PropertyLensBengaluru · invest
Embassy Group · Devanahalli / Airport Road / Bagalur

Embassy Greenshore

KHATA NO. 175/106/A1, 338/59/7/A2 & 338/59/8/A3, IN SY.NO. 57/3, 57/4, 58/1, 59/2, 59/3, 59/4…
Handover Dec 2031 · no rent beforeapartment · luxuryRERA registered+ CompareFull report ↗
1 · Which home?
2 · Which exit plan?

Score, growth and returns below are for the highlighted home and plan. Prices, rent and possession never mix across phases.

53
Investment score
53/100
Evidence confidence55%
2 BHK · ~1,205 sq ft (803 carpet)
Price growth per year, next 5 yrs model
11.6%
likely range 8.1%–15.0% · over 10 yrs 10.1%/yr
Net-wealth CAGR, 8-yr hold
8.6%
your cash in → cash back incl. sale, per year
Cash-flow IRR, 8-yr hold
16.0%
with 75% loan · all-cash 13.0% · with interiors
Three numbers, three questions. Price growth: what will the home be worth? Net-wealth CAGR: what will my money have earned after every cost? Cash-flow IRR: the same, but counting when each rupee moves. Tap i on any of them.
Price · edit here or below assumed
₹Cr
₹ psf × 1,205 sq ft · as of Sep 2026
Price edits apply to ·
All-in cost
₹1.65 Cr
+ other charges 4.6 L, GST 6.8 L, stamp/reg 8.9 L, interiors 14.5 L
Gross rental yield assumed
2.5%
rent starts in ~5.6 yr

All-in cost sheet this home, default assumptions

ItemBasisAmount
Base price₹10,850 per sq ft × 1,205 sq ft super built-up1.31 Cr
Other charges3.5% of base: floor-rise, preferred-location, car park, club, maintenance deposit, legal, corpus (edit in Assumptions)4.6 L
GST5.0% on an under-construction home6.8 L
Stamp duty and registration6.6% in Karnataka: 5% stamp duty + 1% registration + cess and surcharge on the agreement value8.9 L
Interiors₹1,200 per sq ft, needed before the home can be let14.5 L
All-in costwhat leaves your pocket and the bank's, before rent or resale₹1.65 Cr
Your own money75.0% loan at 8.5% for 20 years covers the rest; EMI 0.9 L a month₹98.5 L

Carpet area 803 sq ft against 1,205 sq ft super built-up: you pay for 33% that is common area and walls. Price per sq ft of carpet ≈ ₹16,282. Every percentage above is editable in Assumptions; the defaults are Karnataka rates as of 2026-09.

In plain words

Why 53 out of 100

Each home is marked on 11 things a careful buyer checks, then compared with every project we analyse in Bengaluru: 50 is the average project, 62 beats about five in six. Here is what lifts this one and what drags it:

  • +
    Expected price growth (5-yr CAGR model) · 14/26 pts
    We expect prices here to rise about 11.6% a year for the next 5 years (explained below).
  • +
    Layout, size, age, amenities, maintenance · 1/3 pts
    Moderately dense layout (61 homes per acre); about 72% of the area you pay for is usable carpet area. Maintenance ~₹6 per sq ft a month.
  • +
    Resale liquidity · 1/4 pts
    Plenty of buyers can afford a ₹1.31 Cr home, and homes in Devanahalli / Airport Road / Bagalur take time to resell. Reselling before handover needs the builder’s permission.
  • −
    Legal, title & approvals · -4/5 pts
    Registered with Karnataka RERA; litigation reported; land title not yet verified by us, so get a lawyer to check. The due-diligence report below flags 1 item in red.
  • −
    Employment access · -8/10 pts
    Drive times right now: Manyata Tech Park 52 min, Hebbal (Kirloskar) 54 min, MG Road (CBD) 72 min; Electronic City Ph-1 110 min. About 15 million sq ft of new offices are planned nearby in 3 years.
  • −
    Schools, hospitals, daily needs · -2/3 pts
    Schools, hospitals and daily shopping are limited in this area.
All 11 checks
  • •
    Price vs comparables · -0/3 pts
    Priced about the same as similar luxury homes nearby (₹10,850 vs ~₹11,000 per sq ft).
  • •
    Rental demand & yield · -1/8 pts
    Rent pays back 2.5% of the price every year, close to the usual 3% in Bengaluru. Tenant demand here is thin.
  • +
    Resale liquidity · 1/4 pts
    Plenty of buyers can afford a ₹1.31 Cr home, and homes in Devanahalli / Airport Road / Bagalur take time to resell. Reselling before handover needs the builder’s permission.
  • −
    Employment access · -8/10 pts
    Drive times right now: Manyata Tech Park 52 min, Hebbal (Kirloskar) 54 min, MG Road (CBD) 72 min; Electronic City Ph-1 110 min. About 15 million sq ft of new offices are planned nearby in 3 years.
  • −
    Metro, bus, rail & airport · -1/9 pts
    No working metro nearby (nearest 15 km). Airport is about 31 minutes by road right now.
  • •
    Schools, hospitals, daily needs · -2/3 pts
    Schools, hospitals and daily shopping are limited in this area.
  • •
    Builder delivery & handover risk · 2/16 pts
    Embassy Group has finished 30+ projects and delivered on time about 70% of the time. This phase is 10% built, with handover promised for 2031-12-31: delays would push your rent start back.
  • +
    Layout, size, age, amenities, maintenance · 1/3 pts
    Moderately dense layout (61 homes per acre); about 72% of the area you pay for is usable carpet area. Maintenance ~₹6 per sq ft a month.
  • •
    Water, flooding, noise, infrastructure · -0/9 pts
    Low flood risk; water supply is mostly borewell or tankers; noise is manageable.
  • •
    Legal, title & approvals · -4/5 pts
    Registered with Karnataka RERA; litigation reported; land title not yet verified by us, so get a lawyer to check. The due-diligence report below flags 1 item in red.
  • +
    Expected price growth (5-yr CAGR model) · 14/26 pts
    We expect prices here to rise about 11.6% a year for the next 5 years (explained below).
Why prices should grow ~11.6% a year for the next 5 years

We build the forecast step by step, starting from what Bengaluru homes normally do and adjusting for this area and this project:

  1. + 6.0%Start with 6.0% a year: the normal long-run growth of Bengaluru home prices.
  2. + 1.2%Add 1.2%: prices here rose 14.0% a year recently (2023-06 to 2026-06). Some of that pace continues, but it fades each year.
  3. − 0.4%Subtract 0.4%: at ₹10,850 per sq ft, fewer families can afford to buy here, which slows further rises.
  4. + 2.4%Add 2.4%: 15 million sq ft of new offices nearby means more people wanting homes here.
  5. + 0.0%Supply and demand are balanced here (17 months of unsold stock).
  6. + 0.3%Add 0.3% for new roads, metro and water lines, weighted by how likely they are to actually finish: Blue Line KR Puram–Hebbal–Airport (construction, 2027); Satellite Town Ring Road (construction, 2028); Bagalur ITIR / Aerospace expansion (planned, 2030).
  7. + 2.1%Add 2.1% for this project itself: unfinished homes are worth more once they are complete.
  8. = 11.6%Result: about 11.6% a year, so a home worth ₹1.35 Cr today would be worth about ₹2.34 Cr in 5 years. We are 56% confident in the evidence behind this.

Which exit suits you?

For an unfinished flat the answer depends on whether you sell at handover or hold, and whether you spend on interiors. Same price, same loan; only the strategy changes:

StrategyHoldIRR / yrWealth CAGR / yrCash you put inNet rentNet saleApply
Sell at handover, no interiors best IRR
Take delivery in 2031-12-31 and sell the bare flat (6 yr hold). Needs builder NOC or registration first; no rent.
6 yrs23.0%13.9%₹61.2 L₹31,233₹1.47 Cr
Hold bare, rent unfurnished
Skip interiors; rent 12% lower than a fitted home; sell after 8 yrs with no interiors value.
8 yrs17.8%10.3%₹84.6 L₹2.6 L₹1.95 Cr
Hold, do interiors, rent & sell fitted selected
Spend ₹1,200/sq ft on interiors, earn full rent, recover ~40% of interiors cost at sale (fading over 10 yrs).
8 yrs16.0%8.6%₹98.5 L₹3.4 L₹2.00 Cr

IRR and CAGR are per year over the hold shown. A short hold can show a high IRR on a small absolute gain; compare the net-sale column too. Selling before registration usually needs the builder’s transfer NOC and a fee.

Highlights

  • Embassy · Devanahalli / Airport Road / Bagalur · 878 homes on 14.3 acres
  • Under construction: 10% complete, RERA completion 2031-12-31
  • 14 court case(s) declared · 0 complaints on this registration

Assumptions editable

Purchase

₹/sq ft
₹ Cr
sq ft
% of base
%
%
%
₹/sq ft

FinancingLoan 75% · cash 25% · EMI ₹92,478/mo

% loan
% p.a.
years
%

Rent & running costs

₹
% p.a.
%
months
months
₹/sq ft/mo
% of rent
% of rent
% of value

Interiors & exit

%
%
years
% p.a. (blank = model)
%
%

Returns over 8 years · with interiors

Cash you put in₹98.5 L
Exit value (yr 8)₹3.02 Cr
Net sale after loan & costs₹2.00 Cr
Net rent after opex₹3.4 L
Loan (75% of price)₹1.07 Cr
EMI / month₹92,478
Year 0: ₹-13.0 L0Year 1: ₹-6.9 L1Year 2: ₹-8.3 L2Year 3: ₹-9.6 L3Year 4: ₹-11.0 L4Year 5: ₹-12.3 L5Year 6: ₹-27.7 L6Year 7: ₹-9.6 L7Year 8: ₹1.90 Cr8
YearPurchaseLoan inRent (net of vacancy)OpexDebt serviceSale − loanNet cash
Today-23.7 L10.7 L0.0 L0.0 L0.0 L0.0 L-13.0 L
Yr 1-21.3 L16.0 L0.0 L0.0 L-1.6 L0.0 L-6.9 L
Yr 2-21.3 L16.0 L0.0 L0.0 L-2.9 L0.0 L-8.3 L
Yr 3-21.3 L16.0 L0.0 L0.0 L-4.3 L0.0 L-9.6 L
Yr 4-21.3 L16.0 L0.0 L0.0 L-5.7 L0.0 L-11.0 L
Yr 5-21.3 L16.0 L0.0 L0.0 L-7.0 L0.0 L-12.3 L
Yr 6-35.8 L16.0 L1.4 L-0.9 L-8.4 L0.0 L-27.7 L
Yr 70.0 L0.0 L3.4 L-2.0 L-11.1 L0.0 L-9.6 L
Yr 80.0 L0.0 L3.6 L-2.0 L-11.1 L2.00 Cr1.90 Cr

Pre-tax unless capital-gains tax is set. Rent enters the cash flows once. Net-wealth CAGR = (cash returned incl. sale ÷ cash put in)^(1/years) − 1. IRR uses the dated cash flows.

Score factors

Bars show points added or taken away versus the average analysed Bengaluru project (score 50).

Price vs comparables
−0.4 pts vs avg
this home 5.8/10 · Bengaluru average 6.2 · confidence 35%
₹10,850 psf vs luxury comps ₹11,000 (-1%; under-construction should price ~8% below ready). Price is a model estimate, so this factor carries a third of its normal weight until a listed price is observed.
Rental demand & yield
−0.7 pts vs avg
this home 5.6/10 · Bengaluru average 6.0 · confidence 38%
Gross yield 2.6% (₹24 psf/month); locality rental demand 6/10.
Resale liquidity
+1.1 pts vs avg
this home 8.2/10 · Bengaluru average 7.6 · confidence 60%
Locality resale depth 6/10; ticket ₹1.31 Cr narrows the buyer pool; UC resale needs builder NOC; 878-home project gives deep resale comps; RERA sales pace ratio 4.72.
Employment access
−7.6 pts vs avg
this home 1.5/10 · Bengaluru average 5.2 · confidence 85%
Drive times now (Google Maps, 2026-09-16): Manyata Tech Park 52 min, Hebbal (Kirloskar) 54 min, MG Road (CBD) 72 min, ITPL Whitefield 77 min; 0 of 7 major hubs within 30 min; 15 msf office pipeline (3 yr).
Metro, bus, rail & airport
−0.8 pts vs avg
this home 4.3/10 · Bengaluru average 4.8 · confidence 60%
none; Blue Line airport terminal station under construction; Airport City (Blue Line) ~2027; airport ~31 min by road now (Google Maps); .
Schools, hospitals, daily needs
−2.0 pts vs avg
this home 5.0/10 · Bengaluru average 7.0 · confidence 50%
Locality social-infrastructure index (interim, expert-set; POI distances pending Maps integration).
Builder delivery & handover risk
+2.3 pts vs avg
this home 4.6/10 · Bengaluru average 3.7 · confidence 50%
Embassy Group: 30+ projects, on-time 70% (assumed); handover 2031-12-31 (RERA); within the RERA timeline, work on schedule (-2 pts).
Layout, size, age, amenities, maintenance
+1.5 pts vs avg
this home 8.5/10 · Bengaluru average 7.3 · confidence 55%
61 units/acre; carpet/SBA ~72%; maintenance ~₹6 psf/month (assumed); filed construction cost ₹6,548 per sq ft (premium spec).
Water, flooding, noise, infrastructure
−0.1 pts vs avg
this home 5.8/10 · Bengaluru average 5.8 · confidence 50%
Plotted-development heavy; social infrastructure still thin
Legal, title & approvals
−4.5 pts vs avg
this home 5.2/10 · Bengaluru average 7.4 · confidence 55%
RERA registered; litigation: 14 case(s) declared; approvals: Plan BIAAPA/TP/CC/277/2025-26 dated 2025-11-11; title: not verified. Due-diligence report lists 1 red flag (−0.8 pts).
Expected price growth (5-yr CAGR model)
+14.1 pts vs avg
this home 8.2/10 · Bengaluru average 6.0 · confidence 56%
Model 5-yr price CAGR 11.6% (range 8.1–15.0%).

Price growth model, year by year

Nominal growth per year. Parts add up; momentum fades, infrastructure is weighted by delivery probability and dated.

ComponentYr 1Yr 2Yr 3Yr 4Yr 5Yr 6Confidence
Bengaluru long-run nominal trend6.06.06.06.06.06.080%
Locality momentum (mean-reverting)2.81.50.80.50.30.145%
Affordability ceiling-0.7-0.5-0.3-0.2-0.2-0.160%
Employment access & office pipeline2.42.42.42.42.42.455%
Supply–demand balance0.00.00.00.00.00.050%
Infrastructure delivery (probability-weighted)0.40.40.30.20.20.055%
Project-specific adjustments2.62.62.61.41.41.450%
Total growth13.5%12.4%11.8%10.2%10.1%9.8%56%

Bengaluru long-run nominal trend: City-wide 2013-25 nominal residential trend ≈ inflation + real income growth.

Locality momentum (mean-reverting): Trailing 3.0-yr locality CAGR 14.0% vs 6.0% trend; 35% carried forward, halving each year.

Affordability ceiling: Ticket at ₹10,850 psf vs city median ₹9,500; buyer pool thins above ₹15k/₹20k psf and after >6pp excess growth.

Employment access & office pipeline: 15 msf office pipeline (3 yr) on 8 msf stock; 30-min jobs index 0.45.

Supply–demand balance: 17 months of unsold inventory; new-launch/absorption ratio 1.36 (from 45 under-construction RERA filings in this locality: 7,627 unsold homes, 1616.1 sold per month).

Infrastructure delivery (probability-weighted): Blue Line KR Puram–Hebbal–Airport (construction, 2027, p=0.65); Satellite Town Ring Road (construction, 2028, p=0.6); Bagalur ITIR / Aerospace expansion (planned, 2030, p=0.5)

Project-specific adjustments: Remaining construction risk (90% work left) re-rates toward ready comps by handover (~7.2% over 5.3 yr). Sales pace from RERA filings: 71% of 878 homes booked with 12% of the build timeline elapsed (pace ratio 4.72); fast sellers re-rate, slow sellers discount.

Locality evidence: ₹5,400 (Jun 2023) → ₹8,000 (Jun 2026) = 14.0% p.a. Sources: Platform estimate (interim, not observed).

Financial & legal due diligence

What the public record says

Automated from the Karnataka RERA file PRM/KA/RERA/1250/303/PR/201125/008265 and 3 quarterly filings. Prices and rents are locality estimates, not verified listings. Compiled Sep 2026 from the Karnataka RERA file, company registers, rating agencies, tribunal records and press. Facts only; anything that deserves a written answer before signing is flagged.

Delivery timeline9/10
no extensions, no overdue dates on the RERA file
Legal & complaints3.5/10
14 court cases declared in filings (−4.5); land litigation declared “Yes” on a registration (−1)
Money to finish8/10
finance cost is 0% of the registered budget; last quarter: collected ₹28.43 cr, withdrew ₹13.81 cr
Developer strength4.5/10
Acuité BB+ (Embassy Property Developments NCDs)

Meters are rule-based from the RERA file and public ratings (rules shown under each), not opinions.

Registration
PRM/KA/RERA/1250/303/PR/201125/008265 · EMBASSY DEVELOPMENTS LIMITED
On original date
RegisteredJan 2026TodaySep 2026Original completionDec 2031
Construction10%
quarterly filing Q1 2026-27 (submitted 2026-07-15)
Homes booked621 / 878
257 still available
Sold vs built71% vs 10%
Buyers are well ahead of construction: most money is in, delivery risk sits with the developer.
Money through the RERA account
Collected ₹69.33 CrWithdrawn ₹0Q3 2025-2669.33 Cr0.0 LCollected ₹56.54 CrWithdrawn ₹9.50 CrQ4 2025-2656.54 Cr9.50 CrCollected ₹28.43 CrWithdrawn ₹13.81 CrQ1 2026-2728.43 Cr13.81 Cr
Collected from buyersWithdrawn for construction
Latest milestones
  • Upto Plinth Level
    0%
  • Sub-structure flooring
    0%
  • RCC or MS Framed structure
    0%
  • Masonry Construction
    0%
  • Plastering inside , outside & Ceiling
    0%
  • Joinery: Doors, Windows, Ventilators etc
    0%
14 court cases declaredNo complaintsEscrow: HDFC
Credit ratings of the people behind it
AAAAAABBBBBBCDinvestment grade ◀▶ speculative gradeAcuité BB+ · Embassy Property Developments NCDs · May 2024
Complaints & disputes on record
On this project00 open
On the promoter entity0all projects
Court cases declared14no stay recorded
At a glance
On its original RERA date

On its original RERA completion date: 2031-12-31

10% built, 71% booked

10% built per the latest filing; 621/878 homes booked

No complaints on this project

No RERA complaints on this project; 0 on the promoter overall

14 court cases declared

14 court cases declared in RERA filings (no stay recorded)

The record, in pictures

RERA file · Registration

Registered project cost ₹946 cr — where it goes
Land ₹0 cr · 0%Approvals ₹11.5 cr · 1%Construction & on-site ₹921.2 cr · 97%Other / taxes ₹13 cr · 1%
Construction programme as filed (quarterly filing Q1 2026-27 (submitted 2026-07-15))
202620272028202920302031Earth work and other leveling preparat95%Foundation footing work2%Upto Plinth Level0%Sub-structure flooring0%RCC or MS Framed structure0%Masonry Construction0%Plastering inside , outside & Ceiling0%Joinery: Doors, Windows, Ventilators e0%Basic work of Water supply, Sanitary a0%Dadoing, Skirting, Flooring, Tiles wor0%Railing and Grill fixing0%Electrification, Water supply and Sani0%Painting0%Fire prevention and fire fighting fitt0%Weather Proof work0%Elevation work0%Internal and External work including l0%Handover0%today
Bars are the filed schedule; filled part is reported progress. Red = past its scheduled end and not complete.
Civil 350/2012 · The Senior Civil Judge , Devanahalli Hon'ble Judge Praveen Nayak · no stayCivil 774/2014 · 1 st Additional Senior Civil Judge Devanahalli Hon'ble Judge Yeshwanth · no stayCivil 385/2019 · The Principal Civil Judge & JMFC, Devanahalli Hon'ble Judge Venkatesh · no stayCivil 152/2016 · Additional Civil Judge & JMFC Devanahalli Hon'ble Judge Chandrika · no stayCivil 348/2015 · Senior Civil Judge Devanahalli Hon'ble Judge Praveen Nayak · no stayCivil 2259/2019 · The High Court of Karnataka Hon'ble Judge Anu Sivaraman and Hon'ble Mr.Judge Vijaykumar A Patil · no stayCivil 752/2015 · The High Court of Karnataka Hon'ble Mr.Judge D.K.Singh and Hon'ble Mr.Judge S.Rachaiah · no staySuit for Partition and Declaration O.S. 350/12/2012 · The Senior Civil Judge , Devanahalli · no staySuit for Partition O.S. 774/14/2014 · 1 st Additional Senior Civil Judge Devanahalli · no staySuit for Partition and Suit for Permanent injunction O.S. 348/15/2015 · Senior Civil Judge Devanahalli · no stayAppeal to set aside the Judgment in O.S.No.752/2015 RFA.No.1741/2018 (OS.No.752/2015)/2018 · The High Court of Karnataka · no staySuit for Partition and Declaration O.S. 385/2019/2019 · The Principal Civil Judge & JMFC, Devanahalli · no stayAppeal to set aside the Judgment passed in O.S.No.157/2010 R.F.A.No.2259/2019/2019 · The High Court of Karnataka · no staySuit for Partition O.S 152/16/2016 · Additional Civil Judge & JMFC Devanahalli · no stayBorrowing declared: NoEscrow at HDFC7 recorded land-owner sharesOwners’ association: not formed

Red flags to resolve in writing

1
Legal

14 court cases declared in RERA filings (350/2012, 774/2014); check for stays and title impact.

Questions to put to the developer before you sign

  1. Share the latest CA Form 4 and architect Form 5 with the escrow deposit ratio.
  2. Confirm the price list, floor-rise and other charges for the exact unit.
  3. Which date is contractual — 2031-12-31 — and what is the per-month delay compensation?
  4. What do the declared cases (350/2012, 774/2014, 385/2019, 152/2016, 348/2015, 2259/2019, 752/2015, O.S. 350/12/2012, O.S. 774/14/2014, O.S. 348/15/2015, RFA.No.1741/2018 (OS.No.752/2015)/2018, O.S. 385/2019/2019, R.F.A.No.2259/2019/2019, O.S 152/16/2016) concern and is any stay in force?
  5. Is the land freehold with the developer, and is any part mortgaged?
Full record: every filed number, line by line1 sections · 13 items

RERA file · Registration

Registration
PRM/KA/RERA/1250/303/PR/201125/008265 · promoter EMBASSY DEVELOPMENTS LIMITED (Company) · L45101HR2006PLC095409
Dates
Start 2026-01-01 · original completion 2031-12-31 · no extensions
Progress
10% complete per quarterly filing Q1 2026-27 (submitted 2026-07-15) · 621 of 878 homes booked (257 available)
Registered cost
Total ₹946 cr · land ₹0.00 cr · construction ₹921 cr
Borrowing / mortgage declared
Borrowing: No
RERA bank account
HDFC, Kasturba Road (70% construction account)
Plan sanction
BIAAPA/TP/CC/277/2025-26 dated 2025-11-11 · BIAPPA - Bangalore Airport Area Planning Authority
Land & towers
14.34 acres (58,037 sq m) · Tower 1 112 homes, 16 floors; Tower 2 104 homes, 17 floors; Tower 3 131 homes, 18 floors; Tower 4 91 homes, 18 floors; Tower 5 129 homes, 18 floors; Tower 6 127 homes, 18 floors; Tower 7 129 homes, 18 floors; Tower 8 55 homes, 18 floors
Land owners / co-promoters
Embassy Developments Limited (100.0%, Sy 45/1); Embassy Developments Limited (100.0%, Sy 45/2 (P)); Embassy Developments Limited (100.0%, Sy 46); Embassy Developments Limited (100.0%, Sy 56/1 (P)); Embassy Developments Limited (100.0%, Sy 57/1 (P)); Embassy Developments Limited (100.0%, Sy 57/3 (P)); Embassy Developments Limited (100.0%, Sy 57/4 (P))
Litigation declared
Civil 350/2012, The Senior Civil Judge , Devanahalli Hon'ble Judge Praveen Nayak — no stay; Civil 774/2014, 1 st Additional Senior Civil Judge Devanahalli Hon'ble Judge Yeshwanth — no stay; Civil 385/2019, The Principal Civil Judge & JMFC, Devanahalli Hon'ble Judge Venkatesh — no stay; Civil 152/2016, Additional Civil Judge & JMFC Devanahalli Hon'ble Judge Chandrika — no stay; Civil 348/2015, Senior Civil Judge Devanahalli Hon'ble Judge Praveen Nayak — no stay; Civil 2259/2019, The High Court of Karnataka Hon'ble Judge Anu Sivaraman and Hon'ble Mr.Judge Vijaykumar A Patil — no stay; Civil 752/2015, The High Court of Karnataka Hon'ble Mr.Judge D.K.Singh and Hon'ble Mr.Judge S.Rachaiah — no stay; Suit for Partition and Declaration O.S. 350/12/2012, The Senior Civil Judge , Devanahalli — no stay; Suit for Partition O.S. 774/14/2014, 1 st Additional Senior Civil Judge Devanahalli — no stay; Suit for Partition and Suit for Permanent injunction O.S. 348/15/2015, Senior Civil Judge Devanahalli — no stay; Appeal to set aside the Judgment in O.S.No.752/2015 RFA.No.1741/2018 (OS.No.752/2015)/2018, The High Court of Karnataka — no stay; Suit for Partition and Declaration O.S. 385/2019/2019, The Principal Civil Judge & JMFC, Devanahalli — no stay; Appeal to set aside the Judgment passed in O.S.No.157/2010 R.F.A.No.2259/2019/2019, The High Court of Karnataka — no stay; Suit for Partition O.S 152/16/2016, Additional Civil Judge & JMFC Devanahalli — no stay
K-RERA complaints
0 on this registration (0 open) · 0 on the promoter entity across all its projects
Owners’ association
Not yet formed
Completion applied
19/12/2020

Source: Karnataka RERA project record PRM/KA/RERA/1250/303/PR/201125/008265, fetched 2026-09-15. Figures are the promoter’s own filings.

Sources & caveats2 sources
  • Karnataka RERA project record PRM/KA/RERA/1250/303/PR/201125/008265 (registration file, quarterly updates, complaint register), fetched 2026-09-15
  • PropertyLens locality model (market-level estimates)
  • Karnataka RERA project records PRM/KA/RERA/1250/303/PR/201125/008265 (registration file, quarterly updates, complaint register), fetched Sep 2026.

Caveats. Automated analysis: prices, rents and travel times are estimates until listings and Maps data are verified. RERA figures are the promoter’s own filings. Nothing here is legal, tax or investment advice.

Evidence

Location, jobs & transit3 hubs · metro none nearby
Job hubs nearby
Airport city / KIADB aerospace parkBagalur ITIR plannedManyata 25 km
Measured drive times below
Office space
Existing8 msf
Coming in 3 yrs15 msf
Jobs within 30 min5/10
Getting around
Metro today
none; Blue Line airport terminal station under construction
none within 5 km
Metro planned
Airport City (Blue Line)
~2027 70% likely ~4,000 m estimate
Rail
—
estimate
Airport
31 min by road now · 10.3 km
Google Maps
Buses
7/10 coverage
estimate
Drive times to job hubs
DestinationDrive nowRoad km
Kempegowda Airport (KIA)31 min10.3
Manyata Tech Park52 min18.3
Hebbal (Kirloskar)54 min19.4
MG Road (CBD)72 min26.1
ITPL Whitefield77 min28.2
Koramangala (Forum)84 min30.6
ORR Bellandur (Ecospace)88 min32.4
Electronic City Ph-1110 min40.9

Google Maps driving time with live traffic, measured Sep 2026. Refreshed monthly.

Location used: Google Maps match “”. Bus coverage and planned-station distances are still interim estimates.

Price historylocality 14.0%/yr

No dated project-level price series yet; only the latest observation is on file.

Locality · average ₹/sq ft
Date₹ psfSourceConfidenceKind
Jun 20214,200Platform estimate (interim, not observed)40%derived
Jun 20235,400Platform estimate (interim, not observed)45%derived
Jun 20257,000Platform estimate (interim, not observed)50%derived
Jun 20268,000Platform estimate (interim, not observed)50%derived
Luxury comps₹11,000
Premium comps₹8,500
Mid comps₹6,500
Unsold stock17 months

Model backtest on this locality: 1-yr hold-out (Jun 2025→Jun 2026): predicted ₹7,737 vs actual ₹8,000 (-3.3%). Longer 3-yr hold-out (Jun 2023→Jun 2026): predicted 9.7% p.a. vs actual 14% p.a. — the model is deliberately mean-reverting and under-predicted the 2021–26 boom.

Environment, legal & productflood ok · water risk · RERA yes
Flood risklow
Water supplytankers/borewell
Quietok
Roads & drainspatchy

Plotted-development heavy; social infrastructure still thin

Legal & approvals
Registration 008265
RERA PRM/KA/RERA/1250/303/PR/201125/008265
possession Dec 2031
Litigation
14 case(s) declared
observed
Approvals
Plan BIAAPA/TP/CC/277/2025-26 dated 2025-11-11
observed
Title
not verified
assumed
Product
Land14.34 acres
Homes878
Density61/acre
Launched2026
Sources & data gapswhat we know, from where, and what is missing

Automated analysis: unit mix and carpet areas come from the RERA inventory table; prices and rents are locality-model estimates until listings are verified.

FieldValueSource classDateConf.KindConflicting values
AddressKHATA NO. 175/106/A1, 338/59/7/A2 & 338/59/8/A3, IN SY.NO. 57/3, 57/4, 58/1, 59/2, 59/3, 59/4, 59/5, 59/6, 59/7, 59/8 OF HEGGANAHALLI VILLAGE AND , SY.NOs. 94,95,96,97,99,100,103, 106,109,112,116,119&122 OF NAGAMANGALA VILLAGE , Devanahalli , Bengaluru RuralKarnataka RERA (number as reported; registry lookup pending)Sep 202680%observed
Land area (acres)14.34Karnataka RERA (number as reported; registry lookup pending)Sep 202680%observed
Total units878Karnataka RERA (number as reported; registry lookup pending)Sep 202680%observed
Launch year2026Karnataka RERA (number as reported; registry lookup pending)Sep 202670%observed
Possession · Registration 0082652031-12-31Karnataka RERA (number as reported; registry lookup pending)Sep 202670%observed
Price psf · 2 BHK · ~1,205 sq ft (803 carpet)10850Platform estimate (interim, not observed)Sep 202635%assumed
Ticket · 2 BHK · ~1,205 sq ft (803 carpet)13074250Platform estimate (interim, not observed)Sep 202635%derived
Rent · 2 BHK · ~1,205 sq ft (803 carpet)28500Platform estimate (interim, not observed)Sep 202635%assumed
Carpet area803Karnataka RERA (number as reported; registry lookup pending)Sep 202660%observed
Builder on-time rate0.7Platform estimate (interim, not observed)Sep 202650%assumed
Litigation14 case(s) declaredKarnataka RERA (number as reported; registry lookup pending)Sep 202670%observed
ApprovalsPlan BIAAPA/TP/CC/277/2025-26 dated 2025-11-11Karnataka RERA (number as reported; registry lookup pending)Sep 202660%observed

Commercial listing portals are shown as “Listing portal (aggregated)”; full provenance is retained internally. Official developer and Karnataka RERA sources are named.

Other projects worth comparing

Same model, same date. Scores are out of 100, where 50 is the average analysed Bengaluru project.

Questions people ask about Embassy Greenshore

Is Embassy Greenshore a good investment?

On PropertyLens's evidence-based model Embassy Greenshore scores 53/100, below the average analysed Bengaluru project (50 = average, 12 points = one standard deviation). The model projects price growth of about 11.6% a year over five years and a net-wealth CAGR of 8.6% after every cost on an 8-year hold with a 75.0% loan. That is research on public filings, not advice; the factor breakdown on this page shows what drives the score.

What is the price per sq ft at Embassy Greenshore?

About ₹10,850 per sq ft of super built-up area, a model estimate from Devanahalli / Airport Road / Bagalur comparables that you can edit. The 2 BHK home costs about ₹1.31 Cr before other charges, GST and stamp duty, and ₹1.65 Cr all-in.

When is Embassy Greenshore ready for possession?

The RERA registration commits to Dec 2031. Latest filing: 12% of the schedule elapsed, 71% of homes booked.

Is Embassy Greenshore RERA registered?

Yes. Karnataka RERA registration: PRM/KA/RERA/1250/303/PR/201125/008265. No complaints on this registration at K-RERA as of 2026-09-15.

How reliable is Embassy Group on delivery?

70% of Embassy Group's crawled Bengaluru registrations needed no extension. 30 registrations analysed. The developer scorecard compares this with every other Bengaluru developer.

What rent can Embassy Greenshore earn?

About ₹28,500 a month for this home (a model estimate from Devanahalli / Airport Road / Bagalur rents), a gross yield of 2.5% on the all-in cost. Nothing is earned before handover. Rent covers 31% of the EMI at the default loan.

Answers are generated from the filings and the model for this home and change when you edit the assumptions above. See the Embassy Group scorecard and the Devanahalli / Airport Road / Bagalur area page.

Go deeper

Share on WhatsApp