Is Yelahanka / Jakkur / Airport corridor good for investment?
120 RERA-registered projects scored on one model, as of September 11, 2026. Prices, growth, yields, supply and the best-scored homes.
Yelahanka / Jakkur / Airport corridor in one paragraph
On PropertyLens's model, Yelahanka / Jakkur / Airport corridor is an average place to buy in Bengaluru right now: the median analysed project scores 54/100 (below the Bengaluru average), with projected price growth of 10.3% a year over five years and a median gross rental yield of 3.5%. Unsold homes would take about 18 months to absorb at the current sales pace, a balanced market. 48 of 93 under-construction projects here are past their original RERA completion date, so weight the developer's record heavily.
Median of 120 projects; the spread inside the area is wide, so the ranked list below matters more than the average.
Best-scored projects in Yelahanka / Jakkur / Airport corridor
All 120 analysed projects in Yelahanka / Jakkur / Airport corridor
| Project | Score | Growth / yr | Net-wealth CAGR | Cash-flow IRR | Price / sq ft | Price | Status |
|---|---|---|---|---|---|---|---|
| Casagrand Estancia Casagrand · Yelahanka / Jakkur / Airport corridor | 83 | 12.2% | 9.6% | 16.5% | ₹10,350 est. | ₹54.9 L | Under construction Oct 2030 |
| Godrej Woods Godrej Properties · Yelahanka / Jakkur / Airport corridor | 81 | 12.2% | 9.2% | 16.0% | ₹10,350 est. | ₹1.07 Cr | Under construction Nov 2030 |
| Brigade Insignia Brigade Group · Yelahanka / Jakkur / Airport corridor | 81 | 11.0% | 7.9% | 12.2% | ₹10,650 est. | ₹42.1 L | Under construction Jun 2029 |
| Godrej Aveline Godrej Properties · Yelahanka / Jakkur / Airport corridor | 80 | 12.1% | 9.0% | 15.7% | ₹10,350 est. | ₹92.6 L | Under construction Mar 2031 |
| Brigade Eternia Brigade Group · Yelahanka / Jakkur / Airport corridor | 77 | 11.7% | 8.6% | 14.1% | ₹10,350 est. | ₹64.7 L | Under construction Mar 2030 |
| Prestige Camden Gardens Prestige · Yelahanka / Jakkur / Airport corridor | 77 | 11.5% | 8.4% | 12.1% | ₹10,350 est. | ₹76.1 L | Under construction Dec 2027 |
| Casagrand Promenade Casagrand · Yelahanka / Jakkur / Airport corridor | 75 | 11.9% | 7.9% | 12.4% | ₹10,350 est. | ₹1.28 Cr | Under construction Aug 2029 |
| Concorde Neo Concorde · Yelahanka / Jakkur / Airport corridor | 74 | 11.3% | 8.2% | 13.6% | ₹10,350 est. | ₹1.12 Cr | Under construction Oct 2029 |
| Nikoo Homes 8, Bhartiya Garden Enclave, Phase-1 Bhartiya City · Yelahanka / Jakkur / Airport corridor | 73 | 11.0% | 8.1% | 14.1% | ₹10,350 est. | ₹65.7 L | Under construction Mar 2031 |
| Elara Celestia L&T Realty · Yelahanka / Jakkur / Airport corridor | 72 | 11.6% | 8.2% | 13.7% | ₹16,300 est. | ₹2.55 Cr | Under construction Mar 2030 |
| Vajram Vivera Vajram · Yelahanka / Jakkur / Airport corridor | 72 | 11.1% | 8.1% | 13.2% | ₹10,350 est. | ₹71.4 L | Under construction Feb 2030 |
| Aurora VBHC · Yelahanka / Jakkur / Airport corridor | 69 | 11.8% | 7.8% | 11.3% | ₹7,700 est. | ₹1.20 Cr | Under construction Dec 2027 |
| Assetz Zen & Sato Assetz · Yelahanka / Jakkur / Airport corridor | 68 | 10.7% | 7.5% | 12.4% | ₹10,350 est. | ₹71.4 L | Under construction May 2030 |
| NCC Urban Misty Woods NCC Urban · Yelahanka / Jakkur / Airport corridor | 68 | 11.2% | 7.1% | 10.0% | ₹6,050 est. | ₹4.39 Cr | Ready |
| Century Kindle Phase 1 Century Real Estate · Yelahanka / Jakkur / Airport corridor | 67 | 12.0% | 8.8% | 15.4% | ₹10,350 est. | ₹1.10 Cr | Under construction Mar 2031 |
| Concorde Antares Concorde · Yelahanka / Jakkur / Airport corridor | 67 | 10.5% | 7.6% | 11.6% | ₹10,650 est. | ₹69.8 L | Under construction Dec 2028 |
| Brigade Northridge Neo Brigade Group · Yelahanka / Jakkur / Airport corridor | 66 | 9.7% | 7.0% | 9.0% | ₹11,000 est. | ₹1.43 Cr | Ready |
| Riviera Glade Goyal & Co · Yelahanka / Jakkur / Airport corridor | 66 | 11.6% | 8.2% | 14.5% | ₹10,350 est. | ₹3.71 Cr | Under construction Dec 2030 |
| Green Field Gardens Extension-1B Telecom Employees -operative Housing Society · Yelahanka / Jakkur / Airport corridor | 66 | 12.2% | 9.8% | 16.0% | ₹4,250 est. | ₹45.5 L | Under construction Dec 2028 |
| Ajmera Marina Ajmera · Yelahanka / Jakkur / Airport corridor | 66 | 11.1% | 7.7% | 12.0% | ₹10,350 est. | ₹1.20 Cr | Under construction Dec 2028 |
| Green Field Gardens Extension-1c Telecom Employees -operative Housing Society · Yelahanka / Jakkur / Airport corridor | 64 | 12.2% | 9.8% | 16.0% | ₹4,250 est. | ₹1.02 Cr | Under construction Dec 2028 |
| Concorde Mayfair Concorde · Yelahanka / Jakkur / Airport corridor | 64 | 10.6% | 7.5% | 11.6% | ₹10,350 est. | ₹1.00 Cr | Under construction Nov 2028 |
| Gcorp Mahalakshmi G Corp · Yelahanka / Jakkur / Airport corridor | 63 | 9.7% | 7.0% | 8.8% | ₹8,200 est. | ₹1.16 Cr | Ready |
| Ranka Ankura Ranka · Yelahanka / Jakkur / Airport corridor | 63 | 10.8% | 7.2% | 12.0% | ₹7,700 est. | ₹86.2 L | Under construction Dec 2029 |
| Merusri Serenova Merusri Developers · Yelahanka / Jakkur / Airport corridor | 63 | 13.0% | 12.0% | 20.5% | ₹4,250 est. | ₹51.0 L | Under construction Dec 2030 |
| NCC Urban Mayfair NCC Urban · Yelahanka / Jakkur / Airport corridor | 63 | 9.7% | 6.9% | 8.9% | ₹11,000 est. | ₹1.65 Cr | Ready |
| Shriram Serenity Shriram Properties · Yelahanka / Jakkur / Airport corridor | 63 | 11.7% | 8.0% | 12.4% | ₹10,350 est. | ₹1.03 Cr | Under construction Jul 2029 |
| Century Liva Century Real Estate · Yelahanka / Jakkur / Airport corridor | 62 | 11.3% | 7.9% | 12.3% | ₹10,350 est. | ₹1.16 Cr | Under construction Dec 2028 |
| Elegant Takt Elegant Builders · Yelahanka / Jakkur / Airport corridor | 62 | 11.0% | 7.2% | 11.2% | ₹7,700 est. | ₹92.4 L | Under construction Dec 2028 |
| Prestige Marigold Phase II Prestige · Yelahanka / Jakkur / Airport corridor | 62 | 12.1% | 9.1% | 14.4% | ₹5,850 est. | ₹70.2 L | Under construction Nov 2027 |
| Green Woods Gardens Extension-3c Telecom Employees -operative Housing Society · Yelahanka / Jakkur / Airport corridor | 62 | 12.2% | 9.8% | 16.0% | ₹4,250 est. | ₹51.0 L | Under construction Dec 2028 |
| Purva Zenium 2 Puravankara · Yelahanka / Jakkur / Airport corridor | 62 | 9.8% | 7.5% | 9.5% | ₹11,000 est. | ₹1.08 Cr | Ready |
| Samruddhi North Square Samruddhi Realty · Yelahanka / Jakkur / Airport corridor | 61 | 11.3% | 6.9% | 8.6% | ₹7,700 est. | ₹1.16 Cr | Under construction Mar 2019 |
| Green Woods Gardens Extension-3b Telecom Employees -operative Housing Society · Yelahanka / Jakkur / Airport corridor | 61 | 12.4% | 10.0% | 16.3% | ₹4,250 est. | ₹51.0 L | Under construction Dec 2028 |
| Shriram Solitaire Shriram Properties · Yelahanka / Jakkur / Airport corridor | 61 | 9.7% | 7.2% | 9.2% | ₹11,000 est. | ₹1.16 Cr | Ready |
| Ajmera Lugaano - Ab Wing Ajmera · Yelahanka / Jakkur / Airport corridor | 61 | 10.1% | 6.6% | 8.3% | ₹10,350 est. | ₹86.4 L | Under construction Sep 2026 |
| Vajram Chrysanthemum Vajram · Yelahanka / Jakkur / Airport corridor | 61 | 11.3% | 7.4% | 11.6% | ₹10,350 est. | ₹2.18 Cr | Under construction Mar 2029 |
| Arvind Skylands Arvind SmartSpaces · Yelahanka / Jakkur / Airport corridor | 61 | 9.7% | 6.9% | 8.8% | ₹11,000 est. | ₹1.66 Cr | Ready |
| Life By The Lake Keya Homes · Yelahanka / Jakkur / Airport corridor | 61 | 11.2% | 6.2% | 7.9% | ₹7,700 est. | ₹2.84 Cr | Under construction Jun 2022 |
| Sattva Lumina Sattva (Salarpuria) · Yelahanka / Jakkur / Airport corridor | 60 | 11.4% | 8.6% | 14.0% | ₹10,350 est. | ₹62.1 L | Under construction Nov 2029 |
| Nikoo Homes 8, Bhartiya Garden Enclave, Phase-2 Bhartiya City · Yelahanka / Jakkur / Airport corridor | 59 | 9.8% | 7.5% | 13.8% | ₹10,350 est. | ₹50.7 L | Under construction Dec 2031 |
| Dsmax Skycity DS-MAX · Yelahanka / Jakkur / Airport corridor | 59 | 9.7% | 6.9% | 8.7% | ₹8,200 est. | ₹1.23 Cr | Ready |
| Provident Parkwoods Provident · Yelahanka / Jakkur / Airport corridor | 59 | 11.3% | 7.5% | 9.5% | ₹10,350 est. | ₹98.8 L | Under construction Dec 2021 |
| Sobha Palm Court Sobha · Yelahanka / Jakkur / Airport corridor | 59 | 9.7% | 6.8% | 8.8% | ₹11,000 est. | ₹1.89 Cr | Ready |
| Alpine Pyramid Efgh Alpine Housing · Yelahanka / Jakkur / Airport corridor | 59 | 9.7% | 6.9% | 8.7% | ₹8,200 est. | ₹1.18 Cr | Ready |
| Ds Max Shresta DS-MAX · Yelahanka / Jakkur / Airport corridor | 59 | 9.6% | 7.0% | 8.8% | ₹8,200 est. | ₹1.05 Cr | Ready |
| Affinity Sowparnika Affinity Projects · Yelahanka / Jakkur / Airport corridor | 58 | 9.7% | 6.9% | 8.7% | ₹8,200 est. | ₹1.23 Cr | Ready |
| Classique Windchimes Allegro Mahabaleshwara Ventures · Yelahanka / Jakkur / Airport corridor | 58 | 9.7% | 7.3% | 9.0% | ₹8,200 est. | ₹88.6 L | Ready |
| Mims Residency MIMS Builders · Yelahanka / Jakkur / Airport corridor | 58 | 9.7% | 6.3% | 8.1% | ₹8,200 est. | ₹3.27 Cr | Ready |
| Amigo Alfresco Amigo Shelters · Yelahanka / Jakkur / Airport corridor | 57 | 10.9% | 7.1% | 11.1% | ₹7,700 est. | ₹1.01 Cr | Under construction Dec 2028 |
| Casa Grande Lorenza Casagrand · Yelahanka / Jakkur / Airport corridor | 57 | 9.7% | 7.1% | 9.1% | ₹11,000 est. | ₹1.33 Cr | Ready |
| Tharuns B V Sattva Sattva (Salarpuria) · Yelahanka / Jakkur / Airport corridor | 56 | 9.7% | 7.0% | 8.9% | ₹11,000 est. | ₹1.50 Cr | Ready |
| Prestige Royale Gardens Phase 2 Prestige · Yelahanka / Jakkur / Airport corridor | 56 | 9.7% | 7.0% | 8.9% | ₹11,000 est. | ₹1.58 Cr | Ready |
| Embassy South Reserve Embassy Group · Yelahanka / Jakkur / Airport corridor | 55 | 10.8% | 8.6% | 15.6% | ₹16,300 est. | ₹2.03 Cr | Under construction Mar 2032 |
| Slv Icon SLV Developers · Yelahanka / Jakkur / Airport corridor | 55 | 11.3% | 7.3% | 9.0% | ₹7,700 est. | ₹78.5 L | Under construction Jan 2025 |
| Mahaveer Cygnet Mahaveer · Yelahanka / Jakkur / Airport corridor | 54 | 11.3% | 7.3% | 9.0% | ₹7,700 est. | ₹77.8 L | Under construction Dec 2020 |
| Century Novus Century Real Estate · Yelahanka / Jakkur / Airport corridor | 54 | 10.1% | 6.4% | 8.8% | ₹10,650 est. | ₹99.6 L | Under construction Aug 2027 |
| Prestige Royal Gardens Phase-III Prestige · Yelahanka / Jakkur / Airport corridor | 54 | 11.3% | 7.2% | 9.1% | ₹10,350 est. | ₹1.49 Cr | Under construction Sep 2020 |
| Slv Golden Towers SLV Developers · Yelahanka / Jakkur / Airport corridor | 54 | 10.6% | 6.8% | 10.6% | ₹7,700 est. | ₹80.8 L | Under construction Apr 2029 |
| Prestige Royale Gardens Phase-I Prestige · Yelahanka / Jakkur / Airport corridor | 54 | 9.7% | 7.1% | 9.0% | ₹11,000 est. | ₹1.40 Cr | Ready |
| Jahnavi Brindavan Affinity Projects · Yelahanka / Jakkur / Airport corridor | 54 | 9.3% | 6.5% | 8.2% | ₹8,200 est. | ₹1.32 Cr | Ready |
| vajram tiara Vajram · Yelahanka / Jakkur / Airport corridor | 54 | 9.7% | 6.4% | 8.3% | ₹11,000 est. | ₹3.24 Cr | Ready |
| Prestige Woodside Prestige · Yelahanka / Jakkur / Airport corridor | 53 | 11.3% | 6.6% | 8.5% | ₹10,350 est. | ₹3.29 Cr | Under construction Jul 2020 |
| Dhiraan Galaxy Dhiraan Infrastructure · Yelahanka / Jakkur / Airport corridor | 52 | 9.2% | 6.8% | 8.5% | ₹8,200 est. | ₹86.1 L | Ready |
| G R Opal G R Promoters · Yelahanka / Jakkur / Airport corridor | 52 | 10.1% | 5.9% | 7.3% | ₹7,700 est. | ₹1.07 Cr | Under construction Dec 2021 |
| Assetz Miru & Miyo Assetz · Yelahanka / Jakkur / Airport corridor | 52 | 10.1% | 6.9% | 12.2% | ₹10,350 est. | ₹1.76 Cr | Under construction Mar 2031 |
| Raja Ira Raja Housing · Yelahanka / Jakkur / Airport corridor | 52 | 12.6% | 8.4% | 11.8% | ₹4,250 est. | ₹49.5 L | Under construction Jun 2026 |
| Down by the Water Total Environment · Yelahanka / Jakkur / Airport corridor | 52 | 11.2% | 8.0% | 14.0% | ₹16,300 est. | ₹4.56 Cr | Under construction May 2031 |
| G R Onyx G R Promoters · Yelahanka / Jakkur / Airport corridor | 52 | 10.1% | 5.9% | 7.3% | ₹7,700 est. | ₹1.07 Cr | Under construction Dec 2021 |
| Prestige Dew Drops Prestige · Yelahanka / Jakkur / Airport corridor | 52 | 9.7% | 6.4% | 8.3% | ₹11,000 est. | ₹3.42 Cr | Ready |
| Embassy Riverine Embassy Group · Yelahanka / Jakkur / Airport corridor | 51 | 10.7% | 8.1% | 15.0% | ₹16,300 est. | ₹6.92 Cr | Under construction Sep 2032 |
| Axis Oaklyn Axis Concept Construction · Yelahanka / Jakkur / Airport corridor | 51 | 9.5% | 7.2% | 9.0% | ₹8,200 est. | ₹78.3 L | Ready |
| Godrej Avenues Godrej Properties · Yelahanka / Jakkur / Airport corridor | 51 | 11.3% | 7.1% | 9.1% | ₹10,350 est. | ₹1.55 Cr | Under construction Feb 2022 |
| Century Breeze Century Real Estate · Yelahanka / Jakkur / Airport corridor | 51 | 11.3% | 7.1% | 9.1% | ₹10,350 est. | ₹1.55 Cr | Under construction Dec 2020 |
| Ds Max Sasmara DS-MAX · Yelahanka / Jakkur / Airport corridor | 51 | 10.1% | 6.4% | 7.8% | ₹7,700 est. | ₹67.0 L | Under construction Dec 2024 |
| Brigade Bricklane Brigade Group · Yelahanka / Jakkur / Airport corridor | 51 | 10.1% | 6.0% | 7.7% | ₹10,350 est. | ₹1.55 Cr | Under construction Mar 2023 |
| After The Rain Phase III Total Environment · Yelahanka / Jakkur / Airport corridor | 51 | 11.3% | 8.9% | 16.2% | ₹16,300 est. | ₹6.46 Cr | Under construction Apr 2032 |
| Legacy Salvador Legacy Global · Yelahanka / Jakkur / Airport corridor | 51 | 9.4% | 7.0% | 8.7% | ₹8,200 est. | ₹98.8 L | Ready |
| Prestige Willow Tree Prestige · Yelahanka / Jakkur / Airport corridor | 51 | 10.1% | 6.1% | 7.8% | ₹10,350 est. | ₹1.42 Cr | Under construction Mar 2023 |
| Kumar Plumeria Kumar Properties · Yelahanka / Jakkur / Airport corridor | 50 | 10.8% | 6.7% | 10.5% | ₹7,700 est. | ₹1.75 Cr | Under construction Dec 2028 |
| Ajmera Florenza Ajmera · Yelahanka / Jakkur / Airport corridor | 50 | 10.1% | 6.3% | 7.9% | ₹10,350 est. | ₹1.19 Cr | Under construction Sep 2025 |
| Earth & Essence - Plotted Development - Phase 2 Assetz · Yelahanka / Jakkur / Airport corridor | 50 | 11.6% | 7.5% | 10.7% | ₹5,700 est. | ₹1.37 Cr | Under construction Mar 2024 |
| NCC Urban Park View NCC Urban · Yelahanka / Jakkur / Airport corridor | 49 | 10.1% | 5.6% | 7.2% | ₹10,350 est. | ₹2.50 Cr | Under construction Dec 2024 |
| Sumadhura Sushantham Phase I Sumadhura · Yelahanka / Jakkur / Airport corridor | 49 | 10.1% | 6.0% | 7.7% | ₹10,350 est. | ₹1.55 Cr | Under construction Jun 2023 |
| Nitesh Columbus Square Phase II Nitesh Estates · Yelahanka / Jakkur / Airport corridor | 49 | 10.7% | 6.8% | 8.5% | ₹10,650 est. | ₹1.24 Cr | Under construction Dec 2018 |
| Mahaveer Celesse Mahaveer · Yelahanka / Jakkur / Airport corridor | 48 | 11.3% | 7.4% | 9.1% | ₹7,700 est. | ₹73.9 L | Under construction Mar 2025 |
| Affinity Sarovar Affinity Projects · Yelahanka / Jakkur / Airport corridor | 48 | 9.6% | 5.4% | 7.3% | ₹7,950 est. | ₹1.05 Cr | Under construction Sep 2027 |
| Classique Woodsville Allegro Mahabaleshwara Ventures · Yelahanka / Jakkur / Airport corridor | 48 | 10.1% | 5.7% | 7.2% | ₹7,700 est. | ₹1.20 Cr | Under construction Jan 2024 |
| Earth & Essence - Plotted Development Assetz · Yelahanka / Jakkur / Airport corridor | 48 | 11.6% | 7.5% | 10.7% | ₹5,700 est. | ₹68.4 L | Under construction Jul 2023 |
| Century Horizon Century Real Estate · Yelahanka / Jakkur / Airport corridor | 48 | 10.1% | 6.0% | 7.7% | ₹10,350 est. | ₹1.55 Cr | Under construction Dec 2024 |
| Bird Of Paradise Earthen Hues · Yelahanka / Jakkur / Airport corridor | 48 | 11.6% | 7.5% | 10.7% | ₹4,250 est. | ₹52.9 L | Under construction Mar 2020 |
| Ds Max Stavam Nest DS-MAX · Yelahanka / Jakkur / Airport corridor | 47 | 9.3% | 6.9% | 8.6% | ₹8,200 est. | ₹89.8 L | Ready |
| Ds Max Synergy DS-MAX · Yelahanka / Jakkur / Airport corridor | 47 | 10.1% | 5.8% | 7.2% | ₹7,700 est. | ₹1.16 Cr | Under construction Sep 2023 |
| Ramky One North Phase-4 Ramky Estates · Yelahanka / Jakkur / Airport corridor | 47 | 9.7% | 7.1% | 8.9% | ₹8,200 est. | ₹95.5 L | Ready |
| Elite Pristine Elite Estates · Yelahanka / Jakkur / Airport corridor | 47 | 11.6% | 7.5% | 10.7% | ₹4,250 est. | ₹57.2 L | Under construction May 2024 |
| Flowing Tree Axis Concept Construction · Yelahanka / Jakkur / Airport corridor | 47 | 10.1% | 6.1% | 7.6% | ₹7,700 est. | ₹83.9 L | Under construction Jan 2025 |
| Dsr Rr Avenues DSR Infrastructure · Yelahanka / Jakkur / Airport corridor | 47 | 10.1% | 5.8% | 7.2% | ₹7,700 est. | ₹1.16 Cr | Under construction Oct 2023 |
| Legacy Calista Legacy Global · Yelahanka / Jakkur / Airport corridor | 47 | 10.1% | 5.9% | 7.4% | ₹7,700 est. | ₹99.7 L | Under construction Jul 2023 |
| Salarpuria-Sattva Exotic Sattva (Salarpuria) · Yelahanka / Jakkur / Airport corridor | 46 | 10.1% | 6.0% | 7.6% | ₹10,350 est. | ₹1.63 Cr | Under construction Aug 2024 |
| Bird Of Paradise - Phase 2 Earthen Hues · Yelahanka / Jakkur / Airport corridor | 46 | 11.6% | 7.5% | 10.7% | ₹4,250 est. | ₹51.0 L | Under construction Dec 2024 |
| Prestige Marigold-Phase I Prestige · Yelahanka / Jakkur / Airport corridor | 46 | 11.6% | 7.5% | 10.7% | ₹5,700 est. | ₹68.4 L | Under construction Jun 2023 |
| Bren Northern Lights Bren Corporation · Yelahanka / Jakkur / Airport corridor | 45 | 10.1% | 6.0% | 7.7% | ₹10,350 est. | ₹1.55 Cr | Under construction Mar 2023 |
| Embassy Boulevard Embassy Group · Yelahanka / Jakkur / Airport corridor | 45 | 9.5% | 5.2% | 6.9% | ₹16,800 est. | ₹2.52 Cr | Under construction Jun 2019 |
| Ramky One North Phase-3 Ramky Estates · Yelahanka / Jakkur / Airport corridor | 45 | 9.7% | 7.1% | 8.9% | ₹8,200 est. | ₹97.6 L | Ready |
| Sumadhura Sushantham Phase II Sumadhura · Yelahanka / Jakkur / Airport corridor | 45 | 10.1% | 6.2% | 7.9% | ₹10,350 est. | ₹1.27 Cr | Under construction Dec 2024 |
| Legacy Eldora Legacy Global · Yelahanka / Jakkur / Airport corridor | 44 | 9.8% | 5.2% | 6.6% | ₹7,950 est. | ₹1.76 Cr | Under construction Aug 2020 |
| Elegant Exotica Elegant Builders · Yelahanka / Jakkur / Airport corridor | 44 | 10.1% | 5.8% | 7.2% | ₹7,700 est. | ₹1.16 Cr | Under construction Mar 2021 |
| After The Rain Commercial Total Environment · Yelahanka / Jakkur / Airport corridor | 44 | 11.2% | 7.1% | 10.7% | ₹16,300 est. | ₹2.44 Cr | Under construction May 2028 |
| After The Rain-Phase Iic Total Environment · Yelahanka / Jakkur / Airport corridor | 44 | 10.6% | 6.5% | 9.8% | ₹16,300 est. | ₹8.65 Cr | Under construction Apr 2028 |
| Ds Max Stavam DS-MAX · Yelahanka / Jakkur / Airport corridor | 43 | 10.1% | 6.5% | 7.9% | ₹7,700 est. | ₹63.1 L | Under construction Mar 2025 |
| Purva Zenium 1 Puravankara · Yelahanka / Jakkur / Airport corridor | 43 | 10.1% | 6.0% | 7.7% | ₹10,350 est. | ₹1.55 Cr | Under construction Dec 2024 |
| Earth & Essence - Phase 1B Assetz · Yelahanka / Jakkur / Airport corridor | 43 | 10.1% | 5.5% | 7.1% | ₹10,350 est. | ₹4.26 Cr | Under construction Dec 2024 |
| Vaishnavi Serene Vaishnavi Group · Yelahanka / Jakkur / Airport corridor | 42 | 10.1% | 6.3% | 7.7% | ₹7,700 est. | ₹72.8 L | Under construction Sep 2023 |
| Godrej Aqua Godrej Properties · Yelahanka / Jakkur / Airport corridor | 40 | 10.1% | 6.0% | 7.7% | ₹10,350 est. | ₹1.55 Cr | Under construction Oct 2024 |
| After the Rain- Phase 1 Total Environment · Yelahanka / Jakkur / Airport corridor | 39 | 10.9% | 6.1% | 8.1% | ₹16,300 est. | ₹6.45 Cr | Under construction Apr 2022 |
| Embassy Eden Embassy Group · Yelahanka / Jakkur / Airport corridor | 39 | 10.2% | 8.0% | 14.6% | ₹16,300 est. | ₹13.83 Cr | Under construction Dec 2031 |
| Earth & Essence - Phase 1A Assetz · Yelahanka / Jakkur / Airport corridor | 39 | 10.1% | 5.5% | 7.1% | ₹10,350 est. | ₹3.51 Cr | Under construction Apr 2024 |
| Provident Neora Provident · Yelahanka / Jakkur / Airport corridor | 39 | 10.1% | 6.0% | 7.7% | ₹10,350 est. | ₹1.55 Cr | Under construction Sep 2023 |
| After The Rain-Phase Iib Total Environment · Yelahanka / Jakkur / Airport corridor | 33 | 10.3% | 5.9% | 7.8% | ₹16,800 est. | ₹2.52 Cr | Under construction Aug 2026 |
| After the Rain - Phase II A Total Environment · Yelahanka / Jakkur / Airport corridor | 30 | 9.8% | 5.1% | 6.9% | ₹16,300 est. | ₹6.45 Cr | Under construction Sep 2024 |
Price per sq ft in Yelahanka / Jakkur / Airport corridor: what the evidence says
| Date | ₹ / sq ft | Basis | Confidence |
|---|---|---|---|
| 2021-06 | ₹5,200 | blr (derived) | 40% |
| 2023-06 | ₹6,400 | blr (derived) | 45% |
| 2025-06 | ₹8,600 | blr (derived) | 50% |
| 2026-06 | ₹9,600 | blr (derived) | 50% |
That is 13.0% a year from 2021-06 to 2026-06. The model projects 10.3% a year from here; the growth story on each project page shows why.
Supply and demand from RERA filings
Karnataka RERA, 2026-09. Months of inventory = unsold homes ÷ monthly sales.
Infrastructure pipeline
| Project | Type | Status | Expected | Chance it lands on time | Price effect if it does |
|---|---|---|---|---|---|
| Blue Line KR Puram–Hebbal–Airport | metro | construction | 2027 | 65% | +1.2% / yr |
| Satellite Town Ring Road | road | construction | 2028 | 60% | +0.6% / yr |
The growth model counts each event at its probability, not its promise. Dates are the latest public schedule.
Developers active in Yelahanka / Jakkur / Airport corridor
Ranked lists for Yelahanka / Jakkur / Airport corridor
Yelahanka / Jakkur / Airport corridor compared with other areas
Questions people ask
Is Yelahanka / Jakkur / Airport corridor good for investment?
On PropertyLens's model the median analysed project in Yelahanka / Jakkur / Airport corridor scores 54/100 (below the Bengaluru average), with projected price growth of 10.3% a year over five years, median price ₹10,350 per sq ft and gross rental yield 3.5%. 120 RERA-registered projects analysed as of September 11, 2026. The best-scored project is Casagrand Estancia at 83.
What is the price per sq ft in Yelahanka / Jakkur / Airport corridor?
Median ₹10,350 per sq ft of super built-up area across analysed projects, modelled from comparables where developers file no price. Entry price for an analysed home is about ₹42.1 L; the median home is ₹1.16 Cr.
What rental yield can I expect in Yelahanka / Jakkur / Airport corridor?
Median gross yield 3.5% on the all-in cost of an analysed home, before maintenance, vacancy and tax. Net-wealth CAGR after every cost on an 8-year hold with a 75% loan is 7.1% at the median.
Are projects in Yelahanka / Jakkur / Airport corridor delayed?
48 of 93 under-construction projects are past the completion date in their original RERA registration, and unsold stock equals about 18 months of sales. Each project page shows extensions, construction against bookings and complaints.
Scores and projections are model outputs built from dated public evidence (Karnataka RERA filings, promoter quarterly updates, complaint registers, public ratings) and stated assumptions. They are research, not investment advice. How the numbers are built.