PropertyLensBengaluru · invest
← Project pageChoose “Save as PDF” in the print dialog. Charts and colours are kept.
PropertyLensBengaluru · invest
Investment & due-diligence report · 18 Oct 2026

Dsr Elixir (phase I)

DSR Infrastructure · Hoskote / Budigere Cross / Old Madras Road

DeveloperDSR Infrastructure · #44 in Bengaluru by RERA registrations
LocalityHoskote / Budigere Cross / Old Madras Road
AddressSy No 64/1 64/2 65/1 65/2 65/3 65/4 69/3 70/1 and Sy.No 70/2 of Bidare Agrahara Village Bidarahalli Hobli, BETQ Bengaluru and Sy No101/1 of, BIDARAHALLI HOBLI BENGALURU EAST TALUK BENGALURU
Typeplot · mid
StatusReady to move in
Homesnot filed
Land21.11 acres
Launched2020
RERAPRM/KA/RERA/1251/446/PR/210219/003912

Home analysed: Plot · 762 sq ft. Financing: 75% loan at 8.5% over 20 years, 8-year hold. Every number states whether it was observed from a source or assumed. Score of 50 = the average analysed Bengaluru project; 12 points = one standard deviation.

54
Investment score
54/100
Evidence confidence55%
Plot · 762 sq ft
Price growth per year, next 5 yrs model
10.4%
likely range 6.9%–13.8% · over 10 yrs 9.9%/yr
Net-wealth CAGR, 8-yr hold
5.9%
your cash in → cash back incl. sale, per year
Cash-flow IRR, 8-yr hold
8.4%
with 75% loan · all-cash 8.5% · no interiors
Three numbers, three questions. Price growth: what will the home be worth? Net-wealth CAGR: what will my money have earned after every cost? Cash-flow IRR: the same, but counting when each rupee moves. Tap i on any of them.
Price · edit here or below assumed
₹Cr
₹ psf × 760 sq ft · as of Sep 2026
Price edits apply to ·
All-in cost
₹27.5 L
+ other charges 0.5 L, GST 0.0 L, stamp/reg 1.7 L
Gross rental yield assumed
0.0%
vacant plot: no rent assumed

In plain words

Why 54 out of 100

Each home is marked on 11 things a careful buyer checks, then compared with every project we analyse in Bengaluru: 50 is the average project, 62 beats about five in six. Here is what lifts this one and what drags it:

  • +
    Legal, title & approvals · 2/5 pts
    Registered with Karnataka RERA; no court cases reported; land title not yet verified by us, so get a lawyer to check. The due-diligence report below flags 0 items in red.
  • +
    Price vs comparables · 1/3 pts
    Cheaper than similar mid homes nearby: ₹3,300 vs about ₹6,000 per sq ft.
  • +
    Builder delivery & handover risk · 5/16 pts
    DSR Infrastructure has finished 11+ projects and delivered on time about 63% of the time. This home is ready, so there is no waiting risk.
  • −
    Rental demand & yield · -6/8 pts
    A plot earns no rent, so this scores low by design.
  • −
    Schools, hospitals, daily needs · -1/3 pts
    Schools, hospitals and daily shopping are limited in this area.
  • −
    Metro, bus, rail & airport · -2/9 pts
    No working metro nearby (nearest 8 km). Airport is about 54 minutes by road right now.
All 11 checks
  • +
    Price vs comparables · 1/3 pts
    Cheaper than similar mid homes nearby: ₹3,300 vs about ₹6,000 per sq ft.
  • −
    Rental demand & yield · -6/8 pts
    A plot earns no rent, so this scores low by design.
  • +
    Resale liquidity · 0/4 pts
    Plenty of buyers can afford a ₹25.1 L home, and homes in Hoskote / Budigere Cross / Old Madras Road resell at a normal pace.
  • •
    Employment access · 2/10 pts
    Drive times right now: ITPL Whitefield 17 min, Manyata Tech Park 38 min, ORR Bellandur (Ecospace) 39 min; Electronic City Ph-1 62 min. About 3 million sq ft of new offices are planned nearby in 3 years.
  • −
    Metro, bus, rail & airport · -2/9 pts
    No working metro nearby (nearest 8 km). Airport is about 54 minutes by road right now.
  • •
    Schools, hospitals, daily needs · -1/3 pts
    Schools, hospitals and daily shopping are limited in this area.
  • •
    Builder delivery & handover risk · 5/16 pts
    DSR Infrastructure has finished 11+ projects and delivered on time about 63% of the time. This home is ready, so there is no waiting risk.
  • •
    Layout, size, age, amenities, maintenance · -0/3 pts
    Moderately dense layout (60 homes per acre); about 72% of the area you pay for is usable carpet area. Maintenance ~₹3.5 per sq ft a month.
  • •
    Water, flooding, noise, infrastructure · -1/9 pts
    Low flood risk; water supply is mostly borewell or tankers; noise is manageable.
  • +
    Legal, title & approvals · 2/5 pts
    Registered with Karnataka RERA; no court cases reported; land title not yet verified by us, so get a lawyer to check. The due-diligence report below flags 0 items in red.
  • •
    Expected price growth (5-yr CAGR model) · 4/26 pts
    We expect prices here to rise about 10.4% a year for the next 5 years (explained below).
Why prices should grow ~10.4% a year for the next 5 years

We build the forecast step by step, starting from what Bengaluru homes normally do and adjusting for this area and this project:

  1. + 6.0%Start with 6.0% a year: the normal long-run growth of Bengaluru home prices.
  2. + 0.9%Add 0.9%: prices here rose 12.1% a year recently (2023-06 to 2026-06). Some of that pace continues, but it fades each year.
  3. − 0.0%Prices are still affordable enough that this does not slow growth.
  4. + 1.9%Add 1.9%: 3 million sq ft of new offices nearby means more people wanting homes here.
  5. + 0.0%Supply and demand are balanced here (17 months of unsold stock).
  6. + 0.1%Add 0.1% for new roads, metro and water lines, weighted by how likely they are to actually finish: Peripheral Ring Road (planned, 2030); Bengaluru suburban rail (K-RIDE) (construction, 2029).
  7. + 1.5%No extra project-level adjustment.
  8. = 10.4%Result: about 10.4% a year, so a home worth ₹25.6 L today would be worth about ₹41.9 L in 5 years. We are 56% confident in the evidence behind this.

Homes on offer

Every unit type on the RERA inventory or price list. Prices marked “assumed” are locality-model estimates until a listing is verified.

HomeCarpetSuper built-upPrice / sq ftPriceRent / monthUnits
Plot
762 sq ft
762 sq ft760 sq ft₹3,300 assumed₹25.1 L—12
Plot
799 sq ft
799 sq ft800 sq ft₹3,300 assumed₹26.4 L—11
Plot
926 sq ft
926 sq ft925 sq ft₹3,300 assumed₹30.5 L—1
Plot
1199 sq ft
1,199 sq ft1,200 sq ft₹3,300 assumed₹39.6 L—75
Plot
1401 sq ft
1,401 sq ft1,400 sq ft₹3,300 assumed₹46.2 L—8
Plot
1421 sq ft
1,421 sq ft1,420 sq ft₹3,300 assumed₹46.9 L—1
Plot
1499 sq ft
1,499 sq ft1,500 sq ft₹3,300 assumed₹49.5 L—74
Plot
1722 sq ft
1,722 sq ft1,720 sq ft₹3,300 assumed₹56.8 L—1
Plot
1755 sq ft
1,755 sq ft1,755 sq ft₹3,300 assumed₹57.9 L—1
Plot
1862 sq ft
1,862 sq ft1,860 sq ft₹3,300 assumed₹61.4 L—1

Highlights

  • DSR Infrastructure · Hoskote / Budigere Cross / Old Madras Road · unit count not filed on 21.1 acres
  • Marked completed on RERA (completion date 2023-03-15)
  • No litigation declared · 1 complaints on this registration

Assumptions used prefilled

These are the inputs behind every number above. Open the project page to change any of them.

Purchase

₹/sq ft
₹ Cr
sq ft
% of base
%
%
%
₹/sq ft

FinancingLoan 75% · cash 25% · EMI ₹16,650/mo

% loan
% p.a.
years
%

Rent & running costs

₹/sq ft/mo
% of rent
% of value

Interiors & exit

%
%
years
% p.a. (blank = model)
%
%

Returns over 8 years · no interiors

Cash you put in₹23.2 L
Exit value (yr 8)₹54.9 L
Net sale after loan & costs₹38.9 L
Net rent after opex₹-87,059
Loan (75% of price)₹19.2 L
EMI / month₹16,650
Year 0: ₹-8.4 L0Year 1: ₹-2.1 L1Year 2: ₹-2.1 L2Year 3: ₹-2.1 L3Year 4: ₹-2.1 L4Year 5: ₹-2.1 L5Year 6: ₹-2.1 L6Year 7: ₹-2.1 L7Year 8: ₹36.7 L8
YearPurchaseLoan inRent (net of vacancy)OpexDebt serviceSale − loanNet cash
Today-27.6 L19.2 L0.0 L0.0 L0.0 L0.0 L-8.4 L
Yr 10.0 L0.0 L0.0 L-0.1 L-2.0 L0.0 L-2.1 L
Yr 20.0 L0.0 L0.0 L-0.1 L-2.0 L0.0 L-2.1 L
Yr 30.0 L0.0 L0.0 L-0.1 L-2.0 L0.0 L-2.1 L
Yr 40.0 L0.0 L0.0 L-0.1 L-2.0 L0.0 L-2.1 L
Yr 50.0 L0.0 L0.0 L-0.1 L-2.0 L0.0 L-2.1 L
Yr 60.0 L0.0 L0.0 L-0.1 L-2.0 L0.0 L-2.1 L
Yr 70.0 L0.0 L0.0 L-0.1 L-2.0 L0.0 L-2.1 L
Yr 80.0 L0.0 L0.0 L-0.1 L-2.0 L38.9 L36.7 L

Pre-tax unless capital-gains tax is set. Rent enters the cash flows once. Net-wealth CAGR = (cash returned incl. sale ÷ cash put in)^(1/years) − 1. IRR uses the dated cash flows.

Score factors

Bars show points added or taken away versus the average analysed Bengaluru project (score 50).

Price vs comparables
+1.0 pts vs avg
this home 7.3/10 · Bengaluru average 6.2 · confidence 35%
₹3,300 psf vs mid comps ₹6,000 (-45%). Price is a model estimate, so this factor carries a third of its normal weight until a listed price is observed.
Rental demand & yield
−5.6 pts vs avg
this home 3.2/10 · Bengaluru average 6.0 · confidence 38%
Gross yield 0.0% (₹0 psf/month); locality rental demand 6/10.
Resale liquidity
+0.1 pts vs avg
this home 7.7/10 · Bengaluru average 7.6 · confidence 50%
Locality resale depth 6/10; ticket ₹0.25 Cr narrows the buyer pool.
Employment access
+2.2 pts vs avg
this home 6.3/10 · Bengaluru average 5.2 · confidence 85%
Drive times now (Google Maps, 2026-09-16): ITPL Whitefield 17 min, Manyata Tech Park 38 min, ORR Bellandur (Ecospace) 39 min, MG Road (CBD) 45 min; 1 of 7 major hubs within 30 min; 3 msf office pipeline (3 yr).
Metro, bus, rail & airport
−1.8 pts vs avg
this home 3.8/10 · Bengaluru average 4.8 · confidence 60%
Purple Line Kadugodi terminus (6–10 km); no planned station within 2 km; airport ~54 min by road now (Google Maps); .
Schools, hospitals, daily needs
−1.5 pts vs avg
this home 5.5/10 · Bengaluru average 7.0 · confidence 50%
Locality social-infrastructure index (interim, expert-set; POI distances pending Maps integration).
Builder delivery & handover risk
+4.7 pts vs avg
this home 5.6/10 · Bengaluru average 3.7 · confidence 60%
DSR Infrastructure: 11+ projects, on-time 63% (derived); ready.
Layout, size, age, amenities, maintenance
−0.4 pts vs avg
this home 7.0/10 · Bengaluru average 7.3 · confidence 50%
60 units/acre; carpet/SBA ~72%; maintenance ~₹3.5 psf/month (assumed).
Water, flooding, noise, infrastructure
−1.1 pts vs avg
this home 5.3/10 · Bengaluru average 5.8 · confidence 50%
Borewell/tanker dependence; NH-75 access
Legal, title & approvals
+2.3 pts vs avg
this home 8.5/10 · Bengaluru average 7.4 · confidence 55%
RERA registered; litigation: none reported; approvals: RERA registered; title: not verified. Due-diligence report lists 0 red flags (−0.3 pts).
Expected price growth (5-yr CAGR model)
+4.1 pts vs avg
this home 6.6/10 · Bengaluru average 6.0 · confidence 56%
Model 5-yr price CAGR 10.4% (range 6.9–13.8%).

Price growth model, year by year

Nominal growth per year. Parts add up; momentum fades, infrastructure is weighted by delivery probability and dated.

ComponentYr 1Yr 2Yr 3Yr 4Yr 5Yr 6Confidence
Bengaluru long-run nominal trend6.06.06.06.06.06.080%
Locality momentum (mean-reverting)2.11.20.60.40.20.145%
Affordability ceiling-0.0-0.0-0.0-0.0-0.0-0.060%
Employment access & office pipeline1.91.91.91.91.91.955%
Supply–demand balance0.00.00.00.00.00.050%
Infrastructure delivery (probability-weighted)0.00.10.20.20.10.055%
Project-specific adjustments1.51.51.51.51.51.550%
Total growth11.5%10.6%10.2%9.9%9.6%9.5%56%

Bengaluru long-run nominal trend: City-wide 2013-25 nominal residential trend ≈ inflation + real income growth.

Locality momentum (mean-reverting): Trailing 3.0-yr locality CAGR 12.1% vs 6.0% trend; 35% carried forward, halving each year.

Affordability ceiling: Ticket at ₹3,300 psf vs city median ₹9,500; buyer pool thins above ₹15k/₹20k psf and after >6pp excess growth.

Employment access & office pipeline: 3 msf office pipeline (3 yr) on 8 msf stock; 30-min jobs index 0.50.

Supply–demand balance: 17 months of unsold inventory; new-launch/absorption ratio 1.09 (from 41 under-construction RERA filings in this locality: 8,263 unsold homes, 1169.6 sold per month).

Infrastructure delivery (probability-weighted): Peripheral Ring Road (planned, 2030, p=0.4); Bengaluru suburban rail (K-RIDE) (construction, 2029, p=0.5)

Project-specific adjustments: Building age 3 yrs. Land in expansion corridors historically outpaces built stock; no depreciation.

Locality evidence: ₹5,400 (Jun 2023) → ₹7,600 (Jun 2026) = 12.1% p.a. Sources: Platform estimate (interim, not observed).

Financial & legal due diligence

What the public record says

Automated from the Karnataka RERA file PRM/KA/RERA/1251/446/PR/210219/003912. Prices and rents are locality estimates, not verified listings. Compiled Sep 2026 from the Karnataka RERA file, company registers, rating agencies, tribunal records and press. Facts only; anything that deserves a written answer before signing is flagged.

Delivery timeline8/10
delivered on the original registration
Legal & complaints8.5/10
1 RERA complaint on the project (−0.5)
Money to finish8/10
finance cost is 0% of the registered budget
Developer strength5/10
no public credit rating for the promoter

Meters are rule-based from the RERA file and public ratings (rules shown under each), not opinions.

Registration
PRM/KA/RERA/1251/446/PR/210219/003912 · DSR INFRASTRUCTURE PVT LTD
Delivered
RegisteredDec 2020Original completionMar 2023TodaySep 2026
Collected (at registration)₹51.98 Cr
Spent₹35.81 Cr
Balance with promoter₹0
No litigation declared1 complaintsEscrow: HDFC
Credit ratings of the people behind it

No public credit rating located for the promoter.

DSR INFRASTRUCTURE PVT LTD: no public rating located

Complaints & disputes on record
On this project1– open
On the promoter entity2all projects
Court cases declared0no stay recorded
At a glance
Delivered

Delivered. RERA registration ran 2020-12-01 → 2023-03-15

1 RERA complaints

1 RERA complaints on this project; 2 on the promoter overall

No litigation declared

No litigation declared in RERA filings

The record, in pictures

RERA file · Registration

Registered project cost ₹156 cr — where it goes
Land ₹128.4 cr · 83%Construction & on-site ₹27.1 cr · 17%
No litigation declaredBorrowing declared: not statedEscrow at HDFC

Red flags to resolve in writing

Questions to put to the developer before you sign

  1. Share the latest CA Form 4 and architect Form 5 with the escrow deposit ratio.
  2. Confirm the price list, floor-rise and other charges for the exact unit.
  3. Provide the occupancy certificate, khata and title chain for the unit.
  4. Confirm there is no litigation on the land or approvals beyond the RERA declaration.
  5. Is the land freehold with the developer, and is any part mortgaged?
Full record: every filed number, line by line1 sections · 9 items

RERA file · Registration

Registration
PRM/KA/RERA/1251/446/PR/210219/003912 · promoter DSR INFRASTRUCTURE PVT LTD (Company) · Proposed Project End Date at the time of registration :
Dates
Start 2020-12-01 · original completion 2023-03-15 · no extensions
Status
Completed and occupied (per project status); RERA progress fields below are historical
Registered cost
Total ₹156 cr · land ₹128 cr · construction ₹27.12 cr
RERA bank account
HDFC, RICHMOND ROAD BRANCH (70% construction account)
Money at registration
collected ₹51.98 cr · spent ₹35.81 cr · balance ₹0.00 cr
Land & towers
21.11 acres (85,439 sq m)
Litigation declared
None declared in filings
K-RERA complaints
1 on this registration · 2 on the promoter entity across all its projects

Source: Karnataka RERA project record PRM/KA/RERA/1251/446/PR/210219/003912, fetched 2026-09-15. Figures are the promoter’s own filings.

Sources & caveats2 sources
  • Karnataka RERA project record PRM/KA/RERA/1251/446/PR/210219/003912 (registration file, quarterly updates, complaint register), fetched 2026-09-15
  • PropertyLens locality model (market-level estimates)
  • Karnataka RERA project records PRM/KA/RERA/1251/446/PR/210219/003912 (registration file, quarterly updates, complaint register), fetched Sep 2026.

Caveats. Automated analysis: prices, rents and travel times are estimates until listings and Maps data are verified. RERA figures are the promoter’s own filings. Nothing here is legal, tax or investment advice.

Evidence

Location, jobs & transit3 hubs · metro none nearby
Job hubs nearby
ITPL / Whitefield 10 kmHoskote industrialKR Puram 10 km
Measured drive times below
Office space
Existing8 msf
Coming in 3 yrs3 msf
Jobs within 30 min5/10
Getting around
Metro today
Purple Line Kadugodi terminus (6–10 km)
none within 5 km
Metro planned
No station planned within 2 km
Rail
—
estimate
Airport
54 min by road now · 19.2 km
Google Maps
Buses
7/10 coverage
estimate
Drive times to job hubs
DestinationDrive nowRoad km
ITPL Whitefield17 min4.9
Manyata Tech Park38 min13.3
ORR Bellandur (Ecospace)39 min13.5
MG Road (CBD)45 min15.9
Hebbal (Kirloskar)45 min15.8
Koramangala (Forum)50 min17.7
Kempegowda Airport (KIA)54 min19.2
Electronic City Ph-162 min22.4

Google Maps driving time with live traffic, measured Sep 2026. Refreshed monthly.

Location used: Google Maps match “”. Bus coverage and planned-station distances are still interim estimates.

Price historylocality 12.1%/yr

No dated project-level price series yet; only the latest observation is on file.

Locality · average ₹/sq ft
Date₹ psfSourceConfidenceKind
Jun 20214,200Platform estimate (interim, not observed)40%derived
Jun 20235,400Platform estimate (interim, not observed)45%derived
Jun 20256,800Platform estimate (interim, not observed)50%derived
Jun 20267,600Platform estimate (interim, not observed)50%derived
Luxury comps₹9,500
Premium comps₹7,800
Mid comps₹6,000
Unsold stock17 months

Model backtest on this locality: 1-yr hold-out (Jun 2025→Jun 2026): predicted ₹7,478 vs actual ₹7,600 (-1.6%). Longer 3-yr hold-out (Jun 2023→Jun 2026): predicted 9.1% p.a. vs actual 12.1% p.a. — the model is deliberately mean-reverting and under-predicted the 2021–26 boom.

Environment, legal & productflood ok · water risk · RERA yes
Flood risklow
Water supplytankers/borewell
Quietok
Roads & drainspatchy

Borewell/tanker dependence; NH-75 access

Legal & approvals
Registration 003912
RERA PRM/KA/RERA/1251/446/PR/210219/003912
ready
Litigation
none reported
observed
Approvals
RERA registered
observed
Title
not verified
assumed
Product
Land21.11 acres
Homesnull
Density60/acre
Launched2020
Sources & data gapswhat we know, from where, and what is missing

Automated analysis: unit mix and carpet areas come from the RERA inventory table; prices and rents are locality-model estimates until listings are verified.

FieldValueSource classDateConf.KindConflicting values
AddressSy No 64/1 64/2 65/1 65/2 65/3 65/4 69/3 70/1 and Sy.No 70/2 of Bidare Agrahara Village Bidarahalli Hobli, BETQ Bengaluru and Sy No101/1 of, BIDARAHALLI HOBLI BENGALURU EAST TALUK BENGALURUKarnataka RERA (number as reported; registry lookup pending)Sep 202680%observed
Land area (acres)21.11Karnataka RERA (number as reported; registry lookup pending)Sep 202680%observed
Total unitsPlatform estimate (interim, not observed)Sep 202620%assumed
Launch year2020Karnataka RERA (number as reported; registry lookup pending)Sep 202670%observed
Possession · Registration 0039122023-03-15Karnataka RERA (number as reported; registry lookup pending)Sep 202670%observed
Price psf · Plot · 762 sq ft3300Platform estimate (interim, not observed)Sep 202635%assumed
Ticket · Plot · 762 sq ft2508000Platform estimate (interim, not observed)Sep 202635%derived
Rent · Plot · 762 sq ft0Platform estimate (interim, not observed)Sep 202635%assumed
Carpet area762Karnataka RERA (number as reported; registry lookup pending)Sep 202660%observed
Builder on-time rate0.63Karnataka RERA (number as reported; registry lookup pending)Sep 202660%derived
Litigationnone reportedKarnataka RERA (number as reported; registry lookup pending)Sep 202670%observed
ApprovalsRERA registeredKarnataka RERA (number as reported; registry lookup pending)Sep 202660%observed

Commercial listing portals are shown as “Listing portal (aggregated)”; full provenance is retained internally. Official developer and Karnataka RERA sources are named.

PropertyLens · property-lens.ai · Scores and projections are model outputs built from dated public evidence (Karnataka RERA filings, quarterly promoter updates, public ratings, Google Maps) and the stated assumptions. They are not investment advice and not a substitute for a title search, a lawyer’s opinion or a site visit. Values marked “assumed” are editable estimates, not verified facts.
Share on WhatsApp