PropertyLensBengaluru · invest
KNS Infrastructure · Mysore Road / RR Nagar / Kengeri

KNS Ananta

Survey nos. 15, 16, 18/1, 18/2… · Mysore Road / RR Nagar / Kengeri
Ready · rent from todayplot · midRERA registered+ CompareFull report ↗
1 · Which home?
2 · Which exit plan?

Score, growth and returns below are for the highlighted home and plan. Prices, rent and possession never mix across phases.

57
Investment score
57/100
Evidence confidence55%
Plot · 600 sq ft
Price growth per year, next 5 yrs model
10.6%
likely range 7.1%–14.1% · over 10 yrs 10.0%/yr
Net-wealth CAGR, 8-yr hold
6.2%
your cash in → cash back incl. sale, per year
Cash-flow IRR, 8-yr hold
8.7%
with 75% loan · all-cash 8.7% · no interiors
Three numbers, three questions. Price growth: what will the home be worth? Net-wealth CAGR: what will my money have earned after every cost? Cash-flow IRR: the same, but counting when each rupee moves. Tap i on any of them.
Price · edit here or below assumed
₹Cr
₹ psf × 600 sq ft · as of Sep 2026
Price edits apply to ·
All-in cost
₹26.0 L
+ other charges 0.5 L, GST 0.0 L, stamp/reg 1.6 L
Gross rental yield assumed
0.0%
vacant plot: no rent assumed

All-in cost sheet this home, default assumptions

ItemBasisAmount
Base price₹3,950 per sq ft × 600 sq ft super built-up23.7 L
Other charges2.0% of base: floor-rise, preferred-location, car park, club, maintenance deposit, legal, corpus (edit in Assumptions)0.5 L
GST0.0% on an under-construction home (this unit may qualify for the 1% affordable rate: ≤ ₹45 lakh and ≤ 60 sq m carpet) — none is due on a ready home with an occupancy certificate, set GST to 0 if buying after OC0.0 L
Stamp duty and registration6.6% in Karnataka: 5% stamp duty + 1% registration + cess and surcharge on the agreement value1.6 L
All-in costwhat leaves your pocket and the bank's, before rent or resale₹26.0 L
Your own money75.0% loan at 8.5% for 20 years covers the rest; EMI 0.2 L a month₹21.9 L

Carpet area 600 sq ft against 600 sq ft super built-up: you pay for 0% that is common area and walls. Price per sq ft of carpet ≈ ₹3,950. Every percentage above is editable in Assumptions; the defaults are Karnataka rates as of 2026-09.

In plain words

Why 57 out of 100

Each home is marked on 11 things a careful buyer checks, then compared with every project we analyse in Bengaluru: 50 is the average project, 62 beats about five in six. Here is what lifts this one and what drags it:

  • +
    Builder delivery & handover risk · 8/16 pts
    KNS Infrastructure has finished 23+ projects and delivered on time about 84% of the time. This home is ready, so there is no waiting risk.
  • +
    Metro, bus, rail & airport · 4/9 pts
    A metro station is a short walk away (~1200 m). Airport is about 111 minutes by road right now.
  • +
    Price vs comparables · 1/3 pts
    Cheaper than similar mid homes nearby: ₹3,950 vs about ₹7,200 per sq ft.
  • −
    Employment access · -10/10 pts
    Drive times right now: MG Road (CBD) 54 min, Koramangala (Forum) 55 min, Hebbal (Kirloskar) 57 min; ITPL Whitefield 90 min. About 3 million sq ft of new offices are planned nearby in 3 years.
  • −
    Rental demand & yield · -5/8 pts
    A plot earns no rent, so this scores low by design.
  • −
    Layout, size, age, amenities, maintenance · -0/3 pts
    Moderately dense layout (60 homes per acre); about 72% of the area you pay for is usable carpet area. Maintenance ~₹3.5 per sq ft a month.
All 11 checks
  • +
    Price vs comparables · 1/3 pts
    Cheaper than similar mid homes nearby: ₹3,950 vs about ₹7,200 per sq ft.
  • −
    Rental demand & yield · -5/8 pts
    A plot earns no rent, so this scores low by design.
  • +
    Resale liquidity · 1/4 pts
    Plenty of buyers can afford a ₹23.7 L home, and homes in Mysore Road / RR Nagar / Kengeri resell at a normal pace.
  • −
    Employment access · -10/10 pts
    Drive times right now: MG Road (CBD) 54 min, Koramangala (Forum) 55 min, Hebbal (Kirloskar) 57 min; ITPL Whitefield 90 min. About 3 million sq ft of new offices are planned nearby in 3 years.
  • •
    Metro, bus, rail & airport · 4/9 pts
    A metro station is a short walk away (~1200 m). Airport is about 111 minutes by road right now.
  • +
    Schools, hospitals, daily needs · 1/3 pts
    Schools, hospitals and daily shopping are good in this area.
  • •
    Builder delivery & handover risk · 8/16 pts
    KNS Infrastructure has finished 23+ projects and delivered on time about 84% of the time. This home is ready, so there is no waiting risk.
  • •
    Layout, size, age, amenities, maintenance · -0/3 pts
    Moderately dense layout (60 homes per acre); about 72% of the area you pay for is usable carpet area. Maintenance ~₹3.5 per sq ft a month.
  • •
    Water, flooding, noise, infrastructure · 1/9 pts
    Low flood risk; water supply is partly piped, partly tankers; noise is manageable.
  • +
    Legal, title & approvals · 1/5 pts
    Registered with Karnataka RERA; no court cases reported; land title not yet verified by us, so get a lawyer to check. The due-diligence report below flags 1 item in red.
  • •
    Expected price growth (5-yr CAGR model) · 6/26 pts
    We expect prices here to rise about 10.6% a year for the next 5 years (explained below).
Why prices should grow ~10.6% a year for the next 5 years

We build the forecast step by step, starting from what Bengaluru homes normally do and adjusting for this area and this project:

  1. + 6.0%Start with 6.0% a year: the normal long-run growth of Bengaluru home prices.
  2. + 0.8%Add 0.8%: prices here rose 11.1% a year recently (2023-06 to 2026-06). Some of that pace continues, but it fades each year.
  3. + 0.0%Prices are still affordable enough that this does not slow growth.
  4. + 1.6%Add 1.6%: 3 million sq ft of new offices nearby means more people wanting homes here.
  5. + 0.5%Add 0.5%: few unsold homes in the area (13 months of stock), so sellers have the upper hand.
  6. + 0.2%Add 0.2% for new roads, metro and water lines, weighted by how likely they are to actually finish: Phase 3 (Orange/Red lines: JP Nagar–Kempapura, Hosahalli–Kadabagere) (construction, 2029); Bengaluru suburban rail (K-RIDE) (construction, 2029).
  7. + 1.5%No extra project-level adjustment.
  8. = 10.6%Result: about 10.6% a year, so a home worth ₹24.2 L today would be worth about ₹40.0 L in 5 years. We are 56% confident in the evidence behind this.

Highlights

  • KNS Infrastructure · Mysore Road / RR Nagar / Kengeri · unit count not filed
  • Marked completed on RERA (completion date 2028-04-30)
  • No litigation declared · 0 complaints on this registration

Assumptions editable

Purchase

₹/sq ft
₹ Cr
sq ft
% of base
%
%
%
₹/sq ft

FinancingLoan 75% · cash 25% · EMI ₹15,734/mo

% loan
% p.a.
years
%

Rent & running costs

₹/sq ft/mo
% of rent
% of value

Interiors & exit

%
%
years
% p.a. (blank = model)
%
%

Returns over 8 years · no interiors

Cash you put in₹21.9 L
Exit value (yr 8)₹52.4 L
Net sale after loan & costs₹37.3 L
Net rent after opex₹-79,446
Loan (75% of price)₹18.1 L
EMI / month₹15,734
Year 0: ₹-8.0 L0Year 1: ₹-2.0 L1Year 2: ₹-2.0 L2Year 3: ₹-2.0 L3Year 4: ₹-2.0 L4Year 5: ₹-2.0 L5Year 6: ₹-2.0 L6Year 7: ₹-2.0 L7Year 8: ₹35.2 L8
YearPurchaseLoan inRent (net of vacancy)OpexDebt serviceSale − loanNet cash
Today-26.1 L18.1 L0.0 L0.0 L0.0 L0.0 L-8.0 L
Yr 10.0 L0.0 L0.0 L-0.1 L-1.9 L0.0 L-2.0 L
Yr 20.0 L0.0 L0.0 L-0.1 L-1.9 L0.0 L-2.0 L
Yr 30.0 L0.0 L0.0 L-0.1 L-1.9 L0.0 L-2.0 L
Yr 40.0 L0.0 L0.0 L-0.1 L-1.9 L0.0 L-2.0 L
Yr 50.0 L0.0 L0.0 L-0.1 L-1.9 L0.0 L-2.0 L
Yr 60.0 L0.0 L0.0 L-0.1 L-1.9 L0.0 L-2.0 L
Yr 70.0 L0.0 L0.0 L-0.1 L-1.9 L0.0 L-2.0 L
Yr 80.0 L0.0 L0.0 L-0.1 L-1.9 L37.3 L35.2 L

Pre-tax unless capital-gains tax is set. Rent enters the cash flows once. Net-wealth CAGR = (cash returned incl. sale ÷ cash put in)^(1/years) − 1. IRR uses the dated cash flows.

Score factors

Bars show points added or taken away versus the average analysed Bengaluru project (score 50).

Price vs comparables
+1.0 pts vs avg
this home 7.4/10 · Bengaluru average 6.2 · confidence 35%
₹3,950 psf vs mid comps ₹7,200 (-45%). Price is a model estimate, so this factor carries a third of its normal weight until a listed price is observed.
Rental demand & yield
−5.0 pts vs avg
this home 3.5/10 · Bengaluru average 6.0 · confidence 38%
Gross yield 0.0% (₹0 psf/month); locality rental demand 7/10.
Resale liquidity
+1.0 pts vs avg
this home 8.2/10 · Bengaluru average 7.6 · confidence 50%
Locality resale depth 7/10; ticket ₹0.24 Cr narrows the buyer pool.
Employment access
−10.0 pts vs avg
this home 0.3/10 · Bengaluru average 5.2 · confidence 85%
Drive times now (Google Maps, 2026-09-16): MG Road (CBD) 54 min, Koramangala (Forum) 55 min, Hebbal (Kirloskar) 57 min, Manyata Tech Park 65 min; 0 of 7 major hubs within 30 min; 3 msf office pipeline (3 yr).
Metro, bus, rail & airport
+3.8 pts vs avg
this home 6.9/10 · Bengaluru average 4.8 · confidence 60%
Purple Line Kengeri / RR Nagar / Mysore Road; no planned station within 2 km; airport ~111 min by road now (Google Maps); .
Schools, hospitals, daily needs
+0.5 pts vs avg
this home 7.5/10 · Bengaluru average 7.0 · confidence 50%
Locality social-infrastructure index (interim, expert-set; POI distances pending Maps integration).
Builder delivery & handover risk
+7.9 pts vs avg
this home 6.8/10 · Bengaluru average 3.7 · confidence 60%
KNS Infrastructure: 23+ projects, on-time 84% (derived); ready.
Layout, size, age, amenities, maintenance
−0.4 pts vs avg
this home 7.0/10 · Bengaluru average 7.3 · confidence 50%
60 units/acre; carpet/SBA ~72%; maintenance ~₹3.5 psf/month (assumed).
Water, flooding, noise, infrastructure
+1.0 pts vs avg
this home 6.3/10 · Bengaluru average 5.8 · confidence 50%
Vrishabhavathi valley pockets flood; metro and NICE road access
Legal, title & approvals
+1.3 pts vs avg
this home 8.0/10 · Bengaluru average 7.4 · confidence 55%
RERA registered; litigation: none reported; approvals: Plan No.BDA/TPM/PRL-37/22/2022-23, dated 2023-04-03; title: not verified. Due-diligence report lists 1 red flag (−0.8 pts).
Expected price growth (5-yr CAGR model)
+6.1 pts vs avg
this home 6.9/10 · Bengaluru average 6.0 · confidence 56%
Model 5-yr price CAGR 10.6% (range 7.1–14.1%).

Price growth model, year by year

Nominal growth per year. Parts add up; momentum fades, infrastructure is weighted by delivery probability and dated.

ComponentYr 1Yr 2Yr 3Yr 4Yr 5Yr 6Confidence
Bengaluru long-run nominal trend6.06.06.06.06.06.080%
Locality momentum (mean-reverting)1.81.00.50.30.20.145%
Affordability ceiling0.00.00.00.00.00.060%
Employment access & office pipeline1.61.61.61.61.61.655%
Supply–demand balance0.80.60.50.40.30.350%
Infrastructure delivery (probability-weighted)0.00.30.30.30.00.055%
Project-specific adjustments1.51.51.51.51.51.550%
Total growth11.7%11.1%10.5%10.1%9.6%9.5%56%

Bengaluru long-run nominal trend: City-wide 2013-25 nominal residential trend ≈ inflation + real income growth.

Locality momentum (mean-reverting): Trailing 3.0-yr locality CAGR 11.1% vs 6.0% trend; 35% carried forward, halving each year.

Affordability ceiling: Ticket at ₹3,950 psf vs city median ₹9,500; buyer pool thins above ₹15k/₹20k psf and after >6pp excess growth.

Employment access & office pipeline: 3 msf office pipeline (3 yr) on 10 msf stock; 30-min jobs index 0.60.

Supply–demand balance: 13 months of unsold inventory; new-launch/absorption ratio 0.86 (from 15 under-construction RERA filings in this locality: 2,487 unsold homes, 285.7 sold per month).

Infrastructure delivery (probability-weighted): Phase 3 (Orange/Red lines: JP Nagar–Kempapura, Hosahalli–Kadabagere) (construction, 2029, p=0.55); Bengaluru suburban rail (K-RIDE) (construction, 2029, p=0.5)

Project-specific adjustments: Building age 0 yrs. Land in expansion corridors historically outpaces built stock; no depreciation.

Locality evidence: ₹6,700 (Jun 2023) → ₹9,200 (Jun 2026) = 11.1% p.a. Sources: Platform estimate (interim, not observed).

Financial & legal due diligence

What the public record says

Automated from the Karnataka RERA file PRM/KA/RERA/1251/310/PR/220623/006012 and 3 quarterly filings. Prices and rents are locality estimates, not verified listings. Compiled Sep 2026 from the Karnataka RERA file, company registers, rating agencies, tribunal records and press. Facts only; anything that deserves a written answer before signing is flagged.

Delivery timeline8/10
delivered on the original registration
Legal & complaints9/10
no litigation and no complaints on the RERA file
Money to finish8/10
finance cost is 0% of the registered budget; last quarter: collected ₹0.40 cr, withdrew ₹0.19 cr
Developer strength5/10
no public credit rating for the promoter

Meters are rule-based from the RERA file and public ratings (rules shown under each), not opinions.

Registration
PRM/KA/RERA/1251/310/PR/220623/006012 · KNS PROPWORTH LLP
Delivered
RegisteredApr 2023TodaySep 2026Original completionApr 2028
Money through the RERA account
Collected ₹9.57 CrWithdrawn ₹41.82 CrQ3 2025-269.57 Cr41.82 CrCollected ₹9.32 CrWithdrawn ₹9.13 CrQ4 2025-269.32 Cr9.13 CrCollected ₹39.7 LWithdrawn ₹19.0 LQ1 2026-2739.7 L19.0 L
Collected from buyersWithdrawn for construction
Latest milestones
  • Ground Clearance/Formation Of Plots
    100%
  • Formation Of Road, Footpath
    100%
  • Construction Of Water Supply Infrastucture
    100%
  • Construction Of Sewage System Infrastuctur
    100%
  • Power Supply Work
    100%
  • Construction Of Storm Water Drainage
    100%
No litigation declaredNo complaintsEscrow: HDFCJoint-development land
Credit ratings of the people behind it

No public credit rating located for the promoter.

KNS PROPWORTH LLP: no public rating located

Complaints & disputes on record
On this project00 open
On the promoter entity0all projects
Court cases declared0no stay recorded
At a glance
Delivered

Delivered. RERA registration ran 2023-04-20 → 2028-04-30

No complaints on this project

No RERA complaints on this project; 0 on the promoter overall

No litigation declared

No litigation declared in RERA filings

The record, in pictures

RERA file · Registration

Registered project cost ₹66.86 cr — where it goes
Approvals ₹8.6 cr · 13%Construction & on-site ₹43.4 cr · 65%Other / taxes ₹14.8 cr · 22%
No litigation declaredBorrowing declared: NoEscrow at HDFC19 recorded land-owner sharesOwners’ association: not formed

Red flags to resolve in writing

1
Legal

Joint-development land: confirm which units fall in the owners’ share.

Questions to put to the developer before you sign

  1. Share the latest CA Form 4 and architect Form 5 with the escrow deposit ratio.
  2. Confirm the price list, floor-rise and other charges for the exact unit.
  3. Provide the occupancy certificate, khata and title chain for the unit.
  4. Confirm there is no litigation on the land or approvals beyond the RERA declaration.
  5. What is the land owners’ share of built area and is the unit in the developer’s share?
Full record: every filed number, line by line1 sections · 12 items

RERA file · Registration

Registration
PRM/KA/RERA/1251/310/PR/220623/006012 · promoter KNS PROPWORTH LLP (Partnership Firm) · AAS-3886
Dates
Start 2023-04-20 · original completion 2028-04-30 · no extensions
Status
Completed and occupied (per project status); RERA progress fields below are historical
Registered cost
Total ₹66.86 cr · construction ₹43.42 cr
Borrowing / mortgage declared
Borrowing: No
RERA bank account
HDFC, RICHMOND ROAD (70% construction account)
Plan sanction
No.BDA/TPM/PRL-37/22/2022-23, dated 2023-04-03 · BDA - Bangalore Development Authority
Land owners / co-promoters
M V Anjana Gowda (55.0%, Sy 16); Suma Y (55.0%, Sy 18/1); Nagamani (55.0%, Sy 18/2); Dayananda B (55.0%, Sy 18/3); Hanumanthe Gowda R B (43.5%, Sy 18/4); Vijayamma (55.0%, Sy 18/5); Vrundamma (55.0%, Sy 18/6); Thimme Gowda M V (55.0%, Sy 19/1) +11 more
Litigation declared
None declared in filings
K-RERA complaints
0 on this registration (0 open) · 0 on the promoter entity across all its projects (a project-specific LLP; group-level complaints sit under other entities)
Owners’ association
Not yet formed
Completion applied
19/12/2020

Source: Karnataka RERA project record PRM/KA/RERA/1251/310/PR/220623/006012, fetched 2026-09-15. Figures are the promoter’s own filings.

Sources & caveats2 sources
  • Karnataka RERA project record PRM/KA/RERA/1251/310/PR/220623/006012 (registration file, quarterly updates, complaint register), fetched 2026-09-15
  • PropertyLens locality model (market-level estimates)
  • Karnataka RERA project records PRM/KA/RERA/1251/310/PR/220623/006012 (registration file, quarterly updates, complaint register), fetched Sep 2026.

Caveats. Automated analysis: prices, rents and travel times are estimates until listings and Maps data are verified. RERA figures are the promoter’s own filings. Nothing here is legal, tax or investment advice.

Evidence

Location, jobs & transit3 hubs · metro walkable
Job hubs nearby
Global Village Tech ParkBidadi industrialMajestic / CBD 12 km
Measured drive times below
Office space
Existing10 msf
Coming in 3 yrs3 msf
Jobs within 30 min6/10
Getting around
Metro today
Purple Line Kengeri / RR Nagar / Mysore Road
~1,200 m estimate
Metro planned
No station planned within 2 km
Rail
—
estimate
Airport
111 min by road now · 41 km
Google Maps
Buses
7/10 coverage
estimate
Drive times to job hubs
DestinationDrive nowRoad km
MG Road (CBD)54 min19.2
Koramangala (Forum)55 min19.4
Hebbal (Kirloskar)57 min20.5
Manyata Tech Park65 min23.3
ORR Bellandur (Ecospace)74 min26.8
Electronic City Ph-174 min27.1
ITPL Whitefield90 min33.3
Kempegowda Airport (KIA)111 min41

Google Maps driving time with live traffic, measured Sep 2026. Refreshed monthly.

Location used: Google Maps match “”. Bus coverage and planned-station distances are still interim estimates.

Price historylocality 11.1%/yr

No dated project-level price series yet; only the latest observation is on file.

Locality · average ₹/sq ft
Date₹ psfSourceConfidenceKind
Jun 20215,200Platform estimate (interim, not observed)40%derived
Jun 20236,700Platform estimate (interim, not observed)45%derived
Jun 20258,200Platform estimate (interim, not observed)50%derived
Jun 20269,200Platform estimate (interim, not observed)50%derived
Luxury comps₹11,000
Premium comps₹9,200
Mid comps₹7,200
Unsold stock13 months

Model backtest on this locality: 1-yr hold-out (Jun 2025→Jun 2026): predicted ₹9,064 vs actual ₹9,200 (-1.5%). Longer 3-yr hold-out (Jun 2023→Jun 2026): predicted 9.5% p.a. vs actual 11.1% p.a. — the model is deliberately mean-reverting and under-predicted the 2021–26 boom.

Environment, legal & productflood ok · water risk · RERA yes
Flood risklow
Water supplymixed
Quietok
Roads & drainspatchy

Vrishabhavathi valley pockets flood; metro and NICE road access

Legal & approvals
Registration 006012
RERA PRM/KA/RERA/1251/310/PR/220623/006012
ready
Litigation
none reported
observed
Approvals
Plan No.BDA/TPM/PRL-37/22/2022-23, dated 2023-04-03
observed
Title
not verified
assumed
Product
Landnull acres
Homesnull
Density60/acre
Launched2023
Sources & data gapswhat we know, from where, and what is missing

Automated analysis: unit mix and carpet areas come from the RERA inventory table; prices and rents are locality-model estimates until listings are verified.

FieldValueSource classDateConf.KindConflicting values
AddressSy.Nos.15, 16, 18/1, 18/2, 18/3, 18/4, 18/5, 18/6, 19/1, 19/2, 20/1, 20/2, 20/3(P), 20/4(P), 21, 22, 23/1, 23/2, 28, 29/1, 29/2, 30/1, 30/2, , 31/1, 31/2, 31/3, 31/4, 32 & 33 OF M KRISHNASAGARA VILLAGE, KENGERI HOBLI, BANGALORE SOUTH TALUK, BANGALORE URBAN DISTRICT.Karnataka RERA (number as reported; registry lookup pending)Sep 202680%observed
Land area (acres)Platform estimate (interim, not observed)Sep 202620%assumed
Total unitsPlatform estimate (interim, not observed)Sep 202620%assumed
Launch year2023Karnataka RERA (number as reported; registry lookup pending)Sep 202670%observed
Possession · Registration 0060122028-04-30Karnataka RERA (number as reported; registry lookup pending)Sep 202670%observed
Price psf · Plot · 600 sq ft3950Platform estimate (interim, not observed)Sep 202635%assumed
Ticket · Plot · 600 sq ft2370000Platform estimate (interim, not observed)Sep 202635%derived
Rent · Plot · 600 sq ft0Platform estimate (interim, not observed)Sep 202635%assumed
Carpet area600Karnataka RERA (number as reported; registry lookup pending)Sep 202660%observed
Builder on-time rate0.84Karnataka RERA (number as reported; registry lookup pending)Sep 202660%derived
Litigationnone reportedKarnataka RERA (number as reported; registry lookup pending)Sep 202670%observed
ApprovalsPlan No.BDA/TPM/PRL-37/22/2022-23, dated 2023-04-03Karnataka RERA (number as reported; registry lookup pending)Sep 202660%observed

Commercial listing portals are shown as “Listing portal (aggregated)”; full provenance is retained internally. Official developer and Karnataka RERA sources are named.

Other projects worth comparing

Same model, same date. Scores are out of 100, where 50 is the average analysed Bengaluru project.

Questions people ask about KNS Ananta

Is KNS Ananta a good investment?

On PropertyLens's evidence-based model KNS Ananta scores 57/100, above the average analysed Bengaluru project (50 = average, 12 points = one standard deviation). The model projects price growth of about 10.6% a year over five years and a net-wealth CAGR of 6.2% after every cost on an 8-year hold with a 75.0% loan. That is research on public filings, not advice; the factor breakdown on this page shows what drives the score.

What is the price per sq ft at KNS Ananta?

About ₹3,950 per sq ft of super built-up area, a model estimate from Mysore Road / RR Nagar / Kengeri comparables that you can edit. The Plot home costs about ₹23.7 L before other charges, GST and stamp duty, and ₹26.0 L all-in.

When is KNS Ananta ready for possession?

The project is marked ready to move in; confirm the occupancy certificate before paying.

Is KNS Ananta RERA registered?

Yes. Karnataka RERA registration: PRM/KA/RERA/1251/310/PR/220623/006012. No complaints on this registration at K-RERA as of 2026-09-15.

How reliable is KNS Infrastructure on delivery?

84% of KNS Infrastructure's crawled Bengaluru registrations needed no extension (20 of 23 crawled Bengaluru registrations needed no extension). 23 registrations analysed. The developer scorecard compares this with every other Bengaluru developer.

What rent can KNS Ananta earn?

Plots earn no rent; the return is price growth alone.

Answers are generated from the filings and the model for this home and change when you edit the assumptions above. See the KNS Infrastructure scorecard and the Mysore Road / RR Nagar / Kengeri area page.

Go deeper

Share on WhatsApp