PropertyLensBengaluru · invest
Phoenix Mills · Devanahalli / Airport Road / Bagalur

Varnam Phase 1B

Survey nos. 37/1(P), 37/2(P), 37/4(P), 37/5(P)… · Devanahalli / Airport Road / Bagalur
Handover Aug 2030 · no rent beforeapartment · midRERA registered+ CompareFull report ↗
1 · Which home?
2 · Which exit plan?

Score, growth and returns below are for the highlighted home and plan. Prices, rent and possession never mix across phases.

60
Investment score
60/100
Evidence confidence56%
2 BHK · ~1,380 sq ft (1020 carpet)
Price growth per year, next 5 yrs model
11.7%
likely range 8.2%–15.2% · over 10 yrs 10.0%/yr
Net-wealth CAGR, 8-yr hold
6.4%
your cash in → cash back incl. sale, per year
Cash-flow IRR, 8-yr hold
11.1%
with 75% loan · all-cash 10.3% · with interiors
Three numbers, three questions. Price growth: what will the home be worth? Net-wealth CAGR: what will my money have earned after every cost? Cash-flow IRR: the same, but counting when each rupee moves. Tap i on any of them.
Price · edit here or below assumed
₹Cr
₹ psf × 1,380 sq ft · as of Sep 2026
Price edits apply to ·
All-in cost
₹1.14 Cr
+ other charges 2.9 L, GST 4.4 L, stamp/reg 5.8 L, interiors 16.6 L
Gross rental yield assumed
3.2%
rent starts in ~4.3 yr

All-in cost sheet this home, default assumptions

ItemBasisAmount
Base price₹6,100 per sq ft × 1,380 sq ft super built-up84.2 L
Other charges3.5% of base: floor-rise, preferred-location, car park, club, maintenance deposit, legal, corpus (edit in Assumptions)2.9 L
GST5.0% on an under-construction home4.4 L
Stamp duty and registration6.6% in Karnataka: 5% stamp duty + 1% registration + cess and surcharge on the agreement value5.8 L
Interiors₹1,200 per sq ft, needed before the home can be let16.6 L
All-in costwhat leaves your pocket and the bank's, before rent or resale₹1.14 Cr
Your own money75.0% loan at 8.5% for 20 years covers the rest; EMI 0.6 L a month₹76.4 L

Carpet area 1,020 sq ft against 1,380 sq ft super built-up: you pay for 26% that is common area and walls. Price per sq ft of carpet ≈ ₹8,253. Every percentage above is editable in Assumptions; the defaults are Karnataka rates as of 2026-09.

In plain words

Why 60 out of 100

Each home is marked on 11 things a careful buyer checks, then compared with every project we analyse in Bengaluru: 50 is the average project, 62 beats about five in six. Here is what lifts this one and what drags it:

  • +
    Expected price growth (5-yr CAGR model) · 15/26 pts
    We expect prices here to rise about 11.7% a year for the next 5 years (explained below).
  • +
    Layout, size, age, amenities, maintenance · 2/3 pts
    Spacious layout (28 homes per acre); about 72% of the area you pay for is usable carpet area. Maintenance ~₹3.5 per sq ft a month.
  • +
    Legal, title & approvals · 2/5 pts
    Registered with Karnataka RERA; no court cases reported; land title not yet verified by us, so get a lawyer to check. The due-diligence report below flags 0 items in red.
  • −
    Employment access · -8/10 pts
    Drive times right now: Manyata Tech Park 48 min, Hebbal (Kirloskar) 54 min, ITPL Whitefield 66 min; Electronic City Ph-1 104 min. About 15 million sq ft of new offices are planned nearby in 3 years.
  • −
    Schools, hospitals, daily needs · -2/3 pts
    Schools, hospitals and daily shopping are limited in this area.
  • −
    Metro, bus, rail & airport · -1/9 pts
    No working metro nearby (nearest 15 km). Airport is about 15 minutes by road right now.
All 11 checks
  • •
    Price vs comparables · -0/3 pts
    Priced about the same as similar mid homes nearby (₹6,100 vs ~₹6,500 per sq ft).
  • •
    Rental demand & yield · 2/8 pts
    Rent pays back 3.2% of the price every year, close to the usual 3% in Bengaluru. Tenant demand here is thin.
  • +
    Resale liquidity · 0/4 pts
    Plenty of buyers can afford a ₹84.2 L home, and homes in Devanahalli / Airport Road / Bagalur take time to resell. Reselling before handover needs the builder’s permission.
  • −
    Employment access · -8/10 pts
    Drive times right now: Manyata Tech Park 48 min, Hebbal (Kirloskar) 54 min, ITPL Whitefield 66 min; Electronic City Ph-1 104 min. About 15 million sq ft of new offices are planned nearby in 3 years.
  • −
    Metro, bus, rail & airport · -1/9 pts
    No working metro nearby (nearest 15 km). Airport is about 15 minutes by road right now.
  • •
    Schools, hospitals, daily needs · -2/3 pts
    Schools, hospitals and daily shopping are limited in this area.
  • −
    Builder delivery & handover risk · -0/16 pts
    Phoenix Mills has finished 14+ projects and delivered on time about 69% of the time. This phase is 9% built, with handover promised for 2030-08-31: delays would push your rent start back.
  • +
    Layout, size, age, amenities, maintenance · 2/3 pts
    Spacious layout (28 homes per acre); about 72% of the area you pay for is usable carpet area. Maintenance ~₹3.5 per sq ft a month.
  • •
    Water, flooding, noise, infrastructure · -0/9 pts
    Low flood risk; water supply is mostly borewell or tankers; noise is manageable.
  • +
    Legal, title & approvals · 2/5 pts
    Registered with Karnataka RERA; no court cases reported; land title not yet verified by us, so get a lawyer to check. The due-diligence report below flags 0 items in red.
  • +
    Expected price growth (5-yr CAGR model) · 15/26 pts
    We expect prices here to rise about 11.7% a year for the next 5 years (explained below).
Why prices should grow ~11.7% a year for the next 5 years

We build the forecast step by step, starting from what Bengaluru homes normally do and adjusting for this area and this project:

  1. + 6.0%Start with 6.0% a year: the normal long-run growth of Bengaluru home prices.
  2. + 1.2%Add 1.2%: prices here rose 14.0% a year recently (2023-06 to 2026-06). Some of that pace continues, but it fades each year.
  3. − 0.4%Subtract 0.4%: at ₹6,100 per sq ft, fewer families can afford to buy here, which slows further rises.
  4. + 2.4%Add 2.4%: 15 million sq ft of new offices nearby means more people wanting homes here.
  5. + 0.0%Supply and demand are balanced here (17 months of unsold stock).
  6. + 0.3%Add 0.3% for new roads, metro and water lines, weighted by how likely they are to actually finish: Blue Line KR Puram–Hebbal–Airport (construction, 2027); Satellite Town Ring Road (construction, 2028); Bagalur ITIR / Aerospace expansion (planned, 2030).
  7. + 2.2%Add 2.2% for this project itself: unfinished homes are worth more once they are complete.
  8. = 11.7%Result: about 11.7% a year, so a home worth ₹87.1 L today would be worth about ₹1.51 Cr in 5 years. We are 56% confident in the evidence behind this.

Which exit suits you?

For an unfinished flat the answer depends on whether you sell at handover or hold, and whether you spend on interiors. Same price, same loan; only the strategy changes:

StrategyHoldIRR / yrWealth CAGR / yrCash you put inNet rentNet saleApply
Sell at handover, no interiors best IRR
Take delivery in 2030-08-31 and sell the bare flat (4 yr hold). Needs builder NOC or registration first; no rent.
4 yrs26.3%16.5%₹31.5 L₹-42,914₹68.6 L
Hold bare, rent unfurnished
Skip interiors; rent 12% lower than a fitted home; sell after 8 yrs with no interiors value.
8 yrs15.0%9.1%₹60.6 L₹3.9 L₹1.28 Cr
Hold, do interiors, rent & sell fitted selected
Spend ₹1,200/sq ft on interiors, earn full rent, recover ~40% of interiors cost at sale (fading over 10 yrs).
8 yrs11.1%6.4%₹76.4 L₹5.0 L₹1.31 Cr

IRR and CAGR are per year over the hold shown. A short hold can show a high IRR on a small absolute gain; compare the net-sale column too. Selling before registration usually needs the builder’s transfer NOC and a fee.

Highlights

  • Phoenix Mills · Devanahalli / Airport Road / Bagalur · 285 homes on 10.1 acres
  • Under construction: 9% complete, RERA completion 2030-08-31
  • No litigation declared · 0 complaints on this registration

Assumptions editable

Purchase

₹/sq ft
₹ Cr
sq ft
% of base
%
%
%
₹/sq ft

FinancingLoan 75% · cash 25% · EMI ₹59,543/mo

% loan
% p.a.
years
%

Rent & running costs

₹
% p.a.
%
months
months
₹/sq ft/mo
% of rent
% of rent
% of value

Interiors & exit

%
%
years
% p.a. (blank = model)
%
%

Returns over 8 years · with interiors

Cash you put in₹76.4 L
Exit value (yr 8)₹1.93 Cr
Net sale after loan & costs₹1.31 Cr
Net rent after opex₹5.0 L
Loan (75% of price)₹68.6 L
EMI / month₹59,543
Year 0: ₹-8.4 L0Year 1: ₹-6.4 L1Year 2: ₹-7.7 L2Year 3: ₹-9.0 L3Year 4: ₹-27.3 L4Year 5: ₹-6.3 L5Year 6: ₹-5.7 L6Year 7: ₹-5.6 L7Year 8: ₹1.26 Cr8
YearPurchaseLoan inRent (net of vacancy)OpexDebt serviceSale − loanNet cash
Today-15.2 L6.9 L0.0 L0.0 L0.0 L0.0 L-8.4 L
Yr 1-20.6 L15.4 L0.0 L0.0 L-1.2 L0.0 L-6.4 L
Yr 2-20.6 L15.4 L0.0 L0.0 L-2.6 L0.0 L-7.7 L
Yr 3-20.6 L15.4 L0.0 L0.0 L-3.9 L0.0 L-9.0 L
Yr 4-37.1 L15.4 L0.0 L-0.4 L-5.2 L0.0 L-27.3 L
Yr 50.0 L0.0 L2.0 L-1.2 L-7.1 L0.0 L-6.3 L
Yr 60.0 L0.0 L2.8 L-1.4 L-7.1 L0.0 L-5.7 L
Yr 70.0 L0.0 L3.0 L-1.4 L-7.1 L0.0 L-5.6 L
Yr 80.0 L0.0 L3.1 L-1.5 L-7.1 L1.31 Cr1.26 Cr

Pre-tax unless capital-gains tax is set. Rent enters the cash flows once. Net-wealth CAGR = (cash returned incl. sale ÷ cash put in)^(1/years) − 1. IRR uses the dated cash flows.

Score factors

Bars show points added or taken away versus the average analysed Bengaluru project (score 50).

Price vs comparables
−0.2 pts vs avg
this home 5.9/10 · Bengaluru average 6.2 · confidence 35%
₹6,100 psf vs mid comps ₹6,500 (-6%; under-construction should price ~8% below ready). Price is a model estimate, so this factor carries a third of its normal weight until a listed price is observed.
Rental demand & yield
+1.7 pts vs avg
this home 6.8/10 · Bengaluru average 6.0 · confidence 38%
Gross yield 3.3% (₹17 psf/month); locality rental demand 6/10.
Resale liquidity
+0.2 pts vs avg
this home 7.7/10 · Bengaluru average 7.6 · confidence 60%
Locality resale depth 6/10; ticket ₹0.84 Cr narrows the buyer pool; UC resale needs builder NOC; 285-home project; RERA sales pace ratio 4.05.
Employment access
−7.6 pts vs avg
this home 1.5/10 · Bengaluru average 5.2 · confidence 85%
Drive times now (Google Maps, 2026-09-16): Manyata Tech Park 48 min, Hebbal (Kirloskar) 54 min, ITPL Whitefield 66 min, MG Road (CBD) 69 min; 0 of 7 major hubs within 30 min; 15 msf office pipeline (3 yr).
Metro, bus, rail & airport
−0.8 pts vs avg
this home 4.3/10 · Bengaluru average 4.8 · confidence 60%
none; Blue Line airport terminal station under construction; Airport City (Blue Line) ~2027; airport ~15 min by road now (Google Maps); .
Schools, hospitals, daily needs
−2.0 pts vs avg
this home 5.0/10 · Bengaluru average 7.0 · confidence 50%
Locality social-infrastructure index (interim, expert-set; POI distances pending Maps integration).
Builder delivery & handover risk
−0.2 pts vs avg
this home 3.7/10 · Bengaluru average 3.7 · confidence 60%
Phoenix Mills: 14+ projects, on-time 69% (derived); handover 2030-08-31 (RERA); within the RERA timeline, work on schedule (-13 pts).
Layout, size, age, amenities, maintenance
+1.7 pts vs avg
this home 8.7/10 · Bengaluru average 7.3 · confidence 55%
28 units/acre; carpet/SBA ~72%; maintenance ~₹3.5 psf/month (assumed); filed construction cost ₹6,818 per sq ft (premium spec).
Water, flooding, noise, infrastructure
−0.1 pts vs avg
this home 5.8/10 · Bengaluru average 5.8 · confidence 50%
Plotted-development heavy; social infrastructure still thin
Legal, title & approvals
+2.3 pts vs avg
this home 8.5/10 · Bengaluru average 7.4 · confidence 55%
RERA registered; litigation: none reported; approvals: Plan BIAAPA/TP/CC/331/2024-25/25-26/888 dated 2025-06-25; title: not verified. Due-diligence report lists 0 red flags (−0.0 pts).
Expected price growth (5-yr CAGR model)
+14.9 pts vs avg
this home 8.3/10 · Bengaluru average 6.0 · confidence 56%
Model 5-yr price CAGR 11.7% (range 8.2–15.2%).

Price growth model, year by year

Nominal growth per year. Parts add up; momentum fades, infrastructure is weighted by delivery probability and dated.

ComponentYr 1Yr 2Yr 3Yr 4Yr 5Yr 6Confidence
Bengaluru long-run nominal trend6.06.06.06.06.06.080%
Locality momentum (mean-reverting)2.81.50.80.50.30.145%
Affordability ceiling-0.7-0.5-0.3-0.2-0.2-0.160%
Employment access & office pipeline2.42.42.42.42.42.455%
Supply–demand balance0.00.00.00.00.00.050%
Infrastructure delivery (probability-weighted)0.40.40.30.20.20.055%
Project-specific adjustments3.13.13.11.90.00.050%
Total growth14.0%12.9%12.3%10.7%8.7%8.5%56%

Bengaluru long-run nominal trend: City-wide 2013-25 nominal residential trend ≈ inflation + real income growth.

Locality momentum (mean-reverting): Trailing 3.0-yr locality CAGR 14.0% vs 6.0% trend; 35% carried forward, halving each year.

Affordability ceiling: Ticket at ₹6,100 psf vs city median ₹9,500; buyer pool thins above ₹15k/₹20k psf and after >6pp excess growth.

Employment access & office pipeline: 15 msf office pipeline (3 yr) on 8 msf stock; 30-min jobs index 0.45.

Supply–demand balance: 17 months of unsold inventory; new-launch/absorption ratio 1.36 (from 45 under-construction RERA filings in this locality: 7,627 unsold homes, 1616.1 sold per month).

Infrastructure delivery (probability-weighted): Blue Line KR Puram–Hebbal–Airport (construction, 2027, p=0.65); Satellite Town Ring Road (construction, 2028, p=0.6); Bagalur ITIR / Aerospace expansion (planned, 2030, p=0.5)

Project-specific adjustments: Remaining construction risk (91% work left) re-rates toward ready comps by handover (~7.3% over 3.9 yr). Sales pace from RERA filings: 87% of 285 homes booked with 22% of the build timeline elapsed (pace ratio 4.05); fast sellers re-rate, slow sellers discount.

Locality evidence: ₹5,400 (Jun 2023) → ₹8,000 (Jun 2026) = 14.0% p.a. Sources: Platform estimate (interim, not observed).

Financial & legal due diligence

What the public record says

Automated from the Karnataka RERA file PRM/KA/RERA/1250/303/PR/110825/007989 and 3 quarterly filings. Prices and rents are locality estimates, not verified listings. Compiled Sep 2026 from the Karnataka RERA file, company registers, rating agencies, tribunal records and press. Facts only; anything that deserves a written answer before signing is flagged.

Delivery timeline9/10
no extensions, no overdue dates on the RERA file
Legal & complaints9/10
no litigation and no complaints on the RERA file
Money to finish8/10
finance cost is 1% of the registered budget; last quarter withdrew ₹104 cr against ₹46.87 cr collected (−1); 87% of homes booked (+1)
Developer strength5/10
no public credit rating for the promoter

Meters are rule-based from the RERA file and public ratings (rules shown under each), not opinions.

Registration
PRM/KA/RERA/1250/303/PR/110825/007989 · ONE BANGALORE LUXURY PROJECTS LLP
On original date
RegisteredAug 2025TodaySep 2026Original completionAug 2030
Construction9%
quarterly filing Q1 2026-27 (submitted 2026-07-15)
Homes booked249 / 285
36 still available
Sold vs built87% vs 9%
Buyers are well ahead of construction: most money is in, delivery risk sits with the developer.
Money through the RERA account
Collected ₹42.01 CrWithdrawn ₹67.36 CrQ3 2025-2642.01 Cr67.36 CrCollected ₹37.04 CrWithdrawn ₹63.64 CrQ4 2025-2637.04 Cr63.64 CrCollected ₹46.87 CrWithdrawn ₹104.18 CrQ1 2026-2746.87 Cr104.18 Cr
Collected from buyersWithdrawn for construction
Latest milestones
  • Sub-structure flooring
    0%
  • Retaining wall
    0%
  • RCC or MS Framed structure
    0%
  • Masonry Construction
    0%
  • Plastering inside , outside & Ceiling
    0%
  • Joinery: Doors, Windows, Ventilators etc
    0%
No litigation declaredNo complaintsNBFC finance 1% of budgetEscrow: ICICI BankJoint-development land
Credit ratings of the people behind it

No public credit rating located for the promoter.

ONE BANGALORE LUXURY PROJECTS LLP: no public rating located

Complaints & disputes on record
On this project00 open
On the promoter entity0all projects
Court cases declared0no stay recorded
At a glance
On its original RERA date

On its original RERA completion date: 2030-08-31

9% built, 87% booked

9% built per the latest filing; 249/285 homes booked

No complaints on this project

No RERA complaints on this project; 0 on the promoter overall

No litigation declared

No litigation declared in RERA filings

The record, in pictures

RERA file · Registration

Registered project cost ₹358 cr — where it goes
Land ₹0 cr · 0%Approvals ₹3.1 cr · 1%Construction & on-site ₹310.8 cr · 87%Finance (NBFC) ₹3.3 cr · 1%Other / taxes ₹41.1 cr · 11%
Construction programme as filed (quarterly filing Q1 2026-27 (submitted 2026-07-15))
20262027202820292030Earth work and other leveling preparat100%Foundation footing work45%Upto Plinth Level45%Sub-structure flooring0%Retaining wall0%RCC or MS Framed structure0%Masonry Construction0%Plastering inside , outside & Ceiling0%Joinery: Doors, Windows, Ventilators e0%Basic work of Water supply, Sanitary a0%Dadoing, Skirting, Flooring, Tiles wor0%Railing and Grill fixing0%Electrification, Water supply and Sani0%Painting0%Fire prevention and fire fighting fitt0%Weather Proof work0%Elevation work0%Internal and External work including l0%today
Bars are the filed schedule; filled part is reported progress. Red = past its scheduled end and not complete.
No litigation declaredBorrowing declared: YesEscrow at ICICI Bank7 recorded land-owner sharesOwners’ association: not formed

Red flags to resolve in writing

Questions to put to the developer before you sign

  1. Share the latest CA Form 4 and architect Form 5 with the escrow deposit ratio.
  2. Confirm the price list, floor-rise and other charges for the exact unit.
  3. Which date is contractual — 2030-08-31 — and what is the per-month delay compensation?
  4. Confirm there is no litigation on the land or approvals beyond the RERA declaration.
  5. Is the land freehold with the developer, and is any part mortgaged?
Full record: every filed number, line by line1 sections · 13 items

RERA file · Registration

Registration
PRM/KA/RERA/1250/303/PR/110825/007989 · promoter ONE BANGALORE LUXURY PROJECTS LLP (Partnership Firm) · AAE 8922
Dates
Start 2025-08-15 · original completion 2030-08-31 · no extensions
Progress
9% complete per quarterly filing Q1 2026-27 (submitted 2026-07-15) · 249 of 285 homes booked (36 available)
Registered cost
Total ₹358 cr · land ₹0.00 cr · construction ₹311 cr · NBFC principal+interest ₹3.26 cr (1%)
Borrowing / mortgage declared
Borrowing: Yes
RERA bank account
ICICI Bank, Residency Road (70% construction account)
Plan sanction
BIAAPA/TP/CC/331/2024-25/25-26/888 dated 2025-06-25 · BIAPPA - Bangalore Airport Area Planning Authority
Land & towers
10.09 acres (40,827 sq m) · T28 74 homes, 12 floors; T29 74 homes, 12 floors; T30 74 homes, 12 floors; T31 63 homes, 10 floors
Land owners / co-promoters
MS Ramaiah Realty LLP (5.1%, Sy 2/2); MS Ramaiah Realty LLP (5.1%, Sy 7/P); MS Ramaiah Realty LLP (5.1%, Sy 37/1); MS Ramaiah Realty LLP (5.1%, Sy 37/2); MS Ramaiah Realty LLP (5.1%, Sy 37/4); MS Ramaiah Realty LLP (5.1%, Sy 37/7); MS Ramaiah Realty LLP (5.1%, Sy 37/10)
Litigation declared
None declared in filings
K-RERA complaints
0 on this registration (0 open) · 0 on the promoter entity across all its projects (a project-specific LLP; group-level complaints sit under other entities)
Owners’ association
Not yet formed
Completion applied
19/12/2020

Source: Karnataka RERA project record PRM/KA/RERA/1250/303/PR/110825/007989, fetched 2026-09-15. Figures are the promoter’s own filings.

Sources & caveats2 sources
  • Karnataka RERA project record PRM/KA/RERA/1250/303/PR/110825/007989 (registration file, quarterly updates, complaint register), fetched 2026-09-15
  • PropertyLens locality model (market-level estimates)
  • Karnataka RERA project records PRM/KA/RERA/1250/303/PR/110825/007989 (registration file, quarterly updates, complaint register), fetched Sep 2026.

Caveats. Automated analysis: prices, rents and travel times are estimates until listings and Maps data are verified. RERA figures are the promoter’s own filings. Nothing here is legal, tax or investment advice.

Evidence

Location, jobs & transit3 hubs · metro none nearby
Job hubs nearby
Airport city / KIADB aerospace parkBagalur ITIR plannedManyata 25 km
Measured drive times below
Office space
Existing8 msf
Coming in 3 yrs15 msf
Jobs within 30 min5/10
Getting around
Metro today
none; Blue Line airport terminal station under construction
none within 5 km
Metro planned
Airport City (Blue Line)
~2027 70% likely ~4,000 m estimate
Rail
—
estimate
Airport
15 min by road now · 4.2 km
Google Maps
Buses
7/10 coverage
estimate
Drive times to job hubs
DestinationDrive nowRoad km
Kempegowda Airport (KIA)15 min4.2
Manyata Tech Park48 min17.1
Hebbal (Kirloskar)54 min19
ITPL Whitefield66 min24
MG Road (CBD)69 min25
Koramangala (Forum)80 min29.3
ORR Bellandur (Ecospace)81 min29.7
Electronic City Ph-1104 min38.6

Google Maps driving time with live traffic, measured Sep 2026. Refreshed monthly.

Location used: Google Maps match “”. Bus coverage and planned-station distances are still interim estimates.

Price historylocality 14.0%/yr

No dated project-level price series yet; only the latest observation is on file.

Locality · average ₹/sq ft
Date₹ psfSourceConfidenceKind
Jun 20214,200Platform estimate (interim, not observed)40%derived
Jun 20235,400Platform estimate (interim, not observed)45%derived
Jun 20257,000Platform estimate (interim, not observed)50%derived
Jun 20268,000Platform estimate (interim, not observed)50%derived
Luxury comps₹11,000
Premium comps₹8,500
Mid comps₹6,500
Unsold stock17 months

Model backtest on this locality: 1-yr hold-out (Jun 2025→Jun 2026): predicted ₹7,737 vs actual ₹8,000 (-3.3%). Longer 3-yr hold-out (Jun 2023→Jun 2026): predicted 9.7% p.a. vs actual 14% p.a. — the model is deliberately mean-reverting and under-predicted the 2021–26 boom.

Environment, legal & productflood ok · water risk · RERA yes
Flood risklow
Water supplytankers/borewell
Quietok
Roads & drainspatchy

Plotted-development heavy; social infrastructure still thin

Legal & approvals
Registration 007989
RERA PRM/KA/RERA/1250/303/PR/110825/007989
possession Aug 2030
Litigation
none reported
observed
Approvals
Plan BIAAPA/TP/CC/331/2024-25/25-26/888 dated 2025-06-25
observed
Title
not verified
assumed
Product
Land10.09 acres
Homes285
Density28/acre
Launched2025
Sources & data gapswhat we know, from where, and what is missing

Automated analysis: unit mix and carpet areas come from the RERA inventory table; prices and rents are locality-model estimates until listings are verified.

FieldValueSource classDateConf.KindConflicting values
AddressSY. NO. 37/1(P), 37/2(P), 37/4(P),37/5(P), 37/7(P), 37/10(P), 37/13 (P) &37/16(P) OF , AKKALENAHALLI-MALLENAHALLI VILLAGE , KASABAHOBLI , Devanahalli , Bengaluru Rural,Karnataka - 562157Karnataka RERA (number as reported; registry lookup pending)Sep 202680%observed
Land area (acres)10.09Karnataka RERA (number as reported; registry lookup pending)Sep 202680%observed
Total units285Karnataka RERA (number as reported; registry lookup pending)Sep 202680%observed
Launch year2025Karnataka RERA (number as reported; registry lookup pending)Sep 202670%observed
Possession · Registration 0079892030-08-31Karnataka RERA (number as reported; registry lookup pending)Sep 202670%observed
Price psf · 2 BHK · ~1,380 sq ft (1020 carpet)6100Platform estimate (interim, not observed)Sep 202635%assumed
Ticket · 2 BHK · ~1,380 sq ft (1020 carpet)8418000Platform estimate (interim, not observed)Sep 202635%derived
Rent · 2 BHK · ~1,380 sq ft (1020 carpet)23500Platform estimate (interim, not observed)Sep 202635%assumed
Carpet area1020Karnataka RERA (number as reported; registry lookup pending)Sep 202660%observed
Builder on-time rate0.69Karnataka RERA (number as reported; registry lookup pending)Sep 202660%derived
Litigationnone reportedKarnataka RERA (number as reported; registry lookup pending)Sep 202670%observed
ApprovalsPlan BIAAPA/TP/CC/331/2024-25/25-26/888 dated 2025-06-25Karnataka RERA (number as reported; registry lookup pending)Sep 202660%observed

Commercial listing portals are shown as “Listing portal (aggregated)”; full provenance is retained internally. Official developer and Karnataka RERA sources are named.

Other projects worth comparing

Same model, same date. Scores are out of 100, where 50 is the average analysed Bengaluru project.

Questions people ask about Varnam Phase 1B

Is Varnam Phase 1B a good investment?

On PropertyLens's evidence-based model Varnam Phase 1B scores 60/100, above the average analysed Bengaluru project (50 = average, 12 points = one standard deviation). The model projects price growth of about 11.7% a year over five years and a net-wealth CAGR of 6.4% after every cost on an 8-year hold with a 75.0% loan. That is research on public filings, not advice; the factor breakdown on this page shows what drives the score.

What is the price per sq ft at Varnam Phase 1B?

About ₹6,100 per sq ft of super built-up area, a model estimate from Devanahalli / Airport Road / Bagalur comparables that you can edit. The 2 BHK home costs about ₹84.2 L before other charges, GST and stamp duty, and ₹1.14 Cr all-in.

When is Varnam Phase 1B ready for possession?

The RERA registration commits to Aug 2030. Latest filing: 22% of the schedule elapsed, 87% of homes booked.

Is Varnam Phase 1B RERA registered?

Yes. Karnataka RERA registration: PRM/KA/RERA/1250/303/PR/110825/007989. No complaints on this registration at K-RERA as of 2026-09-15.

How reliable is Phoenix Mills on delivery?

69% of Phoenix Mills's crawled Bengaluru registrations needed no extension (10 of 14 crawled Bengaluru registrations needed no extension). 14 registrations analysed. The developer scorecard compares this with every other Bengaluru developer.

What rent can Varnam Phase 1B earn?

About ₹23,500 a month for this home (a model estimate from Devanahalli / Airport Road / Bagalur rents), a gross yield of 3.2% on the all-in cost. Nothing is earned before handover. Rent covers 39% of the EMI at the default loan.

Answers are generated from the filings and the model for this home and change when you edit the assumptions above. See the Phoenix Mills scorecard and the Devanahalli / Airport Road / Bagalur area page.

Go deeper

Share on WhatsApp