PropertyLensBengaluru · invest
Lewis Infrastructure · Central Bengaluru (MG Road / Richmond / Lavelle / Cunningham)

Ferris

SY NO 79/2, KYALASANAHALLI VILLAGE, K R PURAM TALUK,
Handover Apr 2028 · no rent beforeapartment · midRERA registered+ CompareFull report ↗
1 · Which home?
2 · Which exit plan?

Score, growth and returns below are for the highlighted home and plan. Prices, rent and possession never mix across phases.

70
Investment score
70/100
Evidence confidence56%
3 BHK · ~1,755 sq ft (1302 carpet)
Price growth per year, next 5 yrs model
10.5%
likely range 7.0%–14.0% · over 10 yrs 8.9%/yr
Net-wealth CAGR, 8-yr hold
6.5%
your cash in → cash back incl. sale, per year
Cash-flow IRR, 8-yr hold
9.6%
with 75% loan · all-cash 9.5% · with interiors
Three numbers, three questions. Price growth: what will the home be worth? Net-wealth CAGR: what will my money have earned after every cost? Cash-flow IRR: the same, but counting when each rupee moves. Tap i on any of them.
Price · edit here or below assumed
₹Cr
₹ psf × 1,755 sq ft · as of Sep 2026
Price edits apply to ·
All-in cost
₹3.26 Cr
+ other charges 9.2 L, GST 13.7 L, stamp/reg 18.0 L, interiors 21.1 L
Gross rental yield assumed
3.1%
rent starts in ~1.9 yr

All-in cost sheet this home, default assumptions

ItemBasisAmount
Base price₹15,050 per sq ft × 1,755 sq ft super built-up2.64 Cr
Other charges3.5% of base: floor-rise, preferred-location, car park, club, maintenance deposit, legal, corpus (edit in Assumptions)9.2 L
GST5.0% on an under-construction home13.7 L
Stamp duty and registration6.6% in Karnataka: 5% stamp duty + 1% registration + cess and surcharge on the agreement value18.0 L
Interiors₹1,200 per sq ft, needed before the home can be let21.1 L
All-in costwhat leaves your pocket and the bank's, before rent or resale₹3.26 Cr
Your own money75.0% loan at 8.5% for 20 years covers the rest; EMI 1.9 L a month₹2.13 Cr

Carpet area 1,302 sq ft against 1,755 sq ft super built-up: you pay for 26% that is common area and walls. Price per sq ft of carpet ≈ ₹20,286. Every percentage above is editable in Assumptions; the defaults are Karnataka rates as of 2026.

In plain words

Why 70 out of 100

Each home is marked on 11 things a careful buyer checks, then compared with every project we analyse in Bengaluru: 50 is the average project, 62 beats about five in six. Here is what lifts this one and what drags it:

  • +
    Schools, hospitals, daily needs · 3/3 pts
    Schools, hospitals and daily shopping are excellent in this area.
  • +
    Employment access · 6/10 pts
    Drive times right now: MG Road (CBD) 10 min, Hebbal (Kirloskar) 16 min, Manyata Tech Park 19 min; Electronic City Ph-1 50 min. About 2 million sq ft of new offices are planned nearby in 3 years.
  • +
    Metro, bus, rail & airport · 5/9 pts
    A metro station is a short walk away (~800 m). Airport is about 70 minutes by road right now.
  • −
    Resale liquidity · -4/4 pts
    Plenty of buyers can afford a ₹2.64 Cr home, and homes in Central Bengaluru resell quickly. Reselling before handover needs the builder’s permission.
  • −
    Layout, size, age, amenities, maintenance · -0/3 pts
    Moderately dense layout (69 homes per acre); about 72% of the area you pay for is usable carpet area. Maintenance ~₹3.5 per sq ft a month.
  • −
    Price vs comparables · -0/3 pts
    Priced about the same as similar mid homes nearby (₹15,050 vs ~₹16,000 per sq ft).
All 11 checks
  • •
    Price vs comparables · -0/3 pts
    Priced about the same as similar mid homes nearby (₹15,050 vs ~₹16,000 per sq ft).
  • •
    Rental demand & yield · 1/8 pts
    Rent pays back 3.1% of the price every year, close to the usual 3% in Bengaluru. Tenant demand here is very strong.
  • •
    Resale liquidity · -4/4 pts
    Plenty of buyers can afford a ₹2.64 Cr home, and homes in Central Bengaluru resell quickly. Reselling before handover needs the builder’s permission.
  • +
    Employment access · 6/10 pts
    Drive times right now: MG Road (CBD) 10 min, Hebbal (Kirloskar) 16 min, Manyata Tech Park 19 min; Electronic City Ph-1 50 min. About 2 million sq ft of new offices are planned nearby in 3 years.
  • +
    Metro, bus, rail & airport · 5/9 pts
    A metro station is a short walk away (~800 m). Airport is about 70 minutes by road right now.
  • +
    Schools, hospitals, daily needs · 3/3 pts
    Schools, hospitals and daily shopping are excellent in this area.
  • −
    Builder delivery & handover risk · -0/16 pts
    Lewis Infrastructure has finished 9+ projects and delivered on time about 82% of the time. This phase is 5% built, with handover promised for 2028-04-30: delays would push your rent start back.
  • •
    Layout, size, age, amenities, maintenance · -0/3 pts
    Moderately dense layout (69 homes per acre); about 72% of the area you pay for is usable carpet area. Maintenance ~₹3.5 per sq ft a month.
  • +
    Water, flooding, noise, infrastructure · 3/9 pts
    Low flood risk; water supply is reliable piped supply; noticeable traffic or aircraft noise.
  • +
    Legal, title & approvals · 2/5 pts
    Registered with Karnataka RERA; no court cases reported; land title not yet verified by us, so get a lawyer to check. The due-diligence report below flags 0 items in red.
  • •
    Expected price growth (5-yr CAGR model) · 5/26 pts
    We expect prices here to rise about 10.5% a year for the next 5 years (explained below).
Why prices should grow ~10.5% a year for the next 5 years

We build the forecast step by step, starting from what Bengaluru homes normally do and adjusting for this area and this project:

  1. + 6.0%Start with 6.0% a year: the normal long-run growth of Bengaluru home prices.
  2. + 0.9%Add 0.9%: prices here rose 12.4% a year recently (2023-06 to 2026-06). Some of that pace continues, but it fades each year.
  3. − 0.3%Subtract 0.3%: at ₹15,050 per sq ft, fewer families can afford to buy here, which slows further rises.
  4. + 1.0%Add 1.0%: 2 million sq ft of new offices nearby means more people wanting homes here.
  5. + 0.9%Add 0.9%: few unsold homes in the area (12 months of stock), so sellers have the upper hand.
  6. + 0.1%Add 0.1% for new roads, metro and water lines, weighted by how likely they are to actually finish: Pink Line Kalena Agrahara–Nagawara (construction, 2027).
  7. + 1.9%Add 1.9% for this project itself: unfinished homes are worth more once they are complete.
  8. = 10.5%Result: about 10.5% a year, so a home worth ₹2.73 Cr today would be worth about ₹4.50 Cr in 5 years. We are 56% confident in the evidence behind this.

Which exit suits you?

For an unfinished flat the answer depends on whether you sell at handover or hold, and whether you spend on interiors. Same price, same loan; only the strategy changes:

StrategyHoldIRR / yrWealth CAGR / yrCash you put inNet rentNet saleApply
Sell at handover, no interiors best IRR
Take delivery in 2028-04-30 and sell the bare flat (2 yr hold). Needs builder NOC or registration first; no rent.
2 yrs26.9%18.7%₹64.5 L₹-23,047₹1.38 Cr
Hold bare, rent unfurnished
Skip interiors; rent 12% lower than a fitted home; sell after 8 yrs with no interiors value.
8 yrs11.1%7.4%₹1.97 Cr₹32.2 L₹3.65 Cr
Hold, do interiors, rent & sell fitted selected
Spend ₹1,200/sq ft on interiors, earn full rent, recover ~40% of interiors cost at sale (fading over 10 yrs).
8 yrs9.6%6.5%₹2.13 Cr₹38.1 L₹3.68 Cr

IRR and CAGR are per year over the hold shown. A short hold can show a high IRR on a small absolute gain; compare the net-sale column too. Selling before registration usually needs the builder’s transfer NOC and a fee.

Highlights

  • Lewis Infrastructure · Central Bengaluru (MG Road / Richmond / Lavelle / Cunningham) · 12 homes on 0.2 acres
  • Under construction: 5% complete, RERA completion 2028-04-30
  • No litigation declared · 0 complaints on this registration

Assumptions editable

Purchase

₹/sq ft
₹ Cr
sq ft
% of base
%
%
%
₹/sq ft

FinancingLoan 75% · cash 25% · EMI ₹1.9 L/mo

% loan
% p.a.
years
%

Rent & running costs

₹
% p.a.
%
months
months
₹/sq ft/mo
% of rent
% of rent
% of value

Interiors & exit

%
%
years
% p.a. (blank = model)
%
%

Returns over 8 years · with interiors

Cash you put in₹2.13 Cr
Exit value (yr 8)₹5.58 Cr
Net sale after loan & costs₹3.68 Cr
Net rent after opex₹38.1 L
Loan (75% of price)₹2.15 Cr
EMI / month₹1.9 L
Year 0: ₹-26.3 L0Year 1: ₹-38.2 L1Year 2: ₹-67.7 L2Year 3: ₹-16.8 L3Year 4: ₹-16.5 L4Year 5: ₹-16.2 L5Year 6: ₹-15.9 L6Year 7: ₹-15.6 L7Year 8: ₹3.53 Cr8
YearPurchaseLoan inRent (net of vacancy)OpexDebt serviceSale − loanNet cash
Today-47.8 L21.5 L0.0 L0.0 L0.0 L0.0 L-26.3 L
Yr 1-1.29 Cr96.9 L0.0 L0.0 L-5.9 L0.0 L-38.2 L
Yr 2-1.50 Cr96.9 L0.7 L-0.8 L-14.2 L0.0 L-67.7 L
Yr 30.0 L0.0 L8.4 L-2.8 L-22.4 L0.0 L-16.8 L
Yr 40.0 L0.0 L8.9 L-3.0 L-22.4 L0.0 L-16.5 L
Yr 50.0 L0.0 L9.3 L-3.1 L-22.4 L0.0 L-16.2 L
Yr 60.0 L0.0 L9.8 L-3.2 L-22.4 L0.0 L-15.9 L
Yr 70.0 L0.0 L10.3 L-3.4 L-22.4 L0.0 L-15.6 L
Yr 80.0 L0.0 L10.8 L-3.6 L-22.4 L3.68 Cr3.53 Cr

Pre-tax unless capital-gains tax is set. Rent enters the cash flows once. Net-wealth CAGR = (cash returned incl. sale ÷ cash put in)^(1/years) − 1. IRR uses the dated cash flows.

Score factors

Bars show points added or taken away versus the average analysed Bengaluru project (score 50).

Price vs comparables
−0.2 pts vs avg
this home 5.9/10 · Bengaluru average 6.2 · confidence 35%
₹15,050 psf vs mid comps ₹16,000 (-6%; under-construction should price ~8% below ready). Price is a model estimate, so this factor carries a third of its normal weight until a listed price is observed.
Rental demand & yield
+0.7 pts vs avg
this home 6.3/10 · Bengaluru average 6.0 · confidence 38%
Gross yield 3.2% (₹40 psf/month); locality rental demand 9/10.
Resale liquidity
−3.7 pts vs avg
this home 5.5/10 · Bengaluru average 7.6 · confidence 60%
Locality resale depth 8/10; ticket ₹2.64 Cr narrows the buyer pool; UC resale needs builder NOC; 12-home project has thin resale comps; RERA sales pace ratio 0.55.
Employment access
+6.1 pts vs avg
this home 8.2/10 · Bengaluru average 5.2 · confidence 85%
Drive times now (Google Maps, 2026-09-16): MG Road (CBD) 10 min, Hebbal (Kirloskar) 16 min, Manyata Tech Park 19 min, Koramangala (Forum) 22 min; 4 of 7 major hubs within 30 min; 2 msf office pipeline (3 yr).
Metro, bus, rail & airport
+5.1 pts vs avg
this home 7.6/10 · Bengaluru average 4.8 · confidence 60%
Purple / Green Line CBD stations; no planned station within 2 km; airport ~70 min by road now (Google Maps); .
Schools, hospitals, daily needs
+2.6 pts vs avg
this home 9.5/10 · Bengaluru average 7.0 · confidence 50%
Locality social-infrastructure index (interim, expert-set; POI distances pending Maps integration).
Builder delivery & handover risk
−0.4 pts vs avg
this home 3.6/10 · Bengaluru average 3.7 · confidence 60%
Lewis Infrastructure: 9+ projects, on-time 82% (derived); handover 2028-04-30 (RERA); within the RERA timeline, work behind schedule (-25 pts).
Layout, size, age, amenities, maintenance
−0.5 pts vs avg
this home 7.0/10 · Bengaluru average 7.3 · confidence 55%
69 units/acre; carpet/SBA ~72%; maintenance ~₹3.5 psf/month (assumed); filed construction cost ₹2,763 per sq ft (standard spec).
Water, flooding, noise, infrastructure
+3.0 pts vs avg
this home 7.3/10 · Bengaluru average 5.8 · confidence 50%
Best social infrastructure; traffic and noise
Legal, title & approvals
+2.3 pts vs avg
this home 8.5/10 · Bengaluru average 7.4 · confidence 55%
RERA registered; litigation: none reported; approvals: Plan BBMP/Ad.Com./EST/0088/25-26 dated 2025-09-03; title: not verified. Due-diligence report lists 0 red flags (−0.0 pts).
Expected price growth (5-yr CAGR model)
+5.2 pts vs avg
this home 6.8/10 · Bengaluru average 6.0 · confidence 56%
Model 5-yr price CAGR 10.5% (range 7.0–14.0%).

Price growth model, year by year

Nominal growth per year. Parts add up; momentum fades, infrastructure is weighted by delivery probability and dated.

ComponentYr 1Yr 2Yr 3Yr 4Yr 5Yr 6Confidence
Bengaluru long-run nominal trend6.06.06.06.06.06.080%
Locality momentum (mean-reverting)2.21.20.70.40.20.145%
Affordability ceiling-0.5-0.4-0.3-0.2-0.1-0.160%
Employment access & office pipeline1.01.01.01.01.01.055%
Supply–demand balance1.31.00.80.70.50.450%
Infrastructure delivery (probability-weighted)0.20.20.00.00.00.055%
Project-specific adjustments4.84.80.00.00.00.050%
Total growth15.0%13.9%8.3%7.9%7.6%7.5%56%

Bengaluru long-run nominal trend: City-wide 2013-25 nominal residential trend ≈ inflation + real income growth.

Locality momentum (mean-reverting): Trailing 3.0-yr locality CAGR 12.4% vs 6.0% trend; 35% carried forward, halving each year.

Affordability ceiling: Ticket at ₹15,050 psf vs city median ₹9,500; buyer pool thins above ₹15k/₹20k psf and after >6pp excess growth.

Employment access & office pipeline: 2 msf office pipeline (3 yr) on 25 msf stock; 30-min jobs index 0.95.

Supply–demand balance: 12 months of unsold inventory; new-launch/absorption ratio 0.3.

Infrastructure delivery (probability-weighted): Pink Line Kalena Agrahara–Nagawara (construction, 2027, p=0.6)

Project-specific adjustments: Remaining construction risk (95% work left) re-rates toward ready comps by handover (~7.6% over 1.6 yr).

Locality evidence: ₹19,000 (Jun 2023) → ₹27,000 (Jun 2026) = 12.4% p.a. Sources: Platform estimate (interim, not observed).

Financial & legal due diligence

What the public record says

Automated from the Karnataka RERA file PRM/KA/RERA/1251/309/PR/161225/008344 and 3 quarterly filings. Prices and rents are locality estimates, not verified listings. Compiled Sep 2026 from the Karnataka RERA file, company registers, rating agencies, tribunal records and press. Facts only; anything that deserves a written answer before signing is flagged.

Delivery timeline9/10
no extensions, no overdue dates on the RERA file
Legal & complaints9/10
no litigation and no complaints on the RERA file
Money to finish7/10
finance cost is 0% of the registered budget; last quarter: collected ₹0.52 cr, withdrew ₹0.52 cr; only 17% of homes booked (−1)
Developer strength5/10
no public credit rating for the promoter

Meters are rule-based from the RERA file and public ratings (rules shown under each), not opinions.

Registration
PRM/KA/RERA/1251/309/PR/161225/008344 · LEWIS INFRASTRUCTURE AND PROJECTS
On original date
RegisteredJan 2026TodaySep 2026Original completionApr 2028
Construction5%
quarterly filing Q1 2026-27 (submitted 2026-07-14)
Homes booked2 / 12
10 still available
Sold vs built17% vs 5%
Sales and construction are broadly in step.
Money through the RERA account
Collected ₹0Withdrawn ₹0Q3 2025-260.0 L0.0 LCollected ₹0Withdrawn ₹0Q4 2025-260.0 L0.0 LCollected ₹52.3 LWithdrawn ₹52.3 LQ1 2026-2752.3 L52.3 L
Collected from buyersWithdrawn for construction
Latest milestones
  • Foundation footing work
    0%
  • Upto Plinth Level
    0%
  • Sub-structure flooring
    0%
  • RCC or MS Framed structure
    0%
  • Masonry Construction
    0%
  • Plastering inside , outside & Ceiling
    0%
No litigation declaredNo complaintsEscrow: ICICI Bank
Credit ratings of the people behind it

No public credit rating located for the promoter.

LEWIS INFRASTRUCTURE AND PROJECTS: no public rating located

Complaints & disputes on record
On this project00 open
On the promoter entity0all projects
Court cases declared0no stay recorded
At a glance
On its original RERA date

On its original RERA completion date: 2028-04-30

5% built, 17% booked

5% built per the latest filing; 2/12 homes booked

No complaints on this project

No RERA complaints on this project; 0 on the promoter overall

No litigation declared

No litigation declared in RERA filings

The record, in pictures

RERA file · Registration

Registered project cost ₹16.01 cr — where it goes
Land ₹0 cr · 0%Approvals ₹0.7 cr · 4%Construction & on-site ₹5.8 cr · 36%Other / taxes ₹9.5 cr · 59%
Construction programme as filed (quarterly filing Q1 2026-27 (submitted 2026-07-14))
202620272028Earth work and other leveling preparat5%Foundation footing work0%Upto Plinth Level0%Sub-structure flooring0%RCC or MS Framed structure0%Masonry Construction0%Plastering inside , outside & Ceiling0%Joinery: Doors, Windows, Ventilators e0%Basic work of Water supply, Sanitary a0%Dadoing, Skirting, Flooring, Tiles wor0%Railing and Grill fixing0%Electrification, Water supply and Sani0%Painting0%Weather Proof work0%Elevation work0%today
Bars are the filed schedule; filled part is reported progress. Red = past its scheduled end and not complete.
No litigation declaredBorrowing declared: NoEscrow at ICICI BankOwners’ association: not formed

Red flags to resolve in writing

Questions to put to the developer before you sign

  1. Share the latest CA Form 4 and architect Form 5 with the escrow deposit ratio.
  2. Confirm the price list, floor-rise and other charges for the exact unit.
  3. Which date is contractual — 2028-04-30 — and what is the per-month delay compensation?
  4. Confirm there is no litigation on the land or approvals beyond the RERA declaration.
  5. Is the land freehold with the developer, and is any part mortgaged?
Full record: every filed number, line by line1 sections · 12 items

RERA file · Registration

Registration
PRM/KA/RERA/1251/309/PR/161225/008344 · promoter LEWIS INFRASTRUCTURE AND PROJECTS (Partnership Firm) · 912/2015-16
Dates
Start 2026-01-01 · original completion 2028-04-30 · no extensions
Progress
5% complete per quarterly filing Q1 2026-27 (submitted 2026-07-14) · 2 of 12 homes booked (10 available)
Registered cost
Total ₹16.01 cr · land ₹0.00 cr · construction ₹5.83 cr
Borrowing / mortgage declared
Borrowing: No
RERA bank account
ICICI Bank, COX TOWN (70% construction account)
Plan sanction
BBMP/Ad.Com./EST/0088/25-26 dated 2025-09-03 · BBMP - Bruhat Bengaluru Mahanagara Palike
Land & towers
0.17 acres (706 sq m) · FERRIS 12 homes, 4 floors
Litigation declared
None declared in filings
K-RERA complaints
0 on this registration (0 open) · 0 on the promoter entity across all its projects
Owners’ association
Not yet formed
Completion applied
19/12/2020

Source: Karnataka RERA project record PRM/KA/RERA/1251/309/PR/161225/008344, fetched 2026-09-15. Figures are the promoter’s own filings.

Sources & caveats2 sources
  • Karnataka RERA project record PRM/KA/RERA/1251/309/PR/161225/008344 (registration file, quarterly updates, complaint register), fetched 2026-09-15
  • PropertyLens locality model (market-level estimates)
  • Karnataka RERA project records PRM/KA/RERA/1251/309/PR/161225/008344 (registration file, quarterly updates, complaint register), fetched Sep 2026.

Caveats. Automated analysis: prices, rents and travel times are estimates until listings and Maps data are verified. RERA figures are the promoter’s own filings. Nothing here is legal, tax or investment advice.

Evidence

Location, jobs & transit3 hubs · metro walkable
Job hubs nearby
CBD officesUB City / Vittal MallyaEmbassy Golf Links 5 km
Measured drive times below
Office space
Existing25 msf
Coming in 3 yrs2 msf
Jobs within 30 min10/10
Getting around
Metro today
Purple / Green Line CBD stations
~800 m estimate
Metro planned
No station planned within 2 km
Rail
—
estimate
Airport
70 min by road now · 25.3 km
Google Maps
Buses
7/10 coverage
estimate
Drive times to job hubs
DestinationDrive nowRoad km
MG Road (CBD)10 min2.2
Hebbal (Kirloskar)16 min4.6
Manyata Tech Park19 min5.9
Koramangala (Forum)22 min6.8
ORR Bellandur (Ecospace)33 min11.2
ITPL Whitefield41 min14.4
Electronic City Ph-150 min17.8
Kempegowda Airport (KIA)70 min25.3

Google Maps driving time with live traffic, measured Sep 2026. Refreshed monthly.

Location used: Google Maps match “”. Bus coverage and planned-station distances are still interim estimates.

Price historylocality 12.4%/yr

No dated project-level price series yet; only the latest observation is on file.

Locality · average ₹/sq ft
Date₹ psfSourceConfidenceKind
Jun 202115,000Platform estimate (interim, not observed)40%derived
Jun 202319,000Platform estimate (interim, not observed)45%derived
Jun 202524,000Platform estimate (interim, not observed)50%derived
Jun 202627,000Platform estimate (interim, not observed)50%derived
Luxury comps₹32,000
Premium comps₹22,000
Mid comps₹16,000
Unsold stock12 months

Model backtest on this locality: 1-yr hold-out (Jun 2025→Jun 2026): predicted ₹26,263 vs actual ₹27,000 (-2.7%). Longer 3-yr hold-out (Jun 2023→Jun 2026): predicted 9.1% p.a. vs actual 12.4% p.a. — the model is deliberately mean-reverting and under-predicted the 2021–26 boom.

Environment, legal & productflood ok · piped water · RERA yes
Flood risklow
Water supplypiped
Quietnoisy
Roads & drainsgood

Best social infrastructure; traffic and noise

Legal & approvals
Registration 008344
RERA PRM/KA/RERA/1251/309/PR/161225/008344
possession Apr 2028
Litigation
none reported
observed
Approvals
Plan BBMP/Ad.Com./EST/0088/25-26 dated 2025-09-03
observed
Title
not verified
assumed
Product
Land0.17 acres
Homes12
Density69/acre
Launched2026
Sources & data gapswhat we know, from where, and what is missing

Automated analysis: unit mix and carpet areas come from the RERA inventory table; prices and rents are locality-model estimates until listings are verified.

FieldValueSource classDateConf.KindConflicting values
AddressSY NO 79/2, KYALASANAHALLI VILLAGE, K R PURAM TALUK,Karnataka RERA (number as reported; registry lookup pending)Sep 202680%observed
Land area (acres)0.17Karnataka RERA (number as reported; registry lookup pending)Sep 202680%observed
Total units12Karnataka RERA (number as reported; registry lookup pending)Sep 202680%observed
Launch year2026Karnataka RERA (number as reported; registry lookup pending)Sep 202670%observed
Possession · Registration 0083442028-04-30Karnataka RERA (number as reported; registry lookup pending)Sep 202670%observed
Price psf · 3 BHK · ~1,755 sq ft (1302 carpet)15050Platform estimate (interim, not observed)Sep 202635%assumed
Ticket · 3 BHK · ~1,755 sq ft (1302 carpet)26412750Platform estimate (interim, not observed)Sep 202635%derived
Rent · 3 BHK · ~1,755 sq ft (1302 carpet)70500Platform estimate (interim, not observed)Sep 202635%assumed
Carpet area1302Karnataka RERA (number as reported; registry lookup pending)Sep 202660%observed
Builder on-time rate0.82Karnataka RERA (number as reported; registry lookup pending)Sep 202660%derived
Litigationnone reportedKarnataka RERA (number as reported; registry lookup pending)Sep 202670%observed
ApprovalsPlan BBMP/Ad.Com./EST/0088/25-26 dated 2025-09-03Karnataka RERA (number as reported; registry lookup pending)Sep 202660%observed

Commercial listing portals are shown as “Listing portal (aggregated)”; full provenance is retained internally. Official developer and Karnataka RERA sources are named.

Other projects worth comparing

Same model, same date. Scores are out of 100, where 50 is the average analysed Bengaluru project.

Questions people ask about Ferris

Is Ferris a good investment?

On PropertyLens's evidence-based model Ferris scores 70/100, well above the average analysed Bengaluru project (50 = average, 12 points = one standard deviation). The model projects price growth of about 10.5% a year over five years and a net-wealth CAGR of 6.5% after every cost on an 8-year hold with a 75.0% loan. That is research on public filings, not advice; the factor breakdown on this page shows what drives the score.

What is the price per sq ft at Ferris?

About ₹15,050 per sq ft of super built-up area, a model estimate from Central Bengaluru comparables that you can edit. The 3 BHK home costs about ₹2.64 Cr before other charges, GST and stamp duty, and ₹3.26 Cr all-in.

When is Ferris ready for possession?

The RERA registration commits to Apr 2028. Latest filing: 30% of the schedule elapsed, 17% of homes booked.

Is Ferris RERA registered?

Yes. Karnataka RERA registration: PRM/KA/RERA/1251/309/PR/161225/008344. No complaints on this registration at K-RERA as of 2026-09-15.

How reliable is Lewis Infrastructure on delivery?

82% of Lewis Infrastructure's crawled Bengaluru registrations needed no extension (8 of 9 crawled Bengaluru registrations needed no extension). 9 registrations analysed. The developer scorecard compares this with every other Bengaluru developer.

What rent can Ferris earn?

About ₹70,500 a month for this home (a model estimate from Central Bengaluru rents), a gross yield of 3.1% on the all-in cost. Nothing is earned before handover. Rent covers 38% of the EMI at the default loan.

Answers are generated from the filings and the model for this home and change when you edit the assumptions above. See the Lewis Infrastructure scorecard and the Central Bengaluru area page.

Go deeper

Share on WhatsApp