TVS Emerald · Outer OMR (Navalur / Siruseri / Padur / Kelambakkam)

TVS Emerald Lake Shore Club House

Construction of Ground + 2 Floors at Layout No. 187/2023, Commercial Plot comprised in S.F.No.4/1A…
Handover Jan 2026 · no rent beforeapartment · premiumRERA registered+ CompareFull report ↗
1 · Which home?
2 · Which exit plan?

Score, growth and returns below are for the highlighted home and plan. Prices, rent and possession never mix across phases.

24
Investment score
24/100
Evidence confidence55%
2 BHK · ~1,080 sq ft (assumed)
Price growth per year, next 5 yrs model
6.6%
likely range 3.1%–10.0% · over 10 yrs 6.4%/yr
Net-wealth CAGR, 8-yr hold
-0.8%
your cash in → cash back incl. sale, per year
Cash-flow IRR, 8-yr hold
-1.1%
with 75% loan · all-cash 3.7% · with interiors
Three numbers, three questions. Price growth: what will the home be worth? Net-wealth CAGR: what will my money have earned after every cost? Cash-flow IRR: the same, but counting when each rupee moves. Tap i on any of them.
Price · edit here or below assumed
₹Cr
₹ psf × 1,080 sq ft · as of Nov 2026
Price edits apply to ·
All-in cost
₹87.5 L
+ other charges 2.2 L, GST 3.3 L, stamp/reg 5.9 L, interiors 13.0 L
Gross rental yield assumed
3.2%
rent starts in ~0.3 yr

All-in cost sheet this home, default assumptions

ItemBasisAmount
Base price₹5,850 per sq ft × 1,080 sq ft super built-up63.2 L
Other charges3.5% of base: floor-rise, preferred-location, car park, club, maintenance deposit, legal, corpus (edit in Assumptions)2.2 L
GST5.0% on an under-construction home3.3 L
Stamp duty and registration9.0% in Tamil Nadu: 7% stamp duty plus 2% registration on the higher of the agreement value and the guideline value5.9 L
Interiors₹1,200 per sq ft, needed before the home can be let13.0 L
All-in costwhat leaves your pocket and the bank's, before rent or resale₹87.5 L
Your own money75.0% loan at 8.5% for 20 years covers the rest; EMI 0.4 L a month₹66.4 L

Carpet area 850 sq ft against 1,080 sq ft super built-up: you pay for 21% that is common area and walls. Price per sq ft of carpet ≈ ₹7,433. Every percentage above is editable in Assumptions; the defaults are Tamil Nadu rates as of 2026.

In plain words

Why 24 out of 100

Each home is marked on 11 things a careful buyer checks, then compared with every project we analyse in Chennai: 50 is the average project, 62 beats about five in six. Here is what lifts this one and what drags it:

  • +
    Layout, size, age, amenities, maintenance · 0/3 pts
    Moderately dense layout (60 homes per acre); about 79% of the area you pay for is usable carpet area. Maintenance ~₹5 per sq ft a month.
  • +
    Price vs comparables · -0/4 pts
    Priced about the same as similar premium homes nearby (₹5,850 vs ~₹6,200 per sq ft).
  • +
    Resale liquidity · -0/6 pts
    Plenty of buyers can afford a ₹63.2 L home, and homes in Outer OMR resell at a normal pace. Reselling before handover needs the builder’s permission.
  • −
    Employment access · -8/6 pts
    Drive times right now: SIPCOT Siruseri 14 min, OMR (Sholinganallur) 31 min, Chennai airport 54 min; Ambattur industrial estate 86 min. About 6 million sq ft of new offices are planned nearby in 3 years.
  • −
    Schools, hospitals, daily needs · -2/2 pts
    Schools, hospitals and daily shopping are good in this area.
  • −
    Metro, bus, rail & airport · -5/7 pts
    No working metro nearby (nearest 6 km). Airport is about 60 minutes by road.
All 11 checks
  • •
    Price vs comparables · -0/4 pts
    Priced about the same as similar premium homes nearby (₹5,850 vs ~₹6,200 per sq ft).
  • •
    Rental demand & yield · -1/7 pts
    Rent pays back 3.2% of the price every year, close to the usual 3% in Chennai. Tenant demand here is decent.
  • •
    Resale liquidity · -0/6 pts
    Plenty of buyers can afford a ₹63.2 L home, and homes in Outer OMR resell at a normal pace. Reselling before handover needs the builder’s permission.
  • −
    Employment access · -8/6 pts
    Drive times right now: SIPCOT Siruseri 14 min, OMR (Sholinganallur) 31 min, Chennai airport 54 min; Ambattur industrial estate 86 min. About 6 million sq ft of new offices are planned nearby in 3 years.
  • −
    Metro, bus, rail & airport · -5/7 pts
    No working metro nearby (nearest 6 km). Airport is about 60 minutes by road.
  • •
    Schools, hospitals, daily needs · -2/2 pts
    Schools, hospitals and daily shopping are good in this area.
  • −
    Builder delivery & handover risk · -0/16 pts
    TVS Emerald has finished 10+ projects and delivered on time about 91% of the time. This phase is still under construction, with handover promised for 2026-01-31: delays would push your rent start back.
  • +
    Layout, size, age, amenities, maintenance · 0/3 pts
    Moderately dense layout (60 homes per acre); about 79% of the area you pay for is usable carpet area. Maintenance ~₹5 per sq ft a month.
  • •
    Water, flooding, noise, infrastructure · -2/9 pts
    Some flood risk in heavy rain; water supply is mostly borewell or tankers; noise is manageable.
  • •
    Legal, title & approvals · -1/9 pts
    Registered with Tamil Nadu RERA; court cases not disclosed on the public register; land title not yet verified by us, so get a lawyer to check. The due-diligence report below flags 1 item in red.
  • −
    Expected price growth (5-yr CAGR model) · -6/50 pts
    We expect prices here to rise about 6.6% a year for the next 5 years (explained below).
Why prices should grow ~6.6% a year for the next 5 years

We build the forecast step by step, starting from what Chennai homes normally do and adjusting for this area and this project:

  1. + 5.0%Start with 5.0% a year: the normal long-run growth of Chennai home prices.
  2. + 0.5%Add 0.5%: prices here rose 8.6% a year recently (2023-06 to 2026-06). Some of that pace continues, but it fades each year.
  3. + 0.0%Prices are still affordable enough that this does not slow growth.
  4. + 1.5%Add 1.5%: 6 million sq ft of new offices nearby means more people wanting homes here.
  5. − 1.0%Subtract 1.0%: many new homes are being built here (26 months of unsold stock), which keeps prices in check.
  6. + 0.2%Add 0.2% for new roads, metro and water lines, weighted by how likely they are to actually finish: OMR elevated corridor and Phase 2 metro along OMR (construction, 2027); Chennai Metro Phase 2 (Corridors 3, 4, 5: Madhavaram–SIPCOT, Light House–Poonamallee, Madhavaram–Sholinganallur) (construction, 2027).
  7. + 0.4%Add 0.4% for this project itself: unfinished homes are worth more once they are complete.
  8. = 6.6%Result: about 6.6% a year, so a home worth ₹65.4 L today would be worth about ₹89.9 L in 5 years. We are 56% confident in the evidence behind this.

Which exit suits you?

For an unfinished flat the answer depends on whether you sell at handover or hold, and whether you spend on interiors. Same price, same loan; only the strategy changes:

StrategyHoldIRR / yrWealth CAGR / yrCash you put inNet rentNet saleApply
Sell at handover, no interiors
Take delivery in 2026-01-31 and sell the bare flat (1 yr hold). Needs builder NOC or registration first; no rent.
1 yrs-38.6%-38.6%₹23.3 L₹19,548₹19.5 L
Hold bare, rent unfurnished best IRR
Skip interiors; rent 12% lower than a fitted home; sell after 8 yrs with no interiors value.
8 yrs1.7%1.3%₹55.0 L₹7.0 L₹65.0 L
Hold, do interiors, rent & sell fitted selected
Spend ₹1,200/sq ft on interiors, earn full rent, recover ~40% of interiors cost at sale (fading over 10 yrs).
8 yrs-1.1%-0.8%₹66.4 L₹8.9 L₹66.0 L

IRR and CAGR are per year over the hold shown. A short hold can show a high IRR on a small absolute gain; compare the net-sale column too. Selling before registration usually needs the builder’s transfer NOC and a fee.

Highlights

  • TVS Emerald · Outer OMR (Navalur / Siruseri / Padur / Kelambakkam) · unit count not on the public register
  • Under construction: progress not on the public register, TNRERA completion 2026-01-31
  • Registered with Tamil Nadu RERA as TN/35/Building/081/2024

Assumptions editable

Purchase

₹/sq ft
₹ Cr
sq ft
% of base
%
%
%
₹/sq ft

FinancingLoan 75% · cash 25% · EMI ₹44,689/mo

% loan
% p.a.
years
%

Rent & running costs

₹
% p.a.
%
months
months
₹/sq ft/mo
% of rent
% of rent
% of value

Interiors & exit

%
%
years
% p.a. (blank = model)
%
%

Returns over 8 years · with interiors

Cash you put in₹66.4 L
Exit value (yr 8)₹1.07 Cr
Net sale after loan & costs₹66.0 L
Net rent after opex₹8.9 L
Loan (75% of price)₹51.5 L
EMI / month₹44,689
Year 0: ₹-36.3 L0Year 1: ₹-5.0 L1Year 2: ₹-4.4 L2Year 3: ₹-4.3 L3Year 4: ₹-4.2 L4Year 5: ₹-4.1 L5Year 6: ₹-4.1 L6Year 7: ₹-4.0 L7Year 8: ₹62.1 L8
YearPurchaseLoan inRent (net of vacancy)OpexDebt serviceSale − loanNet cash
Today-87.8 L51.5 L0.0 L0.0 L0.0 L0.0 L-36.3 L
Yr 10.0 L0.0 L1.3 L-1.0 L-5.4 L0.0 L-5.0 L
Yr 20.0 L0.0 L2.1 L-1.1 L-5.4 L0.0 L-4.4 L
Yr 30.0 L0.0 L2.2 L-1.2 L-5.4 L0.0 L-4.3 L
Yr 40.0 L0.0 L2.3 L-1.2 L-5.4 L0.0 L-4.2 L
Yr 50.0 L0.0 L2.4 L-1.2 L-5.4 L0.0 L-4.1 L
Yr 60.0 L0.0 L2.5 L-1.2 L-5.4 L0.0 L-4.1 L
Yr 70.0 L0.0 L2.7 L-1.3 L-5.4 L0.0 L-4.0 L
Yr 80.0 L0.0 L2.8 L-1.3 L-5.4 L66.0 L62.1 L

Pre-tax unless capital-gains tax is set. Rent enters the cash flows once. Net-wealth CAGR = (cash returned incl. sale ÷ cash put in)^(1/years) − 1. IRR uses the dated cash flows.

Score factors

Bars show points added or taken away versus the average analysed Chennai project (score 50).

Price vs comparables
−0.0 pts vs avg
this home 5.9/10 · Chennai average 6.0 · confidence 30%
₹5,850 psf vs premium comps ₹6,200 (-6%; under-construction should price ~8% below ready). Price is a model estimate, so this factor carries a third of its normal weight until a listed price is observed.
Rental demand & yield
−0.9 pts vs avg
this home 6.6/10 · Chennai average 7.0 · confidence 34%
Gross yield 3.3% (₹16 psf/month); locality rental demand 8/10.
Resale liquidity
−0.1 pts vs avg
this home 6.9/10 · Chennai average 7.0 · confidence 50%
Locality resale depth 7/10; ticket ₹0.63 Cr narrows the buyer pool; UC resale needs builder NOC.
Employment access
−8.2 pts vs avg
this home 3.6/10 · Chennai average 7.4 · confidence 85%
Drive times now (Google Maps, 2026-11-11): SIPCOT Siruseri 14 min, OMR (Sholinganallur) 31 min, Chennai airport 54 min, Guindy 60 min; 1 of 8 major hubs within 30 min; 6 msf office pipeline (3 yr).
Metro, bus, rail & airport
−5.3 pts vs avg
this home 3.6/10 · Chennai average 6.4 · confidence 60%
none; Phase 2 SIPCOT terminal; Phase 2 SIPCOT Siruseri ~2027; airport ~60 min; .
Schools, hospitals, daily needs
−1.8 pts vs avg
this home 6.5/10 · Chennai average 8.1 · confidence 50%
Locality social-infrastructure index (interim, expert-set; POI distances pending Maps integration).
Builder delivery & handover risk
−0.4 pts vs avg
this home 4.1/10 · Chennai average 4.2 · confidence 60%
TVS Emerald: 10+ projects, on-time 91% (derived); handover 2026-01-31 (reported); 9 months past the RERA completion date.
Layout, size, age, amenities, maintenance
+0.3 pts vs avg
this home 8.0/10 · Chennai average 7.8 · confidence 50%
60 units/acre; carpet/SBA ~79%; maintenance ~₹5 psf/month (assumed).
Water, flooding, noise, infrastructure
−1.7 pts vs avg
this home 5.1/10 · Chennai average 5.8 · confidence 50%
Heavy supply; groundwater dependence
Legal, title & approvals
−1.5 pts vs avg
this home 5.2/10 · Chennai average 5.9 · confidence 55%
RERA registered; litigation: not published on the public register; approvals: issued; title: not verified. Due-diligence report lists 1 red flag (−0.8 pts).
Expected price growth (5-yr CAGR model)
−6.5 pts vs avg
this home 1.7/10 · Chennai average 2.7 · confidence 56%
Model 5-yr price CAGR 6.6% (range 3.1–10.0%).

Price growth model, year by year

Nominal growth per year. Parts add up; momentum fades, infrastructure is weighted by delivery probability and dated.

ComponentYr 1Yr 2Yr 3Yr 4Yr 5Yr 6Confidence
Chennai long-run nominal trend5.05.05.05.05.05.080%
Locality momentum (mean-reverting)1.30.70.40.20.10.145%
Affordability ceiling0.00.00.00.00.00.060%
Employment access & office pipeline1.51.51.51.51.51.555%
Supply–demand balance-1.5-1.2-1.0-0.8-0.6-0.550%
Infrastructure delivery (probability-weighted)0.40.40.00.00.00.055%
Project-specific adjustments2.00.00.00.00.00.050%
Total growth8.7%6.4%5.9%5.9%6.0%6.1%56%

Chennai long-run nominal trend: City-wide 2013-25 nominal residential trend ≈ inflation + real income growth.

Locality momentum (mean-reverting): Trailing 3.0-yr locality CAGR 8.6% vs 5.0% trend; 35% carried forward, halving each year.

Affordability ceiling: Ticket at ₹5,850 psf vs city median ₹7,300; buyer pool thins above ₹15k/₹20k psf and after >6pp excess growth.

Employment access & office pipeline: 6 msf office pipeline (3 yr) on 25 msf stock; 30-min jobs index 0.70.

Supply–demand balance: 26 months of unsold inventory; new-launch/absorption ratio 1.6.

Infrastructure delivery (probability-weighted): OMR elevated corridor and Phase 2 metro along OMR (construction, 2027, p=0.6); Chennai Metro Phase 2 (Corridors 3, 4, 5: Madhavaram–SIPCOT, Light House–Poonamallee, Madhavaram–Sholinganallur) (construction, 2027, p=0.6)

Project-specific adjustments: Remaining construction risk (13% work left) re-rates toward ready comps by handover (~1.0% over 0.5 yr).

Locality evidence: ₹5,000 (Jun 2023) → ₹6,400 (Jun 2026) = 8.6% p.a. Sources: Platform estimate (interim, not observed).

Financial & legal due diligence

What the public record says

Automated from the Tamil Nadu RERA registration TN/35/Building/081/2024. Prices and rents are locality estimates, not verified listings. Compiled Nov 2026 from the Tamil Nadu RERA file, company registers, rating agencies, tribunal records and press. Facts only; anything that deserves a written answer before signing is flagged.

Delivery timeline7/10
a registration completion date has already passed (−2)
Legal & complaints9/10
no litigation and no complaints on the RERA file
Money to finish8/10
Developer strength5/10
no public credit rating for the promoter

Meters are rule-based from the RERA file and public ratings (rules shown under each), not opinions.

Registration
TN/35/Building/081/2024 · Emerald Haven Property Development Limited
Past RERA date
RegisteredMar 2024Original completionJan 2026TodaySep 2026
No litigation declaredNo complaints
Credit ratings of the people behind it

No public credit rating located for the promoter.

Emerald Haven Property Development Limited: credit rating not yet checked by PropertyLens

Complaints & disputes on record
On this project00 open
On the promoter entity0all projects
Court cases declared0no stay recorded
At a glance
On its original RERA date

On its original RERA completion date: 2026-01-31

No complaints on this project

No RERA complaints on this project; 0 on the promoter overall

No litigation declared

No litigation declared in RERA filings

The record, in pictures

RERA file · Registration

No litigation declaredBorrowing declared: not stated

Red flags to resolve in writing

1
Timeline

TNRERA completion date 2026-01-31 has passed.

Questions to put to the developer before you sign

  1. Share the latest quarterly progress filing and the architect and engineer certificates.
  2. Confirm the price list, floor-rise, parking and other charges for the exact unit.
  3. Which date is contractual, 2026-01-31 or the agreement's, and what is the delay compensation?
  4. Confirm there is no litigation on the land or approvals beyond the RERA declaration.
  5. Is the land owned by the promoter, or is this a joint development, and is any part mortgaged?
Full record: every filed number, line by line1 sections · 4 items

RERA file · Registration

Registration
TN/35/Building/081/2024 · promoter Emerald Haven Property Development Limited (Company)
Dates
Start 2024-03-15 · original completion 2026-01-31 · no extensions · current date has passed
Plan sanction
issued · Panchayat / DTCP
Litigation declared
None declared in filings

Source: Tamil Nadu RERA project record TN/35/Building/081/2024, fetched 2026-11-10. Figures are the promoter’s own filings.

Sources & caveats2 sources
  • Tamil Nadu RERA project record TN/35/Building/081/2024, fetched 2026-11-10
  • PropertyLens Chennai locality model (market-level estimates)
  • Tamil Nadu RERA project records TN/35/Building/081/2024 (registration file, quarterly updates, complaint register), fetched Sep 2026.

Caveats. Automated analysis: prices, rents and travel times are estimates until listings and Maps data are verified. RERA figures are the promoter’s own filings. Nothing here is legal, tax or investment advice.

Evidence

Location, jobs & transit2 hubs · metro none nearby
Job hubs nearby
SIPCOT IT Park SiruseriSholinganallur 8 km
Measured drive times below
Office space
Existing25 msf
Coming in 3 yrs6 msf
Jobs within 30 min7/10
Getting around
Metro today
none; Phase 2 SIPCOT terminal
none within 5 km
Metro planned
Phase 2 SIPCOT Siruseri
~2027 60% likely ~2,000 m estimate
Rail
—
estimate
Airport
~60 min by road
estimate
Buses
7/10 coverage
estimate
Drive times to job hubs
DestinationDrive nowRoad km
SIPCOT Siruseri14 min3.7
OMR (Sholinganallur)31 min10.2
Chennai airport54 min19.4
Guindy60 min21.5
DLF Ramapuram66 min23.8
Anna Salai (CBD)77 min28.2
Sriperumbudur85 min31
Ambattur industrial estate86 min31.7

Google Maps driving time with live traffic, measured Nov 2026. Refreshed monthly.

Location used: Google Maps match “”. Bus coverage and planned-station distances are still interim estimates.

Price historylocality 8.6%/yr

No dated project-level price series yet; only the latest observation is on file.

Locality · average ₹/sq ft
Date₹ psfSourceConfidenceKind
Jun 20214,600Platform estimate (interim, not observed)40%derived
Jun 20235,000Platform estimate (interim, not observed)45%derived
Jun 20255,900Platform estimate (interim, not observed)50%derived
Jun 20266,400Platform estimate (interim, not observed)50%derived
Luxury comps₹7,800
Premium comps₹6,200
Mid comps₹4,900
Unsold stock26 months

Model backtest on this locality: 1-yr hold-out (Jun 2025→Jun 2026): predicted ₹6,223 vs actual ₹6,400 (-2.8%). Longer 3-yr hold-out (Jun 2023→Jun 2026): predicted 5.1% p.a. vs actual 8.6% p.a. — the model is deliberately mean-reverting and under-predicted the 2021–26 boom.

Environment, legal & productflood ok · water risk · RERA yes
Flood risksome risk
Water supplytankers/borewell
Quietok
Roads & drainspatchy

Heavy supply; groundwater dependence

Legal & approvals
Registration TN/35/Building/081/2024
RERA TN/35/Building/081/2024
possession Jan 2026
Litigation
not published on the public register
assumed
Approvals
issued
observed
Title
not verified
assumed
Product
Landnot filed
Homesnot filed
Densitynot filed
Launched2024
Sources & data gapswhat we know, from where, and what is missing

Automated analysis: unit mix and carpet areas come from the RERA unit table where filed; prices and rents are locality-model estimates until listings are verified.

FieldValueSource classDateConf.KindConflicting values
AddressConstruction of Ground + 2 Floors at Layout No. 187/2023, Commercial Plot comprised in S.F.No.4/1A of Pudupakkam Village, Vandalur Taluk, Chengalpattu District.Tamil Nadu RERANov 202670%observed
Land area (acres)Platform estimate (interim, not observed)Nov 202620%assumed
Total unitsPlatform estimate (interim, not observed)Nov 202620%assumed
Launch year2024Tamil Nadu RERANov 202670%observed
Possession · Registration TN/35/Building/081/20242026-01-31Tamil Nadu RERANov 202670%observed
Price psf · 2 BHK · ~1,080 sq ft (assumed)5850Platform estimate (interim, not observed)Nov 202630%assumed
Ticket · 2 BHK · ~1,080 sq ft (assumed)6318000Platform estimate (interim, not observed)Nov 202630%derived
Rent · 2 BHK · ~1,080 sq ft (assumed)17500Platform estimate (interim, not observed)Nov 202630%assumed
Carpet area850Platform estimate (interim, not observed)Nov 202630%assumed
Builder on-time rate0.91Tamil Nadu RERANov 202660%derived
Litigationnot published on the public registerTamil Nadu RERANov 202630%assumed
ApprovalsissuedTamil Nadu RERANov 202660%observed

Commercial listing portals are shown as “Listing portal (aggregated)”; full provenance is retained internally. Official developer and Tamil Nadu RERA sources are named.

Other projects worth comparing

Same model, same date. Scores are out of 100, where 50 is the average analysed Chennai project.

Questions people ask about TVS Emerald Lake Shore Club House

Is TVS Emerald Lake Shore Club House a good investment?

On PropertyLens's evidence-based model TVS Emerald Lake Shore Club House scores 24/100, well below the average analysed Chennai project (50 = average, 12 points = one standard deviation). The model projects price growth of about 6.6% a year over five years and a net-wealth CAGR of -0.8% after every cost on an 8-year hold with a 75.0% loan. That is research on public filings, not advice; the factor breakdown on this page shows what drives the score.

What is the price per sq ft at TVS Emerald Lake Shore Club House?

About ₹5,850 per sq ft of super built-up area, a model estimate from Outer OMR comparables that you can edit. The 2 BHK home costs about ₹63.2 L before other charges, GST and stamp duty, and ₹87.5 L all-in.

When is TVS Emerald Lake Shore Club House ready for possession?

The RERA registration commits to Jan 2026. The project is 9 months past its original RERA completion date.

Is TVS Emerald Lake Shore Club House RERA registered?

Yes. Tamil Nadu RERA registration: TN/35/Building/081/2024. No complaints on this registration at TNRERA as of 2026-11-10.

How reliable is TVS Emerald on delivery?

91% of TVS Emerald's crawled Chennai registrations needed no extension (10 of 10 analysed Chennai registrations needed no extension). 10 registrations analysed. The developer scorecard compares this with every other Chennai developer.

What rent can TVS Emerald Lake Shore Club House earn?

About ₹17,500 a month for this home (a model estimate from Outer OMR rents), a gross yield of 3.2% on the all-in cost. Nothing is earned before handover. Rent covers 39% of the EMI at the default loan.

Answers are generated from the filings and the model for this home and change when you edit the assumptions above. See the TVS Emerald scorecard and the Outer OMR area page.

Go deeper

Share on WhatsApp