Maan-Hinje Township Developers · Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani

Godrej Eden Estate Phase 1

Mulshi, Pune, 411057
Handover Feb 2026 · no rent beforeplot · midRERA registered+ CompareFull report ↗
1 · Which home?
2 · Which exit plan?

Score, growth and returns below are for the highlighted home and plan. Prices, rent and possession never mix across phases.

40
Investment score
40/100
Evidence confidence55%
Plot · ~750 sq ft (assumed)
Price growth per year, next 5 yrs model
9.7%
likely range 6.2%–13.2% · over 10 yrs 9.3%/yr
Net-wealth CAGR, 8-yr hold
5.1%
your cash in → cash back incl. sale, per year
Cash-flow IRR, 8-yr hold
7.3%
with 75% loan · all-cash 8.0% · no interiors
Three numbers, three questions. Price growth: what will the home be worth? Net-wealth CAGR: what will my money have earned after every cost? Cash-flow IRR: the same, but counting when each rupee moves. Tap i on any of them.
Price · edit here or below assumed
₹Cr
₹ psf × 750 sq ft · as of Nov 2026
Price edits apply to ·
All-in cost
₹32.4 L
+ other charges 0.6 L, GST 0.0 L, stamp/reg 2.2 L
Gross rental yield assumed
0.0%
vacant plot: no rent assumed

All-in cost sheet this home, default assumptions

ItemBasisAmount
Base price₹3,950 per sq ft × 750 sq ft carpet29.6 L
Other charges2.0% of base: floor-rise, preferred-location, car park, club, maintenance deposit, legal, corpus (edit in Assumptions)0.6 L
GST0.0% on an under-construction home0.0 L
Stamp duty and registration7.2% in Maharashtra: 7% stamp duty including 1% metro cess and 1% local body tax, plus 1% registration capped at ₹30,0002.2 L
All-in costwhat leaves your pocket and the bank's, before rent or resale₹32.4 L
Your own money75.0% loan at 8.5% for 20 years covers the rest; EMI 0.2 L a month₹27.2 L

Prices here are per sq ft of RERA carpet area (750 sq ft), the way homes are sold in Pune; there is no super built-up loading to discount. Every percentage above is editable in Assumptions; the defaults are Maharashtra rates as of 2026.

In plain words

Why 40 out of 100

Each home is marked on 11 things a careful buyer checks, then compared with every project we analyse in Pune: 50 is the average project, 62 beats about five in six. Here is what lifts this one and what drags it:

  • +
    Price vs comparables · 1/3 pts
    Cheaper than similar mid homes nearby: ₹3,950 vs about ₹7,600 per sq ft.
  • +
    Expected price growth (5-yr CAGR model) · 10/35 pts
    We expect prices here to rise about 9.7% a year for the next 5 years (explained below).
  • +
    Employment access · 1/6 pts
    Drive times right now: Hinjewadi Phase 1 12 min, Baner 17 min, Pimpri MIDC 17 min; Chakan MIDC 57 min. About 6 million sq ft of new offices are planned nearby in 3 years.
  • −
    Builder delivery & handover risk · -13/10 pts
    Maan-Hinje Township Developers has finished 5+ projects and delivered on time about 47% of the time. This phase is still under construction, with handover promised for 2026-02-04: delays would push your rent start back.
  • −
    Rental demand & yield · -5/6 pts
    A plot earns no rent, so this scores low by design.
  • −
    Legal, title & approvals · -3/8 pts
    Registered with MahaRERA; court cases not disclosed on the public register; land title not yet verified by us, so get a lawyer to check. The due-diligence report below flags 2 items in red.
All 11 checks
  • +
    Price vs comparables · 1/3 pts
    Cheaper than similar mid homes nearby: ₹3,950 vs about ₹7,600 per sq ft.
  • −
    Rental demand & yield · -5/6 pts
    A plot earns no rent, so this scores low by design.
  • +
    Resale liquidity · 0/4 pts
    Plenty of buyers can afford a ₹29.6 L home, and homes in Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani resell quickly. Reselling before handover needs the builder’s permission.
  • +
    Employment access · 1/6 pts
    Drive times right now: Hinjewadi Phase 1 12 min, Baner 17 min, Pimpri MIDC 17 min; Chakan MIDC 57 min. About 6 million sq ft of new offices are planned nearby in 3 years.
  • •
    Metro, bus, rail & airport · -1/7 pts
    No working metro nearby (nearest 4 km). Airport is about 60 minutes by road.
  • +
    Schools, hospitals, daily needs · 0/2 pts
    Schools, hospitals and daily shopping are good in this area.
  • −
    Builder delivery & handover risk · -13/10 pts
    Maan-Hinje Township Developers has finished 5+ projects and delivered on time about 47% of the time. This phase is still under construction, with handover promised for 2026-02-04: delays would push your rent start back.
  • +
    Layout, size, age, amenities, maintenance · -0/2 pts
    Moderately dense layout (60 homes per acre); about 100% of the area you pay for is usable carpet area. Maintenance ~₹3.5 per sq ft a month.
  • •
    Water, flooding, noise, infrastructure · -1/7 pts
    Low flood risk; water supply is partly piped, partly tankers; noticeable traffic or aircraft noise.
  • −
    Legal, title & approvals · -3/8 pts
    Registered with MahaRERA; court cases not disclosed on the public register; land title not yet verified by us, so get a lawyer to check. The due-diligence report below flags 2 items in red.
  • •
    Expected price growth (5-yr CAGR model) · 10/35 pts
    We expect prices here to rise about 9.7% a year for the next 5 years (explained below).
Why prices should grow ~9.7% a year for the next 5 years

We build the forecast step by step, starting from what Pune homes normally do and adjusting for this area and this project:

  1. + 6.0%Start with 6.0% a year: the normal long-run growth of Pune home prices.
  2. + 0.3%Add 0.3%: prices here rose 8.2% a year recently (2023-06 to 2026-06). Some of that pace continues, but it fades each year.
  3. + 0.0%Prices are still affordable enough that this does not slow growth.
  4. + 1.3%Add 1.3%: 6 million sq ft of new offices nearby means more people wanting homes here.
  5. + 0.0%Supply and demand are balanced here (18 months of unsold stock).
  6. + 0.1%Add 0.1% for new roads, metro and water lines, weighted by how likely they are to actually finish: Metro Line 3 Hinjewadi–Shivajinagar (construction, 2026); Pune Ring Road (PMRDA) (construction, 2029).
  7. + 1.9%Add 1.9% for this project itself: unfinished homes are worth more once they are complete.
  8. = 9.7%Result: about 9.7% a year, so a home worth ₹30.2 L today would be worth about ₹48.0 L in 5 years. We are 56% confident in the evidence behind this.

Highlights

  • Maan-Hinje Township Developers · Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani · unit count not on the public register
  • Under construction: progress not on the public register, MahaRERA completion 2026-02-04 (2 extensions)
  • Registered with MahaRERA as P52100054326

Assumptions editable

Purchase

₹/sq ft
₹ Cr
sq ft
% of base
%
%
%
₹/sq ft

FinancingLoan 75% · cash 25% · EMI ₹19,668/mo

% loan
% p.a.
years
%

Rent & running costs

₹/sq ft/mo
% of rent
% of value

Interiors & exit

%
%
years
% p.a. (blank = model)
%
%

Returns over 8 years · no interiors

Cash you put in₹27.2 L
Exit value (yr 8)₹61.9 L
Net sale after loan & costs₹43.0 L
Net rent after opex₹-96,455
Loan (75% of price)₹22.7 L
EMI / month₹19,668
Year 0: ₹-9.8 L0Year 1: ₹-2.5 L1Year 2: ₹-2.5 L2Year 3: ₹-2.5 L3Year 4: ₹-2.5 L4Year 5: ₹-2.5 L5Year 6: ₹-2.5 L6Year 7: ₹-2.5 L7Year 8: ₹40.5 L8
YearPurchaseLoan inRent (net of vacancy)OpexDebt serviceSale − loanNet cash
Today-32.5 L22.7 L0.0 L0.0 L0.0 L0.0 L-9.8 L
Yr 10.0 L0.0 L0.0 L-0.1 L-2.4 L0.0 L-2.5 L
Yr 20.0 L0.0 L0.0 L-0.1 L-2.4 L0.0 L-2.5 L
Yr 30.0 L0.0 L0.0 L-0.1 L-2.4 L0.0 L-2.5 L
Yr 40.0 L0.0 L0.0 L-0.1 L-2.4 L0.0 L-2.5 L
Yr 50.0 L0.0 L0.0 L-0.1 L-2.4 L0.0 L-2.5 L
Yr 60.0 L0.0 L0.0 L-0.1 L-2.4 L0.0 L-2.5 L
Yr 70.0 L0.0 L0.0 L-0.1 L-2.4 L0.0 L-2.5 L
Yr 80.0 L0.0 L0.0 L-0.2 L-2.4 L43.0 L40.5 L

Pre-tax unless capital-gains tax is set. Rent enters the cash flows once. Net-wealth CAGR = (cash returned incl. sale ÷ cash put in)^(1/years) − 1. IRR uses the dated cash flows.

Score factors

Bars show points added or taken away versus the average analysed Pune project (score 50).

Price vs comparables
+1.0 pts vs avg
this home 7.2/10 · Pune average 6.0 · confidence 30%
₹3,950 psf vs mid comps ₹7,600 (-48%; under-construction should price ~8% below ready). Price is a model estimate, so this factor carries a third of its normal weight until a listed price is observed.
Rental demand & yield
−5.4 pts vs avg
this home 3.9/10 · Pune average 6.9 · confidence 34%
Gross yield 0.0% (₹0 psf/month); locality rental demand 9/10.
Resale liquidity
+0.1 pts vs avg
this home 7.7/10 · Pune average 7.6 · confidence 50%
Locality resale depth 8/10; ticket ₹0.30 Cr narrows the buyer pool; UC resale needs builder NOC.
Employment access
+1.1 pts vs avg
this home 7.6/10 · Pune average 7.0 · confidence 85%
Drive times now (Google Maps, 2026-11-11): Hinjewadi Phase 1 12 min, Baner 17 min, Pimpri MIDC 17 min, Shivajinagar (CBD) 34 min; 3 of 8 major hubs within 30 min; 6 msf office pipeline (3 yr).
Metro, bus, rail & airport
−1.0 pts vs avg
this home 4.8/10 · Pune average 5.4 · confidence 60%
none; Line 3 Hinjewadi at 3–5 km; no planned station within 2 km; airport ~60 min; .
Schools, hospitals, daily needs
+0.1 pts vs avg
this home 8.0/10 · Pune average 7.8 · confidence 50%
Locality social-infrastructure index (interim, expert-set; POI distances pending Maps integration).
Builder delivery & handover risk
−12.7 pts vs avg
this home 0.0/10 · Pune average 5.5 · confidence 60%
Maan-Hinje Township Developers: 5+ projects, on-time 47% (derived); handover 2026-02-04 (reported); 9 months past the RERA completion date, 2 extensions.
Layout, size, age, amenities, maintenance
−0.1 pts vs avg
this home 7.8/10 · Pune average 7.9 · confidence 50%
60 units/acre; carpet/SBA ~100%; maintenance ~₹3.5 psf/month (assumed).
Water, flooding, noise, infrastructure
−0.5 pts vs avg
this home 5.9/10 · Pune average 6.2 · confidence 50%
Hinjewadi traffic; PCMC water
Legal, title & approvals
−2.7 pts vs avg
this home 4.4/10 · Pune average 5.9 · confidence 55%
RERA registered; litigation: not published on the public register; approvals: MahaRERA registered; title: not verified. Due-diligence report lists 2 red flags (−1.6 pts).
Expected price growth (5-yr CAGR model)
+10.0 pts vs avg
this home 5.7/10 · Pune average 4.0 · confidence 56%
Model 5-yr price CAGR 9.7% (range 6.2–13.2%).

Price growth model, year by year

Nominal growth per year. Parts add up; momentum fades, infrastructure is weighted by delivery probability and dated.

ComponentYr 1Yr 2Yr 3Yr 4Yr 5Yr 6Confidence
Pune long-run nominal trend6.06.06.06.06.06.080%
Locality momentum (mean-reverting)0.80.40.20.10.10.045%
Affordability ceiling0.00.00.00.00.00.060%
Employment access & office pipeline1.31.31.31.31.31.355%
Supply–demand balance0.00.00.00.00.00.050%
Infrastructure delivery (probability-weighted)0.30.10.10.10.00.055%
Project-specific adjustments3.51.51.51.51.51.550%
Total growth11.9%9.4%9.2%9.1%8.9%8.9%56%

Pune long-run nominal trend: City-wide 2013-25 nominal residential trend ≈ inflation + real income growth.

Locality momentum (mean-reverting): Trailing 3.0-yr locality CAGR 8.2% vs 6.0% trend; 35% carried forward, halving each year.

Affordability ceiling: Ticket at ₹3,950 psf vs city median ₹8,700; buyer pool thins above ₹15k/₹20k psf and after >6pp excess growth.

Employment access & office pipeline: 6 msf office pipeline (3 yr) on 35 msf stock; 30-min jobs index 0.85.

Supply–demand balance: 18 months of unsold inventory; new-launch/absorption ratio 1.4.

Infrastructure delivery (probability-weighted): Metro Line 3 Hinjewadi–Shivajinagar (construction, 2026, p=0.7); Pune Ring Road (PMRDA) (construction, 2029, p=0.45)

Project-specific adjustments: Remaining construction risk (13% work left) re-rates toward ready comps by handover (~1.0% over 0.5 yr). Land in expansion corridors historically outpaces built stock; no depreciation.

Locality evidence: ₹7,900 (Jun 2023) → ₹10,000 (Jun 2026) = 8.2% p.a. Sources: Platform estimate (interim, not observed).

Financial & legal due diligence

What the public record says

Automated from MahaRERA's public register entry and registration certificates for P52100054326. Prices and rents are locality estimates, not verified listings. Compiled Nov 2026 from the MahaRERA file, company registers, rating agencies, tribunal records and press. Facts only; anything that deserves a written answer before signing is flagged.

Delivery timeline3/10
2 extensions on the registration (−4); a registration completion date has already passed (−2)
Legal & complaints9/10
no litigation and no complaints on the RERA file
Money to finish8/10
Developer strength5/10
no public credit rating for the promoter

Meters are rule-based from the RERA file and public ratings (rules shown under each), not opinions.

Registration
P52100054326 · Maan-Hinje Township Developers LLP
Past RERA date
RegisteredJan 2024Original completionDec 2024Extension ext.Dec 2025Extension ext.Feb 2026TodaySep 2026
No litigation declaredNo complaints
Credit ratings of the people behind it

No public credit rating located for the promoter.

Maan-Hinje Township Developers LLP: credit rating not yet checked by PropertyLens

Complaints & disputes on record
On this project00 open
On the promoter entity0all projects
Court cases declared0no stay recorded
At a glance
Registration extended 2×

Registration extended 2× — from 2024-12-31 to 2026-02-04 (already passed)

No complaints on this project

No RERA complaints on this project; 0 on the promoter overall

No litigation declared

No litigation declared in RERA filings

The record, in pictures

RERA file · Registration

No litigation declaredBorrowing declared: not stated

Red flags to resolve in writing

1
Timeline

Registration extended 2 times: original completion 2024-12-31, now 2026-02-04.

2
Timeline

MahaRERA completion date 2026-02-04 has passed and the public register shows no completion.

Questions to put to the developer before you sign

  1. Share the latest quarterly progress filing and the architect and engineer certificates.
  2. Confirm the price list, floor-rise, parking and other charges for the exact unit.
  3. Which date is contractual, 2026-02-04 or the agreement's, and what is the delay compensation?
  4. Confirm there is no litigation on the land or approvals beyond the RERA declaration.
  5. Is the land owned by the promoter, or is this a joint development, and is any part mortgaged?
Full record: every filed number, line by line1 sections · 3 items

RERA file · Registration

Registration
P52100054326 · promoter Maan-Hinje Township Developers LLP
Dates
Start 2024-01-15 · original completion 2024-12-31 · 2 extensions: Extension → 2025-12-30, Extension → 2026-02-04 · current date has passed
Litigation declared
None declared in filings

Source: MahaRERA project record P52100054326, fetched 2026-11-10. Figures are the promoter’s own filings.

Sources & caveats2 sources
  • MahaRERA project record P52100054326, fetched 2026-11-10
  • PropertyLens Pune locality model (market-level estimates)
  • MahaRERA project records P52100054326 (registration file, quarterly updates, complaint register), fetched Sep 2026.

Caveats. Automated analysis: prices, rents and travel times are estimates until listings and Maps data are verified. RERA figures are the promoter’s own filings. Nothing here is legal, tax or investment advice.

Evidence

Location, jobs & transit2 hubs · metro 4.0 km
Job hubs nearby
Hinjewadi Phase 1–3 4–8 kmPimpri MIDC
Measured drive times below
Office space
Existing35 msf
Coming in 3 yrs6 msf
Jobs within 30 min9/10
Getting around
Metro today
none; Line 3 Hinjewadi at 3–5 km
~4,000 m estimate
Metro planned
No station planned within 2 km
Rail
—
estimate
Airport
~60 min by road
estimate
Buses
7/10 coverage
estimate
Drive times to job hubs
DestinationDrive nowRoad km
Hinjewadi Phase 112 min3
Baner17 min4.9
Pimpri MIDC17 min5
Shivajinagar (CBD)34 min11.6
Pune airport47 min16.5
Magarpatta55 min19.4
Kharadi EON IT Park57 min20.2
Chakan MIDC57 min20.4

Google Maps driving time with live traffic, measured Nov 2026. Refreshed monthly.

Location used: recorded coordinates (estimate). Bus coverage and planned-station distances are still interim estimates.

Price historylocality 8.2%/yr

No dated project-level price series yet; only the latest observation is on file.

Locality · average ₹/sq ft
Date₹ psfSourceConfidenceKind
Jun 20217,200Platform estimate (interim, not observed)40%derived
Jun 20237,900Platform estimate (interim, not observed)45%derived
Jun 20259,200Platform estimate (interim, not observed)50%derived
Jun 202610,000Platform estimate (interim, not observed)50%derived
Luxury comps₹12,200
Premium comps₹9,700
Mid comps₹7,600
Unsold stock18 months

Model backtest on this locality: 1-yr hold-out (Jun 2025→Jun 2026): predicted ₹9,912 vs actual ₹10,000 (-0.9%). Longer 3-yr hold-out (Jun 2023→Jun 2026): predicted 7.2% p.a. vs actual 8.2% p.a. — the model is deliberately mean-reverting and under-predicted the 2021–26 boom.

Environment, legal & productflood ok · water risk · RERA yes
Flood risklow
Water supplymixed
Quietnoisy
Roads & drainspatchy

Hinjewadi traffic; PCMC water

Legal & approvals
Registration P52100054326
RERA P52100054326
possession Feb 2026
Litigation
not published on the public register
assumed
Approvals
MahaRERA registered
observed
Title
not verified
assumed
Product
Landnot filed
Homesnot filed
Densitynot filed
Launched2024
Sources & data gapswhat we know, from where, and what is missing

Automated analysis from MahaRERA's public register: unit sizes and prices are locality-model estimates until listings are verified.

FieldValueSource classDateConf.KindConflicting values
AddressMulshi, Pune, 411057MahaRERANov 202670%observed
Land area (acres)Platform estimate (interim, not observed)Nov 202620%assumed
Total unitsPlatform estimate (interim, not observed)Nov 202620%assumed
Launch year2024MahaRERANov 202670%observed
Possession · Registration P521000543262026-02-04MahaRERANov 202670%observed
Price psf · Plot · ~750 sq ft (assumed)3950Platform estimate (interim, not observed)Nov 202630%assumed
Ticket · Plot · ~750 sq ft (assumed)2962500Platform estimate (interim, not observed)Nov 202630%derived
Rent · Plot · ~750 sq ft (assumed)0Platform estimate (interim, not observed)Nov 202630%assumed
Carpet area750Platform estimate (interim, not observed)Nov 202630%assumed
Builder on-time rate0.47MahaRERANov 202660%derived
Litigationnot published on the public registerMahaRERANov 202630%assumed
ApprovalsMahaRERA registeredMahaRERANov 202660%observed

Commercial listing portals are shown as “Listing portal (aggregated)”; full provenance is retained internally. Official developer and MahaRERA sources are named.

Other projects worth comparing

Same model, same date. Scores are out of 100, where 50 is the average analysed Pune project.

Questions people ask about Godrej Eden Estate Phase 1

Is Godrej Eden Estate Phase 1 a good investment?

On PropertyLens's evidence-based model Godrej Eden Estate Phase 1 scores 40/100, below the average analysed Pune project (50 = average, 12 points = one standard deviation). The model projects price growth of about 9.7% a year over five years and a net-wealth CAGR of 5.1% after every cost on an 8-year hold with a 75.0% loan. That is research on public filings, not advice; the factor breakdown on this page shows what drives the score.

What is the price per sq ft at Godrej Eden Estate Phase 1?

About ₹3,950 per sq ft of super built-up area, a model estimate from Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani comparables that you can edit. The Plot home costs about ₹29.6 L before other charges, GST and stamp duty, and ₹32.4 L all-in.

When is Godrej Eden Estate Phase 1 ready for possession?

The RERA registration commits to Feb 2026. The project is 9 months past its original RERA completion date with 2 extensions filed.

Is Godrej Eden Estate Phase 1 RERA registered?

Yes. MahaRERA registration: P52100054326. No complaints on this registration at MahaRERA as of 2026-11-10.

How reliable is Maan-Hinje Township Developers on delivery?

47% of Maan-Hinje Township Developers's crawled Pune registrations needed no extension (2 of 5 analysed Pune registrations needed no extension). 5 registrations analysed. The developer scorecard compares this with every other Pune developer.

What rent can Godrej Eden Estate Phase 1 earn?

Plots earn no rent; the return is price growth alone.

Answers are generated from the filings and the model for this home and change when you edit the assumptions above. See the Maan-Hinje Township Developers scorecard and the Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani area page.

Go deeper

Share on WhatsApp