West, Pune · Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani

Is Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani good for investment?

181 RERA-registered projects scored on one model, as of November 11, 2026. Prices, growth, yields, supply and the best-scored homes.

Straight answer · as of November 11, 2026

Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani in one paragraph

On PropertyLens's model, Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani is an average place to buy in Pune right now: the median analysed project scores 53/100 (below the Pune average), with projected price growth of 8.6% a year over five years and a median gross rental yield of 3.7%. Unsold homes would take about 18 months to absorb at the current sales pace, a balanced market. 14 of 136 under-construction projects here are past their original RERA completion date, so weight the developer's record heavily.

Median of 181 projects; the spread inside the area is wide, so the ranked list below matters more than the average.

Projects analysed
181
45 ready · 136 under construction
Median score
53
below the Pune average
Projected growth / yr
8.6%
5-yr; 10-yr 8.0%
Median price / sq ft
₹7,150
modelled from comparables
Gross rental yield
3.7%
median, on all-in cost
Net-wealth CAGR
4.1%
8-yr hold, 75% loan, after all costs
Months of inventory
18
RERA filings
Past RERA date
14 / 136
under-construction projects overdue
Entry price
₹29.6 L
median ₹53.6 L

Best-scored projects in Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani

All 181 analysed projects in Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani

ProjectScoreGrowth / yrNet-wealth CAGRCash-flow IRRPrice / sq ftPriceStatus
Life Republic Sector R14/14th Avenue - Qrious/Phase - I
Kolte-Patil · Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani
609.4%4.6%7.8%₹9,100 est.₹68.3 LUnder construction
Apr 2030
Puneville Phase II Cluster B
Benchmarrk Realty · Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani
599.4%4.6%8.3%₹7,150 est.₹53.6 LUnder construction
May 2031
Jhamtani BizOne
Jhamtani Realty · Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani
599.6%5.0%9.0%₹7,150 est.₹53.6 LUnder construction
Dec 2030
Akshay Residency
Moraya Associates · Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani
599.4%4.7%7.8%₹7,150 est.₹53.6 LUnder construction
Dec 2029
Brpl Mhada Cluster
Benchmarrk Realty · Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani
599.3%4.4%8.0%₹7,150 est.₹53.6 LUnder construction
Aug 2031
6, Boulevard
Namrata Group · Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani
599.6%5.0%9.0%₹7,150 est.₹53.6 LUnder construction
Dec 2030
Basil Maximus Wing G
Basil Avante · Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani
599.4%4.7%7.8%₹7,150 est.₹53.6 LUnder construction
Dec 2029
Luxton
Neev Sai Developers · Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani
599.4%4.3%7.3%₹7,150 est.₹53.6 LUnder construction
Jun 2030
Basil Maximus Wing H
Basil Avante · Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani
599.4%4.7%7.8%₹7,150 est.₹53.6 LUnder construction
Dec 2029
Marigold Heights
Vastu Developers · Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani
589.4%4.7%7.8%₹7,150 est.₹53.6 LUnder construction
Dec 2029
Sukhwani Celaeno
Sukhwani Constructions · Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani
589.4%4.7%7.8%₹7,150 est.₹53.6 LUnder construction
Dec 2029
Life Republic Sector R34/34th Avenue-Duet/Phase - II
Kolte-Patil · Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani
589.6%5.2%9.3%₹9,100 est.₹68.3 LUnder construction
Dec 2030
Life Republic Sector R5/5th Avenue-Canvas/Phase-II
Kolte-Patil · Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani
589.6%5.2%9.3%₹9,100 est.₹68.3 LUnder construction
Dec 2030
Life Republic Sector R14/14th Avenue - Qrious/Phase – II
Kolte-Patil · Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani
589.6%5.2%9.3%₹9,100 est.₹68.3 LUnder construction
Dec 2030
LIFE REPUBLIC SECTOR R31/31st AVENUE – ECHOES/PHASE – 1
Kolte-Patil · Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani
589.6%5.2%9.3%₹9,100 est.₹68.3 LUnder construction
Dec 2030
Puneville Phase III Cluster D
Benchmarrk Realty · Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani
589.5%4.8%8.7%₹7,150 est.₹53.6 LUnder construction
Mar 2031
Monarque By Vtp Luxe Phase 3
Mexus Real Estate Developers · Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani
589.6%5.0%9.0%₹7,150 est.₹53.6 LUnder construction
Dec 2030
Life Republic Sector R22/22nd Avenue - Atmos/Phase - I
Kolte-Patil · Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani
588.6%3.7%5.6%₹9,100 est.₹68.3 LUnder construction
Oct 2027
Life Republic Sector R17a/17a Avenue-Sound Of Soul/Sound Square
Kolte-Patil · Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani
578.6%3.7%5.5%₹9,100 est.₹68.3 LUnder construction
Nov 2027
Wakad New Project- Tower 2
Lodha (Macrotech) · Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani
579.0%6.2%12.0%₹12,050 est.₹90.4 LUnder construction
Dec 2032
Namrata Manifesta
Namrata Group · Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani
579.4%4.7%7.8%₹7,150 est.₹53.6 LUnder construction
Dec 2029
Puneville Phase III Cluster C
Benchmarrk Realty · Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani
579.4%4.7%7.8%₹7,150 est.₹53.6 LUnder construction
Dec 2029
Pune Wakad Project
Lodha (Macrotech) · Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani
579.4%4.9%8.9%₹12,050 est.₹90.4 LUnder construction
Jun 2031
Building B3 Eon Homes
Hinjawadi Infradevelopment · Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani
579.4%4.3%7.3%₹7,150 est.₹53.6 LUnder construction
Jun 2030
R7 - The Altius
Paranjape Schemes · Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani
579.4%4.7%8.0%₹9,100 est.₹68.3 LUnder construction
Jan 2030
Sonigara Quorra
Shree Developers · Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani
579.4%4.7%7.8%₹7,150 est.₹53.6 LUnder construction
Dec 2029
Mahindra Happinest Tathawade Phase 3
Mahindra Lifespaces · Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani
578.6%3.7%5.5%₹9,100 est.₹68.3 LUnder construction
Dec 2027
Life Republic Sector R34/34th Avenue - Duet/Phase I
Kolte-Patil · Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani
579.4%4.8%8.0%₹9,100 est.₹68.3 LUnder construction
Dec 2029
Kohinoor Avantara
Intofinity Promoters · Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani
579.2%5.0%9.7%₹7,150 est.₹53.6 LUnder construction
Mar 2032
Life Republic Sector R13/13th Avenue/Aros/Phase I
Kolte-Patil · Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani
578.2%2.8%3.7%₹9,100 est.₹68.3 LUnder construction
Dec 2026
Life Republic Sector R31/31st Avenue/24K-Espada
Kolte-Patil · Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani
578.2%2.8%3.7%₹9,100 est.₹68.3 LUnder construction
Dec 2026
The Ridges 41
Aurigaa Realtors · Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani
569.4%4.7%7.8%₹7,150 est.₹53.6 LUnder construction
Dec 2029
Monarque By Vtp Luxe Phase 1
Mexus Real Estate Developers · Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani
569.4%4.7%7.8%₹7,150 est.₹53.6 LUnder construction
Dec 2029
Vtp Volare
Mexus Real Estate Developers · Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani
569.4%4.7%7.8%₹7,150 est.₹53.6 LUnder construction
Dec 2029
Monarque By Vtp Luxe Phase 2
Mexus Real Estate Developers · Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani
569.4%4.7%7.8%₹7,150 est.₹53.6 LUnder construction
Dec 2029
Oriana World Phase 2
Balaji Builders · Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani
569.4%4.7%7.8%₹7,150 est.₹53.6 LUnder construction
Dec 2029
Oriana World Phase 3
Balaji Builders · Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani
569.4%4.7%7.8%₹7,150 est.₹53.6 LUnder construction
Dec 2029
6, Boulevard
Namrata Group · Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani
569.2%5.2%10.0%₹7,150 est.₹53.6 LUnder construction
Dec 2031
Nest EWS
Mahindra Lifespaces · Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani
568.2%2.8%3.7%₹9,100 est.₹68.3 LUnder construction
Jan 2027
Shashwat
Moraya Associates · Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani
568.6%3.7%5.5%₹7,150 est.₹53.6 LUnder construction
Dec 2027
Oriana World
Balaji Builders · Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani
569.0%4.2%6.5%₹7,150 est.₹53.6 LUnder construction
Dec 2028
Western Avenue
Kolte-Patil · Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani
567.8%3.8%5.0%₹9,700 est.₹72.8 LReady
Life Republic/Sector R10/10th Avenue/Universe/Phase-I
Kolte-Patil · Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani
567.8%3.8%5.0%₹9,700 est.₹72.8 LReady
Life Republic/Sector R10/10th Avenue/Universe/Phase-II
Kolte-Patil · Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani
567.8%3.8%5.0%₹9,700 est.₹72.8 LReady
Wakad New Project- Tower 1
Lodha (Macrotech) · Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani
569.0%6.2%12.0%₹12,050 est.₹90.4 LUnder construction
Dec 2032
Wakad New Project- Tower 4
Lodha (Macrotech) · Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani
569.0%6.2%12.0%₹12,050 est.₹90.4 LUnder construction
Dec 2032
Park Titanium Phase II
Pride Purple · Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani
557.8%4.1%5.2%₹7,600 est.₹57.0 LReady
Vyomora Phase 1
Joyville Shapoorji Housing · Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani
559.3%4.4%8.0%₹7,150 est.₹53.6 LUnder construction
Aug 2031
Vyomora Phase 3
Joyville Shapoorji Housing · Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani
559.3%4.4%8.0%₹7,150 est.₹53.6 LUnder construction
Aug 2031
Sukhwani Kingsley
Sukhwani Constructions · Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani
559.0%4.0%6.3%₹7,150 est.₹53.6 LUnder construction
Apr 2029
Mahindra Happinest Tathawade Phase 2
Mahindra Lifespaces · Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani
558.2%2.9%4.1%₹9,100 est.₹68.3 LUnder construction
May 2027
Park Titan Phase V
Pride Purple · Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani
559.0%3.7%5.9%₹7,150 est.₹53.6 LUnder construction
Aug 2029
Roshan Milestone Wing H
Rahul Bhagwandas Sankla · Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani
559.0%4.2%6.5%₹7,150 est.₹53.6 LUnder construction
Dec 2028
Roshan Milestone Wing E
Rahul Bhagwandas Sankla · Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani
559.0%4.2%6.5%₹7,150 est.₹53.6 LUnder construction
Dec 2028
Roshan Milestone Wing F
Rahul Bhagwandas Sankla · Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani
559.0%4.2%6.5%₹7,150 est.₹53.6 LUnder construction
Dec 2028
Roshan Milestone Wing G
Rahul Bhagwandas Sankla · Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani
559.0%4.2%6.5%₹7,150 est.₹53.6 LUnder construction
Dec 2028
Niwas
Ashiana Housing · Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani
559.0%4.1%6.5%₹7,150 est.₹53.6 LUnder construction
Jan 2029
Amberwood Phase 1
Namrata Group · Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani
559.0%4.2%6.5%₹7,150 est.₹53.6 LUnder construction
Dec 2028
Rohan Harita Phase 3
Rohan Builders · Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani
559.4%4.8%8.0%₹9,100 est.₹68.3 LUnder construction
Dec 2029
Rohan Harita Phase 4
Rohan Builders · Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani
559.4%4.8%8.0%₹9,100 est.₹68.3 LUnder construction
Dec 2029
Park Titan Phase IV
Pride Purple · Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani
548.6%3.6%5.3%₹7,150 est.₹53.6 LUnder construction
Mar 2028
Sterling Blooms
City Corporation / Amanora · Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani
547.8%4.1%5.2%₹7,600 est.₹57.0 LReady
Vyomora Phase 2
Joyville Shapoorji Housing · Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani
549.2%5.2%10.0%₹7,150 est.₹53.6 LUnder construction
Dec 2031
Park Astra Phase II
Pride Purple · Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani
548.2%2.9%3.8%₹7,150 est.₹53.6 LUnder construction
Dec 2026
Basil Maximus Wing F
Basil Avante · Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani
549.0%4.2%6.5%₹7,150 est.₹53.6 LUnder construction
Dec 2028
Yashwin Urbo Centro Phase 2
Vilas Javdekar · Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani
549.0%3.9%6.2%₹9,100 est.₹68.3 LUnder construction
Jun 2029
Puneville Phase III Cluster B
Benchmarrk Realty · Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani
549.0%3.8%6.0%₹7,150 est.₹53.6 LUnder construction
Jun 2029
Yashwin Urbo Centro - Phase 1
Vilas Javdekar · Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani
548.6%3.7%5.5%₹9,100 est.₹68.3 LUnder construction
Dec 2027
Newton Homes Tathawade Phase II
Ravima Developer · Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani
549.0%4.2%6.5%₹7,150 est.₹53.6 LUnder construction
Dec 2028
Kairosa Cluster B
Benchmarrk Realty · Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani
549.0%3.7%5.9%₹7,150 est.₹53.6 LUnder construction
Sep 2029
Millennium Falcon
Millennium Developers · Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani
549.0%4.2%6.5%₹7,150 est.₹53.6 LUnder construction
Dec 2028
Life Republic Sector R22/22nd Avenue - Atmos/Phase-II
Kolte-Patil · Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani
549.0%4.2%6.6%₹9,100 est.₹68.3 LUnder construction
Dec 2028
Roshan Milestone Wing D
Rahul Bhagwandas Sankla · Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani
548.6%3.7%5.5%₹7,150 est.₹53.6 LUnder construction
Dec 2027
Life Republic- Sector R16- 16th Avenue- Arezo- F Building
Kolte-Patil · Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani
547.8%3.8%5.0%₹9,700 est.₹72.8 LReady
Ashiana Malhar Phase III
Ashiana Housing · Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani
548.6%3.6%5.3%₹7,150 est.₹53.6 LUnder construction
Mar 2028
Kuber Antonia
Vikas Vilas Bhalgat · Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani
547.8%4.1%5.2%₹7,600 est.₹57.0 LReady
Itrend City Life
Neev Sai Developers · Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani
548.6%3.7%5.5%₹7,150 est.₹53.6 LUnder construction
Dec 2027
Life Republic Sector R5/5th Avenue - Canvas/Phase I
Kolte-Patil · Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani
549.0%3.8%6.0%₹9,100 est.₹68.3 LUnder construction
Sep 2029
Life Republic Sector R35/35thAvenue Harmony Residency
Kolte-Patil · Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani
548.6%3.7%5.5%₹9,100 est.₹68.3 LUnder construction
Dec 2027
Roshan Milestone Wing B
Rahul Bhagwandas Sankla · Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani
548.2%2.9%3.8%₹7,150 est.₹53.6 LUnder construction
Dec 2026
Roshan Milestone Wing C
Rahul Bhagwandas Sankla · Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani
548.2%2.9%3.8%₹7,150 est.₹53.6 LUnder construction
Dec 2026
Roshan Milestone Wing A
Rahul Bhagwandas Sankla · Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani
548.2%2.9%3.8%₹7,150 est.₹53.6 LUnder construction
Dec 2026
Sukhwani Niketan Phase II
Sukhwani Constructions · Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani
537.8%4.1%5.2%₹7,600 est.₹57.0 LReady
Sukhwani Araya
Sukhwani Constructions · Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani
537.8%4.1%5.2%₹7,600 est.₹57.0 LReady
Radhey Premlok Co Operative Housing Society Ltd
Moraya Associates · Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani
538.2%2.9%3.8%₹7,150 est.₹53.6 LUnder construction
Dec 2026
Abhishek Sahakari Gruhrachana Sanstha Maryadit
Moraya Associates · Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani
538.2%2.9%3.8%₹7,150 est.₹53.6 LUnder construction
Dec 2026
Sukhwani Skylines
Sukhwani Constructions · Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani
538.6%3.7%5.5%₹7,150 est.₹53.6 LUnder construction
Dec 2027
Park Titan Phase III
Pride Purple · Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani
538.2%3.0%4.1%₹7,150 est.₹53.6 LUnder construction
Jun 2027
Sukhwani Sepia, 97 Sepia, Phase III
Sukhwani Constructions · Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani
538.6%3.7%5.5%₹7,150 est.₹53.6 LUnder construction
Dec 2027
Gurudeo
Moraya Associates · Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani
538.6%3.4%5.0%₹7,150 est.₹53.6 LUnder construction
Jun 2028
Aria
Aurigaa Realtors · Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani
539.4%4.7%7.8%₹7,150 est.₹53.6 LUnder construction
Dec 2029
VJ Grand Central
Vilas Javdekar · Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani
537.8%3.8%5.0%₹9,700 est.₹72.8 LReady
Ashiana Malhar Phase II
Ashiana Housing · Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani
538.2%3.0%4.2%₹7,150 est.₹53.6 LUnder construction
May 2027
Puneville Phase II Cluster A
Benchmarrk Realty · Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani
537.8%4.1%5.2%₹7,600 est.₹57.0 LReady
Kairosa Cluster A
Benchmarrk Realty · Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani
537.8%4.1%5.2%₹7,600 est.₹57.0 LReady
Mirai Phase-I
Aurigaa Realtors · Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani
538.2%2.9%3.8%₹7,150 est.₹53.6 LUnder construction
Dec 2026
Geras Imperium Rise
Gera Developments · Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani
537.8%3.8%5.0%₹9,700 est.₹72.8 LReady
Kohinoor Central Park - Phase II
Intofinity Promoters · Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani
539.4%4.7%7.9%₹7,150 est.₹53.6 LUnder construction
Oct 2029
Galaxy
Moraya Associates · Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani
527.8%4.1%5.2%₹7,600 est.₹57.0 LReady
Kohinoor Sapphire
Rising Associates · Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani
527.8%4.1%5.2%₹7,600 est.₹57.0 LReady
Trident E F
Paranjape Schemes · Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani
528.6%3.7%5.5%₹9,100 est.₹68.3 LUnder construction
Dec 2027
VJ IndiLife Wakad
Vilas Javdekar · Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani
528.2%2.9%4.1%₹9,100 est.₹68.3 LUnder construction
Jun 2027
Narmada
Moraya Associates · Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani
528.2%3.0%4.1%₹7,150 est.₹53.6 LUnder construction
Jun 2027
Trident
Paranjape Schemes · Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani
527.8%3.8%5.0%₹9,700 est.₹72.8 LReady
Trident C, D
Paranjape Schemes · Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani
527.8%3.8%5.0%₹9,700 est.₹72.8 LReady
Vivanta Apartment
Balaji Developers · Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani
527.8%4.1%5.2%₹7,600 est.₹57.0 LReady
28 Pearls
Bhakti Builders · Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani
527.8%4.1%5.2%₹7,600 est.₹57.0 LReady
Bhakti Shrinidhi
Bhakti Builders · Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani
527.8%4.1%5.2%₹7,600 est.₹57.0 LReady
Rohan Harita Phase 2
Rohan Builders · Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani
529.0%4.2%6.6%₹9,100 est.₹68.3 LUnder construction
Dec 2028
Itrend Life
Neev Sai Developers · Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani
527.8%4.1%5.2%₹7,600 est.₹57.0 LReady
Millennium Pacific
Millennium Developers · Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani
527.8%4.1%5.2%₹7,600 est.₹57.0 LReady
41 Elite Phase 3 Building C
Krisala Enterprises · Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani
527.8%4.1%5.2%₹7,600 est.₹57.0 LReady
41 Elite
Krisala Enterprises · Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani
527.8%4.1%5.2%₹7,600 est.₹57.0 LReady
41 Elite
Krisala Enterprises · Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani
527.8%4.1%5.2%₹7,600 est.₹57.0 LReady
41 Elite
Krisala Enterprises · Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani
527.8%4.1%5.2%₹7,600 est.₹57.0 LReady
Itrend Life 2
Neev Sai Developers · Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani
527.8%4.1%5.2%₹7,600 est.₹57.0 LReady
41cosmo
Krisala Enterprises · Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani
527.8%4.1%5.2%₹7,600 est.₹57.0 LReady
Newton Homes Tathawade Phase I
Ravima Developer · Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani
527.8%4.1%5.2%₹7,600 est.₹57.0 LReady
Millennium Atlas
Millennium Developers · Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani
527.8%4.1%5.2%₹7,600 est.₹57.0 LReady
Kuber Antonia A Wing
Vikas Vilas Bhalgat · Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani
528.2%3.2%4.4%₹7,150 est.₹53.6 LUnder construction
Apr 2027
Kuber Antonia C Wing
Vikas Vilas Bhalgat · Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani
528.2%3.2%4.4%₹7,150 est.₹53.6 LUnder construction
Apr 2027
Sensorium, Phase VII
Joyville Shapoorji Housing · Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani
528.2%2.9%3.8%₹7,150 est.₹53.6 LUnder construction
Dec 2026
Metro Life Ultima Residences Phase I
Rama Synergy Spaces · Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani
528.6%3.7%5.5%₹7,150 est.₹53.6 LUnder construction
Dec 2027
Basil Maximus Wing D And E
Basil Avante · Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani
528.6%3.7%5.5%₹7,150 est.₹53.6 LUnder construction
Dec 2027
Rudraksh Vantage
Gurudatta Developers · Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani
518.6%3.7%5.5%₹7,150 est.₹53.6 LUnder construction
Dec 2027
Rohan Viti
Rohan Builders · Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani
518.6%3.7%5.5%₹9,100 est.₹68.3 LUnder construction
Dec 2027
Rohan Harita Phase 1
Rohan Builders · Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani
518.6%3.7%5.5%₹9,100 est.₹68.3 LUnder construction
Dec 2027
Sukhwani Ambar
Sukhwani Constructions · Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani
518.2%3.0%4.1%₹7,150 est.₹53.6 LUnder construction
Jun 2027
Basil Maximus Wing C
Basil Avante · Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani
518.2%2.9%3.8%₹7,150 est.₹53.6 LUnder construction
Dec 2026
The Aqua Retreat at Godrej Park World
Maan-Hinje Township Developers · Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani
519.3%4.3%7.9%₹7,150 est.₹53.6 LUnder construction
Sep 2031
SENSORIUM, Phase VI
Joyville Shapoorji Housing · Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani
518.2%3.0%3.8%₹7,150 est.₹53.6 LUnder construction
Sep 2026
Metro Life Ultima Residences Phase II
Rama Synergy Spaces · Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani
518.6%3.4%5.0%₹7,150 est.₹53.6 LUnder construction
Jun 2028
Life Republic Sector R13/13th Avenue/Aros/Phase-II
Kolte-Patil · Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani
508.6%3.4%5.0%₹9,100 est.₹68.3 LUnder construction
Jun 2028
Saarrthi Savvy Homes II
Siddharth Properties · Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani
507.8%4.1%5.2%₹7,600 est.₹57.0 LReady
Metro Life Bizz Bay
Rama Synergy Spaces · Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani
507.8%4.1%5.2%₹7,600 est.₹57.0 LReady
Metro Life Maxima Residences Phase I
Rama Synergy Spaces · Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani
507.8%4.1%5.2%₹7,600 est.₹57.0 LReady
Metro Life Maxima Residences Phase II
Rama Synergy Spaces · Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani
507.8%4.1%5.2%₹7,600 est.₹57.0 LReady
Metro Life Optima Residences
Rama Synergy Spaces · Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani
507.8%4.1%5.2%₹7,600 est.₹57.0 LReady
Elysia Towers
Bhakti Builders · Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani
507.8%4.1%5.2%₹7,600 est.₹57.0 LReady
Kohinoor Central Park - Phase 1
Intofinity Promoters · Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani
509.0%4.2%6.5%₹7,150 est.₹53.6 LUnder construction
Dec 2028
Building C2 Eon Homes
Hinjawadi Infradevelopment · Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani
508.6%3.7%5.5%₹7,150 est.₹53.6 LUnder construction
Dec 2027
Building B2 Eon Homes
Hinjawadi Infradevelopment · Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani
508.6%3.7%5.5%₹7,150 est.₹53.6 LUnder construction
Dec 2027
Kamalraj Athens A
Kamalraj Estate · Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani
508.2%3.0%4.1%₹7,150 est.₹53.6 LUnder construction
Jun 2027
Shree Capital
Shree Developers · Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani
507.8%4.1%5.2%₹7,600 est.₹57.0 LReady
Godrej Eden Estate Phase 3
Maan-Hinje Township Developers · Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani
499.7%5.5%8.5%₹3,950 est.₹29.6 LUnder construction
Mar 2027
Brramha Residency
Sukhwani Constructions · Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani
498.6%3.4%5.0%₹7,150 est.₹53.6 LUnder construction
May 2028
Building C1 Eon Homes
Hinjawadi Infradevelopment · Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani
499.0%4.1%6.5%₹7,150 est.₹53.6 LUnder construction
Jan 2029
Yashone Eternitee Phase 2
Vilas Javdekar · Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani
498.2%2.9%4.1%₹9,100 est.₹68.3 LUnder construction
Jun 2027
The Water Edge
Vision Developers · Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani
497.8%4.1%5.2%₹7,600 est.₹57.0 LReady
The Gale at Godrej Park World
Maan-Hinje Township Developers · Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani
489.0%3.8%6.0%₹7,150 est.₹53.6 LUnder construction
Jul 2029
Sonigara Estilo
Shree Developers · Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani
488.2%2.9%3.8%₹7,150 est.₹53.6 LUnder construction
Dec 2026
Rohan Ananta Phase II
Rohan Builders · Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani
488.2%2.8%3.7%₹9,100 est.₹68.3 LUnder construction
Dec 2026
Rohan Ananta Phase III
Rohan Builders · Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani
488.2%2.8%3.7%₹9,100 est.₹68.3 LUnder construction
Dec 2026
Anand Vrindavan
Anand Developers · Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani
478.2%3.2%4.4%₹7,150 est.₹53.6 LUnder construction
Apr 2027
Megapolis Shimmer - A1
Pegasus Properties · Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani
479.0%4.0%6.3%₹7,150 est.₹53.6 LUnder construction
Mar 2029
Life Republic/Sector R10/10th Avenue/Universe/Phase III
Kolte-Patil · Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani
478.2%2.9%3.7%₹9,100 est.₹68.3 LUnder construction
Dec 2025
Akshara Meadows
Garve Developers And Promoters · Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani
478.2%2.9%3.8%₹7,150 est.₹53.6 LUnder construction
Dec 2026
Park Astra Phase III
Pride Purple · Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani
468.2%3.0%3.8%₹7,150 est.₹53.6 LUnder construction
Jun 2026
Yashwin NuovoCentro
Vilas Javdekar · Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani
468.2%2.9%3.7%₹9,100 est.₹68.3 LUnder construction
Jun 2026
172W Inclusive Housing
Vilas Javdekar · Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani
468.2%2.9%3.7%₹9,100 est.₹68.3 LUnder construction
Jun 2026
Megapolis Mystic - G
Pegasus Properties · Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani
468.2%3.2%4.4%₹7,150 est.₹53.6 LUnder construction
Apr 2027
Megapolis Springs - B and F
Pegasus Properties · Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani
467.8%4.1%5.2%₹7,600 est.₹57.0 LReady
Megapolis Springs - A
Pegasus Properties · Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani
467.8%4.1%5.2%₹7,600 est.₹57.0 LReady
Megapolis Saffron - A3 to A9
Pegasus Properties · Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani
467.8%4.1%5.2%₹7,600 est.₹57.0 LReady
Megapolis Saffron - A10 to A14
Pegasus Properties · Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani
467.8%4.1%5.2%₹7,600 est.₹57.0 LReady
Yashwin SuperNova
Vilas Javdekar · Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani
458.2%2.9%3.7%₹9,100 est.₹68.3 LUnder construction
Mar 2026
Fusion Towers Phase II
Rama Synergy Spaces · Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani
457.8%4.1%5.2%₹7,600 est.₹57.0 LReady
Kohinoor Sapphire III
Rising Associates · Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani
448.2%3.0%3.8%₹7,150 est.₹53.6 LUnder construction
Feb 2026
Fusion Towers Phase I
Rama Synergy Spaces · Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani
447.8%4.1%5.2%₹7,600 est.₹57.0 LReady
Megapolis Mystic - F
Pegasus Properties · Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani
447.8%4.1%5.2%₹7,600 est.₹57.0 LReady
Akshara Serenity B and C
Garve Developers And Promoters · Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani
448.2%2.9%3.8%₹7,150 est.₹53.6 LUnder construction
Dec 2026
Akshara Harmony
Garve Developers And Promoters · Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani
448.2%2.9%3.8%₹7,150 est.₹53.6 LUnder construction
Dec 2026
Bhakti Elite
Bhakti Builders · Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani
438.2%3.0%3.8%₹7,150 est.₹53.6 LUnder construction
Apr 2026
Fusion Towers Phase IV
Rama Synergy Spaces · Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani
428.2%2.9%3.8%₹7,150 est.₹53.6 LUnder construction
Dec 2026
Akshara Serenity
Garve Developers And Promoters · Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani
428.2%3.0%3.9%₹7,150 est.₹53.6 LUnder construction
Oct 2026
Bhakti Rudved
Bhakti Builders · Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani
428.2%3.0%3.8%₹7,150 est.₹53.6 LUnder construction
Jun 2026
YashONE Eternitee Phase 1
Vilas Javdekar · Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani
418.2%2.9%3.7%₹9,100 est.₹68.3 LUnder construction
Apr 2026
Sai Residency
Sai Developers · Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani
418.2%2.9%3.8%₹7,150 est.₹53.6 LUnder construction
Dec 2026
Godrej Eden Estate Phase 2
Maan-Hinje Township Developers · Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani
409.7%5.1%7.3%₹3,950 est.₹29.6 LUnder construction
Feb 2026
Godrej Eden Estate Phase 1
Maan-Hinje Township Developers · Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani
409.7%5.1%7.3%₹3,950 est.₹29.6 LUnder construction
Feb 2026
Fusion Towers Phase III
Rama Synergy Spaces · Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani
358.2%3.0%3.8%₹7,150 est.₹53.6 LUnder construction
Jul 2026

Price per sq ft in Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani: what the evidence says

Date₹ / sq ftBasisConfidence
2021-06₹7,200pun (derived)40%
2023-06₹7,900pun (derived)45%
2025-06₹9,200pun (derived)50%
2026-06₹10,000pun (derived)50%

That is 6.8% a year from 2021-06 to 2026-06. The model projects 8.6% a year from here; the growth story on each project page shows why.

Infrastructure pipeline

ProjectTypeStatusExpectedChance it lands on timePrice effect if it does
Metro Line 3 Hinjewadi–Shivajinagarmetroconstruction202670%+1.2% / yr
Pune Ring Road (PMRDA)roadconstruction202945%+0.8% / yr

The growth model counts each event at its probability, not its promise. Dates are the latest public schedule.

Developers active in Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani

Ranked lists for Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani

Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani compared with other areas

Questions people ask

Is Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani good for investment?

On PropertyLens's model the median analysed project in Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani scores 53/100 (below the Pune average), with projected price growth of 8.6% a year over five years, median price ₹7,150 per sq ft and gross rental yield 3.7%. 181 RERA-registered projects analysed as of November 11, 2026. The best-scored project is Life Republic Sector R14/14th Avenue - Qrious/Phase - I at 60.

What is the price per sq ft in Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani?

Median ₹7,150 per sq ft of super built-up area across analysed projects, modelled from comparables where developers file no price. Entry price for an analysed home is about ₹29.6 L; the median home is ₹53.6 L.

What rental yield can I expect in Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani?

Median gross yield 3.7% on the all-in cost of an analysed home, before maintenance, vacancy and tax. Net-wealth CAGR after every cost on an 8-year hold with a 75% loan is 4.1% at the median.

Are projects in Wakad / Pimple Saudagar / Punawale / Tathawade / Rahatani delayed?

14 of 136 under-construction projects are past the completion date in their original RERA registration, and unsold stock equals about 18 months of sales. Each project page shows extensions, construction against bookings and complaints.

Scores and projections are model outputs built from dated public evidence (MahaRERA public filings, public ratings) and stated assumptions. Unit sizes and prices in this city are modelled estimates because the regulator does not publish unit inventories openly. They are research, not investment advice. How the numbers are built.