
Airport
26 min by road now · 8.5 km
Google Maps
Buses
7/10 coverage
estimate
Drive times to job hubs
DestinationDrive nowRoad km
Kempegowda Airport (KIA)26 min8.5
Manyata Tech Park43 min15
Hebbal (Kirloskar)47 min16.5
MG Road (CBD)64 min22.9
ITPL Whitefield67 min24.4
Koramangala (Forum)75 min27.4
ORR Bellandur (Ecospace)79 min28.8
Electronic City Ph-1101 min37.4

Google Maps driving time with live traffic, measured Sep 2026. Refreshed monthly.

Location used: Google Maps match “”. Bus coverage and planned-station distances are still interim estimates.

Price historylocality 14.0%/yr

No dated project-level price series yet; only the latest observation is on file.

Locality · average ₹/sq ft
Date₹ psfSourceConfidenceKind
Jun 20214,200Platform estimate (interim, not observed)40%derived
Jun 20235,400Platform estimate (interim, not observed)45%derived
Jun 20257,000Platform estimate (interim, not observed)50%derived
Jun 20268,000Platform estimate (interim, not observed)50%derived
Luxury comps₹11,000
Premium comps₹8,500
Mid comps₹6,500
Unsold stock17 months

Model backtest on this locality: 1-yr hold-out (Jun 2025→Jun 2026): predicted ₹7,737 vs actual ₹8,000 (-3.3%). Longer 3-yr hold-out (Jun 2023→Jun 2026): predicted 9.7% p.a. vs actual 14% p.a. — the model is deliberately mean-reverting and under-predicted the 2021–26 boom.

Environment, legal & productflood ok · water risk · RERA yes
Flood risklow
Water supplytankers/borewell
Quietok
Roads & drainspatchy

Plotted-development heavy; social infrastructure still thin

Legal & approvals
Registration 008121
RERA PRM/KA/RERA/1251/309/PR/250925/008121
possession Aug 2029
Litigation
none reported
observed
Approvals
Plan BIAAPA/TPA/LAO/36/2024-25 dated 2025-03-01
observed
Title
not verified
assumed
Product
Landnull acres
Homesnull
Density60/acre
Launched2025
Sources & data gapswhat we know, from where, and what is missing

Automated analysis: unit mix and carpet areas come from the RERA inventory table; prices and rents are locality-model estimates until listings are verified.

FieldValueSource classDateConf.KindConflicting values
AddressSy Nos. 26/3B, 26/3C, 32, 33/1, 33/2, 33/3, 33/4, 33/5, 33/7, 33/8, 33/9, 34/1, 35/1, 35/2, 35/3, 35/4, 36/1, 36/2, 36/3, 36/4, 36/5, 36/6, 37, 38/1, 38/4 and 38/5 of Tarabanahalli Village, Jala Hobli, Bangalore North TalukKarnataka RERA (number as reported; registry lookup pending)Sep 202680%observed
Land area (acres)Platform estimate (interim, not observed)Sep 202620%assumed
Total unitsPlatform estimate (interim, not observed)Sep 202620%assumed
Launch year2025Karnataka RERA (number as reported; registry lookup pending)Sep 202670%observed
Possession · Registration 0081212029-08-31Karnataka RERA (number as reported; registry lookup pending)Sep 202670%observed
Price psf · Plot · 1200 sq ft3350Platform estimate (interim, not observed)Sep 202635%assumed
Ticket · Plot · 1200 sq ft4020000Platform estimate (interim, not observed)Sep 202635%derived
Rent · Plot · 1200 sq ft0Platform estimate (interim, not observed)Sep 202635%assumed
Carpet area1200Karnataka RERA (number as reported; registry lookup pending)Sep 202660%observed
Builder on-time rate0.8Karnataka RERA (number as reported; registry lookup pending)Sep 202660%derived
Litigationnone reportedKarnataka RERA (number as reported; registry lookup pending)Sep 202670%observed
ApprovalsPlan BIAAPA/TPA/LAO/36/2024-25 dated 2025-03-01Karnataka RERA (number as reported; registry lookup pending)Sep 202660%observed

Commercial listing portals are shown as “Listing portal (aggregated)”; full provenance is retained internally. Official developer and Karnataka RERA sources are named.

Other projects worth comparing

Same model, same date. Scores are out of 100, where 50 is the average analysed Bengaluru project.

Questions people ask about Century OneWorld Seraya Phase 2

Is Century OneWorld Seraya Phase 2 a good investment?

On PropertyLens's evidence-based model Century OneWorld Seraya Phase 2 scores 57/100, above the average analysed Bengaluru project (50 = average, 12 points = one standard deviation). The model projects price growth of about 12.1% a year over five years and a net-wealth CAGR of 9.5% after every cost on an 8-year hold with a 75.0% loan. That is research on public filings, not advice; the factor breakdown on this page shows what drives the score.

What is the price per sq ft at Century OneWorld Seraya Phase 2?

About ₹3,350 per sq ft of super built-up area, a model estimate from Devanahalli / Airport Road / Bagalur comparables that you can edit. The Plot home costs about ₹40.2 L before other charges, GST and stamp duty, and ₹43.7 L all-in.

When is Century OneWorld Seraya Phase 2 ready for possession?

The RERA registration commits to Aug 2029.

Is Century OneWorld Seraya Phase 2 RERA registered?

Yes. Karnataka RERA registration: PRM/KA/RERA/1251/309/PR/250925/008121. No complaints on this registration at K-RERA as of 2026-09-15.

How reliable is Century Dwellings on delivery?

80% of Century Dwellings's crawled Bengaluru registrations needed no extension (3 of 3 crawled Bengaluru registrations needed no extension). 3 registrations analysed. The developer scorecard compares this with every other Bengaluru developer.

What rent can Century OneWorld Seraya Phase 2 earn?

Plots earn no rent; the return is price growth alone.

Answers are generated from the filings and the model for this home and change when you edit the assumptions above. See the Century Dwellings scorecard and the Devanahalli / Airport Road / Bagalur area page.

Go deeper

Share on WhatsApp