VTP Leonara building C and F
Score, growth and returns below are for the highlighted home and plan. Prices, rent and possession never mix across phases.
Price edits apply to ·
All-in cost sheet this home, default assumptions
| Item | Basis | Amount |
|---|---|---|
| Base price | ₹10,100 per sq ft × 750 sq ft carpet | 75.8 L |
| Other charges | 3.5% of base: floor-rise, preferred-location, car park, club, maintenance deposit, legal, corpus (edit in Assumptions) | 2.7 L |
| GST | 0.0% on an under-construction home — none is due on a ready home with an occupancy certificate, set GST to 0 if buying after OC | 0.0 L |
| Stamp duty and registration | 7.2% in Maharashtra: 7% stamp duty including 1% metro cess and 1% local body tax, plus 1% registration capped at ₹30,000 | 5.6 L |
| Interiors | ₹800 per sq ft, needed before the home can be let | 6.0 L |
| All-in cost | what leaves your pocket and the bank's, before rent or resale | ₹90.8 L |
| Your own money | 75.0% loan at 8.5% for 20 years covers the rest; EMI 0.5 L a month | ₹62.4 L |
Prices here are per sq ft of RERA carpet area (750 sq ft), the way homes are sold in Pune; there is no super built-up loading to discount. Every percentage above is editable in Assumptions; the defaults are Maharashtra rates as of 2026.
In plain words
Each home is marked on 11 things a careful buyer checks, then compared with every project we analyse in Pune: 50 is the average project, 62 beats about five in six. Here is what lifts this one and what drags it:
- +Resale liquidity · 2/4 pts
Plenty of buyers can afford a ₹75.8 L home, and homes in Baner / Balewadi / Pashan / Sus resell quickly. - +Employment access · 3/6 pts
Drive times right now: Baner 4 min, Hinjewadi Phase 1 20 min, Shivajinagar (CBD) 23 min; Chakan MIDC 65 min. About 5 million sq ft of new offices are planned nearby in 3 years. - +Builder delivery & handover risk · 4/10 pts
Nnp Buildcon has finished 10+ projects and delivered on time about 91% of the time. This home is ready, so there is no waiting risk. - •Layout, size, age, amenities, maintenance · -0/2 pts
Moderately dense layout (60 homes per acre); about 100% of the area you pay for is usable carpet area. Maintenance ~₹3.5 per sq ft a month. - −Expected price growth (5-yr CAGR model) · -1/35 pts
We expect prices here to rise about 8.2% a year for the next 5 years (explained below). - −Price vs comparables · 0/3 pts
Priced about the same as similar mid homes nearby (₹10,100 vs ~₹10,100 per sq ft).
All 11 checks
- •Price vs comparables · 0/3 pts
Priced about the same as similar mid homes nearby (₹10,100 vs ~₹10,100 per sq ft). - +Rental demand & yield · 1/6 pts
Rent pays back 3.4% of the price every year, close to the usual 3.2% in Pune. Tenant demand here is very strong. - +Resale liquidity · 2/4 pts
Plenty of buyers can afford a ₹75.8 L home, and homes in Baner / Balewadi / Pashan / Sus resell quickly. - +Employment access · 3/6 pts
Drive times right now: Baner 4 min, Hinjewadi Phase 1 20 min, Shivajinagar (CBD) 23 min; Chakan MIDC 65 min. About 5 million sq ft of new offices are planned nearby in 3 years. - •Metro, bus, rail & airport · 2/7 pts
The nearest working metro is ~2.5 km away; Line 3 Baner / Balewadi stations is planned for ~2026. Airport is about 60 minutes by road. - +Schools, hospitals, daily needs · 1/2 pts
Schools, hospitals and daily shopping are excellent in this area. - +Builder delivery & handover risk · 4/10 pts
Nnp Buildcon has finished 10+ projects and delivered on time about 91% of the time. This home is ready, so there is no waiting risk. - +Layout, size, age, amenities, maintenance · -0/2 pts
Moderately dense layout (60 homes per acre); about 100% of the area you pay for is usable carpet area. Maintenance ~₹3.5 per sq ft a month. - •Water, flooding, noise, infrastructure · 0/7 pts
Low flood risk; water supply is partly piped, partly tankers; noticeable traffic or aircraft noise. - •Legal, title & approvals · 1/8 pts
Registered with MahaRERA; court cases not disclosed on the public register; land title not yet verified by us, so get a lawyer to check. The due-diligence report below flags 0 items in red. - −Expected price growth (5-yr CAGR model) · -1/35 pts
We expect prices here to rise about 8.2% a year for the next 5 years (explained below).
We build the forecast step by step, starting from what Pune homes normally do and adjusting for this area and this project:
- + 6.0%Start with 6.0% a year: the normal long-run growth of Pune home prices.
- + 0.3%Add 0.3%: prices here rose 8.2% a year recently (2023-06 to 2026-06). Some of that pace continues, but it fades each year.
- + 0.0%Prices are still affordable enough that this does not slow growth.
- + 1.7%Add 1.7%: 5 million sq ft of new offices nearby means more people wanting homes here.
- + 0.0%Supply and demand are balanced here (16 months of unsold stock).
- + 0.1%Add 0.1% for new roads, metro and water lines, weighted by how likely they are to actually finish: Metro Line 3 Hinjewadi–Shivajinagar (construction, 2026); Pune Ring Road (PMRDA) (construction, 2029).
- + 0.0%No extra project-level adjustment.
- = 8.2%Result: about 8.2% a year, so a home worth ₹78.4 L today would be worth about ₹1.16 Cr in 5 years. We are 56% confident in the evidence behind this.
Which exit suits you?
Interiors change both the rent you get and what you recover at sale. Same price, same loan; only the strategy changes:
| Strategy | Hold | IRR / yr | Wealth CAGR / yr | Cash you put in | Net rent | Net sale | Apply |
|---|---|---|---|---|---|---|---|
| No interiors, rent unfurnished best IRR Skip interiors; rent 12% lower than a fitted home; sell after 8 yrs with no interiors value. | 8 yrs | 7.9% | 5.9% | ₹58.4 L | ₹12.8 L | ₹96.7 L | |
| Do interiors, rent & sell fitted selected Spend ₹800/sq ft on interiors, earn full rent, recover ~40% of interiors cost at sale (fading over 10 yrs). | 8 yrs | 6.6% | 5.2% | ₹62.4 L | ₹15.1 L | ₹97.1 L |
IRR and CAGR are per year over the hold shown. A short hold can show a high IRR on a small absolute gain; compare the net-sale column too. Selling before registration usually needs the builder’s transfer NOC and a fee.
Highlights
- Nnp Buildcon · Baner / Balewadi / Pashan / Sus · unit count not on the public register
- Registered completion date passed (2024-12-30)
- Registered with MahaRERA as P52100019994
Assumptions editable
Purchase
FinancingLoan 75% · cash 25% · EMI ₹51,029/mo
Rent & running costs
Interiors & exit
Returns over 8 years · with interiors
| Year | Purchase | Loan in | Rent (net of vacancy) | Opex | Debt service | Sale − loan | Net cash |
|---|---|---|---|---|---|---|---|
| Today | -91.1 L | 58.8 L | 0.0 L | 0.0 L | 0.0 L | 0.0 L | -32.3 L |
| Yr 1 | 0.0 L | 0.0 L | 1.7 L | -0.7 L | -6.1 L | 0.0 L | -5.2 L |
| Yr 2 | 0.0 L | 0.0 L | 2.6 L | -0.9 L | -6.1 L | 0.0 L | -4.4 L |
| Yr 3 | 0.0 L | 0.0 L | 2.8 L | -1.0 L | -6.1 L | 0.0 L | -4.3 L |
| Yr 4 | 0.0 L | 0.0 L | 2.9 L | -1.0 L | -6.1 L | 0.0 L | -4.2 L |
| Yr 5 | 0.0 L | 0.0 L | 3.0 L | -1.0 L | -6.1 L | 0.0 L | -4.1 L |
| Yr 6 | 0.0 L | 0.0 L | 3.2 L | -1.1 L | -6.1 L | 0.0 L | -4.0 L |
| Yr 7 | 0.0 L | 0.0 L | 3.4 L | -1.1 L | -6.1 L | 0.0 L | -3.9 L |
| Yr 8 | 0.0 L | 0.0 L | 3.5 L | -1.2 L | -6.1 L | 97.1 L | 93.4 L |
Pre-tax unless capital-gains tax is set. Rent enters the cash flows once. Net-wealth CAGR = (cash returned incl. sale ÷ cash put in)^(1/years) − 1. IRR uses the dated cash flows.
Score factors
Bars show points added or taken away versus the average analysed Pune project (score 50).
Price growth model, year by year
Nominal growth per year. Parts add up; momentum fades, infrastructure is weighted by delivery probability and dated.
| Component | Yr 1 | Yr 2 | Yr 3 | Yr 4 | Yr 5 | Yr 6 | Confidence |
|---|---|---|---|---|---|---|---|
| Pune long-run nominal trend | 6.0 | 6.0 | 6.0 | 6.0 | 6.0 | 6.0 | 80% |
| Locality momentum (mean-reverting) | 0.8 | 0.4 | 0.2 | 0.1 | 0.1 | 0.0 | 45% |
| Affordability ceiling | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 60% |
| Employment access & office pipeline | 1.7 | 1.7 | 1.7 | 1.7 | 1.7 | 1.7 | 55% |
| Supply–demand balance | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 50% |
| Infrastructure delivery (probability-weighted) | 0.3 | 0.1 | 0.1 | 0.1 | 0.0 | 0.0 | 55% |
| Project-specific adjustments | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 50% |
| Total growth | 8.8% | 8.3% | 8.1% | 8.0% | 7.8% | 7.8% | 56% |
Pune long-run nominal trend: City-wide 2013-25 nominal residential trend ≈ inflation + real income growth.
Locality momentum (mean-reverting): Trailing 3.0-yr locality CAGR 8.2% vs 6.0% trend; 35% carried forward, halving each year.
Affordability ceiling: Ticket at ₹10,100 psf vs city median ₹8,700; buyer pool thins above ₹15k/₹20k psf and after >6pp excess growth.
Employment access & office pipeline: 5 msf office pipeline (3 yr) on 20 msf stock; 30-min jobs index 0.85.
Supply–demand balance: 16 months of unsold inventory; new-launch/absorption ratio 1.2.
Infrastructure delivery (probability-weighted): Metro Line 3 Hinjewadi–Shivajinagar (construction, 2026, p=0.7); Pune Ring Road (PMRDA) (construction, 2029, p=0.45)
Project-specific adjustments: Building age 2 yrs.
Locality evidence: ₹10,500 (Jun 2023) → ₹13,300 (Jun 2026) = 8.2% p.a. Sources: Platform estimate (interim, not observed).
What the public record says
Automated from MahaRERA's public register entry and registration certificate for P52100019994. Prices and rents are locality estimates, not verified listings. Compiled Nov 2026 from the MahaRERA file, company registers, rating agencies, tribunal records and press. Facts only; anything that deserves a written answer before signing is flagged.
Meters are rule-based from the RERA file and public ratings (rules shown under each), not opinions.
No public credit rating located for the promoter.
NNP BUILDCON PRIVATE LIMITED: credit rating not yet checked by PropertyLens
Delivered. RERA registration ran 2019-03-15 → 2024-12-30
No RERA complaints on this project; 0 on the promoter overall
No litigation declared in RERA filings
RERA file · Registration
Red flags to resolve in writing
Questions to put to the developer before you sign
- Share the latest quarterly progress filing and the architect and engineer certificates.
- Confirm the price list, floor-rise, parking and other charges for the exact unit.
- Provide the occupancy certificate and the title chain for the unit.
- Confirm there is no litigation on the land or approvals beyond the RERA declaration.
- Is the land owned by the promoter, or is this a joint development, and is any part mortgaged?
Full record: every filed number, line by line1 sections · 4 items
RERA file · Registration
Source: MahaRERA project record P52100019994, fetched 2026-11-10. Figures are the promoter’s own filings.
Sources & caveats2 sources
- MahaRERA project record P52100019994, fetched 2026-11-10
- PropertyLens Pune locality model (market-level estimates)
- MahaRERA project records P52100019994 (registration file, quarterly updates, complaint register), fetched Sep 2026.
Caveats. Automated analysis: prices, rents and travel times are estimates until listings and Maps data are verified. RERA figures are the promoter’s own filings. Nothing here is legal, tax or investment advice.
Evidence
Location, jobs & transit3 hubs · metro 2.5 km
| Destination | Drive now | Road km |
|---|---|---|
| Baner | 4 min | 0 |
| Hinjewadi Phase 1 | 20 min | 6 |
| Shivajinagar (CBD) | 23 min | 7.3 |
| Pimpri MIDC | 25 min | 7.9 |
| Pune airport | 42 min | 14.4 |
| Magarpatta | 45 min | 15.7 |
| Kharadi EON IT Park | 49 min | 17.4 |
| Chakan MIDC | 65 min | 23.6 |
Google Maps driving time with live traffic, measured Nov 2026. Refreshed monthly.
Location used: recorded coordinates (estimate). Bus coverage and planned-station distances are still interim estimates.
Price historylocality 8.2%/yr
No dated project-level price series yet; only the latest observation is on file.
| Date | ₹ psf | Source | Confidence | Kind |
|---|---|---|---|---|
| Jun 2021 | 9,500 | Platform estimate (interim, not observed) | 40% | derived |
| Jun 2023 | 10,500 | Platform estimate (interim, not observed) | 45% | derived |
| Jun 2025 | 12,300 | Platform estimate (interim, not observed) | 50% | derived |
| Jun 2026 | 13,300 | Platform estimate (interim, not observed) | 50% | derived |
Model backtest on this locality: 1-yr hold-out (Jun 2025→Jun 2026): predicted ₹13,315 vs actual ₹13,300 (+0.1%). Longer 3-yr hold-out (Jun 2023→Jun 2026): predicted 7.6% p.a. vs actual 8.2% p.a. — the model is deliberately mean-reverting and under-predicted the 2021–26 boom.
Environment, legal & productflood ok · water risk · RERA yes
High-rise boom; Sus and Mahalunge water via tankers
Sources & data gapswhat we know, from where, and what is missing
Automated analysis from MahaRERA's public register: unit sizes and prices are locality-model estimates until listings are verified.
| Field | Value | Source class | Date | Conf. | Kind | Conflicting values |
|---|---|---|---|---|---|---|
| Address | Mulshi, Pune, 411045 | MahaRERA | Nov 2026 | 70% | observed | |
| Land area (acres) | Platform estimate (interim, not observed) | Nov 2026 | 20% | assumed | ||
| Total units | Platform estimate (interim, not observed) | Nov 2026 | 20% | assumed | ||
| Launch year | 2019 | MahaRERA | Nov 2026 | 70% | observed | |
| Possession · Registration P52100019994 | 2024-12-30 | MahaRERA | Nov 2026 | 40% | assumed | |
| Price psf · 2 BHK · ~750 sq ft carpet (assumed) | 10100 | Platform estimate (interim, not observed) | Nov 2026 | 30% | assumed | |
| Ticket · 2 BHK · ~750 sq ft carpet (assumed) | 7575000 | Platform estimate (interim, not observed) | Nov 2026 | 30% | derived | |
| Rent · 2 BHK · ~750 sq ft carpet (assumed) | 22000 | Platform estimate (interim, not observed) | Nov 2026 | 30% | assumed | |
| Carpet area | 750 | Platform estimate (interim, not observed) | Nov 2026 | 30% | assumed | |
| Builder on-time rate | 0.91 | MahaRERA | Nov 2026 | 60% | derived | |
| Litigation | not published on the public register | MahaRERA | Nov 2026 | 30% | assumed | |
| Approvals | MahaRERA registered | MahaRERA | Nov 2026 | 60% | observed |
Commercial listing portals are shown as “Listing portal (aggregated)”; full provenance is retained internally. Official developer and MahaRERA sources are named.
Other projects worth comparing
Same model, same date. Scores are out of 100, where 50 is the average analysed Pune project.
More in Baner / Balewadi / Pashan / Sus All Baner / Balewadi / Pashan / Sus →
More from Nnp Buildcon Delivery record →
Around ₹75.8 L elsewhere in Pune All projects →
Questions people ask about VTP Leonara building C and F
Is VTP Leonara building C and F a good investment?
On PropertyLens's evidence-based model VTP Leonara building C and F scores 63/100, above the average analysed Pune project (50 = average, 12 points = one standard deviation). The model projects price growth of about 8.2% a year over five years and a net-wealth CAGR of 5.2% after every cost on an 8-year hold with a 75.0% loan. That is research on public filings, not advice; the factor breakdown on this page shows what drives the score.
What is the price per sq ft at VTP Leonara building C and F?
About ₹10,100 per sq ft of super built-up area, a model estimate from Baner / Balewadi / Pashan / Sus comparables that you can edit. The 2 BHK home costs about ₹75.8 L before other charges, GST and stamp duty, and ₹90.8 L all-in.
When is VTP Leonara building C and F ready for possession?
The project is marked ready to move in; confirm the occupancy certificate before paying.
Is VTP Leonara building C and F RERA registered?
Yes. MahaRERA registration: P52100019994. No complaints on this registration at MahaRERA as of 2026-11-10.
How reliable is Nnp Buildcon on delivery?
91% of Nnp Buildcon's crawled Pune registrations needed no extension (10 of 10 analysed Pune registrations needed no extension). 10 registrations analysed. The developer scorecard compares this with every other Pune developer.
What rent can VTP Leonara building C and F earn?
About ₹22,000 a month for this home (a model estimate from Baner / Balewadi / Pashan / Sus rents), a gross yield of 3.4% on the all-in cost. Rent covers 43% of the EMI at the default loan.
Answers are generated from the filings and the model for this home and change when you edit the assumptions above. See the Nnp Buildcon scorecard and the Baner / Balewadi / Pashan / Sus area page.