Lodha (Macrotech) · Worli / Lower Parel / Prabhadevi

Lodha Worli Residential Project

Mumbai City, Mumbai City, 400025
Handover Jun 2033 · no rent beforeapartment · luxuryRERA registered+ CompareFull report ↗
1 · Which home?
2 · Which exit plan?

Score, growth and returns below are for the highlighted home and plan. Prices, rent and possession never mix across phases.

60
Investment score
60/100
Evidence confidence55%
2 BHK · ~650 sq ft carpet (assumed)
Price growth per year, next 5 yrs model
6.9%
likely range 3.5%–10.4% · over 10 yrs 6.9%/yr
Net-wealth CAGR, 8-yr hold
4.4%
your cash in → cash back incl. sale, per year
Cash-flow IRR, 8-yr hold
8.3%
with 75% loan · all-cash 9.0% · with interiors
Three numbers, three questions. Price growth: what will the home be worth? Net-wealth CAGR: what will my money have earned after every cost? Cash-flow IRR: the same, but counting when each rupee moves. Tap i on any of them.
Price · edit here or below assumed
₹Cr
₹ psf × 650 sq ft · as of Nov 2026
Price edits apply to ·
All-in cost
₹5.31 Cr
+ other charges 15.9 L, GST 23.5 L, stamp/reg 29.2 L, interiors 7.8 L
Gross rental yield assumed
2.3%
rent starts in ~7.1 yr

All-in cost sheet this home, default assumptions

ItemBasisAmount
Base price₹69,900 per sq ft × 650 sq ft carpet4.54 Cr
Other charges3.5% of base: floor-rise, preferred-location, car park, club, maintenance deposit, legal, corpus (edit in Assumptions)15.9 L
GST5.0% on an under-construction home23.5 L
Stamp duty and registration6.2% in Maharashtra: 6% stamp duty including 1% metro cess inside BMC limits (7% in Thane, Navi Mumbai and other corporations), plus 1% registration capped at ₹30,00029.2 L
Interiors₹1,200 per sq ft, needed before the home can be let7.8 L
All-in costwhat leaves your pocket and the bank's, before rent or resale₹5.31 Cr
Your own money75.0% loan at 8.5% for 20 years covers the rest; EMI 3.2 L a month₹2.84 Cr

Prices here are per sq ft of RERA carpet area (650 sq ft), the way homes are sold in Mumbai; there is no super built-up loading to discount. Every percentage above is editable in Assumptions; the defaults are Maharashtra rates as of 2026.

In plain words

Why 60 out of 100

Each home is marked on 11 things a careful buyer checks, then compared with every project we analyse in Mumbai: 50 is the average project, 62 beats about five in six. Here is what lifts this one and what drags it:

  • +
    Employment access · 8/11 pts
    Drive times right now: Lower Parel 9 min, BKC 24 min, Nariman Point 29 min; Thane (Wagle Estate) 71 min. About 6 million sq ft of new offices are planned nearby in 3 years.
  • +
    Schools, hospitals, daily needs · 1/2 pts
    Schools, hospitals and daily shopping are excellent in this area.
  • +
    Metro, bus, rail & airport · 3/8 pts
    A metro station is a short walk away (~900 m). Airport is about 72 minutes by road right now.
  • −
    Rental demand & yield · -1/7 pts
    Rent pays back 2.3% of the price every year, well below the usual 2.8% in Mumbai. Tenant demand here is very strong.
  • −
    Resale liquidity · -1/4 pts
    Plenty of buyers can afford a ₹4.54 Cr home, and homes in Worli / Lower Parel / Prabhadevi resell quickly. Reselling before handover needs the builder’s permission.
  • −
    Expected price growth (5-yr CAGR model) · -3/43 pts
    We expect prices here to rise about 6.9% a year for the next 5 years (explained below).
All 11 checks
  • •
    Price vs comparables · -0/3 pts
    Priced about the same as similar luxury homes nearby (₹69,900 vs ~₹70,800 per sq ft).
  • •
    Rental demand & yield · -1/7 pts
    Rent pays back 2.3% of the price every year, well below the usual 2.8% in Mumbai. Tenant demand here is very strong.
  • •
    Resale liquidity · -1/4 pts
    Plenty of buyers can afford a ₹4.54 Cr home, and homes in Worli / Lower Parel / Prabhadevi resell quickly. Reselling before handover needs the builder’s permission.
  • +
    Employment access · 8/11 pts
    Drive times right now: Lower Parel 9 min, BKC 24 min, Nariman Point 29 min; Thane (Wagle Estate) 71 min. About 6 million sq ft of new offices are planned nearby in 3 years.
  • +
    Metro, bus, rail & airport · 3/8 pts
    A metro station is a short walk away (~900 m). Airport is about 72 minutes by road right now.
  • +
    Schools, hospitals, daily needs · 1/2 pts
    Schools, hospitals and daily shopping are excellent in this area.
  • •
    Builder delivery & handover risk · 1/11 pts
    Lodha (Macrotech) has finished 204+ projects and delivered on time about 80% of the time. This phase is still under construction, with handover promised for 2033-06-30: delays would push your rent start back.
  • +
    Layout, size, age, amenities, maintenance · 0/2 pts
    Moderately dense layout (60 homes per acre); about 100% of the area you pay for is usable carpet area. Maintenance ~₹7 per sq ft a month.
  • •
    Water, flooding, noise, infrastructure · 2/8 pts
    Low flood risk; water supply is reliable piped supply; noticeable traffic or aircraft noise.
  • •
    Legal, title & approvals · 0/8 pts
    Registered with MahaRERA; court cases not disclosed on the public register; land title not yet verified by us, so get a lawyer to check. The due-diligence report below flags 0 items in red.
  • −
    Expected price growth (5-yr CAGR model) · -3/43 pts
    We expect prices here to rise about 6.9% a year for the next 5 years (explained below).
Why prices should grow ~6.9% a year for the next 5 years

We build the forecast step by step, starting from what Mumbai homes normally do and adjusting for this area and this project:

  1. + 5.5%Start with 5.5% a year: the normal long-run growth of Mumbai home prices.
  2. + 0.3%Add 0.3%: prices here rose 7.3% a year recently (2023-06 to 2026-06). Some of that pace continues, but it fades each year.
  3. − 0.9%Subtract 0.9%: at ₹69,900 per sq ft, fewer families can afford to buy here, which slows further rises.
  4. + 1.3%Add 1.3%: 6 million sq ft of new offices nearby means more people wanting homes here.
  5. − 0.7%Subtract 0.7%: many new homes are being built here (26 months of unsold stock), which keeps prices in check.
  6. + 0.3%Add 0.3% for new roads, metro and water lines, weighted by how likely they are to actually finish: Metro Line 3 (Aqua) Colaba–BKC–SEEPZ, fully open Oct 2025 (operational, 2025); Mumbai Coastal Road (Marine Drive–Worli, 2024–25) (operational, 2025); Atal Setu trans-harbour link (Jan 2024) (operational, 2024).
  7. + 1.1%Add 1.1% for this project itself: unfinished homes are worth more once they are complete.
  8. = 6.9%Result: about 6.9% a year, so a home worth ₹4.70 Cr today would be worth about ₹6.57 Cr in 5 years. We are 56% confident in the evidence behind this.

Which exit suits you?

For an unfinished flat the answer depends on whether you sell at handover or hold, and whether you spend on interiors. Same price, same loan; only the strategy changes:

StrategyHoldIRR / yrWealth CAGR / yrCash you put inNet rentNet saleApply
Sell at handover, no interiors best IRR
Take delivery in 2033-06-30 and sell the bare flat (7 yr hold). Needs builder NOC or registration first; no rent.
7 yrs9.3%5.3%₹2.30 Cr₹-1.0 L₹3.77 Cr
Hold bare, rent unfurnished
Skip interiors; rent 12% lower than a fitted home; sell after 8 yrs with no interiors value.
8 yrs8.5%4.7%₹2.77 Cr₹3.7 L₹4.32 Cr
Hold, do interiors, rent & sell fitted selected
Spend ₹1,200/sq ft on interiors, earn full rent, recover ~40% of interiors cost at sale (fading over 10 yrs).
8 yrs8.3%4.4%₹2.84 Cr₹4.6 L₹4.35 Cr

IRR and CAGR are per year over the hold shown. A short hold can show a high IRR on a small absolute gain; compare the net-sale column too. Selling before registration usually needs the builder’s transfer NOC and a fee.

Highlights

  • Lodha (Macrotech) · Worli / Lower Parel / Prabhadevi · unit count not on the public register
  • Under construction: progress not on the public register, MahaRERA completion 2033-06-30
  • Registered with MahaRERA as PR1170002502174

Assumptions editable

Purchase

₹/sq ft
₹ Cr
sq ft
% of base
%
%
%
₹/sq ft

FinancingLoan 75% · cash 25% · EMI ₹3.2 L/mo

% loan
% p.a.
years
%

Rent & running costs

₹
% p.a.
%
months
months
₹/sq ft/mo
% of rent
% of rent
% of value

Interiors & exit

%
%
years
% p.a. (blank = model)
%
%

Returns over 8 years · with interiors

Cash you put in₹2.84 Cr
Exit value (yr 8)₹8.07 Cr
Net sale after loan & costs₹4.35 Cr
Net rent after opex₹4.6 L
Loan (75% of price)₹3.70 Cr
EMI / month₹3.2 L
Year 0: ₹-43.4 L0Year 1: ₹-21.0 L1Year 2: ₹-25.1 L2Year 3: ₹-29.1 L3Year 4: ₹-33.2 L4Year 5: ₹-37.2 L5Year 6: ₹-41.3 L6Year 7: ₹-54.2 L7Year 8: ₹4.02 Cr8
YearPurchaseLoan inRent (net of vacancy)OpexDebt serviceSale − loanNet cash
Today-80.4 L37.0 L0.0 L0.0 L0.0 L0.0 L-43.4 L
Yr 1-63.5 L47.6 L0.0 L0.0 L-5.2 L0.0 L-21.0 L
Yr 2-63.5 L47.6 L0.0 L0.0 L-9.2 L0.0 L-25.1 L
Yr 3-63.5 L47.6 L0.0 L0.0 L-13.3 L0.0 L-29.1 L
Yr 4-63.5 L47.6 L0.0 L0.0 L-17.3 L0.0 L-33.2 L
Yr 5-63.5 L47.6 L0.0 L0.0 L-21.4 L0.0 L-37.2 L
Yr 6-63.5 L47.6 L0.0 L0.0 L-25.4 L0.0 L-41.3 L
Yr 7-71.3 L47.6 L0.0 L-1.0 L-29.5 L0.0 L-54.2 L
Yr 80.0 L0.0 L9.3 L-3.6 L-38.6 L4.35 Cr4.02 Cr

Pre-tax unless capital-gains tax is set. Rent enters the cash flows once. Net-wealth CAGR = (cash returned incl. sale ÷ cash put in)^(1/years) − 1. IRR uses the dated cash flows.

Score factors

Bars show points added or taken away versus the average analysed Mumbai project (score 50).

Price vs comparables
−0.1 pts vs avg
this home 5.8/10 · Mumbai average 6.0 · confidence 30%
₹69,900 psf vs luxury comps ₹70,800 (-1%; under-construction should price ~8% below ready). Price is a model estimate, so this factor carries a third of its normal weight until a listed price is observed.
Rental demand & yield
−1.5 pts vs avg
this home 5.5/10 · Mumbai average 6.2 · confidence 34%
Gross yield 2.4% (₹137 psf/month); locality rental demand 9/10.
Resale liquidity
−0.8 pts vs avg
this home 6.9/10 · Mumbai average 7.4 · confidence 50%
Locality resale depth 8/10; ticket ₹4.54 Cr narrows the buyer pool; UC resale needs builder NOC.
Employment access
+7.9 pts vs avg
this home 8.6/10 · Mumbai average 4.4 · confidence 85%
Drive times now (Google Maps, 2026-11-11): Lower Parel 9 min, BKC 24 min, Nariman Point 29 min, Andheri SEEPZ 40 min; 3 of 7 major hubs within 30 min; 6 msf office pipeline (3 yr).
Metro, bus, rail & airport
+3.5 pts vs avg
this home 7.5/10 · Mumbai average 5.5 · confidence 60%
Aqua Line Worli / Siddhivinayak / Science Museum; no planned station within 2 km; airport ~72 min by road now (Google Maps); .
Schools, hospitals, daily needs
+1.1 pts vs avg
this home 9.0/10 · Mumbai average 7.8 · confidence 50%
Locality social-infrastructure index (interim, expert-set; POI distances pending Maps integration).
Builder delivery & handover risk
+0.9 pts vs avg
this home 5.9/10 · Mumbai average 5.5 · confidence 60%
Lodha (Macrotech): 204+ projects, on-time 80% (derived); handover 2033-06-30 (reported); within the RERA timeline.
Layout, size, age, amenities, maintenance
+0.5 pts vs avg
this home 8.3/10 · Mumbai average 7.9 · confidence 50%
60 units/acre; carpet/SBA ~100%; maintenance ~₹7 psf/month (assumed).
Water, flooding, noise, infrastructure
+1.8 pts vs avg
this home 6.8/10 · Mumbai average 5.8 · confidence 50%
Mill-land towers; luxury supply heavy; Coastal Road and Sea Link access
Legal, title & approvals
+0.2 pts vs avg
this home 6.0/10 · Mumbai average 5.9 · confidence 55%
RERA registered; litigation: not published on the public register; approvals: MahaRERA registered; title: not verified. Due-diligence report lists 0 red flags (−0.0 pts).
Expected price growth (5-yr CAGR model)
−3.3 pts vs avg
this home 2.2/10 · Mumbai average 2.7 · confidence 56%
Model 5-yr price CAGR 6.9% (range 3.5–10.4%).

Price growth model, year by year

Nominal growth per year. Parts add up; momentum fades, infrastructure is weighted by delivery probability and dated.

ComponentYr 1Yr 2Yr 3Yr 4Yr 5Yr 6Confidence
Mumbai long-run nominal trend5.55.55.55.55.55.580%
Locality momentum (mean-reverting)0.60.30.20.10.10.045%
Affordability ceiling-1.6-1.1-0.8-0.5-0.4-0.360%
Employment access & office pipeline1.31.31.31.31.31.355%
Supply–demand balance-1.0-0.8-0.6-0.5-0.4-0.350%
Infrastructure delivery (probability-weighted)1.00.50.00.00.00.055%
Project-specific adjustments1.11.11.11.11.11.150%
Total growth7.0%6.8%6.7%7.0%7.2%7.4%56%

Mumbai long-run nominal trend: City-wide 2013-25 nominal residential trend ≈ inflation + real income growth.

Locality momentum (mean-reverting): Trailing 3.0-yr locality CAGR 7.3% vs 5.5% trend; 35% carried forward, halving each year.

Affordability ceiling: Ticket at ₹69,900 psf vs city median ₹14,500; buyer pool thins above ₹15k/₹20k psf and after >6pp excess growth.

Employment access & office pipeline: 6 msf office pipeline (3 yr) on 45 msf stock; 30-min jobs index 0.95.

Supply–demand balance: 26 months of unsold inventory; new-launch/absorption ratio 0.8.

Infrastructure delivery (probability-weighted): Metro Line 3 (Aqua) Colaba–BKC–SEEPZ, fully open Oct 2025 (operational, 2025, p=1); Mumbai Coastal Road (Marine Drive–Worli, 2024–25) (operational, 2025, p=1); Atal Setu trans-harbour link (Jan 2024) (operational, 2024, p=1)

Project-specific adjustments: Remaining construction risk (95% work left) re-rates toward ready comps by handover (~7.6% over 6.8 yr).

Locality evidence: ₹47,000 (Jun 2023) → ₹58,000 (Jun 2026) = 7.3% p.a. Sources: Platform estimate (interim, not observed).

Financial & legal due diligence

What the public record says

Automated from MahaRERA's public register entry and registration certificate for PR1170002502174. Prices and rents are locality estimates, not verified listings. Compiled Nov 2026 from the MahaRERA file, company registers, rating agencies, tribunal records and press. Facts only; anything that deserves a written answer before signing is flagged.

Delivery timeline9/10
no extensions, no overdue dates on the RERA file
Legal & complaints9/10
no litigation and no complaints on the RERA file
Money to finish8/10
Developer strength9/10
CRISIL AA/Stable (Macrotech Developers)

Meters are rule-based from the RERA file and public ratings (rules shown under each), not opinions.

Registration
PR1170002502174 · Lodha Developers Limited
On original date
RegisteredJan 2026TodaySep 2026Original completionJun 2033
No litigation declaredNo complaints
Credit ratings of the people behind it
AAAAAABBBBBBCDinvestment grade ◀▶ speculative gradeCRISIL AA / Stable ▲ · Macrotech Developers · Aug 2025
Complaints & disputes on record
On this project00 open
On the promoter entity0all projects
Court cases declared0no stay recorded
At a glance
On its original RERA date

On its original RERA completion date: 2033-06-30

No complaints on this project

No RERA complaints on this project; 0 on the promoter overall

No litigation declared

No litigation declared in RERA filings

The record, in pictures

RERA file · Registration

No litigation declaredBorrowing declared: not stated

Red flags to resolve in writing

Questions to put to the developer before you sign

  1. Share the latest quarterly progress filing and the architect and engineer certificates.
  2. Confirm the price list, floor-rise, parking and other charges for the exact unit.
  3. Which date is contractual, 2033-06-30 or the agreement's, and what is the delay compensation?
  4. Confirm there is no litigation on the land or approvals beyond the RERA declaration.
  5. Is the land owned by the promoter, or is this a joint development, and is any part mortgaged?
Full record: every filed number, line by line1 sections · 3 items

RERA file · Registration

Registration
PR1170002502174 · promoter Lodha Developers Limited
Dates
Start 2026-01-23 · original completion 2033-06-30 · no extensions
Litigation declared
None declared in filings

Source: MahaRERA project record PR1170002502174, fetched 2026-11-10. Figures are the promoter’s own filings.

Sources & caveats2 sources
  • MahaRERA project record PR1170002502174, fetched 2026-11-10
  • PropertyLens Mumbai locality model (market-level estimates)
  • MahaRERA project records PR1170002502174 (registration file, quarterly updates, complaint register), fetched Sep 2026.

Caveats. Automated analysis: prices, rents and travel times are estimates until listings and Maps data are verified. RERA figures are the promoter’s own filings. Nothing here is legal, tax or investment advice.

Evidence

Location, jobs & transit3 hubs · metro walkable
Job hubs nearby
Lower Parel / Kamala Mills officesWorli One World Centre, PeninsulaBKC 6 km
Measured drive times below
Office space
Existing45 msf
Coming in 3 yrs6 msf
Jobs within 30 min10/10
Getting around
Metro today
Aqua Line Worli / Siddhivinayak / Science Museum
~900 m estimate
Metro planned
No station planned within 2 km
Rail
—
estimate
Airport
72 min by road now · 26 km
Google Maps
Buses
7/10 coverage
estimate
Drive times to job hubs
DestinationDrive nowRoad km
Lower Parel9 min1.9
BKC24 min7.7
Nariman Point29 min9.5
Andheri SEEPZ40 min13.9
Powai (Hiranandani)43 min14.9
Malad Mindspace53 min18.8
Thane (Wagle Estate)71 min25.6
Navi Mumbai Airport72 min26

Google Maps driving time with live traffic, measured Nov 2026. Refreshed monthly.

Location used: Google Maps match “”. Bus coverage and planned-station distances are still interim estimates.

Price historylocality 7.3%/yr

No dated project-level price series yet; only the latest observation is on file.

Locality · average ₹/sq ft
Date₹ psfSourceConfidenceKind
Jun 202142,000Platform estimate (interim, not observed)40%derived
Jun 202347,000Platform estimate (interim, not observed)45%derived
Jun 202554,000Platform estimate (interim, not observed)50%derived
Jun 202658,000Platform estimate (interim, not observed)50%derived
Luxury comps₹70,800
Premium comps₹56,300
Mid comps₹44,100
Unsold stock26 months

Model backtest on this locality: 1-yr hold-out (Jun 2025→Jun 2026): predicted ₹57,143 vs actual ₹58,000 (-1.5%). Longer 3-yr hold-out (Jun 2023→Jun 2026): predicted 5.6% p.a. vs actual 7.3% p.a. — the model is deliberately mean-reverting and under-predicted the 2021–26 boom.

Environment, legal & productflood ok · piped water · RERA yes
Flood risklow
Water supplypiped
Quietnoisy
Roads & drainsgood

Mill-land towers; luxury supply heavy; Coastal Road and Sea Link access

Legal & approvals
Registration PR1170002502174
RERA PR1170002502174
possession Jun 2033
Litigation
not published on the public register
assumed
Approvals
MahaRERA registered
observed
Title
not verified
assumed
Product
Landnot filed
Homesnot filed
Densitynot filed
Launched2026
Sources & data gapswhat we know, from where, and what is missing

Automated analysis from MahaRERA's public register: unit sizes and prices are locality-model estimates until listings are verified.

FieldValueSource classDateConf.KindConflicting values
AddressMumbai City, Mumbai City, 400025MahaRERANov 202670%observed
Land area (acres)Platform estimate (interim, not observed)Nov 202620%assumed
Total unitsPlatform estimate (interim, not observed)Nov 202620%assumed
Launch year2026MahaRERANov 202670%observed
Possession · Registration PR11700025021742033-06-30MahaRERANov 202670%observed
Price psf · 2 BHK · ~650 sq ft carpet (assumed)69900Platform estimate (interim, not observed)Nov 202630%assumed
Ticket · 2 BHK · ~650 sq ft carpet (assumed)45435000Platform estimate (interim, not observed)Nov 202630%derived
Rent · 2 BHK · ~650 sq ft carpet (assumed)89000Platform estimate (interim, not observed)Nov 202630%assumed
Carpet area650Platform estimate (interim, not observed)Nov 202630%assumed
Builder on-time rate0.8MahaRERANov 202660%derived
Litigationnot published on the public registerMahaRERANov 202630%assumed
ApprovalsMahaRERA registeredMahaRERANov 202660%observed

Commercial listing portals are shown as “Listing portal (aggregated)”; full provenance is retained internally. Official developer and MahaRERA sources are named.

Other projects worth comparing

Same model, same date. Scores are out of 100, where 50 is the average analysed Mumbai project.

Questions people ask about Lodha Worli Residential Project

Is Lodha Worli Residential Project a good investment?

On PropertyLens's evidence-based model Lodha Worli Residential Project scores 60/100, above the average analysed Mumbai project (50 = average, 12 points = one standard deviation). The model projects price growth of about 6.9% a year over five years and a net-wealth CAGR of 4.4% after every cost on an 8-year hold with a 75.0% loan. That is research on public filings, not advice; the factor breakdown on this page shows what drives the score.

What is the price per sq ft at Lodha Worli Residential Project?

About ₹69,900 per sq ft of super built-up area, a model estimate from Worli / Lower Parel / Prabhadevi comparables that you can edit. The 2 BHK home costs about ₹4.54 Cr before other charges, GST and stamp duty, and ₹5.31 Cr all-in.

When is Lodha Worli Residential Project ready for possession?

The RERA registration commits to Jun 2033.

Is Lodha Worli Residential Project RERA registered?

Yes. MahaRERA registration: PR1170002502174. No complaints on this registration at MahaRERA as of 2026-11-10.

How reliable is Lodha (Macrotech) on delivery?

80% of Lodha (Macrotech)'s crawled Mumbai registrations needed no extension (164 of 204 analysed Mumbai registrations needed no extension). 204 registrations analysed. The developer scorecard compares this with every other Mumbai developer.

What rent can Lodha Worli Residential Project earn?

About ₹89,000 a month for this home (a model estimate from Worli / Lower Parel / Prabhadevi rents), a gross yield of 2.3% on the all-in cost. Nothing is earned before handover. Rent covers 28% of the EMI at the default loan.

Answers are generated from the filings and the model for this home and change when you edit the assumptions above. See the Lodha (Macrotech) scorecard and the Worli / Lower Parel / Prabhadevi area page.

Go deeper

Share on WhatsApp