Gini Belvista Phase 3
Score, growth and returns below are for the highlighted home and plan. Prices, rent and possession never mix across phases.
Price edits apply to ·
All-in cost sheet this home, default assumptions
| Item | Basis | Amount |
|---|---|---|
| Base price | ₹7,350 per sq ft × 750 sq ft carpet | 55.1 L |
| Other charges | 3.5% of base: floor-rise, preferred-location, car park, club, maintenance deposit, legal, corpus (edit in Assumptions) | 1.9 L |
| GST | 5.0% on an under-construction home | 2.9 L |
| Stamp duty and registration | 7.2% in Maharashtra: 7% stamp duty including 1% metro cess and 1% local body tax, plus 1% registration capped at ₹30,000 | 4.1 L |
| Interiors | ₹1,200 per sq ft, needed before the home can be let | 9.0 L |
| All-in cost | what leaves your pocket and the bank's, before rent or resale | ₹73.0 L |
| Your own money | 75.0% loan at 8.5% for 20 years covers the rest; EMI 0.4 L a month | ₹51.6 L |
Prices here are per sq ft of RERA carpet area (750 sq ft), the way homes are sold in Pune; there is no super built-up loading to discount. Every percentage above is editable in Assumptions; the defaults are Maharashtra rates as of 2026.
In plain words
Each home is marked on 11 things a careful buyer checks, then compared with every project we analyse in Pune: 50 is the average project, 62 beats about five in six. Here is what lifts this one and what drags it:
- +Employment access · 2/6 pts
Drive times right now: Pune airport 13 min, Kharadi EON IT Park 25 min, Magarpatta 32 min; Hinjewadi Phase 1 50 min. About 3 million sq ft of new offices are planned nearby in 3 years. - +Rental demand & yield · 1/6 pts
Rent pays back 3.6% of the price every year, close to the usual 3.2% in Pune. Tenant demand here is very strong. - +Expected price growth (5-yr CAGR model) · 0/35 pts
We expect prices here to rise about 8.4% a year for the next 5 years (explained below). - −Builder delivery & handover risk · -5/10 pts
Gini Citicorp Realty has finished 6+ projects and delivered on time about 87% of the time. This phase is still under construction, with handover promised for 2025-12-31: delays would push your rent start back. - •Schools, hospitals, daily needs · -0/2 pts
Schools, hospitals and daily shopping are good in this area. - −Legal, title & approvals · -1/8 pts
Registered with MahaRERA; court cases not disclosed on the public register; land title not yet verified by us, so get a lawyer to check. The due-diligence report below flags 1 item in red.
All 11 checks
- •Price vs comparables · -0/3 pts
Priced about the same as similar mid homes nearby (₹7,350 vs ~₹7,800 per sq ft). - +Rental demand & yield · 1/6 pts
Rent pays back 3.6% of the price every year, close to the usual 3.2% in Pune. Tenant demand here is very strong. - +Resale liquidity · -0/4 pts
Plenty of buyers can afford a ₹55.1 L home, and homes in Yerawada / Dhanori / Vishrantwadi / Tingre Nagar resell at a normal pace. Reselling before handover needs the builder’s permission. - +Employment access · 2/6 pts
Drive times right now: Pune airport 13 min, Kharadi EON IT Park 25 min, Magarpatta 32 min; Hinjewadi Phase 1 50 min. About 3 million sq ft of new offices are planned nearby in 3 years. - •Metro, bus, rail & airport · -1/7 pts
The nearest working metro is ~3.0 km away. Airport is about 60 minutes by road. - +Schools, hospitals, daily needs · -0/2 pts
Schools, hospitals and daily shopping are good in this area. - −Builder delivery & handover risk · -5/10 pts
Gini Citicorp Realty has finished 6+ projects and delivered on time about 87% of the time. This phase is still under construction, with handover promised for 2025-12-31: delays would push your rent start back. - +Layout, size, age, amenities, maintenance · -0/2 pts
Moderately dense layout (60 homes per acre); about 100% of the area you pay for is usable carpet area. Maintenance ~₹3.5 per sq ft a month. - •Water, flooding, noise, infrastructure · -1/7 pts
Low flood risk; water supply is partly piped, partly tankers; noticeable traffic or aircraft noise. - •Legal, title & approvals · -1/8 pts
Registered with MahaRERA; court cases not disclosed on the public register; land title not yet verified by us, so get a lawyer to check. The due-diligence report below flags 1 item in red. - −Expected price growth (5-yr CAGR model) · 0/35 pts
We expect prices here to rise about 8.4% a year for the next 5 years (explained below).
We build the forecast step by step, starting from what Pune homes normally do and adjusting for this area and this project:
- + 6.0%Start with 6.0% a year: the normal long-run growth of Pune home prices.
- + 0.3%Add 0.3%: prices here rose 7.9% a year recently (2023-06 to 2026-06). Some of that pace continues, but it fades each year.
- + 0.0%Prices are still affordable enough that this does not slow growth.
- + 1.6%Add 1.6%: 3 million sq ft of new offices nearby means more people wanting homes here.
- + 0.0%Supply and demand are balanced here (18 months of unsold stock).
- + 0.1%Add 0.1% for new roads, metro and water lines, weighted by how likely they are to actually finish: Pune Metro Purple and Aqua lines (PCMC–Swargate, Vanaz–Ramwadi), open 2022–24 (operational, 2024); Pune airport new terminal (2024); Purandar airport planned (planned, 2030).
- + 0.4%Add 0.4% for this project itself: unfinished homes are worth more once they are complete.
- = 8.4%Result: about 8.4% a year, so a home worth ₹57.1 L today would be worth about ₹85.3 L in 5 years. We are 56% confident in the evidence behind this.
Which exit suits you?
For an unfinished flat the answer depends on whether you sell at handover or hold, and whether you spend on interiors. Same price, same loan; only the strategy changes:
| Strategy | Hold | IRR / yr | Wealth CAGR / yr | Cash you put in | Net rent | Net sale | Apply |
|---|---|---|---|---|---|---|---|
| Sell at handover, no interiors Take delivery in 2025-12-31 and sell the bare flat (1 yr hold). Needs builder NOC or registration first; no rent. | 1 yrs | -28.4% | -28.4% | ₹19.3 L | ₹51,644 | ₹18.0 L | |
| Hold bare, rent unfurnished best IRR Skip interiors; rent 12% lower than a fitted home; sell after 8 yrs with no interiors value. | 8 yrs | 6.9% | 5.1% | ₹44.2 L | ₹9.4 L | ₹69.1 L | |
| Hold, do interiors, rent & sell fitted selected Spend ₹1,200/sq ft on interiors, earn full rent, recover ~40% of interiors cost at sale (fading over 10 yrs). | 8 yrs | 4.2% | 3.3% | ₹51.6 L | ₹11.2 L | ₹69.8 L |
IRR and CAGR are per year over the hold shown. A short hold can show a high IRR on a small absolute gain; compare the net-sale column too. Selling before registration usually needs the builder’s transfer NOC and a fee.
Highlights
- Gini Citicorp Realty · Yerawada / Dhanori / Vishrantwadi / Tingre Nagar · unit count not on the public register
- Under construction: progress not on the public register, MahaRERA completion 2025-12-31
- Registered with MahaRERA as P52100032590
Assumptions editable
Purchase
FinancingLoan 75% · cash 25% · EMI ₹38,992/mo
Rent & running costs
Interiors & exit
Returns over 8 years · with interiors
| Year | Purchase | Loan in | Rent (net of vacancy) | Opex | Debt service | Sale − loan | Net cash |
|---|---|---|---|---|---|---|---|
| Today | -73.2 L | 44.9 L | 0.0 L | 0.0 L | 0.0 L | 0.0 L | -28.3 L |
| Yr 1 | 0.0 L | 0.0 L | 1.3 L | -0.6 L | -4.7 L | 0.0 L | -4.0 L |
| Yr 2 | 0.0 L | 0.0 L | 2.0 L | -0.8 L | -4.7 L | 0.0 L | -3.4 L |
| Yr 3 | 0.0 L | 0.0 L | 2.1 L | -0.8 L | -4.7 L | 0.0 L | -3.3 L |
| Yr 4 | 0.0 L | 0.0 L | 2.2 L | -0.8 L | -4.7 L | 0.0 L | -3.3 L |
| Yr 5 | 0.0 L | 0.0 L | 2.4 L | -0.9 L | -4.7 L | 0.0 L | -3.2 L |
| Yr 6 | 0.0 L | 0.0 L | 2.5 L | -0.9 L | -4.7 L | 0.0 L | -3.1 L |
| Yr 7 | 0.0 L | 0.0 L | 2.6 L | -0.9 L | -4.7 L | 0.0 L | -3.0 L |
| Yr 8 | 0.0 L | 0.0 L | 2.7 L | -1.0 L | -4.7 L | 69.8 L | 66.9 L |
Pre-tax unless capital-gains tax is set. Rent enters the cash flows once. Net-wealth CAGR = (cash returned incl. sale ÷ cash put in)^(1/years) − 1. IRR uses the dated cash flows.
Score factors
Bars show points added or taken away versus the average analysed Pune project (score 50).
Price growth model, year by year
Nominal growth per year. Parts add up; momentum fades, infrastructure is weighted by delivery probability and dated.
| Component | Yr 1 | Yr 2 | Yr 3 | Yr 4 | Yr 5 | Yr 6 | Confidence |
|---|---|---|---|---|---|---|---|
| Pune long-run nominal trend | 6.0 | 6.0 | 6.0 | 6.0 | 6.0 | 6.0 | 80% |
| Locality momentum (mean-reverting) | 0.7 | 0.4 | 0.2 | 0.1 | 0.1 | 0.0 | 45% |
| Affordability ceiling | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 60% |
| Employment access & office pipeline | 1.6 | 1.6 | 1.6 | 1.6 | 1.6 | 1.6 | 55% |
| Supply–demand balance | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 50% |
| Infrastructure delivery (probability-weighted) | 0.2 | 0.2 | 0.1 | 0.1 | 0.1 | 0.0 | 55% |
| Project-specific adjustments | 2.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 50% |
| Total growth | 10.4% | 8.1% | 7.9% | 7.8% | 7.7% | 7.6% | 56% |
Pune long-run nominal trend: City-wide 2013-25 nominal residential trend ≈ inflation + real income growth.
Locality momentum (mean-reverting): Trailing 3.0-yr locality CAGR 7.9% vs 6.0% trend; 35% carried forward, halving each year.
Affordability ceiling: Ticket at ₹7,350 psf vs city median ₹8,700; buyer pool thins above ₹15k/₹20k psf and after >6pp excess growth.
Employment access & office pipeline: 3 msf office pipeline (3 yr) on 12 msf stock; 30-min jobs index 0.75.
Supply–demand balance: 18 months of unsold inventory; new-launch/absorption ratio 1.2.
Infrastructure delivery (probability-weighted): Pune Metro Purple and Aqua lines (PCMC–Swargate, Vanaz–Ramwadi), open 2022–24 (operational, 2024, p=1); Pune airport new terminal (2024); Purandar airport planned (planned, 2030, p=0.35)
Project-specific adjustments: Remaining construction risk (13% work left) re-rates toward ready comps by handover (~1.0% over 0.5 yr).
Locality evidence: ₹8,200 (Jun 2023) → ₹10,300 (Jun 2026) = 7.9% p.a. Sources: Platform estimate (interim, not observed).
What the public record says
Automated from MahaRERA's public register entry and registration certificate for P52100032590. Prices and rents are locality estimates, not verified listings. Compiled Nov 2026 from the MahaRERA file, company registers, rating agencies, tribunal records and press. Facts only; anything that deserves a written answer before signing is flagged.
Meters are rule-based from the RERA file and public ratings (rules shown under each), not opinions.
No public credit rating located for the promoter.
Gini Citicorp Realty LLP: credit rating not yet checked by PropertyLens
On its original RERA completion date: 2025-12-31
No RERA complaints on this project; 0 on the promoter overall
No litigation declared in RERA filings
RERA file · Registration
Red flags to resolve in writing
MahaRERA completion date 2025-12-31 has passed and the public register shows no completion.
Questions to put to the developer before you sign
- Share the latest quarterly progress filing and the architect and engineer certificates.
- Confirm the price list, floor-rise, parking and other charges for the exact unit.
- Which date is contractual, 2025-12-31 or the agreement's, and what is the delay compensation?
- Confirm there is no litigation on the land or approvals beyond the RERA declaration.
- Is the land owned by the promoter, or is this a joint development, and is any part mortgaged?
Full record: every filed number, line by line1 sections · 3 items
RERA file · Registration
Source: MahaRERA project record P52100032590, fetched 2026-11-10. Figures are the promoter’s own filings.
Sources & caveats2 sources
- MahaRERA project record P52100032590, fetched 2026-11-10
- PropertyLens Pune locality model (market-level estimates)
- MahaRERA project records P52100032590 (registration file, quarterly updates, complaint register), fetched Sep 2026.
Caveats. Automated analysis: prices, rents and travel times are estimates until listings and Maps data are verified. RERA figures are the promoter’s own filings. Nothing here is legal, tax or investment advice.
Evidence
Location, jobs & transit2 hubs · metro 3.0 km
| Destination | Drive now | Road km |
|---|---|---|
| Pune airport | 13 min | 3.5 |
| Kharadi EON IT Park | 25 min | 8.1 |
| Magarpatta | 32 min | 10.8 |
| Shivajinagar (CBD) | 32 min | 10.6 |
| Pimpri MIDC | 33 min | 11.2 |
| Baner | 40 min | 13.7 |
| Chakan MIDC | 49 min | 17.3 |
| Hinjewadi Phase 1 | 50 min | 17.6 |
Google Maps driving time with live traffic, measured Nov 2026. Refreshed monthly.
Location used: Google Maps match “”. Bus coverage and planned-station distances are still interim estimates.
Price historylocality 7.9%/yr
No dated project-level price series yet; only the latest observation is on file.
| Date | ₹ psf | Source | Confidence | Kind |
|---|---|---|---|---|
| Jun 2021 | 7,500 | Platform estimate (interim, not observed) | 40% | derived |
| Jun 2023 | 8,200 | Platform estimate (interim, not observed) | 45% | derived |
| Jun 2025 | 9,500 | Platform estimate (interim, not observed) | 50% | derived |
| Jun 2026 | 10,300 | Platform estimate (interim, not observed) | 50% | derived |
Model backtest on this locality: 1-yr hold-out (Jun 2025→Jun 2026): predicted ₹10,265 vs actual ₹10,300 (-0.3%). Longer 3-yr hold-out (Jun 2023→Jun 2026): predicted 7.6% p.a. vs actual 7.9% p.a. — the model is deliberately mean-reverting and under-predicted the 2021–26 boom.
Environment, legal & productflood ok · water risk · RERA yes
Airport flight path; Alandi Road congestion
Sources & data gapswhat we know, from where, and what is missing
Automated analysis from MahaRERA's public register: unit sizes and prices are locality-model estimates until listings are verified.
| Field | Value | Source class | Date | Conf. | Kind | Conflicting values |
|---|---|---|---|---|---|---|
| Address | Haveli, Pune, 411015 | MahaRERA | Nov 2026 | 70% | observed | |
| Land area (acres) | Platform estimate (interim, not observed) | Nov 2026 | 20% | assumed | ||
| Total units | Platform estimate (interim, not observed) | Nov 2026 | 20% | assumed | ||
| Launch year | 2022 | MahaRERA | Nov 2026 | 70% | observed | |
| Possession · Registration P52100032590 | 2025-12-31 | MahaRERA | Nov 2026 | 70% | observed | |
| Price psf · 2 BHK · ~750 sq ft carpet (assumed) | 7350 | Platform estimate (interim, not observed) | Nov 2026 | 30% | assumed | |
| Ticket · 2 BHK · ~750 sq ft carpet (assumed) | 5512500 | Platform estimate (interim, not observed) | Nov 2026 | 30% | derived | |
| Rent · 2 BHK · ~750 sq ft carpet (assumed) | 17000 | Platform estimate (interim, not observed) | Nov 2026 | 30% | assumed | |
| Carpet area | 750 | Platform estimate (interim, not observed) | Nov 2026 | 30% | assumed | |
| Builder on-time rate | 0.87 | MahaRERA | Nov 2026 | 60% | derived | |
| Litigation | not published on the public register | MahaRERA | Nov 2026 | 30% | assumed | |
| Approvals | MahaRERA registered | MahaRERA | Nov 2026 | 60% | observed |
Commercial listing portals are shown as “Listing portal (aggregated)”; full provenance is retained internally. Official developer and MahaRERA sources are named.
Other projects worth comparing
Same model, same date. Scores are out of 100, where 50 is the average analysed Pune project.
More in Yerawada / Dhanori / Vishrantwadi / Tingre Nagar All Yerawada / Dhanori / Vishrantwadi / Tingre Nagar →
More from Gini Citicorp Realty Delivery record →
Around ₹55.1 L elsewhere in Pune All projects →
Questions people ask about Gini Belvista Phase 3
Is Gini Belvista Phase 3 a good investment?
On PropertyLens's evidence-based model Gini Belvista Phase 3 scores 45/100, below the average analysed Pune project (50 = average, 12 points = one standard deviation). The model projects price growth of about 8.4% a year over five years and a net-wealth CAGR of 3.3% after every cost on an 8-year hold with a 75.0% loan. That is research on public filings, not advice; the factor breakdown on this page shows what drives the score.
What is the price per sq ft at Gini Belvista Phase 3?
About ₹7,350 per sq ft of super built-up area, a model estimate from Yerawada / Dhanori / Vishrantwadi / Tingre Nagar comparables that you can edit. The 2 BHK home costs about ₹55.1 L before other charges, GST and stamp duty, and ₹73.0 L all-in.
When is Gini Belvista Phase 3 ready for possession?
The RERA registration commits to Dec 2025. The project is 10 months past its original RERA completion date.
Is Gini Belvista Phase 3 RERA registered?
Yes. MahaRERA registration: P52100032590. No complaints on this registration at MahaRERA as of 2026-11-10.
How reliable is Gini Citicorp Realty on delivery?
87% of Gini Citicorp Realty's crawled Pune registrations needed no extension (6 of 6 analysed Pune registrations needed no extension). 6 registrations analysed. The developer scorecard compares this with every other Pune developer.
What rent can Gini Belvista Phase 3 earn?
About ₹17,000 a month for this home (a model estimate from Yerawada / Dhanori / Vishrantwadi / Tingre Nagar rents), a gross yield of 3.6% on the all-in cost. Nothing is earned before handover. Rent covers 44% of the EMI at the default loan.
Answers are generated from the filings and the model for this home and change when you edit the assumptions above. See the Gini Citicorp Realty scorecard and the Yerawada / Dhanori / Vishrantwadi / Tingre Nagar area page.