Investment & due-diligence report · 18 Oct 2026

LGCL One Street

LGCL Urban Homes · Hennur Road / Kothanur / Kalyan Nagar

DeveloperLGCL Urban Homes · #57 in Bengaluru by RERA registrations
LocalityHennur Road / Kothanur / Kalyan Nagar
AddressSy. No.75/1, BBMP Khata No.58/75/1, Kyalasanahalli Village, Krishnarajapuram Hobli,
Typeapartment · mid
StatusUnder construction · handover Mar 2019
Homes32 units
Land1.35 acres
Launched2015
RERAPRM/KA/RERA/1251/446/PR/171014/000374

Home analysed: 3 BHK · ~1,685 sq ft (1247 carpet). Financing: 75% loan at 8.5% over 20 years, 8-year hold, interiors fitted before letting. Every number states whether it was observed from a source or assumed. Score of 50 = the average analysed Bengaluru project; 12 points = one standard deviation.

56
Investment score
56/100
Evidence confidence56%
3 BHK · ~1,685 sq ft (1247 carpet)
Price growth per year, next 5 yrs model
10.6%
likely range 7.1%–14.0% · over 10 yrs 9.3%/yr
Net-wealth CAGR, 8-yr hold
5.5%
your cash in → cash back incl. sale, per year
Cash-flow IRR, 8-yr hold
7.0%
with 75% loan · all-cash 7.7% · with interiors
Three numbers, three questions. Price growth: what will the home be worth? Net-wealth CAGR: what will my money have earned after every cost? Cash-flow IRR: the same, but counting when each rupee moves. Tap i on any of them.
Price · edit here or below assumed
₹Cr
₹ psf × 1,685 sq ft · as of Sep 2026
Price edits apply to ·
All-in cost
₹1.76 Cr
+ other charges 4.7 L, GST 7.0 L, stamp/reg 9.2 L, interiors 20.2 L
Gross rental yield assumed
3.3%
rent starts in ~0.3 yr

In plain words

Why 56 out of 100

Each home is marked on 11 things a careful buyer checks, then compared with every project we analyse in Bengaluru: 50 is the average project, 62 beats about five in six. Here is what lifts this one and what drags it:

  • +
    Layout, size, age, amenities, maintenance · 3/3 pts
    Spacious layout (24 homes per acre); about 72% of the area you pay for is usable carpet area. Maintenance ~₹3.5 per sq ft a month.
  • +
    Employment access · 7/10 pts
    Drive times right now: Manyata Tech Park 17 min, Hebbal (Kirloskar) 24 min, MG Road (CBD) 34 min; Electronic City Ph-1 68 min. About 6 million sq ft of new offices are planned nearby in 3 years.
  • +
    Schools, hospitals, daily needs · 1/3 pts
    Schools, hospitals and daily shopping are good in this area.
  • −
    Builder delivery & handover risk · -9/16 pts
    LGCL Urban Homes has finished 9+ projects and delivered on time about 57% of the time. This phase is 45% built, with handover promised for 2019-03-31: delays would push your rent start back.
  • −
    Legal, title & approvals · -2/5 pts
    Registered with Karnataka RERA; no court cases reported; land title not yet verified by us, so get a lawyer to check. The due-diligence report below flags 1 item in red.
  • −
    Resale liquidity · -2/4 pts
    Plenty of buyers can afford a ₹1.35 Cr home, and homes in Hennur Road / Kothanur / Kalyan Nagar resell at a normal pace. Reselling before handover needs the builder’s permission.
All 11 checks
  • •
    Price vs comparables · -0/3 pts
    Priced about the same as similar mid homes nearby (₹8,000 vs ~₹8,500 per sq ft).
  • •
    Rental demand & yield · 2/8 pts
    Rent pays back 3.3% of the price every year, close to the usual 3% in Bengaluru. Tenant demand here is very strong.
  • •
    Resale liquidity · -2/4 pts
    Plenty of buyers can afford a ₹1.35 Cr home, and homes in Hennur Road / Kothanur / Kalyan Nagar resell at a normal pace. Reselling before handover needs the builder’s permission.
  • +
    Employment access · 7/10 pts
    Drive times right now: Manyata Tech Park 17 min, Hebbal (Kirloskar) 24 min, MG Road (CBD) 34 min; Electronic City Ph-1 68 min. About 6 million sq ft of new offices are planned nearby in 3 years.
  • •
    Metro, bus, rail & airport · 1/9 pts
    No working metro nearby (nearest 4 km). Airport is about 44 minutes by road right now.
  • +
    Schools, hospitals, daily needs · 1/3 pts
    Schools, hospitals and daily shopping are good in this area.
  • −
    Builder delivery & handover risk · -9/16 pts
    LGCL Urban Homes has finished 9+ projects and delivered on time about 57% of the time. This phase is 45% built, with handover promised for 2019-03-31: delays would push your rent start back.
  • +
    Layout, size, age, amenities, maintenance · 3/3 pts
    Spacious layout (24 homes per acre); about 72% of the area you pay for is usable carpet area. Maintenance ~₹3.5 per sq ft a month.
  • •
    Water, flooding, noise, infrastructure · 0/9 pts
    Some flood risk in heavy rain; water supply is partly piped, partly tankers; noise is manageable.
  • •
    Legal, title & approvals · -2/5 pts
    Registered with Karnataka RERA; no court cases reported; land title not yet verified by us, so get a lawyer to check. The due-diligence report below flags 1 item in red.
  • •
    Expected price growth (5-yr CAGR model) · 6/26 pts
    We expect prices here to rise about 10.6% a year for the next 5 years (explained below).
Why prices should grow ~10.6% a year for the next 5 years

We build the forecast step by step, starting from what Bengaluru homes normally do and adjusting for this area and this project:

  1. + 6.0%Start with 6.0% a year: the normal long-run growth of Bengaluru home prices.
  2. + 1.0%Add 1.0%: prices here rose 12.9% a year recently (2023-06 to 2026-06). Some of that pace continues, but it fades each year.
  3. − 0.2%Subtract 0.2%: at ₹8,000 per sq ft, fewer families can afford to buy here, which slows further rises.
  4. + 1.8%Add 1.8%: 6 million sq ft of new offices nearby means more people wanting homes here.
  5. + 0.0%Supply and demand are balanced here (16 months of unsold stock).
  6. + 0.2%Add 0.2% for new roads, metro and water lines, weighted by how likely they are to actually finish: Pink Line Kalena Agrahara–Nagawara (construction, 2027); Blue Line KR Puram–Hebbal–Airport (construction, 2027).
  7. + 1.8%Add 1.8% for this project itself: unfinished homes are worth more once they are complete.
  8. = 10.6%Result: about 10.6% a year, so a home worth ₹1.40 Cr today would be worth about ₹2.30 Cr in 5 years. We are 56% confident in the evidence behind this.

Which exit suits you?

For an unfinished flat the answer depends on whether you sell at handover or hold, and whether you spend on interiors. Same price, same loan; only the strategy changes:

StrategyHoldIRR / yrWealth CAGR / yrCash you put inNet rentNet saleApply
Sell at handover, no interiors
Take delivery in 2019-03-31 and sell the bare flat (1 yr hold). Needs builder NOC or registration first; no rent.
1 yrs-1.4%-1.4%₹46.4 L₹1.1 L₹56.1 L
Hold bare, rent unfurnished best IRR
Skip interiors; rent 12% lower than a fitted home; sell after 8 yrs with no interiors value.
8 yrs9.7%7.3%₹1.09 Cr₹20.3 L₹2.00 Cr
Hold, do interiors, rent & sell fitted selected
Spend ₹1,200/sq ft on interiors, earn full rent, recover ~40% of interiors cost at sale (fading over 10 yrs).
8 yrs7.0%5.5%₹1.26 Cr₹24.4 L₹2.01 Cr

IRR and CAGR are per year over the hold shown. A short hold can show a high IRR on a small absolute gain; compare the net-sale column too. Selling before registration usually needs the builder’s transfer NOC and a fee.

Homes on offer

Every unit type on the RERA inventory or price list. Prices marked “assumed” are locality-model estimates until a listing is verified.

HomeCarpetSuper built-upPrice / sq ftPriceRent / monthUnits
3 BHK
~1,685 sq ft (1247 carpet)
1,247 sq ft1,685 sq ft₹8,000 assumed₹1.35 Cr₹38,000 assumed7

Highlights

  • LGCL Urban Homes · Hennur Road / Kothanur / Kalyan Nagar · 32 homes on 1.3 acres
  • Under construction: 45% complete, RERA completion 2019-03-31
  • No litigation declared · 5 complaints on this registration

Assumptions used prefilled

These are the inputs behind every number above. Open the project page to change any of them.

Purchase

₹/sq ft
₹ Cr
sq ft
% of base
%
%
%
₹/sq ft

FinancingLoan 75% · cash 25% · EMI ₹95,348/mo

% loan
% p.a.
years
%

Rent & running costs

₹
% p.a.
%
months
months
₹/sq ft/mo
% of rent
% of rent
% of value

Interiors & exit

%
%
years
% p.a. (blank = model)
%
%

Returns over 8 years · with interiors

Cash you put in₹1.26 Cr
Exit value (yr 8)₹2.91 Cr
Net sale after loan & costs₹2.01 Cr
Net rent after opex₹24.4 L
Loan (75% of price)₹1.10 Cr
EMI / month₹95,348
Year 0: ₹-66.6 L0Year 1: ₹-10.1 L1Year 2: ₹-8.7 L2Year 3: ₹-8.5 L3Year 4: ₹-8.4 L4Year 5: ₹-8.2 L5Year 6: ₹-8.0 L6Year 7: ₹-7.8 L7Year 8: ₹1.94 Cr8
YearPurchaseLoan inRent (net of vacancy)OpexDebt serviceSale − loanNet cash
Today-1.76 Cr1.10 Cr0.0 L0.0 L0.0 L0.0 L-66.6 L
Yr 10.0 L0.0 L2.9 L-1.5 L-11.4 L0.0 L-10.1 L
Yr 20.0 L0.0 L4.5 L-1.8 L-11.4 L0.0 L-8.7 L
Yr 30.0 L0.0 L4.8 L-1.9 L-11.4 L0.0 L-8.5 L
Yr 40.0 L0.0 L5.0 L-1.9 L-11.4 L0.0 L-8.4 L
Yr 50.0 L0.0 L5.3 L-2.0 L-11.4 L0.0 L-8.2 L
Yr 60.0 L0.0 L5.5 L-2.1 L-11.4 L0.0 L-8.0 L
Yr 70.0 L0.0 L5.8 L-2.2 L-11.4 L0.0 L-7.8 L
Yr 80.0 L0.0 L6.1 L-2.3 L-11.4 L2.01 Cr1.94 Cr

Pre-tax unless capital-gains tax is set. Rent enters the cash flows once. Net-wealth CAGR = (cash returned incl. sale ÷ cash put in)^(1/years) − 1. IRR uses the dated cash flows.

Score factors

Bars show points added or taken away versus the average analysed Bengaluru project (score 50).

Price vs comparables
−0.2 pts vs avg
this home 5.9/10 · Bengaluru average 6.2 · confidence 35%
₹8,000 psf vs mid comps ₹8,500 (-6%; under-construction should price ~8% below ready). Price is a model estimate, so this factor carries a third of its normal weight until a listed price is observed.
Rental demand & yield
+1.7 pts vs avg
this home 6.8/10 · Bengaluru average 6.0 · confidence 38%
Gross yield 3.4% (₹23 psf/month); locality rental demand 8/10.
Resale liquidity
−1.9 pts vs avg
this home 6.5/10 · Bengaluru average 7.6 · confidence 50%
Locality resale depth 8/10; ticket ₹1.35 Cr narrows the buyer pool; UC resale needs builder NOC; 32-home project has thin resale comps.
Employment access
+6.9 pts vs avg
this home 8.6/10 · Bengaluru average 5.2 · confidence 85%
Drive times now (Google Maps, 2026-09-16): Manyata Tech Park 17 min, Hebbal (Kirloskar) 24 min, MG Road (CBD) 34 min, ITPL Whitefield 36 min; 2 of 7 major hubs within 30 min; 6 msf office pipeline (3 yr).
Metro, bus, rail & airport
+0.8 pts vs avg
this home 5.2/10 · Bengaluru average 4.8 · confidence 60%
none operational; Pink Line Nagawara terminal under construction; Nagawara (Pink Line) ~2027; airport ~44 min by road now (Google Maps); .
Schools, hospitals, daily needs
+1.0 pts vs avg
this home 8.0/10 · Bengaluru average 7.0 · confidence 50%
Locality social-infrastructure index (interim, expert-set; POI distances pending Maps integration).
Builder delivery & handover risk
−8.6 pts vs avg
this home 0.3/10 · Bengaluru average 3.7 · confidence 60%
LGCL Urban Homes: 9+ projects, on-time 57% (derived); handover 2019-03-31 (RERA); 90 months past the RERA completion date, work behind schedule (-55 pts).
Layout, size, age, amenities, maintenance
+2.8 pts vs avg
this home 9.5/10 · Bengaluru average 7.3 · confidence 55%
24 units/acre; carpet/SBA ~72%; maintenance ~₹3.5 psf/month (assumed); filed construction cost ₹15,973 per sq ft (premium spec).
Water, flooding, noise, infrastructure
+0.0 pts vs avg
this home 5.8/10 · Bengaluru average 5.8 · confidence 50%
Hennur Road widening incomplete; Kothanur lake flooding
Legal, title & approvals
−2.4 pts vs avg
this home 6.2/10 · Bengaluru average 7.4 · confidence 55%
RERA registered; litigation: none reported; approvals: RERA registered; title: not verified. Due-diligence report lists 1 red flag (−2.3 pts).
Expected price growth (5-yr CAGR model)
+5.7 pts vs avg
this home 6.9/10 · Bengaluru average 6.0 · confidence 56%
Model 5-yr price CAGR 10.6% (range 7.1–14.0%).

Price growth model, year by year

Nominal growth per year. Parts add up; momentum fades, infrastructure is weighted by delivery probability and dated.

ComponentYr 1Yr 2Yr 3Yr 4Yr 5Yr 6Confidence
Bengaluru long-run nominal trend6.06.06.06.06.06.080%
Locality momentum (mean-reverting)2.41.30.70.40.20.145%
Affordability ceiling-0.3-0.2-0.2-0.1-0.1-0.160%
Employment access & office pipeline1.81.81.81.81.81.855%
Supply–demand balance0.00.00.00.00.00.050%
Infrastructure delivery (probability-weighted)0.50.50.00.00.00.255%
Project-specific adjustments8.80.00.00.00.00.050%
Total growth19.2%9.4%8.4%8.1%8.0%8.1%56%

Bengaluru long-run nominal trend: City-wide 2013-25 nominal residential trend ≈ inflation + real income growth.

Locality momentum (mean-reverting): Trailing 3.0-yr locality CAGR 12.9% vs 6.0% trend; 35% carried forward, halving each year.

Affordability ceiling: Ticket at ₹8,000 psf vs city median ₹9,500; buyer pool thins above ₹15k/₹20k psf and after >6pp excess growth.

Employment access & office pipeline: 6 msf office pipeline (3 yr) on 20 msf stock; 30-min jobs index 0.75.

Supply–demand balance: 16 months of unsold inventory; new-launch/absorption ratio 1.01 (from 26 under-construction RERA filings in this locality: 2,249 unsold homes, 140.4 sold per month).

Infrastructure delivery (probability-weighted): Pink Line Kalena Agrahara–Nagawara (construction, 2027, p=0.6); Blue Line KR Puram–Hebbal–Airport (construction, 2027, p=0.65); Phase 3A Sarjapur–Hebbal (planned, 2033, p=0.45)

Project-specific adjustments: Remaining construction risk (55% work left) re-rates toward ready comps by handover (~4.4% over 0.5 yr).

Locality evidence: ₹7,500 (Jun 2023) → ₹10,800 (Jun 2026) = 12.9% p.a. Sources: Platform estimate (interim, not observed).

Financial & legal due diligence

What the public record says

Automated from the Karnataka RERA file PRM/KA/RERA/1251/446/PR/171014/000374. Prices and rents are locality estimates, not verified listings. Compiled Sep 2026 from the Karnataka RERA file, company registers, rating agencies, tribunal records and press. Facts only; anything that deserves a written answer before signing is flagged.

Delivery timeline7/10
a registration completion date has already passed (−2)
Legal & complaints6.5/10
5 RERA complaints on the project (−2.5)
Money to finish6/10
finance cost is 0% of the registered budget; registration-time status shows spend above collections (₹-1.51 cr) (−2)
Developer strength5/10
no public credit rating for the promoter

Meters are rule-based from the RERA file and public ratings (rules shown under each), not opinions.

Registration
PRM/KA/RERA/1251/446/PR/171014/000374 · Lalith Gangadhar Constructions Pvt. Ltd.
Past RERA date
RegisteredMar 2015Original completionMar 2019TodaySep 2026
Construction45%
registration-time status
Collected (at registration)₹9.47 Cr
Spent₹10.98 Cr
Balance with promoter₹-1.51 Cr
Delay declaredNo
No litigation declared5 complaints · 0 openEscrow: ICICI Bank
Credit ratings of the people behind it

No public credit rating located for the promoter.

Lalith Gangadhar Constructions Pvt. Ltd.: no public rating located

Complaints & disputes on record
On this project50 open
On the promoter entity5all projects
Court cases declared0no stay recorded
What complainants raise
  • Refund and compensation
  • Refund and Misrepresentation
  • Gross delay in handing over possession of the property
  • Refund, interest & compensation and cancellation of the town house
At a glance
On its original RERA date

On its original RERA completion date: 2019-03-31

45% built

45% built per the latest filing

5 RERA complaints, 0 open

5 RERA complaints on this project (0 open); 5 on the promoter overall

No litigation declared

No litigation declared in RERA filings

The record, in pictures

RERA file · Registration

Registered project cost ₹21.54 cr — where it goes
Land ₹2.7 cr · 13%Construction & on-site ₹18.8 cr · 87%
No litigation declaredBorrowing declared: not statedEscrow at ICICI Bank

Complaint log (K-RERA) · 5 on this project

  • Mar 2021Refund and compensationdisposed
  • Feb 2021Refund and Misrepresentationdisposed
  • Aug 2020Gross delay in handing over possession of the propertydisposed
  • Oct 2019Refund, interest & compensation and cancellation of the town housedisposed
  • Mar 2019Refund - due to delay in completion of projectdisposed
Complaints by status
Disposed (Authority)
3
Disposed (adjudicating officer)
2

Red flags to resolve in writing

1
Timeline

RERA completion date 2019-03-31 has passed without a completion application.

Questions to put to the developer before you sign

  1. Share the latest CA Form 4 and architect Form 5 with the escrow deposit ratio.
  2. Confirm the price list, floor-rise and other charges for the exact unit.
  3. Which date is contractual — 2019-03-31 — and what is the per-month delay compensation?
  4. Confirm there is no litigation on the land or approvals beyond the RERA declaration.
  5. Is the land freehold with the developer, and is any part mortgaged?
Full record: every filed number, line by line2 sections · 15 items

RERA file · Registration

Registration
PRM/KA/RERA/1251/446/PR/171014/000374 · promoter Lalith Gangadhar Constructions Pvt. Ltd. (Company) · Proposed Project End Date at the time of registration :
Dates
Start 2015-03-25 · original completion 2019-03-31 · no extensions · current date has passed
Progress
45% complete per registration-time status
Registered cost
Total ₹21.54 cr · land ₹2.71 cr · construction ₹18.82 cr
RERA bank account
ICICI Bank, M.G.Road ,Bangalore (70% construction account)
Money at registration
collected ₹9.47 cr · used ₹10.98 cr · balance ₹-1.51 cr · delay declared: No
Land & towers
1.35 acres (5,451 sq m) · LGCL ONESTREET 32 homes, 3 floors
Litigation declared
None declared in filings
K-RERA complaints
5 on this registration (0 open) · 5 on the promoter entity across all its projects
Completion applied
19/12/2020

Source: Karnataka RERA project record PRM/KA/RERA/1251/446/PR/171014/000374, fetched 2026-09-15. Figures are the promoter’s own filings.

Complaint log (K-RERA) · 5 on this project

2021-03-27 · CMP/210327/0007844
Refund and compensation — DISPOSED AUTHORITY FULLBENCH (AUTHORITY)
2021-02-14 · CMP/210214/0007617
Refund and Misrepresentation — DISPOSED AUTHORITY FULLBENCH (AUTHORITY)
2020-08-27 · CMP/200827/0006446
Gross delay in handing over possession of the property — DISPOSED AUTHORITY FULLBENCH (AUTHORITY)
2019-10-10 · CMP/191010/0004449
Refund, interest & compensation and cancellation of the town house — DISPOSED AO (ADJUDICATING OFFICER)
2019-03-15 · CMP/190315/0002354
Refund - due to delay in completion of project — DISPOSED AO (ADJUDICATING OFFICER)

Complaint subjects are as filed by complainants; a disposed complaint may have been decided either way.

Sources & caveats2 sources
  • Karnataka RERA project record PRM/KA/RERA/1251/446/PR/171014/000374 (registration file, quarterly updates, complaint register), fetched 2026-09-15
  • PropertyLens locality model (market-level estimates)
  • Karnataka RERA project records PRM/KA/RERA/1251/446/PR/171014/000374 (registration file, quarterly updates, complaint register), fetched Sep 2026.

Caveats. Automated analysis: prices, rents and travel times are estimates until listings and Maps data are verified. RERA figures are the promoter’s own filings. Nothing here is legal, tax or investment advice.

Evidence

Location, jobs & transit3 hubs · metro 4.0 km
Job hubs nearby
Manyata Tech Park 5 kmKirloskar Business ParkBagmane / KR Puram 10 km
Measured drive times below
Office space
Existing20 msf
Coming in 3 yrs6 msf
Jobs within 30 min8/10
Getting around
Metro today
none operational; Pink Line Nagawara terminal under construction
~4,000 m estimate
Metro planned
Nagawara (Pink Line)
~2027 60% likely ~3,000 m estimate
Rail
—
estimate
Airport
44 min by road now · 15.5 km
Google Maps
Buses
7/10 coverage
estimate
Drive times to job hubs
DestinationDrive nowRoad km
Manyata Tech Park17 min4.8
Hebbal (Kirloskar)24 min7.7
MG Road (CBD)34 min11.7
ITPL Whitefield36 min12.1
Kempegowda Airport (KIA)44 min15.5
ORR Bellandur (Ecospace)45 min15.8
Koramangala (Forum)45 min15.6
Electronic City Ph-168 min24.6

Google Maps driving time with live traffic, measured Sep 2026. Refreshed monthly.

Location used: Google Maps match “”. Bus coverage and planned-station distances are still interim estimates.

Price historylocality 12.9%/yr

No dated project-level price series yet; only the latest observation is on file.

Locality · average ₹/sq ft
Date₹ psfSourceConfidenceKind
Jun 20215,800Platform estimate (interim, not observed)40%derived
Jun 20237,500Platform estimate (interim, not observed)45%derived
Jun 20259,500Platform estimate (interim, not observed)50%derived
Jun 202610,800Platform estimate (interim, not observed)50%derived
Luxury comps₹14,000
Premium comps₹11,000
Mid comps₹8,500
Unsold stock16 months

Model backtest on this locality: 1-yr hold-out (Jun 2025→Jun 2026): predicted ₹10,445 vs actual ₹10,800 (-3.3%). Longer 3-yr hold-out (Jun 2023→Jun 2026): predicted 9.1% p.a. vs actual 12.9% p.a. — the model is deliberately mean-reverting and under-predicted the 2021–26 boom.

Environment, legal & productflood ok · water risk · RERA yes
Flood risksome risk
Water supplymixed
Quietok
Roads & drainspatchy

Hennur Road widening incomplete; Kothanur lake flooding

Legal & approvals
Registration 000374
RERA PRM/KA/RERA/1251/446/PR/171014/000374
possession Mar 2019
Litigation
none reported
observed
Approvals
RERA registered
observed
Title
not verified
assumed
Product
Land1.35 acres
Homes32
Density24/acre
Launched2015
Sources & data gapswhat we know, from where, and what is missing

Automated analysis: unit mix and carpet areas come from the RERA inventory table; prices and rents are locality-model estimates until listings are verified.

FieldValueSource classDateConf.KindConflicting values
AddressSy. No.75/1, BBMP Khata No.58/75/1, Kyalasanahalli Village, Krishnarajapuram Hobli,Karnataka RERA (number as reported; registry lookup pending)Sep 202680%observed
Land area (acres)1.35Karnataka RERA (number as reported; registry lookup pending)Sep 202680%observed
Total units32Karnataka RERA (number as reported; registry lookup pending)Sep 202680%observed
Launch year2015Karnataka RERA (number as reported; registry lookup pending)Sep 202670%observed
Possession · Registration 0003742019-03-31Karnataka RERA (number as reported; registry lookup pending)Sep 202670%observed
Price psf · 3 BHK · ~1,685 sq ft (1247 carpet)8000Platform estimate (interim, not observed)Sep 202635%assumed
Ticket · 3 BHK · ~1,685 sq ft (1247 carpet)13480000Platform estimate (interim, not observed)Sep 202635%derived
Rent · 3 BHK · ~1,685 sq ft (1247 carpet)38000Platform estimate (interim, not observed)Sep 202635%assumed
Carpet area1247Karnataka RERA (number as reported; registry lookup pending)Sep 202660%observed
Builder on-time rate0.57Karnataka RERA (number as reported; registry lookup pending)Sep 202660%derived
Litigationnone reportedKarnataka RERA (number as reported; registry lookup pending)Sep 202670%observed
ApprovalsRERA registeredKarnataka RERA (number as reported; registry lookup pending)Sep 202660%observed

Commercial listing portals are shown as “Listing portal (aggregated)”; full provenance is retained internally. Official developer and Karnataka RERA sources are named.

PropertyLens · property-lens.ai · Scores and projections are model outputs built from dated public evidence (Karnataka RERA filings, quarterly promoter updates, public ratings, Google Maps) and the stated assumptions. They are not investment advice and not a substitute for a title search, a lawyer’s opinion or a site visit. Values marked “assumed” are editable estimates, not verified facts.