PropertyLensBengaluru · invest
Prestige · Yelahanka / Jakkur / Airport corridor

Prestige Marigold-Phase I

Survey nos. 14/1, 14/2, 15, 16/1… · Yelahanka / Jakkur / Airport corridor
Handover Jun 2023 · no rent beforeplot · premiumRERA registered+ CompareFull report ↗
1 · Which home?
2 · Which exit plan?

Score, growth and returns below are for the highlighted home and plan. Prices, rent and possession never mix across phases.

46
Investment score
46/100
Evidence confidence55%
Plot · 1199 sq ft
Price growth per year, next 5 yrs model
11.5%
likely range 8.1%–15.0% · over 10 yrs 10.9%/yr
Net-wealth CAGR, 8-yr hold
7.5%
your cash in → cash back incl. sale, per year
Cash-flow IRR, 8-yr hold
10.7%
with 75% loan · all-cash 9.7% · no interiors
Three numbers, three questions. Price growth: what will the home be worth? Net-wealth CAGR: what will my money have earned after every cost? Cash-flow IRR: the same, but counting when each rupee moves. Tap i on any of them.
Price · edit here or below assumed
₹Cr
₹ psf × 1,200 sq ft · as of Sep 2026
Price edits apply to ·
All-in cost
₹74.4 L
+ other charges 1.4 L, GST 0.0 L, stamp/reg 4.6 L
Gross rental yield assumed
0.0%
vacant plot: no rent assumed

All-in cost sheet this home, default assumptions

ItemBasisAmount
Base price₹5,700 per sq ft × 1,200 sq ft super built-up68.4 L
Other charges2.0% of base: floor-rise, preferred-location, car park, club, maintenance deposit, legal, corpus (edit in Assumptions)1.4 L
GST0.0% on an under-construction home0.0 L
Stamp duty and registration6.6% in Karnataka: 5% stamp duty + 1% registration + cess and surcharge on the agreement value4.6 L
All-in costwhat leaves your pocket and the bank's, before rent or resale₹74.4 L
Your own money75.0% loan at 8.5% for 20 years covers the rest; EMI 0.5 L a month₹62.3 L

Carpet area 1,199 sq ft against 1,200 sq ft super built-up: you pay for 0% that is common area and walls. Price per sq ft of carpet ≈ ₹5,705. Every percentage above is editable in Assumptions; the defaults are Karnataka rates as of 2026-09.

In plain words

Why 46 out of 100

Each home is marked on 11 things a careful buyer checks, then compared with every project we analyse in Bengaluru: 50 is the average project, 62 beats about five in six. Here is what lifts this one and what drags it:

  • +
    Expected price growth (5-yr CAGR model) · 14/26 pts
    We expect prices here to rise about 11.5% a year for the next 5 years (explained below).
  • +
    Price vs comparables · 1/3 pts
    Cheaper than similar premium homes nearby: ₹5,700 vs about ₹11,000 per sq ft.
  • +
    Water, flooding, noise, infrastructure · 0/9 pts
    Some flood risk in heavy rain; water supply is partly piped, partly tankers; noise is manageable.
  • −
    Employment access · -8/10 pts
    Drive times right now: Manyata Tech Park 50 min, Hebbal (Kirloskar) 52 min, MG Road (CBD) 69 min; Electronic City Ph-1 109 min. About 14 million sq ft of new offices are planned nearby in 3 years.
  • −
    Rental demand & yield · -5/8 pts
    A plot earns no rent, so this scores low by design.
  • −
    Legal, title & approvals · -2/5 pts
    Registered with Karnataka RERA; no court cases reported; land title not yet verified by us, so get a lawyer to check. The due-diligence report below flags 2 items in red.
All 11 checks
  • +
    Price vs comparables · 1/3 pts
    Cheaper than similar premium homes nearby: ₹5,700 vs about ₹11,000 per sq ft.
  • −
    Rental demand & yield · -5/8 pts
    A plot earns no rent, so this scores low by design.
  • +
    Resale liquidity · -1/4 pts
    Plenty of buyers can afford a ₹68.4 L home, and homes in Yelahanka / Jakkur / Airport corridor resell at a normal pace. Reselling before handover needs the builder’s permission.
  • −
    Employment access · -8/10 pts
    Drive times right now: Manyata Tech Park 50 min, Hebbal (Kirloskar) 52 min, MG Road (CBD) 69 min; Electronic City Ph-1 109 min. About 14 million sq ft of new offices are planned nearby in 3 years.
  • •
    Metro, bus, rail & airport · -0/9 pts
    No working metro nearby (nearest 9 km); Jakkur Cross / Yelahanka (Blue Line) is planned for ~2027. Airport is about 39 minutes by road right now.
  • +
    Schools, hospitals, daily needs · 0/3 pts
    Schools, hospitals and daily shopping are good in this area.
  • −
    Builder delivery & handover risk · -3/16 pts
    Prestige has finished 84+ projects and delivered on time about 61% of the time. This phase is still under construction, with handover promised for 2023-06-30: delays would push your rent start back.
  • +
    Layout, size, age, amenities, maintenance · -0/3 pts
    Moderately dense layout (60 homes per acre); about 72% of the area you pay for is usable carpet area. Maintenance ~₹4.5 per sq ft a month.
  • •
    Water, flooding, noise, infrastructure · 0/9 pts
    Some flood risk in heavy rain; water supply is partly piped, partly tankers; noise is manageable.
  • •
    Legal, title & approvals · -2/5 pts
    Registered with Karnataka RERA; no court cases reported; land title not yet verified by us, so get a lawyer to check. The due-diligence report below flags 2 items in red.
  • +
    Expected price growth (5-yr CAGR model) · 14/26 pts
    We expect prices here to rise about 11.5% a year for the next 5 years (explained below).
Why prices should grow ~11.5% a year for the next 5 years

We build the forecast step by step, starting from what Bengaluru homes normally do and adjusting for this area and this project:

  1. + 6.0%Start with 6.0% a year: the normal long-run growth of Bengaluru home prices.
  2. + 1.3%Add 1.3%: prices here rose 14.5% a year recently (2023-06 to 2026-06). Some of that pace continues, but it fades each year.
  3. − 0.5%Subtract 0.5%: at ₹5,700 per sq ft, fewer families can afford to buy here, which slows further rises.
  4. + 2.7%Add 2.7%: 14 million sq ft of new offices nearby means more people wanting homes here.
  5. + 0.0%Supply and demand are balanced here (18 months of unsold stock).
  6. + 0.2%Add 0.2% for new roads, metro and water lines, weighted by how likely they are to actually finish: Blue Line KR Puram–Hebbal–Airport (construction, 2027); Satellite Town Ring Road (construction, 2028).
  7. + 1.9%Add 1.9% for this project itself: unfinished homes are worth more once they are complete.
  8. = 11.5%Result: about 11.5% a year, so a home worth ₹69.8 L today would be worth about ₹1.20 Cr in 5 years. We are 56% confident in the evidence behind this.

Highlights

  • Prestige · Yelahanka / Jakkur / Airport corridor · unit count not filed
  • Under construction: progress not filed, RERA completion 2023-06-30
  • No litigation declared · 1 complaints on this registration

Assumptions editable

Purchase

₹/sq ft
₹ Cr
sq ft
% of base
%
%
%
₹/sq ft

FinancingLoan 75% · cash 25% · EMI ₹45,410/mo

% loan
% p.a.
years
%

Rent & running costs

₹/sq ft/mo
% of rent
% of value

Interiors & exit

%
%
years
% p.a. (blank = model)
%
%

Returns over 8 years · no interiors

Cash you put in₹62.3 L
Exit value (yr 8)₹1.61 Cr
Net sale after loan & costs₹1.17 Cr
Net rent after opex₹-2.2 L
Loan (75% of price)₹52.3 L
EMI / month₹45,410
Year 0: ₹-22.3 L0Year 1: ₹-5.7 L1Year 2: ₹-5.7 L2Year 3: ₹-5.7 L3Year 4: ₹-5.7 L4Year 5: ₹-5.7 L5Year 6: ₹-5.8 L6Year 7: ₹-5.8 L7Year 8: ₹1.12 Cr8
YearPurchaseLoan inRent (net of vacancy)OpexDebt serviceSale − loanNet cash
Today-74.6 L52.3 L0.0 L0.0 L0.0 L0.0 L-22.3 L
Yr 10.0 L0.0 L0.0 L-0.2 L-5.4 L0.0 L-5.7 L
Yr 20.0 L0.0 L0.0 L-0.2 L-5.4 L0.0 L-5.7 L
Yr 30.0 L0.0 L0.0 L-0.2 L-5.4 L0.0 L-5.7 L
Yr 40.0 L0.0 L0.0 L-0.3 L-5.4 L0.0 L-5.7 L
Yr 50.0 L0.0 L0.0 L-0.3 L-5.4 L0.0 L-5.7 L
Yr 60.0 L0.0 L0.0 L-0.3 L-5.4 L0.0 L-5.8 L
Yr 70.0 L0.0 L0.0 L-0.3 L-5.4 L0.0 L-5.8 L
Yr 80.0 L0.0 L0.0 L-0.4 L-5.4 L1.17 Cr1.12 Cr

Pre-tax unless capital-gains tax is set. Rent enters the cash flows once. Net-wealth CAGR = (cash returned incl. sale ÷ cash put in)^(1/years) − 1. IRR uses the dated cash flows.

Score factors

Bars show points added or taken away versus the average analysed Bengaluru project (score 50).

Price vs comparables
+0.8 pts vs avg
this home 7.2/10 · Bengaluru average 6.2 · confidence 35%
₹5,700 psf vs premium comps ₹11,000 (-48%; under-construction should price ~8% below ready). Price is a model estimate, so this factor carries a third of its normal weight until a listed price is observed.
Rental demand & yield
−5.0 pts vs avg
this home 3.5/10 · Bengaluru average 6.0 · confidence 38%
Gross yield 0.0% (₹0 psf/month); locality rental demand 7/10.
Resale liquidity
−0.8 pts vs avg
this home 7.2/10 · Bengaluru average 7.6 · confidence 50%
Locality resale depth 7/10; ticket ₹0.68 Cr narrows the buyer pool; UC resale needs builder NOC.
Employment access
−7.8 pts vs avg
this home 1.4/10 · Bengaluru average 5.2 · confidence 85%
Drive times now (Google Maps, 2026-09-16): Manyata Tech Park 50 min, Hebbal (Kirloskar) 52 min, MG Road (CBD) 69 min, ITPL Whitefield 79 min; 0 of 7 major hubs within 30 min; 14 msf office pipeline (3 yr).
Metro, bus, rail & airport
−0.3 pts vs avg
this home 4.6/10 · Bengaluru average 4.8 · confidence 60%
none operational (Green Line ~9 km); Jakkur Cross / Yelahanka (Blue Line) ~2027; airport ~39 min by road now (Google Maps); .
Schools, hospitals, daily needs
+0.0 pts vs avg
this home 7.0/10 · Bengaluru average 7.0 · confidence 50%
Locality social-infrastructure index (interim, expert-set; POI distances pending Maps integration).
Builder delivery & handover risk
−3.4 pts vs avg
this home 2.4/10 · Bengaluru average 3.7 · confidence 60%
Prestige: 84+ projects, on-time 61% (derived); handover 2023-06-30 (RERA); 39 months past the RERA completion date.
Layout, size, age, amenities, maintenance
−0.0 pts vs avg
this home 7.3/10 · Bengaluru average 7.3 · confidence 50%
60 units/acre; carpet/SBA ~72%; maintenance ~₹4.5 psf/month (assumed).
Water, flooding, noise, infrastructure
+0.2 pts vs avg
this home 5.9/10 · Bengaluru average 5.8 · confidence 50%
Airport flight path; Jakkur aerodrome noise; lake catchments
Legal, title & approvals
−1.6 pts vs avg
this home 6.6/10 · Bengaluru average 7.4 · confidence 55%
RERA registered; litigation: none reported; approvals: Plan BIAAPA/TP/02/LAO/82/20-21/986 dated 2021-10-12; title: not verified. Due-diligence report lists 2 red flags (−1.9 pts).
Expected price growth (5-yr CAGR model)
+13.8 pts vs avg
this home 8.1/10 · Bengaluru average 6.0 · confidence 56%
Model 5-yr price CAGR 11.5% (range 8.1–15.0%).

Price growth model, year by year

Nominal growth per year. Parts add up; momentum fades, infrastructure is weighted by delivery probability and dated.

ComponentYr 1Yr 2Yr 3Yr 4Yr 5Yr 6Confidence
Bengaluru long-run nominal trend6.06.06.06.06.06.080%
Locality momentum (mean-reverting)3.01.60.90.50.30.145%
Affordability ceiling-0.9-0.6-0.4-0.3-0.2-0.160%
Employment access & office pipeline2.72.72.72.72.72.755%
Supply–demand balance0.00.00.00.00.00.050%
Infrastructure delivery (probability-weighted)0.40.40.10.00.00.055%
Project-specific adjustments3.51.51.51.51.51.550%
Total growth14.7%11.6%10.8%10.4%10.3%10.2%56%

Bengaluru long-run nominal trend: City-wide 2013-25 nominal residential trend ≈ inflation + real income growth.

Locality momentum (mean-reverting): Trailing 3.0-yr locality CAGR 14.5% vs 6.0% trend; 35% carried forward, halving each year.

Affordability ceiling: Ticket at ₹5,700 psf vs city median ₹9,500; buyer pool thins above ₹15k/₹20k psf and after >6pp excess growth.

Employment access & office pipeline: 14 msf office pipeline (3 yr) on 22 msf stock; 30-min jobs index 0.65.

Supply–demand balance: 18 months of unsold inventory; new-launch/absorption ratio 1.17 (from 37 under-construction RERA filings in this locality: 6,837 unsold homes, 434.4 sold per month).

Infrastructure delivery (probability-weighted): Blue Line KR Puram–Hebbal–Airport (construction, 2027, p=0.65); Satellite Town Ring Road (construction, 2028, p=0.6)

Project-specific adjustments: Remaining construction risk (13% work left) re-rates toward ready comps by handover (~1.0% over 0.5 yr). Land in expansion corridors historically outpaces built stock; no depreciation.

Locality evidence: ₹6,400 (Jun 2023) → ₹9,600 (Jun 2026) = 14.5% p.a. Sources: Platform estimate (interim, not observed).

Financial & legal due diligence

What the public record says

Automated from the Karnataka RERA file PRM/KA/RERA/1250/303/PR/240122/004653. Prices and rents are locality estimates, not verified listings. Compiled Sep 2026 from the Karnataka RERA file, company registers, rating agencies, tribunal records and press. Facts only; anything that deserves a written answer before signing is flagged.

Delivery timeline7/10
a registration completion date has already passed (−2)
Legal & complaints8.5/10
1 RERA complaint on the project (−0.5)
Money to finish8/10
finance cost is 0% of the registered budget
Developer strength8.3/10
ICRA A+/Stable (Prestige Estates Projects Ltd)

Meters are rule-based from the RERA file and public ratings (rules shown under each), not opinions.

Registration
PRM/KA/RERA/1250/303/PR/240122/004653 · ACE REALTY VENTURES
Past RERA date
RegisteredJan 2022Original completionJun 2023TodaySep 2026
No litigation declared1 complaints · 0 openEscrow: KOTAK MAHINDRA BANKJoint-development land
Credit ratings of the people behind it
AAAAAABBBBBBCDinvestment grade ◀▶ speculative gradeICRA A+ / Stable · Prestige Estates Projects Ltd · Sep 2025
Complaints & disputes on record
On this project10 open
On the promoter entity1all projects
Court cases declared0no stay recorded
What complainants raise
  • compensation and commission as per their promise
At a glance
On its original RERA date

On its original RERA completion date: 2023-06-30

1 RERA complaints, 0 open

1 RERA complaints on this project (0 open); 1 on the promoter overall

No litigation declared

No litigation declared in RERA filings

The record, in pictures

RERA file · Registration

Registered project cost ₹425 cr — where it goes
Approvals ₹18.4 cr · 4%Construction & on-site ₹124 cr · 29%Other / taxes ₹282.7 cr · 67%
No litigation declaredBorrowing declared: NoEscrow at KOTAK MAHINDRA BANK26 recorded land-owner shares

Complaint log (K-RERA) · 1 on this project

  • Jan 2023compensation and commission as per their promisedisposed
Complaints by status
Disposed (Authority)
1

Red flags to resolve in writing

1
Timeline

RERA completion date 2023-06-30 has passed without a completion application.

2
Legal

Joint-development land: confirm which units fall in the owners’ share.

Questions to put to the developer before you sign

  1. Share the latest CA Form 4 and architect Form 5 with the escrow deposit ratio.
  2. Confirm the price list, floor-rise and other charges for the exact unit.
  3. Which date is contractual — 2023-06-30 — and what is the per-month delay compensation?
  4. Confirm there is no litigation on the land or approvals beyond the RERA declaration.
  5. What is the land owners’ share of built area and is the unit in the developer’s share?
Full record: every filed number, line by line2 sections · 11 items

RERA file · Registration

Registration
PRM/KA/RERA/1250/303/PR/240122/004653 · promoter ACE REALTY VENTURES (Partnership Firm) · SJNF492201920
Dates
Start 2022-01-01 · original completion 2023-06-30 · no extensions · current date has passed
Registered cost
Total ₹425 cr · construction ₹124 cr
Borrowing / mortgage declared
Borrowing: No · mortgage: No
RERA bank account
KOTAK MAHINDRA BANK, Lavelle Road (70% construction account)
Plan sanction
BIAAPA/TP/02/LAO/82/20-21/986 dated 2021-10-12 · BIAPPA - Bangalore Airport Area Planning Authority
Land owners / co-promoters
ACE Realty Ventures (100.0%, Sy 14/2); Ace Realty Ventures (100.0%, Sy 15); Ace Realty Ventures (100.0%, Sy 16/1 and 16/2); Ace Realty Ventures (100.0%, Sy 17); Ace Realty Ventures (100.0%, Sy 18); Ace Realty Ventures (100.0%, Sy 145); Ace Realty Ventures (100.0%, Sy 188/1); Ace Realty Ventures (100.0%, Sy 188/4) +18 more
Litigation declared
None declared in filings
K-RERA complaints
1 on this registration (0 open) · 1 on the promoter entity across all its projects
Completion applied
19/12/2020

Source: Karnataka RERA project record PRM/KA/RERA/1250/303/PR/240122/004653, fetched 2026-09-15. Figures are the promoter’s own filings.

Complaint log (K-RERA) · 1 on this project

2023-01-04 · 00020/2023
compensation and commission as per their promise — DISPOSED AUTHORITY BENCH4 (AUTHORITY)

Complaint subjects are as filed by complainants; a disposed complaint may have been decided either way.

Sources & caveats2 sources
  • Karnataka RERA project record PRM/KA/RERA/1250/303/PR/240122/004653 (registration file, quarterly updates, complaint register), fetched 2026-09-15
  • PropertyLens locality model (market-level estimates)
  • Karnataka RERA project records PRM/KA/RERA/1250/303/PR/240122/004653 (registration file, quarterly updates, complaint register), fetched Sep 2026.

Caveats. Automated analysis: prices, rents and travel times are estimates until listings and Maps data are verified. RERA figures are the promoter’s own filings. Nothing here is legal, tax or investment advice.

Evidence

Location, jobs & transit3 hubs · metro none nearby
Job hubs nearby
Manyata Tech Park 9 kmHebbal officesKIADB Aerospace / Airport business park
Measured drive times below
Office space
Existing22 msf
Coming in 3 yrs14 msf
Jobs within 30 min7/10
Getting around
Metro today
none operational (Green Line ~9 km)
none within 5 km
Metro planned
Jakkur Cross / Yelahanka (Blue Line)
~2027 70% likely ~1,500 m estimate
Rail
—
estimate
Airport
39 min by road now · 13.5 km
Google Maps
Buses
7/10 coverage
estimate
Drive times to job hubs
DestinationDrive nowRoad km
Kempegowda Airport (KIA)39 min13.5
Manyata Tech Park50 min17.7
Hebbal (Kirloskar)52 min18.3
MG Road (CBD)69 min25.1
ITPL Whitefield79 min29
Koramangala (Forum)81 min29.7
ORR Bellandur (Ecospace)88 min32.3
Electronic City Ph-1109 min40.3

Google Maps driving time with live traffic, measured Sep 2026. Refreshed monthly.

Location used: Google Maps match “”. Bus coverage and planned-station distances are still interim estimates.

Price historylocality 14.5%/yr

No dated project-level price series yet; only the latest observation is on file.

Locality · average ₹/sq ft
Date₹ psfSourceConfidenceKind
Jun 20215,200Platform estimate (interim, not observed)40%derived
Jun 20236,400Platform estimate (interim, not observed)45%derived
Jun 20258,600Platform estimate (interim, not observed)50%derived
Jun 20269,600Platform estimate (interim, not observed)50%derived
Luxury comps₹16,500
Premium comps₹11,000
Mid comps₹8,200
Unsold stock18 months

Model backtest on this locality: 1-yr hold-out (Jun 2025→Jun 2026): predicted ₹9,530 vs actual ₹9,600 (-0.7%). Longer 3-yr hold-out (Jun 2023→Jun 2026): predicted 9.8% p.a. vs actual 14.5% p.a. — the model is deliberately mean-reverting and under-predicted the 2021–26 boom.

Environment, legal & productflood ok · water risk · RERA yes
Flood risksome risk
Water supplymixed
Quietok
Roads & drainsgood

Airport flight path; Jakkur aerodrome noise; lake catchments

Legal & approvals
Registration 004653
RERA PRM/KA/RERA/1250/303/PR/240122/004653
possession Jun 2023
Litigation
none reported
observed
Approvals
Plan BIAAPA/TP/02/LAO/82/20-21/986 dated 2021-10-12
observed
Title
not verified
assumed
Product
Landnull acres
Homesnull
Density60/acre
Launched2022
Sources & data gapswhat we know, from where, and what is missing

Automated analysis: unit mix and carpet areas come from the RERA inventory table; prices and rents are locality-model estimates until listings are verified.

FieldValueSource classDateConf.KindConflicting values
AddressSy.No.14/1,14/2,15,16/1,16/2,17,18 and 145 of Maragondanahalli Village and Sy.Nos. 188/1, 188/4, 188/5, 188/6, 188/7, 189/1, 189/2, 189/4, 189/5 , 189/6, 189/7, 189/8, 190/2, 190/3, 190/4, 190/5, 190/6, 190/7, 190/8, 190/9, 191/3, 191/4, 191/8, 194/1, 194/2, 194/4, 194/5, 194/6, 194/7, 195/5 and 195/6 of Bettenahalli Village, Kundana HobliKarnataka RERA (number as reported; registry lookup pending)Sep 202680%observed
Land area (acres)Platform estimate (interim, not observed)Sep 202620%assumed
Total unitsPlatform estimate (interim, not observed)Sep 202620%assumed
Launch year2022Karnataka RERA (number as reported; registry lookup pending)Sep 202670%observed
Possession · Registration 0046532023-06-30Karnataka RERA (number as reported; registry lookup pending)Sep 202670%observed
Price psf · Plot · 1199 sq ft5700Platform estimate (interim, not observed)Sep 202635%assumed
Ticket · Plot · 1199 sq ft6840000Platform estimate (interim, not observed)Sep 202635%derived
Rent · Plot · 1199 sq ft0Platform estimate (interim, not observed)Sep 202635%assumed
Carpet area1199Karnataka RERA (number as reported; registry lookup pending)Sep 202660%observed
Builder on-time rate0.61Karnataka RERA (number as reported; registry lookup pending)Sep 202660%derived
Litigationnone reportedKarnataka RERA (number as reported; registry lookup pending)Sep 202670%observed
ApprovalsPlan BIAAPA/TP/02/LAO/82/20-21/986 dated 2021-10-12Karnataka RERA (number as reported; registry lookup pending)Sep 202660%observed

Commercial listing portals are shown as “Listing portal (aggregated)”; full provenance is retained internally. Official developer and Karnataka RERA sources are named.

Other projects worth comparing

Same model, same date. Scores are out of 100, where 50 is the average analysed Bengaluru project.

Questions people ask about Prestige Marigold-Phase I

Is Prestige Marigold-Phase I a good investment?

On PropertyLens's evidence-based model Prestige Marigold-Phase I scores 46/100, below the average analysed Bengaluru project (50 = average, 12 points = one standard deviation). The model projects price growth of about 11.5% a year over five years and a net-wealth CAGR of 7.5% after every cost on an 8-year hold with a 75.0% loan. That is research on public filings, not advice; the factor breakdown on this page shows what drives the score.

What is the price per sq ft at Prestige Marigold-Phase I?

About ₹5,700 per sq ft of super built-up area, a model estimate from Yelahanka / Jakkur / Airport corridor comparables that you can edit. The Plot home costs about ₹68.4 L before other charges, GST and stamp duty, and ₹74.4 L all-in.

When is Prestige Marigold-Phase I ready for possession?

The RERA registration commits to Jun 2023. The project is 39 months past its original RERA completion date.

Is Prestige Marigold-Phase I RERA registered?

Yes. Karnataka RERA registration: PRM/KA/RERA/1250/303/PR/240122/004653. 1 complaint on this registration and 1 on the promoter across projects at K-RERA as of 2026-09-15.

How reliable is Prestige on delivery?

61% of Prestige's crawled Bengaluru registrations needed no extension (51 of 84 crawled Bengaluru registrations needed no extension). 84 registrations analysed. The developer scorecard compares this with every other Bengaluru developer.

What rent can Prestige Marigold-Phase I earn?

Plots earn no rent; the return is price growth alone.

Answers are generated from the filings and the model for this home and change when you edit the assumptions above. See the Prestige scorecard and the Yelahanka / Jakkur / Airport corridor area page.

Go deeper

Share on WhatsApp