Pareena Infrastructures · Sohna Road and Southern Peripheral Road (Sectors 33, 38–39, 47–50, 67–76)

Hanu Residency

HANU RESIDENCY BADSHAHPUR AKL IMPUR ROAD, SECTOR-68,, Tehsil BADSHAHPUR ST, GURUGRAM
Handover May 2027 · no rent beforeapartment · midRERA registered+ CompareFull report ↗
1 · Which home?
2 · Which exit plan?

Score, growth and returns below are for the highlighted home and plan. Prices, rent and possession never mix across phases.

62
Investment score
62/100
Evidence confidence55%
1 BHK · ~510 sq ft (376 carpet)
Price growth per year, next 5 yrs model
8.8%
likely range 5.3%–12.3% · over 10 yrs 8.4%/yr
Net-wealth CAGR, 8-yr hold
4.9%
your cash in → cash back incl. sale, per year
Cash-flow IRR, 8-yr hold
6.7%
with 75% loan · all-cash 8.0% · with interiors
Three numbers, three questions. Price growth: what will the home be worth? Net-wealth CAGR: what will my money have earned after every cost? Cash-flow IRR: the same, but counting when each rupee moves. Tap i on any of them.
Price · edit here or below assumed
₹Cr
₹ psf × 510 sq ft · as of Nov 2026
Price edits apply to ·
All-in cost
₹71.8 L
+ other charges 2.0 L, GST 2.9 L, stamp/reg 4.2 L, interiors 6.1 L
Gross rental yield assumed
3.6%
rent starts in ~1.0 yr

All-in cost sheet this home, default assumptions

ItemBasisAmount
Base price₹11,100 per sq ft × 510 sq ft super built-up56.6 L
Other charges3.5% of base: floor-rise, preferred-location, car park, club, maintenance deposit, legal, corpus (edit in Assumptions)2.0 L
GST5.0% on an under-construction home2.9 L
Stamp duty and registration7.1% in Haryana: 7% stamp duty for men (5% for women) inside municipal limits, plus registration capped at ₹50,0004.2 L
Interiors₹1,200 per sq ft, needed before the home can be let6.1 L
All-in costwhat leaves your pocket and the bank's, before rent or resale₹71.8 L
Your own money75.0% loan at 8.5% for 20 years covers the rest; EMI 0.4 L a month₹47.9 L

Carpet area 376 sq ft against 510 sq ft super built-up: you pay for 26% that is common area and walls. Price per sq ft of carpet ≈ ₹15,056. Every percentage above is editable in Assumptions; the defaults are Haryana rates as of 2026.

In plain words

Why 62 out of 100

Each home is marked on 11 things a careful buyer checks, then compared with every project we analyse in Gurugram: 50 is the average project, 62 beats about five in six. Here is what lifts this one and what drags it:

  • +
    Employment access · 2/5 pts
    Drive times right now: Sohna Road (Sector 48) 15 min, Golf Course Road (Sector 54) 28 min, Huda City Centre 29 min; Aerocity (Delhi) 58 min. About 4 million sq ft of new offices are planned nearby in 3 years.
  • +
    Rental demand & yield · 4/9 pts
    Rent pays back 3.6% of the price every year, better than the usual 2.6% in Gurugram. Tenant demand here is very strong.
  • +
    Schools, hospitals, daily needs · 1/3 pts
    Schools, hospitals and daily shopping are good in this area.
  • −
    Layout, size, age, amenities, maintenance · -1/3 pts
    Dense layout (139 homes per acre); about 74% of the area you pay for is usable carpet area. Maintenance ~₹3.5 per sq ft a month.
  • −
    Metro, bus, rail & airport · -1/9 pts
    No working metro nearby (nearest 7 km). Airport is about 57 minutes by road right now.
  • −
    Price vs comparables · -0/3 pts
    Priced about the same as similar mid homes nearby (₹11,100 vs ~₹11,800 per sq ft).
All 11 checks
  • •
    Price vs comparables · -0/3 pts
    Priced about the same as similar mid homes nearby (₹11,100 vs ~₹11,800 per sq ft).
  • +
    Rental demand & yield · 4/9 pts
    Rent pays back 3.6% of the price every year, better than the usual 2.6% in Gurugram. Tenant demand here is very strong.
  • +
    Resale liquidity · 1/4 pts
    Plenty of buyers can afford a ₹56.6 L home, and homes in Sohna Road and Southern Peripheral Road resell at a normal pace. Reselling before handover needs the builder’s permission.
  • +
    Employment access · 2/5 pts
    Drive times right now: Sohna Road (Sector 48) 15 min, Golf Course Road (Sector 54) 28 min, Huda City Centre 29 min; Aerocity (Delhi) 58 min. About 4 million sq ft of new offices are planned nearby in 3 years.
  • −
    Metro, bus, rail & airport · -1/9 pts
    No working metro nearby (nearest 7 km). Airport is about 57 minutes by road right now.
  • +
    Schools, hospitals, daily needs · 1/3 pts
    Schools, hospitals and daily shopping are good in this area.
  • •
    Builder delivery & handover risk · 4/13 pts
    Pareena Infrastructures has finished 3+ projects and delivered on time about 80% of the time. This phase is still under construction, with handover promised for 2027-05-31: delays would push your rent start back.
  • •
    Layout, size, age, amenities, maintenance · -1/3 pts
    Dense layout (139 homes per acre); about 74% of the area you pay for is usable carpet area. Maintenance ~₹3.5 per sq ft a month.
  • •
    Water, flooding, noise, infrastructure · 0/9 pts
    Low flood risk; water supply is mostly borewell or tankers; noticeable traffic or aircraft noise.
  • •
    Legal, title & approvals · 0/8 pts
    Registered with Haryana RERA (Gurugram); court cases not disclosed on the public register; land title not yet verified by us, so get a lawyer to check. The due-diligence report below flags 0 items in red.
  • •
    Expected price growth (5-yr CAGR model) · 2/33 pts
    We expect prices here to rise about 8.8% a year for the next 5 years (explained below).
Why prices should grow ~8.8% a year for the next 5 years

We build the forecast step by step, starting from what Gurugram homes normally do and adjusting for this area and this project:

  1. + 6.0%Start with 6.0% a year: the normal long-run growth of Gurugram home prices.
  2. + 1.9%Add 1.9%: prices here rose 19.0% a year recently (2023-06 to 2026-06). Some of that pace continues, but it fades each year.
  3. − 1.4%Subtract 1.4%: at ₹11,100 per sq ft, fewer families can afford to buy here, which slows further rises.
  4. + 2.4%Add 2.4%: 4 million sq ft of new offices nearby means more people wanting homes here.
  5. − 0.7%Subtract 0.7%: many new homes are being built here (26 months of unsold stock), which keeps prices in check.
  6. + 0.2%Add 0.2% for new roads, metro and water lines, weighted by how likely they are to actually finish: Sohna elevated road (Rajiv Chowk–Sohna, 2023) (operational, 2023); Gurugram Metro: Millennium City Centre–Cyber City loop and Sector 5 spur (construction, 2029).
  7. + 0.4%Add 0.4% for this project itself: unfinished homes are worth more once they are complete.
  8. = 8.8%Result: about 8.8% a year, so a home worth ₹58.6 L today would be worth about ₹89.3 L in 5 years. We are 56% confident in the evidence behind this.

Which exit suits you?

For an unfinished flat the answer depends on whether you sell at handover or hold, and whether you spend on interiors. Same price, same loan; only the strategy changes:

StrategyHoldIRR / yrWealth CAGR / yrCash you put inNet rentNet saleApply
Sell at handover, no interiors
Take delivery in 2027-05-31 and sell the bare flat (1 yr hold). Needs builder NOC or registration first; no rent.
1 yrs-65.0%-65.0%₹5.9 L₹-17,247₹18.2 L
Hold bare, rent unfurnished best IRR
Skip interiors; rent 12% lower than a fitted home; sell after 8 yrs with no interiors value.
8 yrs8.7%6.1%₹43.2 L₹9.1 L₹72.5 L
Hold, do interiors, rent & sell fitted selected
Spend ₹1,200/sq ft on interiors, earn full rent, recover ~40% of interiors cost at sale (fading over 10 yrs).
8 yrs6.7%4.9%₹47.9 L₹10.7 L₹73.2 L

IRR and CAGR are per year over the hold shown. A short hold can show a high IRR on a small absolute gain; compare the net-sale column too. Selling before registration usually needs the builder’s transfer NOC and a fee.

Highlights

  • Pareena Infrastructures · Sohna Road and Southern Peripheral Road (Sectors 33, 38–39, 47–50, 67–76) · 1,390 homes on 10.0 acres
  • Under construction: progress not on the public register, HRERA completion 2027-05-31
  • Registered with Haryana RERA (Gurugram) as RERA-GRG-1243-2022

Assumptions editable

Purchase

₹/sq ft
₹ Cr
sq ft
% of base
%
%
%
₹/sq ft

FinancingLoan 75% · cash 25% · EMI ₹40,042/mo

% loan
% p.a.
years
%

Rent & running costs

₹
% p.a.
%
months
months
₹/sq ft/mo
% of rent
% of rent
% of value

Interiors & exit

%
%
years
% p.a. (blank = model)
%
%

Returns over 8 years · with interiors

Cash you put in₹47.9 L
Exit value (yr 8)₹1.12 Cr
Net sale after loan & costs₹73.2 L
Net rent after opex₹10.7 L
Loan (75% of price)₹46.1 L
EMI / month₹40,042
Year 0: ₹-5.9 L0Year 1: ₹-22.3 L1Year 2: ₹-3.5 L2Year 3: ₹-3.4 L3Year 4: ₹-3.3 L4Year 5: ₹-3.3 L5Year 6: ₹-3.2 L6Year 7: ₹-3.1 L7Year 8: ₹70.2 L8
YearPurchaseLoan inRent (net of vacancy)OpexDebt serviceSale − loanNet cash
Today-10.5 L4.6 L0.0 L0.0 L0.0 L0.0 L-5.9 L
Yr 1-61.5 L41.5 L0.0 L-0.2 L-2.2 L0.0 L-22.3 L
Yr 20.0 L0.0 L2.0 L-0.7 L-4.8 L0.0 L-3.5 L
Yr 30.0 L0.0 L2.1 L-0.7 L-4.8 L0.0 L-3.4 L
Yr 40.0 L0.0 L2.2 L-0.7 L-4.8 L0.0 L-3.3 L
Yr 50.0 L0.0 L2.3 L-0.8 L-4.8 L0.0 L-3.3 L
Yr 60.0 L0.0 L2.4 L-0.8 L-4.8 L0.0 L-3.2 L
Yr 70.0 L0.0 L2.5 L-0.8 L-4.8 L0.0 L-3.1 L
Yr 80.0 L0.0 L2.7 L-0.9 L-4.8 L73.2 L70.2 L

Pre-tax unless capital-gains tax is set. Rent enters the cash flows once. Net-wealth CAGR = (cash returned incl. sale ÷ cash put in)^(1/years) − 1. IRR uses the dated cash flows.

Score factors

Bars show points added or taken away versus the average analysed Gurugram project (score 50).

Price vs comparables
−0.2 pts vs avg
this home 5.9/10 · Gurugram average 6.2 · confidence 35%
₹11,100 psf vs mid comps ₹11,800 (-6%; under-construction should price ~8% below ready). Price is a model estimate, so this factor carries a third of its normal weight until a listed price is observed.
Rental demand & yield
+3.7 pts vs avg
this home 7.3/10 · Gurugram average 5.3 · confidence 38%
Gross yield 3.7% (₹34 psf/month); locality rental demand 8/10.
Resale liquidity
+0.8 pts vs avg
this home 8.0/10 · Gurugram average 7.4 · confidence 50%
Locality resale depth 7/10; ticket ₹0.57 Cr narrows the buyer pool; UC resale needs builder NOC; 1390-home project gives deep resale comps.
Employment access
+2.5 pts vs avg
this home 8.4/10 · Gurugram average 7.0 · confidence 85%
Drive times now (Google Maps, 2026-11-11): Sohna Road (Sector 48) 15 min, Golf Course Road (Sector 54) 28 min, Huda City Centre 29 min, IMT Manesar 33 min; 3 of 7 major hubs within 30 min; 4 msf office pipeline (3 yr).
Metro, bus, rail & airport
−0.9 pts vs avg
this home 3.7/10 · Gurugram average 4.2 · confidence 60%
none; no planned station within 2 km; airport ~57 min by road now (Google Maps); .
Schools, hospitals, daily needs
+1.0 pts vs avg
this home 7.5/10 · Gurugram average 6.4 · confidence 50%
Locality social-infrastructure index (interim, expert-set; POI distances pending Maps integration).
Builder delivery & handover risk
+4.0 pts vs avg
this home 5.9/10 · Gurugram average 4.2 · confidence 60%
Pareena Infrastructures: 3+ projects, on-time 80% (derived); handover 2027-05-31 (reported); within the RERA timeline.
Layout, size, age, amenities, maintenance
−1.1 pts vs avg
this home 6.5/10 · Gurugram average 7.5 · confidence 50%
139 units/acre; carpet/SBA ~74%; maintenance ~₹3.5 psf/month (assumed).
Water, flooding, noise, infrastructure
+0.2 pts vs avg
this home 5.4/10 · Gurugram average 5.3 · confidence 50%
SPR stretch heavy with new launches; Badshahpur drain flooding
Legal, title & approvals
+0.4 pts vs avg
this home 6.0/10 · Gurugram average 5.8 · confidence 55%
RERA registered; litigation: not published on the public register; approvals: HRERA registered; title: not verified. Due-diligence report lists 0 red flags (−0.0 pts).
Expected price growth (5-yr CAGR model)
+1.7 pts vs avg
this home 4.6/10 · Gurugram average 4.3 · confidence 56%
Model 5-yr price CAGR 8.8% (range 5.3–12.3%).

Price growth model, year by year

Nominal growth per year. Parts add up; momentum fades, infrastructure is weighted by delivery probability and dated.

ComponentYr 1Yr 2Yr 3Yr 4Yr 5Yr 6Confidence
Gurugram long-run nominal trend6.06.06.06.06.06.080%
Locality momentum (mean-reverting)4.52.51.40.80.40.245%
Affordability ceiling-2.4-1.7-1.2-0.8-0.6-0.460%
Employment access & office pipeline2.42.42.42.42.42.455%
Supply–demand balance-1.0-0.8-0.6-0.5-0.4-0.350%
Infrastructure delivery (probability-weighted)0.10.30.20.20.00.055%
Project-specific adjustments2.00.00.00.00.00.050%
Total growth11.6%8.7%8.1%8.0%7.8%7.8%56%

Gurugram long-run nominal trend: City-wide 2013-25 nominal residential trend ≈ inflation + real income growth.

Locality momentum (mean-reverting): Trailing 3.0-yr locality CAGR 19.0% vs 6.0% trend; 35% carried forward, halving each year.

Affordability ceiling: Ticket at ₹11,100 psf vs city median ₹14,000; buyer pool thins above ₹15k/₹20k psf and after >6pp excess growth.

Employment access & office pipeline: 4 msf office pipeline (3 yr) on 10 msf stock; 30-min jobs index 0.75.

Supply–demand balance: 26 months of unsold inventory; new-launch/absorption ratio 1.4.

Infrastructure delivery (probability-weighted): Sohna elevated road (Rajiv Chowk–Sohna, 2023) (operational, 2023, p=1); Gurugram Metro: Millennium City Centre–Cyber City loop and Sector 5 spur (construction, 2029, p=0.5)

Project-specific adjustments: Remaining construction risk (17% work left) re-rates toward ready comps by handover (~1.3% over 0.7 yr).

Locality evidence: ₹9,500 (Jun 2023) → ₹16,000 (Jun 2026) = 19.0% p.a. Sources: Platform estimate (interim, not observed).

Financial & legal due diligence

What the public record says

Automated from the Haryana RERA registration RERA-GRG-1243-2022 and its REP-I application. Prices and rents are locality estimates, not verified listings. Compiled Nov 2026 from the Haryana RERA (Gurugram) file, company registers, rating agencies, tribunal records and press. Facts only; anything that deserves a written answer before signing is flagged.

Delivery timeline9/10
no extensions, no overdue dates on the RERA file
Legal & complaints9/10
no litigation and no complaints on the RERA file
Money to finish8/10
Developer strength5/10
no public credit rating for the promoter

Meters are rule-based from the RERA file and public ratings (rules shown under each), not opinions.

Registration
RERA-GRG-1243-2022 · PAREENA INFRASTRUCTURES PVT. LTD.
On original date
RegisteredOct 2023TodaySep 2026Original completionMay 2027
No litigation declaredNo complaints
Credit ratings of the people behind it

No public credit rating located for the promoter.

PAREENA INFRASTRUCTURES PVT. LTD.: credit rating not yet checked by PropertyLens

Complaints & disputes on record
On this project00 open
On the promoter entity0all projects
Court cases declared0no stay recorded
At a glance
On its original RERA date

On its original RERA completion date: 2027-05-31

No complaints on this project

No RERA complaints on this project; 0 on the promoter overall

No litigation declared

No litigation declared in RERA filings

The record, in pictures

RERA file · Registration

No litigation declaredBorrowing declared: not stated

Red flags to resolve in writing

Questions to put to the developer before you sign

  1. Share the latest quarterly progress filing and the architect and engineer certificates.
  2. Confirm the price list, floor-rise, parking and other charges for the exact unit.
  3. Which date is contractual, 2027-05-31 or the agreement's, and what is the delay compensation?
  4. Confirm there is no litigation on the land or approvals beyond the RERA declaration.
  5. Is the land owned by the promoter, or is this a joint development, and is any part mortgaged?
Full record: every filed number, line by line1 sections · 4 items

RERA file · Registration

Registration
RERA-GRG-1243-2022 · promoter PAREENA INFRASTRUCTURES PVT. LTD.
Dates
Start 2023-10-01 · original completion 2027-05-31 · no extensions
Land & towers
10.03 acres (40,584 sq m)
Litigation declared
None declared in filings

Source: Haryana RERA (Gurugram) project record RERA-GRG-1243-2022, fetched 2026-11-10. Figures are the promoter’s own filings.

Sources & caveats2 sources
  • Haryana RERA (Gurugram) project record RERA-GRG-1243-2022, fetched 2026-11-10
  • PropertyLens Gurugram locality model (market-level estimates)
  • Haryana RERA (Gurugram) project records RERA-GRG-1243-2022 (registration file, quarterly updates, complaint register), fetched Sep 2026.

Caveats. Automated analysis: prices, rents and travel times are estimates until listings and Maps data are verified. RERA figures are the promoter’s own filings. Nothing here is legal, tax or investment advice.

Evidence

Location, jobs & transit3 hubs · metro none nearby
Job hubs nearby
Sohna Road officesGolf Course Ext 4 kmCyber City 14 km
Measured drive times below
Office space
Existing10 msf
Coming in 3 yrs4 msf
Jobs within 30 min8/10
Getting around
Metro today
none
none within 5 km
Metro planned
No station planned within 2 km
Rail
—
estimate
Airport
57 min by road now · 20.5 km
Google Maps
Buses
7/10 coverage
estimate
Drive times to job hubs
DestinationDrive nowRoad km
Sohna Road (Sector 48)15 min4.4
Golf Course Road (Sector 54)28 min9.1
Huda City Centre29 min9.7
IMT Manesar33 min11.2
Cyber City40 min14
Udyog Vihar43 min14.8
IGI Airport T357 min20.5
Aerocity (Delhi)58 min20.7

Google Maps driving time with live traffic, measured Nov 2026. Refreshed monthly.

Location used: Google Maps match “”. Bus coverage and planned-station distances are still interim estimates.

Price historylocality 19.0%/yr

No dated project-level price series yet; only the latest observation is on file.

Locality · average ₹/sq ft
Date₹ psfSourceConfidenceKind
Jun 20218,000Platform estimate (interim, not observed)40%derived
Jun 20239,500Platform estimate (interim, not observed)45%derived
Jun 202514,000Platform estimate (interim, not observed)50%derived
Jun 202616,000Platform estimate (interim, not observed)50%derived
Luxury comps₹20,000
Premium comps₹15,500
Mid comps₹11,800
Unsold stock26 months

Model backtest on this locality: 1-yr hold-out (Jun 2025→Jun 2026): predicted ₹15,368 vs actual ₹16,000 (-4%). Longer 3-yr hold-out (Jun 2023→Jun 2026): predicted 8.5% p.a. vs actual 19% p.a. — the model is deliberately mean-reverting and under-predicted the 2021–26 boom.

Environment, legal & productflood ok · water risk · RERA yes
Flood risklow
Water supplytankers/borewell
Quietnoisy
Roads & drainspatchy

SPR stretch heavy with new launches; Badshahpur drain flooding

Legal & approvals
Registration RERA-GRG-1243-2022
RERA RERA-GRG-1243-2022
possession May 2027
Litigation
not published on the public register
assumed
Approvals
HRERA registered
observed
Title
not verified
assumed
Product
Land10.03 acres
Homes1390
Density139/acre
Launched2023
Sources & data gapswhat we know, from where, and what is missing

Automated analysis: unit mix and carpet areas come from the RERA unit table where filed; prices and rents are locality-model estimates until listings are verified.

FieldValueSource classDateConf.KindConflicting values
AddressHANU RESIDENCY BADSHAHPUR AKL IMPUR ROAD, SECTOR-68,, Tehsil BADSHAHPUR ST, GURUGRAMHaryana RERA (Gurugram)Nov 202670%observed
Land area (acres)10.03Haryana RERA (Gurugram)Nov 202680%observed
Total units1390Haryana RERA (Gurugram)Nov 202680%observed
Launch year2023Haryana RERA (Gurugram)Nov 202670%observed
Possession · Registration RERA-GRG-1243-20222027-05-31Haryana RERA (Gurugram)Nov 202670%observed
Price psf · 1 BHK · ~510 sq ft (376 carpet)11100Platform estimate (interim, not observed)Nov 202635%assumed
Ticket · 1 BHK · ~510 sq ft (376 carpet)5661000Platform estimate (interim, not observed)Nov 202635%derived
Rent · 1 BHK · ~510 sq ft (376 carpet)17500Platform estimate (interim, not observed)Nov 202635%assumed
Carpet area376Haryana RERA (Gurugram)Nov 202660%observed
Builder on-time rate0.8Haryana RERA (Gurugram)Nov 202660%derived
Litigationnot published on the public registerHaryana RERA (Gurugram)Nov 202630%assumed
ApprovalsHRERA registeredHaryana RERA (Gurugram)Nov 202660%observed

Commercial listing portals are shown as “Listing portal (aggregated)”; full provenance is retained internally. Official developer and Haryana RERA (Gurugram) sources are named.

Other projects worth comparing

Same model, same date. Scores are out of 100, where 50 is the average analysed Gurugram project.

Questions people ask about Hanu Residency

Is Hanu Residency a good investment?

On PropertyLens's evidence-based model Hanu Residency scores 62/100, above the average analysed Gurugram project (50 = average, 12 points = one standard deviation). The model projects price growth of about 8.8% a year over five years and a net-wealth CAGR of 4.9% after every cost on an 8-year hold with a 75.0% loan. That is research on public filings, not advice; the factor breakdown on this page shows what drives the score.

What is the price per sq ft at Hanu Residency?

About ₹11,100 per sq ft of super built-up area, a model estimate from Sohna Road and Southern Peripheral Road comparables that you can edit. The 1 BHK home costs about ₹56.6 L before other charges, GST and stamp duty, and ₹71.8 L all-in.

When is Hanu Residency ready for possession?

The RERA registration commits to May 2027.

Is Hanu Residency RERA registered?

Yes. Haryana RERA (Gurugram) registration: RERA-GRG-1243-2022. No complaints on this registration at HRERA as of 2026-11-10.

How reliable is Pareena Infrastructures on delivery?

80% of Pareena Infrastructures's crawled Gurugram registrations needed no extension (3 of 3 analysed Gurugram registrations needed no extension). 3 registrations analysed. The developer scorecard compares this with every other Gurugram developer.

What rent can Hanu Residency earn?

About ₹17,500 a month for this home (a model estimate from Sohna Road and Southern Peripheral Road rents), a gross yield of 3.6% on the all-in cost. Nothing is earned before handover. Rent covers 44% of the EMI at the default loan.

Answers are generated from the filings and the model for this home and change when you edit the assumptions above. See the Pareena Infrastructures scorecard and the Sohna Road and Southern Peripheral Road area page.

Go deeper

Share on WhatsApp