Rustomjee · Goregaon / Malad

Rustomjee Ozone Skye

Borivali, Mumbai Suburban, 400064
Handover Dec 2031 · no rent beforeapartment · premiumRERA registered+ CompareFull report ↗
1 · Which home?
2 · Which exit plan?

Score, growth and returns below are for the highlighted home and plan. Prices, rent and possession never mix across phases.

66
Investment score
66/100
Evidence confidence55%
2 BHK · ~650 sq ft carpet (assumed)
Price growth per year, next 5 yrs model
7.8%
likely range 4.3%–11.2% · over 10 yrs 7.4%/yr
Net-wealth CAGR, 8-yr hold
4.8%
your cash in → cash back incl. sale, per year
Cash-flow IRR, 8-yr hold
8.8%
with 75% loan · all-cash 9.2% · with interiors
Three numbers, three questions. Price growth: what will the home be worth? Net-wealth CAGR: what will my money have earned after every cost? Cash-flow IRR: the same, but counting when each rupee moves. Tap i on any of them.
Price · edit here or below assumed
₹Cr
₹ psf × 650 sq ft · as of Nov 2026
Price edits apply to ·
All-in cost
₹1.72 Cr
+ other charges 5.0 L, GST 7.4 L, stamp/reg 9.1 L, interiors 7.8 L
Gross rental yield assumed
2.8%
rent starts in ~5.6 yr

All-in cost sheet this home, default assumptions

ItemBasisAmount
Base price₹21,900 per sq ft × 650 sq ft carpet1.42 Cr
Other charges3.5% of base: floor-rise, preferred-location, car park, club, maintenance deposit, legal, corpus (edit in Assumptions)5.0 L
GST5.0% on an under-construction home7.4 L
Stamp duty and registration6.2% in Maharashtra: 6% stamp duty including 1% metro cess inside BMC limits (7% in Thane, Navi Mumbai and other corporations), plus 1% registration capped at ₹30,0009.1 L
Interiors₹1,200 per sq ft, needed before the home can be let7.8 L
All-in costwhat leaves your pocket and the bank's, before rent or resale₹1.72 Cr
Your own money75.0% loan at 8.5% for 20 years covers the rest; EMI 1.0 L a month₹97.3 L

Prices here are per sq ft of RERA carpet area (650 sq ft), the way homes are sold in Mumbai; there is no super built-up loading to discount. Every percentage above is editable in Assumptions; the defaults are Maharashtra rates as of 2026.

In plain words

Why 66 out of 100

Each home is marked on 11 things a careful buyer checks, then compared with every project we analyse in Mumbai: 50 is the average project, 62 beats about five in six. Here is what lifts this one and what drags it:

  • +
    Employment access · 8/11 pts
    Drive times right now: Malad Mindspace 7 min, Andheri SEEPZ 20 min, Powai (Hiranandani) 28 min; Nariman Point 76 min. About 8 million sq ft of new offices are planned nearby in 3 years.
  • +
    Metro, bus, rail & airport · 3/8 pts
    A metro station is a short walk away (~900 m). Airport is about 86 minutes by road right now.
  • +
    Schools, hospitals, daily needs · 1/2 pts
    Schools, hospitals and daily shopping are excellent in this area.
  • −
    Rental demand & yield · -0/7 pts
    Rent pays back 2.8% of the price every year, close to the usual 2.8% in Mumbai. Tenant demand here is very strong.
  • −
    Price vs comparables · -0/3 pts
    Priced about the same as similar premium homes nearby (₹21,900 vs ~₹23,300 per sq ft).
  • −
    Builder delivery & handover risk · 0/11 pts
    Rustomjee has finished 12+ projects and delivered on time about 79% of the time. This phase is still under construction, with handover promised for 2031-12-31: delays would push your rent start back.
All 11 checks
  • •
    Price vs comparables · -0/3 pts
    Priced about the same as similar premium homes nearby (₹21,900 vs ~₹23,300 per sq ft).
  • •
    Rental demand & yield · -0/7 pts
    Rent pays back 2.8% of the price every year, close to the usual 2.8% in Mumbai. Tenant demand here is very strong.
  • +
    Resale liquidity · 0/4 pts
    Plenty of buyers can afford a ₹1.42 Cr home, and homes in Goregaon / Malad resell quickly. Reselling before handover needs the builder’s permission.
  • +
    Employment access · 8/11 pts
    Drive times right now: Malad Mindspace 7 min, Andheri SEEPZ 20 min, Powai (Hiranandani) 28 min; Nariman Point 76 min. About 8 million sq ft of new offices are planned nearby in 3 years.
  • +
    Metro, bus, rail & airport · 3/8 pts
    A metro station is a short walk away (~900 m). Airport is about 86 minutes by road right now.
  • +
    Schools, hospitals, daily needs · 1/2 pts
    Schools, hospitals and daily shopping are excellent in this area.
  • •
    Builder delivery & handover risk · 0/11 pts
    Rustomjee has finished 12+ projects and delivered on time about 79% of the time. This phase is still under construction, with handover promised for 2031-12-31: delays would push your rent start back.
  • +
    Layout, size, age, amenities, maintenance · 0/2 pts
    Moderately dense layout (60 homes per acre); about 100% of the area you pay for is usable carpet area. Maintenance ~₹5 per sq ft a month.
  • •
    Water, flooding, noise, infrastructure · 0/8 pts
    Some flood risk in heavy rain; water supply is partly piped, partly tankers; noticeable traffic or aircraft noise.
  • •
    Legal, title & approvals · 0/8 pts
    Registered with MahaRERA; court cases not disclosed on the public register; land title not yet verified by us, so get a lawyer to check. The due-diligence report below flags 0 items in red.
  • −
    Expected price growth (5-yr CAGR model) · 3/43 pts
    We expect prices here to rise about 7.8% a year for the next 5 years (explained below).
Why prices should grow ~7.8% a year for the next 5 years

We build the forecast step by step, starting from what Mumbai homes normally do and adjusting for this area and this project:

  1. + 5.5%Start with 5.5% a year: the normal long-run growth of Mumbai home prices.
  2. + 0.4%Add 0.4%: prices here rose 8.1% a year recently (2023-06 to 2026-06). Some of that pace continues, but it fades each year.
  3. − 0.6%Subtract 0.6%: at ₹21,900 per sq ft, fewer families can afford to buy here, which slows further rises.
  4. + 1.6%Add 1.6%: 8 million sq ft of new offices nearby means more people wanting homes here.
  5. − 0.7%Subtract 0.7%: many new homes are being built here (22 months of unsold stock), which keeps prices in check.
  6. + 0.1%Add 0.1% for new roads, metro and water lines, weighted by how likely they are to actually finish: Metro Lines 2A and 7 (2023) (operational, 2023); Goregaon–Mulund Link Road (construction, 2028).
  7. + 1.4%Add 1.4% for this project itself: unfinished homes are worth more once they are complete.
  8. = 7.8%Result: about 7.8% a year, so a home worth ₹1.47 Cr today would be worth about ₹2.14 Cr in 5 years. We are 56% confident in the evidence behind this.

Which exit suits you?

For an unfinished flat the answer depends on whether you sell at handover or hold, and whether you spend on interiors. Same price, same loan; only the strategy changes:

StrategyHoldIRR / yrWealth CAGR / yrCash you put inNet rentNet saleApply
Sell at handover, no interiors best IRR
Take delivery in 2031-12-31 and sell the bare flat (6 yr hold). Needs builder NOC or registration first; no rent.
6 yrs11.6%6.8%₹66.0 L₹77,029₹1.12 Cr
Hold bare, rent unfurnished
Skip interiors; rent 12% lower than a fitted home; sell after 8 yrs with no interiors value.
8 yrs9.8%5.5%₹90.1 L₹5.2 L₹1.48 Cr
Hold, do interiors, rent & sell fitted selected
Spend ₹1,200/sq ft on interiors, earn full rent, recover ~40% of interiors cost at sale (fading over 10 yrs).
8 yrs8.8%4.8%₹97.3 L₹6.2 L₹1.51 Cr

IRR and CAGR are per year over the hold shown. A short hold can show a high IRR on a small absolute gain; compare the net-sale column too. Selling before registration usually needs the builder’s transfer NOC and a fee.

Highlights

  • Rustomjee · Goregaon / Malad · unit count not on the public register
  • Under construction: progress not on the public register, MahaRERA completion 2031-12-31
  • Registered with MahaRERA as PR1180002601227

Assumptions editable

Purchase

₹/sq ft
₹ Cr
sq ft
% of base
%
%
%
₹/sq ft

FinancingLoan 75% · cash 25% · EMI ₹1.0 L/mo

% loan
% p.a.
years
%

Rent & running costs

₹
% p.a.
%
months
months
₹/sq ft/mo
% of rent
% of rent
% of value

Interiors & exit

%
%
years
% p.a. (blank = model)
%
%

Returns over 8 years · with interiors

Cash you put in₹97.3 L
Exit value (yr 8)₹2.64 Cr
Net sale after loan & costs₹1.51 Cr
Net rent after opex₹6.2 L
Loan (75% of price)₹1.16 Cr
EMI / month₹1.0 L
Year 0: ₹-13.6 L0Year 1: ₹-7.5 L1Year 2: ₹-9.0 L2Year 3: ₹-10.5 L3Year 4: ₹-12.0 L4Year 5: ₹-13.4 L5Year 6: ₹-21.8 L6Year 7: ₹-9.5 L7Year 8: ₹1.42 Cr8
YearPurchaseLoan inRent (net of vacancy)OpexDebt serviceSale − loanNet cash
Today-25.2 L11.6 L0.0 L0.0 L0.0 L0.0 L-13.6 L
Yr 1-23.2 L17.4 L0.0 L0.0 L-1.7 L0.0 L-7.5 L
Yr 2-23.2 L17.4 L0.0 L0.0 L-3.2 L0.0 L-9.0 L
Yr 3-23.2 L17.4 L0.0 L0.0 L-4.7 L0.0 L-10.5 L
Yr 4-23.2 L17.4 L0.0 L0.0 L-6.2 L0.0 L-12.0 L
Yr 5-23.2 L17.4 L0.0 L0.0 L-7.6 L0.0 L-13.4 L
Yr 6-31.0 L17.4 L1.6 L-0.7 L-9.1 L0.0 L-21.8 L
Yr 70.0 L0.0 L4.1 L-1.5 L-12.1 L0.0 L-9.5 L
Yr 80.0 L0.0 L4.3 L-1.6 L-12.1 L1.51 Cr1.42 Cr

Pre-tax unless capital-gains tax is set. Rent enters the cash flows once. Net-wealth CAGR = (cash returned incl. sale ÷ cash put in)^(1/years) − 1. IRR uses the dated cash flows.

Score factors

Bars show points added or taken away versus the average analysed Mumbai project (score 50).

Price vs comparables
−0.0 pts vs avg
this home 5.9/10 · Mumbai average 6.0 · confidence 30%
₹21,900 psf vs premium comps ₹23,300 (-6%; under-construction should price ~8% below ready). Price is a model estimate, so this factor carries a third of its normal weight until a listed price is observed.
Rental demand & yield
−0.2 pts vs avg
this home 6.1/10 · Mumbai average 6.2 · confidence 34%
Gross yield 2.9% (₹52 psf/month); locality rental demand 9/10.
Resale liquidity
+0.4 pts vs avg
this home 7.7/10 · Mumbai average 7.4 · confidence 50%
Locality resale depth 8/10; ticket ₹1.42 Cr narrows the buyer pool; UC resale needs builder NOC.
Employment access
+8.2 pts vs avg
this home 8.8/10 · Mumbai average 4.4 · confidence 85%
Drive times now (Google Maps, 2026-11-11): Malad Mindspace 7 min, Andheri SEEPZ 20 min, Powai (Hiranandani) 28 min, BKC 36 min; 3 of 7 major hubs within 30 min; 8 msf office pipeline (3 yr).
Metro, bus, rail & airport
+2.9 pts vs avg
this home 7.2/10 · Mumbai average 5.5 · confidence 60%
Line 2A / Line 7 (Goregaon, Malad, Dindoshi); no planned station within 2 km; airport ~86 min by road now (Google Maps); .
Schools, hospitals, daily needs
+0.6 pts vs avg
this home 8.5/10 · Mumbai average 7.8 · confidence 50%
Locality social-infrastructure index (interim, expert-set; POI distances pending Maps integration).
Builder delivery & handover risk
+0.0 pts vs avg
this home 5.5/10 · Mumbai average 5.5 · confidence 60%
Rustomjee: 12+ projects, on-time 79% (derived); handover 2031-12-31 (reported); within the RERA timeline.
Layout, size, age, amenities, maintenance
+0.2 pts vs avg
this home 8.1/10 · Mumbai average 7.9 · confidence 50%
60 units/acre; carpet/SBA ~100%; maintenance ~₹5 psf/month (assumed).
Water, flooding, noise, infrastructure
+0.2 pts vs avg
this home 6.0/10 · Mumbai average 5.8 · confidence 50%
Large township supply near Film City; GMLR under construction
Legal, title & approvals
+0.2 pts vs avg
this home 6.0/10 · Mumbai average 5.9 · confidence 55%
RERA registered; litigation: not published on the public register; approvals: MahaRERA registered; title: not verified. Due-diligence report lists 0 red flags (−0.0 pts).
Expected price growth (5-yr CAGR model)
+3.2 pts vs avg
this home 3.3/10 · Mumbai average 2.7 · confidence 56%
Model 5-yr price CAGR 7.8% (range 4.3–11.2%).

Price growth model, year by year

Nominal growth per year. Parts add up; momentum fades, infrastructure is weighted by delivery probability and dated.

ComponentYr 1Yr 2Yr 3Yr 4Yr 5Yr 6Confidence
Mumbai long-run nominal trend5.55.55.55.55.55.580%
Locality momentum (mean-reverting)0.90.50.30.20.10.045%
Affordability ceiling-1.0-0.7-0.5-0.3-0.2-0.260%
Employment access & office pipeline1.61.61.61.61.61.655%
Supply–demand balance-1.0-0.8-0.6-0.5-0.4-0.350%
Infrastructure delivery (probability-weighted)0.20.20.10.00.00.055%
Project-specific adjustments1.41.41.41.41.41.450%
Total growth7.6%7.7%7.8%7.8%7.9%8.1%56%

Mumbai long-run nominal trend: City-wide 2013-25 nominal residential trend ≈ inflation + real income growth.

Locality momentum (mean-reverting): Trailing 3.0-yr locality CAGR 8.1% vs 5.5% trend; 35% carried forward, halving each year.

Affordability ceiling: Ticket at ₹21,900 psf vs city median ₹14,500; buyer pool thins above ₹15k/₹20k psf and after >6pp excess growth.

Employment access & office pipeline: 8 msf office pipeline (3 yr) on 35 msf stock; 30-min jobs index 0.80.

Supply–demand balance: 22 months of unsold inventory; new-launch/absorption ratio 1.2.

Infrastructure delivery (probability-weighted): Metro Lines 2A and 7 (2023) (operational, 2023, p=1); Goregaon–Mulund Link Road (construction, 2028, p=0.5)

Project-specific adjustments: Remaining construction risk (95% work left) re-rates toward ready comps by handover (~7.6% over 5.3 yr).

Locality evidence: ₹19,000 (Jun 2023) → ₹24,000 (Jun 2026) = 8.1% p.a. Sources: Platform estimate (interim, not observed).

Financial & legal due diligence

What the public record says

Automated from MahaRERA's public register entry and registration certificate for PR1180002601227. Prices and rents are locality estimates, not verified listings. Compiled Nov 2026 from the MahaRERA file, company registers, rating agencies, tribunal records and press. Facts only; anything that deserves a written answer before signing is flagged.

Delivery timeline9/10
no extensions, no overdue dates on the RERA file
Legal & complaints9/10
no litigation and no complaints on the RERA file
Money to finish8/10
Developer strength5/10
no public credit rating for the promoter

Meters are rule-based from the RERA file and public ratings (rules shown under each), not opinions.

Registration
PR1180002601227 · KEYSTONE REALTORS LIMITED
On original date
RegisteredJul 2026TodaySep 2026Original completionDec 2031
No litigation declaredNo complaints
Credit ratings of the people behind it

No public credit rating located for the promoter.

KEYSTONE REALTORS LIMITED: credit rating not yet checked by PropertyLens

Complaints & disputes on record
On this project00 open
On the promoter entity0all projects
Court cases declared0no stay recorded
At a glance
On its original RERA date

On its original RERA completion date: 2031-12-31

No complaints on this project

No RERA complaints on this project; 0 on the promoter overall

No litigation declared

No litigation declared in RERA filings

The record, in pictures

RERA file · Registration

No litigation declaredBorrowing declared: not stated

Red flags to resolve in writing

Questions to put to the developer before you sign

  1. Share the latest quarterly progress filing and the architect and engineer certificates.
  2. Confirm the price list, floor-rise, parking and other charges for the exact unit.
  3. Which date is contractual, 2031-12-31 or the agreement's, and what is the delay compensation?
  4. Confirm there is no litigation on the land or approvals beyond the RERA declaration.
  5. Is the land owned by the promoter, or is this a joint development, and is any part mortgaged?
Full record: every filed number, line by line1 sections · 3 items

RERA file · Registration

Registration
PR1180002601227 · promoter KEYSTONE REALTORS LIMITED
Dates
Start 2026-07-20 · original completion 2031-12-31 · no extensions
Litigation declared
None declared in filings

Source: MahaRERA project record PR1180002601227, fetched 2026-11-10. Figures are the promoter’s own filings.

Sources & caveats2 sources
  • MahaRERA project record PR1180002601227, fetched 2026-11-10
  • PropertyLens Mumbai locality model (market-level estimates)
  • MahaRERA project records PR1180002601227 (registration file, quarterly updates, complaint register), fetched Sep 2026.

Caveats. Automated analysis: prices, rents and travel times are estimates until listings and Maps data are verified. RERA figures are the promoter’s own filings. Nothing here is legal, tax or investment advice.

Evidence

Location, jobs & transit3 hubs · metro walkable
Job hubs nearby
Mindspace MaladNesco / Goregaon officesAndheri 6 km
Measured drive times below
Office space
Existing35 msf
Coming in 3 yrs8 msf
Jobs within 30 min8/10
Getting around
Metro today
Line 2A / Line 7 (Goregaon, Malad, Dindoshi)
~900 m estimate
Metro planned
No station planned within 2 km
Rail
—
estimate
Airport
86 min by road now · 31.5 km
Google Maps
Buses
7/10 coverage
estimate
Drive times to job hubs
DestinationDrive nowRoad km
Malad Mindspace7 min1
Andheri SEEPZ20 min6.2
Powai (Hiranandani)28 min9.4
BKC36 min12.3
Thane (Wagle Estate)36 min12.4
Lower Parel56 min19.9
Nariman Point76 min27.6
Navi Mumbai Airport86 min31.5

Google Maps driving time with live traffic, measured Nov 2026. Refreshed monthly.

Location used: Google Maps match “”. Bus coverage and planned-station distances are still interim estimates.

Price historylocality 8.1%/yr

No dated project-level price series yet; only the latest observation is on file.

Locality · average ₹/sq ft
Date₹ psfSourceConfidenceKind
Jun 202117,500Platform estimate (interim, not observed)40%derived
Jun 202319,000Platform estimate (interim, not observed)45%derived
Jun 202522,000Platform estimate (interim, not observed)50%derived
Jun 202624,000Platform estimate (interim, not observed)50%derived
Luxury comps₹29,300
Premium comps₹23,300
Mid comps₹18,200
Unsold stock22 months

Model backtest on this locality: 1-yr hold-out (Jun 2025→Jun 2026): predicted ₹23,214 vs actual ₹24,000 (-3.3%). Longer 3-yr hold-out (Jun 2023→Jun 2026): predicted 6% p.a. vs actual 8.1% p.a. — the model is deliberately mean-reverting and under-predicted the 2021–26 boom.

Environment, legal & productflood ok · water risk · RERA yes
Flood risksome risk
Water supplymixed
Quietnoisy
Roads & drainsgood

Large township supply near Film City; GMLR under construction

Legal & approvals
Registration PR1180002601227
RERA PR1180002601227
possession Dec 2031
Litigation
not published on the public register
assumed
Approvals
MahaRERA registered
observed
Title
not verified
assumed
Product
Landnot filed
Homesnot filed
Densitynot filed
Launched2026
Sources & data gapswhat we know, from where, and what is missing

Automated analysis from MahaRERA's public register: unit sizes and prices are locality-model estimates until listings are verified.

FieldValueSource classDateConf.KindConflicting values
AddressBorivali, Mumbai Suburban, 400064MahaRERANov 202670%observed
Land area (acres)Platform estimate (interim, not observed)Nov 202620%assumed
Total unitsPlatform estimate (interim, not observed)Nov 202620%assumed
Launch year2026MahaRERANov 202670%observed
Possession · Registration PR11800026012272031-12-31MahaRERANov 202670%observed
Price psf · 2 BHK · ~650 sq ft carpet (assumed)21900Platform estimate (interim, not observed)Nov 202630%assumed
Ticket · 2 BHK · ~650 sq ft carpet (assumed)14235000Platform estimate (interim, not observed)Nov 202630%derived
Rent · 2 BHK · ~650 sq ft carpet (assumed)34000Platform estimate (interim, not observed)Nov 202630%assumed
Carpet area650Platform estimate (interim, not observed)Nov 202630%assumed
Builder on-time rate0.79MahaRERANov 202660%derived
Litigationnot published on the public registerMahaRERANov 202630%assumed
ApprovalsMahaRERA registeredMahaRERANov 202660%observed

Commercial listing portals are shown as “Listing portal (aggregated)”; full provenance is retained internally. Official developer and MahaRERA sources are named.

Other projects worth comparing

Same model, same date. Scores are out of 100, where 50 is the average analysed Mumbai project.

Questions people ask about Rustomjee Ozone Skye

Is Rustomjee Ozone Skye a good investment?

On PropertyLens's evidence-based model Rustomjee Ozone Skye scores 66/100, above the average analysed Mumbai project (50 = average, 12 points = one standard deviation). The model projects price growth of about 7.8% a year over five years and a net-wealth CAGR of 4.8% after every cost on an 8-year hold with a 75.0% loan. That is research on public filings, not advice; the factor breakdown on this page shows what drives the score.

What is the price per sq ft at Rustomjee Ozone Skye?

About ₹21,900 per sq ft of super built-up area, a model estimate from Goregaon / Malad comparables that you can edit. The 2 BHK home costs about ₹1.42 Cr before other charges, GST and stamp duty, and ₹1.72 Cr all-in.

When is Rustomjee Ozone Skye ready for possession?

The RERA registration commits to Dec 2031.

Is Rustomjee Ozone Skye RERA registered?

Yes. MahaRERA registration: PR1180002601227. No complaints on this registration at MahaRERA as of 2026-11-10.

How reliable is Rustomjee on delivery?

79% of Rustomjee's crawled Mumbai registrations needed no extension (10 of 12 analysed Mumbai registrations needed no extension). 12 registrations analysed. The developer scorecard compares this with every other Mumbai developer.

What rent can Rustomjee Ozone Skye earn?

About ₹34,000 a month for this home (a model estimate from Goregaon / Malad rents), a gross yield of 2.8% on the all-in cost. Nothing is earned before handover. Rent covers 34% of the EMI at the default loan.

Answers are generated from the filings and the model for this home and change when you edit the assumptions above. See the Rustomjee scorecard and the Goregaon / Malad area page.

Go deeper

Share on WhatsApp