Mayfair Housing · Vasai / Virar / Naigaon

Mayfair Virar Gardens Cluster-VI

Vasai, Palghar, 401303
Handover Jun 2028 · no rent beforeapartment · midRERA registered+ CompareFull report ↗
1 · Which home?
2 · Which exit plan?

Score, growth and returns below are for the highlighted home and plan. Prices, rent and possession never mix across phases.

29
Investment score
29/100
Evidence confidence55%
2 BHK · ~650 sq ft carpet (assumed)
Price growth per year, next 5 yrs model
7.1%
likely range 3.6%–10.6% · over 10 yrs 7.2%/yr
Net-wealth CAGR, 8-yr hold
0.4%
your cash in → cash back incl. sale, per year
Cash-flow IRR, 8-yr hold
0.6%
with 75% loan · all-cash 4.9% · with interiors
Three numbers, three questions. Price growth: what will the home be worth? Net-wealth CAGR: what will my money have earned after every cost? Cash-flow IRR: the same, but counting when each rupee moves. Tap i on any of them.
Price · edit here or below assumed
₹Cr
₹ psf × 650 sq ft · as of Nov 2026
Price edits apply to ·
All-in cost
₹45.5 L
+ other charges 1.1 L, GST 1.7 L, stamp/reg 2.4 L, interiors 7.8 L
Gross rental yield assumed
3.2%
rent starts in ~2.1 yr

All-in cost sheet this home, default assumptions

ItemBasisAmount
Base price₹5,000 per sq ft × 650 sq ft carpet32.5 L
Other charges3.5% of base: floor-rise, preferred-location, car park, club, maintenance deposit, legal, corpus (edit in Assumptions)1.1 L
GST5.0% on an under-construction home1.7 L
Stamp duty and registration7.2% in Maharashtra: 6% stamp duty including 1% metro cess inside BMC limits (7% in Thane, Navi Mumbai and other corporations), plus 1% registration capped at ₹30,0002.4 L
Interiors₹1,200 per sq ft, needed before the home can be let7.8 L
All-in costwhat leaves your pocket and the bank's, before rent or resale₹45.5 L
Your own money75.0% loan at 8.5% for 20 years covers the rest; EMI 0.2 L a month₹32.8 L

Prices here are per sq ft of RERA carpet area (650 sq ft), the way homes are sold in Mumbai; there is no super built-up loading to discount. Every percentage above is editable in Assumptions; the defaults are Maharashtra rates as of 2026.

In plain words

Why 29 out of 100

Each home is marked on 11 things a careful buyer checks, then compared with every project we analyse in Mumbai: 50 is the average project, 62 beats about five in six. Here is what lifts this one and what drags it:

  • +
    Legal, title & approvals · 0/8 pts
    Registered with MahaRERA; court cases not disclosed on the public register; land title not yet verified by us, so get a lawyer to check. The due-diligence report below flags 0 items in red.
  • +
    Price vs comparables · -0/3 pts
    Priced about the same as similar mid homes nearby (₹5,000 vs ~₹5,300 per sq ft).
  • +
    Rental demand & yield · -0/7 pts
    Rent pays back 3.2% of the price every year, close to the usual 2.8% in Mumbai. Tenant demand here is decent.
  • −
    Employment access · -8/11 pts
    Drive times right now: Malad Mindspace 80 min, Thane (Wagle Estate) 84 min, Andheri SEEPZ 97 min; Nariman Point 153 min. About 1 million sq ft of new offices are planned nearby in 3 years.
  • −
    Schools, hospitals, daily needs · -1/2 pts
    Schools, hospitals and daily shopping are good in this area.
  • −
    Metro, bus, rail & airport · -5/8 pts
    No working metro nearby (nearest 15 km). Airport is about 154 minutes by road right now.
All 11 checks
  • •
    Price vs comparables · -0/3 pts
    Priced about the same as similar mid homes nearby (₹5,000 vs ~₹5,300 per sq ft).
  • •
    Rental demand & yield · -0/7 pts
    Rent pays back 3.2% of the price every year, close to the usual 2.8% in Mumbai. Tenant demand here is decent.
  • •
    Resale liquidity · -2/4 pts
    Plenty of buyers can afford a ₹32.5 L home, and homes in Vasai / Virar / Naigaon take time to resell. Reselling before handover needs the builder’s permission.
  • −
    Employment access · -8/11 pts
    Drive times right now: Malad Mindspace 80 min, Thane (Wagle Estate) 84 min, Andheri SEEPZ 97 min; Nariman Point 153 min. About 1 million sq ft of new offices are planned nearby in 3 years.
  • −
    Metro, bus, rail & airport · -5/8 pts
    No working metro nearby (nearest 15 km). Airport is about 154 minutes by road right now.
  • •
    Schools, hospitals, daily needs · -1/2 pts
    Schools, hospitals and daily shopping are good in this area.
  • •
    Builder delivery & handover risk · -1/11 pts
    Mayfair Housing has finished 10+ projects and delivered on time about 83% of the time. This phase is still under construction, with handover promised for 2028-06-30: delays would push your rent start back.
  • +
    Layout, size, age, amenities, maintenance · -0/2 pts
    Moderately dense layout (60 homes per acre); about 100% of the area you pay for is usable carpet area. Maintenance ~₹3.5 per sq ft a month.
  • •
    Water, flooding, noise, infrastructure · -2/8 pts
    Some flood risk in heavy rain; water supply is mostly borewell or tankers; noise is manageable.
  • •
    Legal, title & approvals · 0/8 pts
    Registered with MahaRERA; court cases not disclosed on the public register; land title not yet verified by us, so get a lawyer to check. The due-diligence report below flags 0 items in red.
  • −
    Expected price growth (5-yr CAGR model) · -2/43 pts
    We expect prices here to rise about 7.1% a year for the next 5 years (explained below).
Why prices should grow ~7.1% a year for the next 5 years

We build the forecast step by step, starting from what Mumbai homes normally do and adjusting for this area and this project:

  1. + 5.5%Start with 5.5% a year: the normal long-run growth of Mumbai home prices.
  2. + 0.2%Add 0.2%: prices here rose 7.1% a year recently (2023-06 to 2026-06). Some of that pace continues, but it fades each year.
  3. + 0.0%Prices are still affordable enough that this does not slow growth.
  4. + 2.2%Add 2.2%: 1 million sq ft of new offices nearby means more people wanting homes here.
  5. − 1.7%Subtract 1.7%: many new homes are being built here (30 months of unsold stock), which keeps prices in check.
  6. + 0.0%Add 0.0% for new roads, metro and water lines, weighted by how likely they are to actually finish: Virar–Alibaug multimodal corridor (planned, 2031).
  7. + 0.8%Add 0.8% for this project itself: unfinished homes are worth more once they are complete.
  8. = 7.1%Result: about 7.1% a year, so a home worth ₹33.6 L today would be worth about ₹47.4 L in 5 years. We are 56% confident in the evidence behind this.

Which exit suits you?

For an unfinished flat the answer depends on whether you sell at handover or hold, and whether you spend on interiors. Same price, same loan; only the strategy changes:

StrategyHoldIRR / yrWealth CAGR / yrCash you put inNet rentNet saleApply
Sell at handover, no interiors
Take delivery in 2028-06-30 and sell the bare flat (2 yr hold). Needs builder NOC or registration first; no rent.
2 yrs-17.8%-12.8%₹8.1 L₹-17,566₹12.1 L
Hold bare, rent unfurnished best IRR
Skip interiors; rent 12% lower than a fitted home; sell after 8 yrs with no interiors value.
8 yrs4.7%3.1%₹25.5 L₹2.7 L₹34.7 L
Hold, do interiors, rent & sell fitted selected
Spend ₹1,200/sq ft on interiors, earn full rent, recover ~40% of interiors cost at sale (fading over 10 yrs).
8 yrs0.6%0.4%₹32.8 L₹3.4 L₹35.9 L

IRR and CAGR are per year over the hold shown. A short hold can show a high IRR on a small absolute gain; compare the net-sale column too. Selling before registration usually needs the builder’s transfer NOC and a fee.

Highlights

  • Mayfair Housing · Vasai / Virar / Naigaon · unit count not on the public register
  • Under construction: progress not on the public register, MahaRERA completion 2028-06-30
  • Registered with MahaRERA as P99000046231

Assumptions editable

Purchase

₹/sq ft
₹ Cr
sq ft
% of base
%
%
%
₹/sq ft

FinancingLoan 75% · cash 25% · EMI ₹22,988/mo

% loan
% p.a.
years
%

Rent & running costs

₹
% p.a.
%
months
months
₹/sq ft/mo
% of rent
% of rent
% of value

Interiors & exit

%
%
years
% p.a. (blank = model)
%
%

Returns over 8 years · with interiors

Cash you put in₹32.8 L
Exit value (yr 8)₹58.3 L
Net sale after loan & costs₹35.9 L
Net rent after opex₹3.4 L
Loan (75% of price)₹26.5 L
EMI / month₹22,988
Year 0: ₹-3.4 L0Year 1: ₹-4.7 L1Year 2: ₹-13.7 L2Year 3: ₹-2.3 L3Year 4: ₹-2.2 L4Year 5: ₹-2.2 L5Year 6: ₹-2.1 L6Year 7: ₹-2.1 L7Year 8: ₹33.8 L8
YearPurchaseLoan inRent (net of vacancy)OpexDebt serviceSale − loanNet cash
Today-6.1 L2.6 L0.0 L0.0 L0.0 L0.0 L-3.4 L
Yr 1-15.9 L11.9 L0.0 L0.0 L-0.7 L0.0 L-4.7 L
Yr 2-23.7 L11.9 L0.0 L-0.2 L-1.7 L0.0 L-13.7 L
Yr 30.0 L0.0 L0.9 L-0.5 L-2.8 L0.0 L-2.3 L
Yr 40.0 L0.0 L1.1 L-0.5 L-2.8 L0.0 L-2.2 L
Yr 50.0 L0.0 L1.1 L-0.5 L-2.8 L0.0 L-2.2 L
Yr 60.0 L0.0 L1.2 L-0.6 L-2.8 L0.0 L-2.1 L
Yr 70.0 L0.0 L1.2 L-0.6 L-2.8 L0.0 L-2.1 L
Yr 80.0 L0.0 L1.3 L-0.6 L-2.8 L35.9 L33.8 L

Pre-tax unless capital-gains tax is set. Rent enters the cash flows once. Net-wealth CAGR = (cash returned incl. sale ÷ cash put in)^(1/years) − 1. IRR uses the dated cash flows.

Score factors

Bars show points added or taken away versus the average analysed Mumbai project (score 50).

Price vs comparables
−0.0 pts vs avg
this home 5.9/10 · Mumbai average 6.0 · confidence 30%
₹5,000 psf vs mid comps ₹5,300 (-6%; under-construction should price ~8% below ready). Price is a model estimate, so this factor carries a third of its normal weight until a listed price is observed.
Rental demand & yield
−0.2 pts vs avg
this home 6.1/10 · Mumbai average 6.2 · confidence 34%
Gross yield 3.3% (₹14 psf/month); locality rental demand 6/10.
Resale liquidity
−1.7 pts vs avg
this home 6.4/10 · Mumbai average 7.4 · confidence 50%
Locality resale depth 6/10; ticket ₹0.33 Cr narrows the buyer pool; UC resale needs builder NOC.
Employment access
−8.2 pts vs avg
this home 0.1/10 · Mumbai average 4.4 · confidence 85%
Drive times now (Google Maps, 2026-11-11): Malad Mindspace 80 min, Thane (Wagle Estate) 84 min, Andheri SEEPZ 97 min, Powai (Hiranandani) 102 min; 0 of 7 major hubs within 30 min; 1 msf office pipeline (3 yr).
Metro, bus, rail & airport
−4.5 pts vs avg
this home 2.7/10 · Mumbai average 5.5 · confidence 60%
none; no planned station within 2 km; airport ~154 min by road now (Google Maps); .
Schools, hospitals, daily needs
−1.3 pts vs avg
this home 6.5/10 · Mumbai average 7.8 · confidence 50%
Locality social-infrastructure index (interim, expert-set; POI distances pending Maps integration).
Builder delivery & handover risk
−1.0 pts vs avg
this home 5.0/10 · Mumbai average 5.5 · confidence 60%
Mayfair Housing: 10+ projects, on-time 83% (derived); handover 2028-06-30 (reported); within the RERA timeline.
Layout, size, age, amenities, maintenance
−0.1 pts vs avg
this home 7.8/10 · Mumbai average 7.9 · confidence 50%
60 units/acre; carpet/SBA ~100%; maintenance ~₹3.5 psf/month (assumed).
Water, flooding, noise, infrastructure
−2.4 pts vs avg
this home 4.6/10 · Mumbai average 5.8 · confidence 50%
Water scarcity and monsoon flooding; long rail commutes
Legal, title & approvals
+0.2 pts vs avg
this home 6.0/10 · Mumbai average 5.9 · confidence 55%
RERA registered; litigation: not published on the public register; approvals: MahaRERA registered; title: not verified. Due-diligence report lists 0 red flags (−0.0 pts).
Expected price growth (5-yr CAGR model)
−1.9 pts vs avg
this home 2.4/10 · Mumbai average 2.7 · confidence 56%
Model 5-yr price CAGR 7.1% (range 3.6–10.6%).

Price growth model, year by year

Nominal growth per year. Parts add up; momentum fades, infrastructure is weighted by delivery probability and dated.

ComponentYr 1Yr 2Yr 3Yr 4Yr 5Yr 6Confidence
Mumbai long-run nominal trend5.55.55.55.55.55.580%
Locality momentum (mean-reverting)0.60.30.20.10.10.045%
Affordability ceiling0.00.00.00.00.00.060%
Employment access & office pipeline2.22.22.22.22.22.255%
Supply–demand balance-2.5-2.0-1.6-1.3-1.0-0.850%
Infrastructure delivery (probability-weighted)0.00.00.00.10.10.155%
Project-specific adjustments2.02.00.00.00.00.050%
Total growth7.8%8.0%6.3%6.6%6.8%7.0%56%

Mumbai long-run nominal trend: City-wide 2013-25 nominal residential trend ≈ inflation + real income growth.

Locality momentum (mean-reverting): Trailing 3.0-yr locality CAGR 7.1% vs 5.5% trend; 35% carried forward, halving each year.

Affordability ceiling: Ticket at ₹5,000 psf vs city median ₹14,500; buyer pool thins above ₹15k/₹20k psf and after >6pp excess growth.

Employment access & office pipeline: 1 msf office pipeline (3 yr) on 2 msf stock; 30-min jobs index 0.30.

Supply–demand balance: 30 months of unsold inventory; new-launch/absorption ratio 1.5.

Infrastructure delivery (probability-weighted): Virar–Alibaug multimodal corridor (planned, 2031, p=0.35)

Project-specific adjustments: Remaining construction risk (44% work left) re-rates toward ready comps by handover (~3.5% over 1.8 yr).

Locality evidence: ₹5,700 (Jun 2023) → ₹7,000 (Jun 2026) = 7.1% p.a. Sources: Platform estimate (interim, not observed).

Financial & legal due diligence

What the public record says

Automated from MahaRERA's public register entry and registration certificate for P99000046231. Prices and rents are locality estimates, not verified listings. Compiled Nov 2026 from the MahaRERA file, company registers, rating agencies, tribunal records and press. Facts only; anything that deserves a written answer before signing is flagged.

Delivery timeline9/10
no extensions, no overdue dates on the RERA file
Legal & complaints9/10
no litigation and no complaints on the RERA file
Money to finish8/10
Developer strength5/10
no public credit rating for the promoter

Meters are rule-based from the RERA file and public ratings (rules shown under each), not opinions.

Registration
P99000046231 · MAYFAIR HOUSING
On original date
RegisteredJun 2022TodaySep 2026Original completionJun 2028
No litigation declaredNo complaints
Credit ratings of the people behind it

No public credit rating located for the promoter.

MAYFAIR HOUSING: credit rating not yet checked by PropertyLens

Complaints & disputes on record
On this project00 open
On the promoter entity0all projects
Court cases declared0no stay recorded
At a glance
On its original RERA date

On its original RERA completion date: 2028-06-30

No complaints on this project

No RERA complaints on this project; 0 on the promoter overall

No litigation declared

No litigation declared in RERA filings

The record, in pictures

RERA file · Registration

No litigation declaredBorrowing declared: not stated

Red flags to resolve in writing

Questions to put to the developer before you sign

  1. Share the latest quarterly progress filing and the architect and engineer certificates.
  2. Confirm the price list, floor-rise, parking and other charges for the exact unit.
  3. Which date is contractual, 2028-06-30 or the agreement's, and what is the delay compensation?
  4. Confirm there is no litigation on the land or approvals beyond the RERA declaration.
  5. Is the land owned by the promoter, or is this a joint development, and is any part mortgaged?
Full record: every filed number, line by line1 sections · 3 items

RERA file · Registration

Registration
P99000046231 · promoter MAYFAIR HOUSING
Dates
Start 2022-06-20 · original completion 2028-06-30 · no extensions
Litigation declared
None declared in filings

Source: MahaRERA project record P99000046231, fetched 2026-11-10. Figures are the promoter’s own filings.

Sources & caveats2 sources
  • MahaRERA project record P99000046231, fetched 2026-11-10
  • PropertyLens Mumbai locality model (market-level estimates)
  • MahaRERA project records P99000046231 (registration file, quarterly updates, complaint register), fetched Sep 2026.

Caveats. Automated analysis: prices, rents and travel times are estimates until listings and Maps data are verified. RERA figures are the promoter’s own filings. Nothing here is legal, tax or investment advice.

Evidence

Location, jobs & transit2 hubs · metro none nearby
Job hubs nearby
Borivali 25 kmVasai industrial
Measured drive times below
Office space
Existing2 msf
Coming in 3 yrs1 msf
Jobs within 30 min3/10
Getting around
Metro today
none
none within 5 km
Metro planned
No station planned within 2 km
Rail
—
estimate
Airport
154 min by road now · 57.6 km
Google Maps
Buses
7/10 coverage
estimate
Drive times to job hubs
DestinationDrive nowRoad km
Malad Mindspace80 min29.3
Thane (Wagle Estate)84 min30.9
Andheri SEEPZ97 min35.8
Powai (Hiranandani)102 min37.7
BKC114 min42.3
Lower Parel133 min49.7
Nariman Point153 min57.3
Navi Mumbai Airport154 min57.6

Google Maps driving time with live traffic, measured Nov 2026. Refreshed monthly.

Location used: Google Maps match “”. Bus coverage and planned-station distances are still interim estimates.

Price historylocality 7.1%/yr

No dated project-level price series yet; only the latest observation is on file.

Locality · average ₹/sq ft
Date₹ psfSourceConfidenceKind
Jun 20215,200Platform estimate (interim, not observed)40%derived
Jun 20235,700Platform estimate (interim, not observed)45%derived
Jun 20256,500Platform estimate (interim, not observed)50%derived
Jun 20267,000Platform estimate (interim, not observed)50%derived
Luxury comps₹8,500
Premium comps₹6,800
Mid comps₹5,300
Unsold stock30 months

Model backtest on this locality: 1-yr hold-out (Jun 2025→Jun 2026): predicted ₹6,845 vs actual ₹7,000 (-2.2%). Longer 3-yr hold-out (Jun 2023→Jun 2026): predicted 5.5% p.a. vs actual 7.1% p.a. — the model is deliberately mean-reverting and under-predicted the 2021–26 boom.

Environment, legal & productflood ok · water risk · RERA yes
Flood risksome risk
Water supplytankers/borewell
Quietok
Roads & drainspatchy

Water scarcity and monsoon flooding; long rail commutes

Legal & approvals
Registration P99000046231
RERA P99000046231
possession Jun 2028
Litigation
not published on the public register
assumed
Approvals
MahaRERA registered
observed
Title
not verified
assumed
Product
Landnot filed
Homesnot filed
Densitynot filed
Launched2022
Sources & data gapswhat we know, from where, and what is missing

Automated analysis from MahaRERA's public register: unit sizes and prices are locality-model estimates until listings are verified.

FieldValueSource classDateConf.KindConflicting values
AddressVasai, Palghar, 401303MahaRERANov 202670%observed
Land area (acres)Platform estimate (interim, not observed)Nov 202620%assumed
Total unitsPlatform estimate (interim, not observed)Nov 202620%assumed
Launch year2022MahaRERANov 202670%observed
Possession · Registration P990000462312028-06-30MahaRERANov 202670%observed
Price psf · 2 BHK · ~650 sq ft carpet (assumed)5000Platform estimate (interim, not observed)Nov 202630%assumed
Ticket · 2 BHK · ~650 sq ft carpet (assumed)3250000Platform estimate (interim, not observed)Nov 202630%derived
Rent · 2 BHK · ~650 sq ft carpet (assumed)9000Platform estimate (interim, not observed)Nov 202630%assumed
Carpet area650Platform estimate (interim, not observed)Nov 202630%assumed
Builder on-time rate0.83MahaRERANov 202660%derived
Litigationnot published on the public registerMahaRERANov 202630%assumed
ApprovalsMahaRERA registeredMahaRERANov 202660%observed

Commercial listing portals are shown as “Listing portal (aggregated)”; full provenance is retained internally. Official developer and MahaRERA sources are named.

Other projects worth comparing

Same model, same date. Scores are out of 100, where 50 is the average analysed Mumbai project.

Questions people ask about Mayfair Virar Gardens Cluster-VI

Is Mayfair Virar Gardens Cluster-VI a good investment?

On PropertyLens's evidence-based model Mayfair Virar Gardens Cluster-VI scores 29/100, well below the average analysed Mumbai project (50 = average, 12 points = one standard deviation). The model projects price growth of about 7.1% a year over five years and a net-wealth CAGR of 0.4% after every cost on an 8-year hold with a 75.0% loan. That is research on public filings, not advice; the factor breakdown on this page shows what drives the score.

What is the price per sq ft at Mayfair Virar Gardens Cluster-VI?

About ₹5,000 per sq ft of super built-up area, a model estimate from Vasai / Virar / Naigaon comparables that you can edit. The 2 BHK home costs about ₹32.5 L before other charges, GST and stamp duty, and ₹45.5 L all-in.

When is Mayfair Virar Gardens Cluster-VI ready for possession?

The RERA registration commits to Jun 2028.

Is Mayfair Virar Gardens Cluster-VI RERA registered?

Yes. MahaRERA registration: P99000046231. No complaints on this registration at MahaRERA as of 2026-11-10.

How reliable is Mayfair Housing on delivery?

83% of Mayfair Housing's crawled Mumbai registrations needed no extension (9 of 10 analysed Mumbai registrations needed no extension). 10 registrations analysed. The developer scorecard compares this with every other Mumbai developer.

What rent can Mayfair Virar Gardens Cluster-VI earn?

About ₹9,000 a month for this home (a model estimate from Vasai / Virar / Naigaon rents), a gross yield of 3.2% on the all-in cost. Nothing is earned before handover. Rent covers 39% of the EMI at the default loan.

Answers are generated from the filings and the model for this home and change when you edit the assumptions above. See the Mayfair Housing scorecard and the Vasai / Virar / Naigaon area page.

Go deeper

Share on WhatsApp