Raheja Modern Vivarea South Tower
Score, growth and returns below are for the highlighted home and plan. Prices, rent and possession never mix across phases.
Price edits apply to ·
All-in cost sheet this home, default assumptions
| Item | Basis | Amount |
|---|---|---|
| Base price | ₹44,500 per sq ft × 650 sq ft carpet | 2.89 Cr |
| Other charges | 3.5% of base: floor-rise, preferred-location, car park, club, maintenance deposit, legal, corpus (edit in Assumptions) | 10.1 L |
| GST | 5.0% on an under-construction home | 15.0 L |
| Stamp duty and registration | 6.2% in Maharashtra: 6% stamp duty including 1% metro cess inside BMC limits (7% in Thane, Navi Mumbai and other corporations), plus 1% registration capped at ₹30,000 | 18.6 L |
| Interiors | ₹1,200 per sq ft, needed before the home can be let | 7.8 L |
| All-in cost | what leaves your pocket and the bank's, before rent or resale | ₹3.41 Cr |
| Your own money | 75.0% loan at 8.5% for 20 years covers the rest; EMI 2.0 L a month | ₹2.30 Cr |
Prices here are per sq ft of RERA carpet area (650 sq ft), the way homes are sold in Mumbai; there is no super built-up loading to discount. Every percentage above is editable in Assumptions; the defaults are Maharashtra rates as of 2026.
In plain words
Each home is marked on 11 things a careful buyer checks, then compared with every project we analyse in Mumbai: 50 is the average project, 62 beats about five in six. Here is what lifts this one and what drags it:
- +Employment access · 8/11 pts
Drive times right now: Lower Parel 8 min, BKC 25 min, Nariman Point 25 min; Thane (Wagle Estate) 72 min. About 5 million sq ft of new offices are planned nearby in 3 years. - +Schools, hospitals, daily needs · 1/2 pts
Schools, hospitals and daily shopping are excellent in this area. - +Metro, bus, rail & airport · 2/8 pts
The nearest working metro is ~1.5 km away; Wadala (Line 4) is planned for ~2027. Airport is about 66 minutes by road right now. - −Resale liquidity · -1/4 pts
Plenty of buyers can afford a ₹2.89 Cr home, and homes in Byculla / Parel / Sewri / Wadala resell at a normal pace. Reselling before handover needs the builder’s permission. - −Rental demand & yield · -2/7 pts
Rent pays back 2.3% of the price every year, well below the usual 2.8% in Mumbai. Tenant demand here is very strong. - −Expected price growth (5-yr CAGR model) · -8/43 pts
We expect prices here to rise about 6.4% a year for the next 5 years (explained below).
All 11 checks
- •Price vs comparables · -0/3 pts
Priced about the same as similar luxury homes nearby (₹44,500 vs ~₹45,100 per sq ft). - •Rental demand & yield · -2/7 pts
Rent pays back 2.3% of the price every year, well below the usual 2.8% in Mumbai. Tenant demand here is very strong. - •Resale liquidity · -1/4 pts
Plenty of buyers can afford a ₹2.89 Cr home, and homes in Byculla / Parel / Sewri / Wadala resell at a normal pace. Reselling before handover needs the builder’s permission. - +Employment access · 8/11 pts
Drive times right now: Lower Parel 8 min, BKC 25 min, Nariman Point 25 min; Thane (Wagle Estate) 72 min. About 5 million sq ft of new offices are planned nearby in 3 years. - •Metro, bus, rail & airport · 2/8 pts
The nearest working metro is ~1.5 km away; Wadala (Line 4) is planned for ~2027. Airport is about 66 minutes by road right now. - +Schools, hospitals, daily needs · 1/2 pts
Schools, hospitals and daily shopping are excellent in this area. - •Builder delivery & handover risk · 1/11 pts
K Raheja Corp has finished 11+ projects and delivered on time about 91% of the time. This phase is still under construction, with handover promised for 2028-09-30: delays would push your rent start back. - +Layout, size, age, amenities, maintenance · 0/2 pts
Moderately dense layout (60 homes per acre); about 100% of the area you pay for is usable carpet area. Maintenance ~₹7 per sq ft a month. - •Water, flooding, noise, infrastructure · 1/8 pts
Some flood risk in heavy rain; water supply is reliable piped supply; noticeable traffic or aircraft noise. - •Legal, title & approvals · 0/8 pts
Registered with MahaRERA; court cases not disclosed on the public register; land title not yet verified by us, so get a lawyer to check. The due-diligence report below flags 0 items in red. - −Expected price growth (5-yr CAGR model) · -8/43 pts
We expect prices here to rise about 6.4% a year for the next 5 years (explained below).
We build the forecast step by step, starting from what Mumbai homes normally do and adjusting for this area and this project:
- + 5.5%Start with 5.5% a year: the normal long-run growth of Mumbai home prices.
- + 0.4%Add 0.4%: prices here rose 8.5% a year recently (2023-06 to 2026-06). Some of that pace continues, but it fades each year.
- − 0.9%Subtract 0.9%: at ₹44,500 per sq ft, fewer families can afford to buy here, which slows further rises.
- + 1.6%Add 1.6%: 5 million sq ft of new offices nearby means more people wanting homes here.
- − 1.3%Subtract 1.3%: many new homes are being built here (28 months of unsold stock), which keeps prices in check.
- + 0.3%Add 0.3% for new roads, metro and water lines, weighted by how likely they are to actually finish: Atal Setu trans-harbour link (Jan 2024) (operational, 2024); Metro Line 4 Wadala–Ghatkopar–Thane–Kasarvadavali (construction, 2027); Metro Line 3 (Aqua) Colaba–BKC–SEEPZ, fully open Oct 2025 (operational, 2025).
- + 0.8%Add 0.8% for this project itself: unfinished homes are worth more once they are complete.
- = 6.4%Result: about 6.4% a year, so a home worth ₹2.99 Cr today would be worth about ₹4.07 Cr in 5 years. We are 56% confident in the evidence behind this.
Which exit suits you?
For an unfinished flat the answer depends on whether you sell at handover or hold, and whether you spend on interiors. Same price, same loan; only the strategy changes:
| Strategy | Hold | IRR / yr | Wealth CAGR / yr | Cash you put in | Net rent | Net sale | Apply |
|---|---|---|---|---|---|---|---|
| Sell at handover, no interiors Take delivery in 2028-09-30 and sell the bare flat (2 yr hold). Needs builder NOC or registration first; no rent. | 2 yrs | -17.8% | -12.6% | ₹69.5 L | ₹-61,851 | ₹1.05 Cr | |
| Hold bare, rent unfurnished best IRR Skip interiors; rent 12% lower than a fitted home; sell after 8 yrs with no interiors value. | 8 yrs | 2.9% | 1.8% | ₹2.26 Cr | ₹22.2 L | ₹2.81 Cr | |
| Hold, do interiors, rent & sell fitted selected Spend ₹1,200/sq ft on interiors, earn full rent, recover ~40% of interiors cost at sale (fading over 10 yrs). | 8 yrs | 2.6% | 1.7% | ₹2.30 Cr | ₹26.4 L | ₹2.82 Cr |
IRR and CAGR are per year over the hold shown. A short hold can show a high IRR on a small absolute gain; compare the net-sale column too. Selling before registration usually needs the builder’s transfer NOC and a fee.
Highlights
- K Raheja Corp · Byculla / Parel / Sewri / Wadala · unit count not on the public register
- Under construction: progress not on the public register, MahaRERA completion 2028-09-30
- Registered with MahaRERA as P51900034288
Assumptions editable
Purchase
FinancingLoan 75% · cash 25% · EMI ₹2.0 L/mo
Rent & running costs
Interiors & exit
Returns over 8 years · with interiors
| Year | Purchase | Loan in | Rent (net of vacancy) | Opex | Debt service | Sale − loan | Net cash |
|---|---|---|---|---|---|---|---|
| Today | -51.2 L | 23.6 L | 0.0 L | 0.0 L | 0.0 L | 0.0 L | -27.6 L |
| Yr 1 | -1.41 Cr | 1.06 Cr | 0.0 L | 0.0 L | -6.5 L | 0.0 L | -41.9 L |
| Yr 2 | -1.49 Cr | 1.06 Cr | 0.0 L | -0.6 L | -15.5 L | 0.0 L | -59.3 L |
| Yr 3 | 0.0 L | 0.0 L | 4.3 L | -2.0 L | -24.6 L | 0.0 L | -22.2 L |
| Yr 4 | 0.0 L | 0.0 L | 6.8 L | -2.4 L | -24.6 L | 0.0 L | -20.1 L |
| Yr 5 | 0.0 L | 0.0 L | 7.2 L | -2.5 L | -24.6 L | 0.0 L | -19.9 L |
| Yr 6 | 0.0 L | 0.0 L | 7.5 L | -2.6 L | -24.6 L | 0.0 L | -19.6 L |
| Yr 7 | 0.0 L | 0.0 L | 7.9 L | -2.7 L | -24.6 L | 0.0 L | -19.4 L |
| Yr 8 | 0.0 L | 0.0 L | 8.3 L | -2.8 L | -24.6 L | 2.82 Cr | 2.63 Cr |
Pre-tax unless capital-gains tax is set. Rent enters the cash flows once. Net-wealth CAGR = (cash returned incl. sale ÷ cash put in)^(1/years) − 1. IRR uses the dated cash flows.
Score factors
Bars show points added or taken away versus the average analysed Mumbai project (score 50).
Price growth model, year by year
Nominal growth per year. Parts add up; momentum fades, infrastructure is weighted by delivery probability and dated.
| Component | Yr 1 | Yr 2 | Yr 3 | Yr 4 | Yr 5 | Yr 6 | Confidence |
|---|---|---|---|---|---|---|---|
| Mumbai long-run nominal trend | 5.5 | 5.5 | 5.5 | 5.5 | 5.5 | 5.5 | 80% |
| Locality momentum (mean-reverting) | 1.0 | 0.6 | 0.3 | 0.2 | 0.1 | 0.1 | 45% |
| Affordability ceiling | -1.6 | -1.1 | -0.8 | -0.5 | -0.4 | -0.3 | 60% |
| Employment access & office pipeline | 1.6 | 1.6 | 1.6 | 1.6 | 1.6 | 1.6 | 55% |
| Supply–demand balance | -2.0 | -1.6 | -1.3 | -1.0 | -0.8 | -0.7 | 50% |
| Infrastructure delivery (probability-weighted) | 0.9 | 0.6 | 0.0 | 0.0 | 0.0 | 0.0 | 55% |
| Project-specific adjustments | 2.0 | 2.0 | 0.0 | 0.0 | 0.0 | 0.0 | 50% |
| Total growth | 7.4% | 7.5% | 5.3% | 5.7% | 6.0% | 6.2% | 56% |
Mumbai long-run nominal trend: City-wide 2013-25 nominal residential trend ≈ inflation + real income growth.
Locality momentum (mean-reverting): Trailing 3.0-yr locality CAGR 8.5% vs 5.5% trend; 35% carried forward, halving each year.
Affordability ceiling: Ticket at ₹44,500 psf vs city median ₹14,500; buyer pool thins above ₹15k/₹20k psf and after >6pp excess growth.
Employment access & office pipeline: 5 msf office pipeline (3 yr) on 25 msf stock; 30-min jobs index 0.90.
Supply–demand balance: 28 months of unsold inventory; new-launch/absorption ratio 1.
Infrastructure delivery (probability-weighted): Atal Setu trans-harbour link (Jan 2024) (operational, 2024, p=1); Metro Line 4 Wadala–Ghatkopar–Thane–Kasarvadavali (construction, 2027, p=0.6); Metro Line 3 (Aqua) Colaba–BKC–SEEPZ, fully open Oct 2025 (operational, 2025, p=1)
Project-specific adjustments: Remaining construction risk (50% work left) re-rates toward ready comps by handover (~4.0% over 2.0 yr).
Locality evidence: ₹29,000 (Jun 2023) → ₹37,000 (Jun 2026) = 8.5% p.a. Sources: Platform estimate (interim, not observed).
What the public record says
Automated from MahaRERA's public register entry and registration certificate for P51900034288. Prices and rents are locality estimates, not verified listings. Compiled Nov 2026 from the MahaRERA file, company registers, rating agencies, tribunal records and press. Facts only; anything that deserves a written answer before signing is flagged.
Meters are rule-based from the RERA file and public ratings (rules shown under each), not opinions.
On its original RERA completion date: 2028-09-30
No RERA complaints on this project; 0 on the promoter overall
No litigation declared in RERA filings
RERA file · Registration
Red flags to resolve in writing
Questions to put to the developer before you sign
- Share the latest quarterly progress filing and the architect and engineer certificates.
- Confirm the price list, floor-rise, parking and other charges for the exact unit.
- Which date is contractual, 2028-09-30 or the agreement's, and what is the delay compensation?
- Confirm there is no litigation on the land or approvals beyond the RERA declaration.
- Is the land owned by the promoter, or is this a joint development, and is any part mortgaged?
Full record: every filed number, line by line1 sections · 3 items
RERA file · Registration
Source: MahaRERA project record P51900034288, fetched 2026-11-10. Figures are the promoter’s own filings.
Sources & caveats2 sources
- MahaRERA project record P51900034288, fetched 2026-11-10
- PropertyLens Mumbai locality model (market-level estimates)
- MahaRERA project records P51900034288 (registration file, quarterly updates, complaint register), fetched Sep 2026.
Caveats. Automated analysis: prices, rents and travel times are estimates until listings and Maps data are verified. RERA figures are the promoter’s own filings. Nothing here is legal, tax or investment advice.
Evidence
Location, jobs & transit3 hubs · metro 1.5 km
| Destination | Drive now | Road km |
|---|---|---|
| Lower Parel | 8 min | 1.6 |
| BKC | 25 min | 8.3 |
| Nariman Point | 25 min | 8 |
| Andheri SEEPZ | 43 min | 15 |
| Powai (Hiranandani) | 44 min | 15.2 |
| Malad Mindspace | 58 min | 20.6 |
| Navi Mumbai Airport | 66 min | 23.7 |
| Thane (Wagle Estate) | 72 min | 26.1 |
Google Maps driving time with live traffic, measured Nov 2026. Refreshed monthly.
Location used: recorded coordinates (estimate). Bus coverage and planned-station distances are still interim estimates.
Price historylocality 8.5%/yr
No dated project-level price series yet; only the latest observation is on file.
| Date | ₹ psf | Source | Confidence | Kind |
|---|---|---|---|---|
| Jun 2021 | 26,000 | Platform estimate (interim, not observed) | 40% | derived |
| Jun 2023 | 29,000 | Platform estimate (interim, not observed) | 45% | derived |
| Jun 2025 | 34,000 | Platform estimate (interim, not observed) | 50% | derived |
| Jun 2026 | 37,000 | Platform estimate (interim, not observed) | 50% | derived |
Model backtest on this locality: 1-yr hold-out (Jun 2025→Jun 2026): predicted ₹35,674 vs actual ₹37,000 (-3.6%). Longer 3-yr hold-out (Jun 2023→Jun 2026): predicted 5.3% p.a. vs actual 8.5% p.a. — the model is deliberately mean-reverting and under-predicted the 2021–26 boom.
Environment, legal & productflood ok · piped water · RERA yes
Mill and port land redevelopment; Atal Setu landfall at Sewri
Sources & data gapswhat we know, from where, and what is missing
Automated analysis from MahaRERA's public register: unit sizes and prices are locality-model estimates until listings are verified.
| Field | Value | Source class | Date | Conf. | Kind | Conflicting values |
|---|---|---|---|---|---|---|
| Address | Ward E, Mumbai City, 400011 | MahaRERA | Nov 2026 | 70% | observed | |
| Land area (acres) | Platform estimate (interim, not observed) | Nov 2026 | 20% | assumed | ||
| Total units | Platform estimate (interim, not observed) | Nov 2026 | 20% | assumed | ||
| Launch year | 2022 | MahaRERA | Nov 2026 | 70% | observed | |
| Possession · Registration P51900034288 | 2028-09-30 | MahaRERA | Nov 2026 | 70% | observed | |
| Price psf · 2 BHK · ~650 sq ft carpet (assumed) | 44500 | Platform estimate (interim, not observed) | Nov 2026 | 30% | assumed | |
| Ticket · 2 BHK · ~650 sq ft carpet (assumed) | 28925000 | Platform estimate (interim, not observed) | Nov 2026 | 30% | derived | |
| Rent · 2 BHK · ~650 sq ft carpet (assumed) | 57000 | Platform estimate (interim, not observed) | Nov 2026 | 30% | assumed | |
| Carpet area | 650 | Platform estimate (interim, not observed) | Nov 2026 | 30% | assumed | |
| Builder on-time rate | 0.91 | MahaRERA | Nov 2026 | 60% | derived | |
| Litigation | not published on the public register | MahaRERA | Nov 2026 | 30% | assumed | |
| Approvals | MahaRERA registered | MahaRERA | Nov 2026 | 60% | observed |
Commercial listing portals are shown as “Listing portal (aggregated)”; full provenance is retained internally. Official developer and MahaRERA sources are named.
Other projects worth comparing
Same model, same date. Scores are out of 100, where 50 is the average analysed Mumbai project.
More in Byculla / Parel / Sewri / Wadala All Byculla / Parel / Sewri / Wadala →
More from K Raheja Corp Delivery record →
Around ₹2.89 Cr elsewhere in Mumbai All projects →
Questions people ask about Raheja Modern Vivarea South Tower
Is Raheja Modern Vivarea South Tower a good investment?
On PropertyLens's evidence-based model Raheja Modern Vivarea South Tower scores 52/100, below the average analysed Mumbai project (50 = average, 12 points = one standard deviation). The model projects price growth of about 6.4% a year over five years and a net-wealth CAGR of 1.7% after every cost on an 8-year hold with a 75.0% loan. That is research on public filings, not advice; the factor breakdown on this page shows what drives the score.
What is the price per sq ft at Raheja Modern Vivarea South Tower?
About ₹44,500 per sq ft of super built-up area, a model estimate from Byculla / Parel / Sewri / Wadala comparables that you can edit. The 2 BHK home costs about ₹2.89 Cr before other charges, GST and stamp duty, and ₹3.41 Cr all-in.
When is Raheja Modern Vivarea South Tower ready for possession?
The RERA registration commits to Sep 2028.
Is Raheja Modern Vivarea South Tower RERA registered?
Yes. MahaRERA registration: P51900034288. No complaints on this registration at MahaRERA as of 2026-11-10.
How reliable is K Raheja Corp on delivery?
91% of K Raheja Corp's crawled Mumbai registrations needed no extension (11 of 11 analysed Mumbai registrations needed no extension). 11 registrations analysed. The developer scorecard compares this with every other Mumbai developer.
What rent can Raheja Modern Vivarea South Tower earn?
About ₹57,000 a month for this home (a model estimate from Byculla / Parel / Sewri / Wadala rents), a gross yield of 2.3% on the all-in cost. Nothing is earned before handover. Rent covers 28% of the EMI at the default loan.
Answers are generated from the filings and the model for this home and change when you edit the assumptions above. See the K Raheja Corp scorecard and the Byculla / Parel / Sewri / Wadala area page.