Season Sahara Building No -6
Score, growth and returns below are for the highlighted home and plan. Prices, rent and possession never mix across phases.
Price edits apply to ·
All-in cost sheet this home, default assumptions
| Item | Basis | Amount |
|---|---|---|
| Base price | ₹6,200 per sq ft × 650 sq ft carpet | 40.3 L |
| Other charges | 3.5% of base: floor-rise, preferred-location, car park, club, maintenance deposit, legal, corpus (edit in Assumptions) | 1.4 L |
| GST | 5.0% on an under-construction home | 2.1 L |
| Stamp duty and registration | 7.2% in Maharashtra: 6% stamp duty including 1% metro cess inside BMC limits (7% in Thane, Navi Mumbai and other corporations), plus 1% registration capped at ₹30,000 | 3.0 L |
| Interiors | ₹1,200 per sq ft, needed before the home can be let | 7.8 L |
| All-in cost | what leaves your pocket and the bank's, before rent or resale | ₹54.6 L |
| Your own money | 75.0% loan at 8.5% for 20 years covers the rest; EMI 0.3 L a month | ₹39.4 L |
Prices here are per sq ft of RERA carpet area (650 sq ft), the way homes are sold in Mumbai; there is no super built-up loading to discount. Every percentage above is editable in Assumptions; the defaults are Maharashtra rates as of 2026.
In plain words
Each home is marked on 11 things a careful buyer checks, then compared with every project we analyse in Mumbai: 50 is the average project, 62 beats about five in six. Here is what lifts this one and what drags it:
- +Rental demand & yield · 0/7 pts
Rent pays back 3.3% of the price every year, better than the usual 2.8% in Mumbai. Tenant demand here is decent. - +Price vs comparables · -0/3 pts
Priced about the same as similar mid homes nearby (₹6,200 vs ~₹6,600 per sq ft). - +Layout, size, age, amenities, maintenance · -0/2 pts
Moderately dense layout (60 homes per acre); about 100% of the area you pay for is usable carpet area. Maintenance ~₹3.5 per sq ft a month. - −Employment access · -8/11 pts
Drive times right now: Thane (Wagle Estate) 53 min, Powai (Hiranandani) 74 min, Andheri SEEPZ 81 min; Nariman Point 128 min. About 1 million sq ft of new offices are planned nearby in 3 years. - −Metro, bus, rail & airport · -3/8 pts
No working metro nearby (nearest 8 km); Line 5 Kalyan stations is planned for ~2028. Airport is about 78 minutes by road right now. - •Schools, hospitals, daily needs · -1/2 pts
Schools, hospitals and daily shopping are good in this area.
All 11 checks
- •Price vs comparables · -0/3 pts
Priced about the same as similar mid homes nearby (₹6,200 vs ~₹6,600 per sq ft). - •Rental demand & yield · 0/7 pts
Rent pays back 3.3% of the price every year, better than the usual 2.8% in Mumbai. Tenant demand here is decent. - •Resale liquidity · -1/4 pts
Plenty of buyers can afford a ₹40.3 L home, and homes in Kalyan / Titwala / Ulhasnagar resell at a normal pace. Reselling before handover needs the builder’s permission. - −Employment access · -8/11 pts
Drive times right now: Thane (Wagle Estate) 53 min, Powai (Hiranandani) 74 min, Andheri SEEPZ 81 min; Nariman Point 128 min. About 1 million sq ft of new offices are planned nearby in 3 years. - −Metro, bus, rail & airport · -3/8 pts
No working metro nearby (nearest 8 km); Line 5 Kalyan stations is planned for ~2028. Airport is about 78 minutes by road right now. - +Schools, hospitals, daily needs · -1/2 pts
Schools, hospitals and daily shopping are good in this area. - •Builder delivery & handover risk · -1/11 pts
Samarth Sai Builders & Developers has finished 5+ projects and delivered on time about 72% of the time. This phase is still under construction, with handover promised for 2026-12-31: delays would push your rent start back. - +Layout, size, age, amenities, maintenance · -0/2 pts
Moderately dense layout (60 homes per acre); about 100% of the area you pay for is usable carpet area. Maintenance ~₹3.5 per sq ft a month. - •Water, flooding, noise, infrastructure · -2/8 pts
Some flood risk in heavy rain; water supply is mostly borewell or tankers; noticeable traffic or aircraft noise. - •Legal, title & approvals · -1/8 pts
Registered with MahaRERA; court cases not disclosed on the public register; land title not yet verified by us, so get a lawyer to check. The due-diligence report below flags 1 item in red. - −Expected price growth (5-yr CAGR model) · -5/43 pts
We expect prices here to rise about 6.6% a year for the next 5 years (explained below).
We build the forecast step by step, starting from what Mumbai homes normally do and adjusting for this area and this project:
- + 5.5%Start with 5.5% a year: the normal long-run growth of Mumbai home prices.
- + 0.5%Add 0.5%: prices here rose 8.6% a year recently (2023-06 to 2026-06). Some of that pace continues, but it fades each year.
- + 0.0%Prices are still affordable enough that this does not slow growth.
- + 1.5%Add 1.5%: 1 million sq ft of new offices nearby means more people wanting homes here.
- − 1.3%Subtract 1.3%: many new homes are being built here (28 months of unsold stock), which keeps prices in check.
- + 0.2%Add 0.2% for new roads, metro and water lines, weighted by how likely they are to actually finish: Metro Line 5 Thane–Bhiwandi–Kalyan (construction, 2028); Metro Line 12 Kalyan–Taloja (planned, 2029).
- + 0.4%Add 0.4% for this project itself: unfinished homes are worth more once they are complete.
- = 6.6%Result: about 6.6% a year, so a home worth ₹41.7 L today would be worth about ₹57.5 L in 5 years. We are 56% confident in the evidence behind this.
Which exit suits you?
For an unfinished flat the answer depends on whether you sell at handover or hold, and whether you spend on interiors. Same price, same loan; only the strategy changes:
| Strategy | Hold | IRR / yr | Wealth CAGR / yr | Cash you put in | Net rent | Net sale | Apply |
|---|---|---|---|---|---|---|---|
| Sell at handover, no interiors Take delivery in 2026-12-31 and sell the bare flat (1 yr hold). Needs builder NOC or registration first; no rent. | 1 yrs | -36.0% | -36.0% | ₹14.1 L | ₹22,317 | ₹11.6 L | |
| Hold bare, rent unfurnished best IRR Skip interiors; rent 12% lower than a fitted home; sell after 8 yrs with no interiors value. | 8 yrs | 3.0% | 2.2% | ₹32.6 L | ₹5.8 L | ₹41.2 L | |
| Hold, do interiors, rent & sell fitted selected Spend ₹1,200/sq ft on interiors, earn full rent, recover ~40% of interiors cost at sale (fading over 10 yrs). | 8 yrs | 0.2% | 0.1% | ₹39.4 L | ₹7.0 L | ₹42.1 L |
IRR and CAGR are per year over the hold shown. A short hold can show a high IRR on a small absolute gain; compare the net-sale column too. Selling before registration usually needs the builder’s transfer NOC and a fee.
Highlights
- Samarth Sai Builders & Developers · Kalyan / Titwala / Ulhasnagar · unit count not on the public register
- Under construction: progress not on the public register, MahaRERA completion 2026-12-31 (1 extension)
- Registered with MahaRERA as P51700077929
Assumptions editable
Purchase
FinancingLoan 75% · cash 25% · EMI ₹28,505/mo
Rent & running costs
Interiors & exit
Returns over 8 years · with interiors
| Year | Purchase | Loan in | Rent (net of vacancy) | Opex | Debt service | Sale − loan | Net cash |
|---|---|---|---|---|---|---|---|
| Today | -47.0 L | 32.8 L | 0.0 L | 0.0 L | 0.0 L | 0.0 L | -14.1 L |
| Yr 1 | -7.8 L | 0.0 L | 0.5 L | -0.3 L | -2.8 L | 0.0 L | -10.3 L |
| Yr 2 | 0.0 L | 0.0 L | 1.4 L | -0.6 L | -3.4 L | 0.0 L | -2.6 L |
| Yr 3 | 0.0 L | 0.0 L | 1.4 L | -0.6 L | -3.4 L | 0.0 L | -2.6 L |
| Yr 4 | 0.0 L | 0.0 L | 1.5 L | -0.6 L | -3.4 L | 0.0 L | -2.5 L |
| Yr 5 | 0.0 L | 0.0 L | 1.6 L | -0.6 L | -3.4 L | 0.0 L | -2.5 L |
| Yr 6 | 0.0 L | 0.0 L | 1.7 L | -0.7 L | -3.4 L | 0.0 L | -2.4 L |
| Yr 7 | 0.0 L | 0.0 L | 1.8 L | -0.7 L | -3.4 L | 0.0 L | -2.3 L |
| Yr 8 | 0.0 L | 0.0 L | 1.8 L | -0.7 L | -3.4 L | 42.1 L | 39.8 L |
Pre-tax unless capital-gains tax is set. Rent enters the cash flows once. Net-wealth CAGR = (cash returned incl. sale ÷ cash put in)^(1/years) − 1. IRR uses the dated cash flows.
Score factors
Bars show points added or taken away versus the average analysed Mumbai project (score 50).
Price growth model, year by year
Nominal growth per year. Parts add up; momentum fades, infrastructure is weighted by delivery probability and dated.
| Component | Yr 1 | Yr 2 | Yr 3 | Yr 4 | Yr 5 | Yr 6 | Confidence |
|---|---|---|---|---|---|---|---|
| Mumbai long-run nominal trend | 5.5 | 5.5 | 5.5 | 5.5 | 5.5 | 5.5 | 80% |
| Locality momentum (mean-reverting) | 1.1 | 0.6 | 0.3 | 0.2 | 0.1 | 0.1 | 45% |
| Affordability ceiling | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 60% |
| Employment access & office pipeline | 1.5 | 1.5 | 1.5 | 1.5 | 1.5 | 1.5 | 55% |
| Supply–demand balance | -2.0 | -1.6 | -1.3 | -1.0 | -0.8 | -0.7 | 50% |
| Infrastructure delivery (probability-weighted) | 0.2 | 0.3 | 0.3 | 0.1 | 0.0 | 0.0 | 55% |
| Project-specific adjustments | 2.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 50% |
| Total growth | 8.2% | 6.2% | 6.3% | 6.2% | 6.2% | 6.4% | 56% |
Mumbai long-run nominal trend: City-wide 2013-25 nominal residential trend ≈ inflation + real income growth.
Locality momentum (mean-reverting): Trailing 3.0-yr locality CAGR 8.6% vs 5.5% trend; 35% carried forward, halving each year.
Affordability ceiling: Ticket at ₹6,200 psf vs city median ₹14,500; buyer pool thins above ₹15k/₹20k psf and after >6pp excess growth.
Employment access & office pipeline: 1 msf office pipeline (3 yr) on 3 msf stock; 30-min jobs index 0.35.
Supply–demand balance: 28 months of unsold inventory; new-launch/absorption ratio 1.4.
Infrastructure delivery (probability-weighted): Metro Line 5 Thane–Bhiwandi–Kalyan (construction, 2028, p=0.5); Metro Line 12 Kalyan–Taloja (planned, 2029, p=0.45)
Project-specific adjustments: Remaining construction risk (13% work left) re-rates toward ready comps by handover (~1.0% over 0.5 yr).
Locality evidence: ₹6,800 (Jun 2023) → ₹8,700 (Jun 2026) = 8.6% p.a. Sources: Platform estimate (interim, not observed).
What the public record says
Automated from MahaRERA's public register entry and registration certificates for P51700077929. Prices and rents are locality estimates, not verified listings. Compiled Nov 2026 from the MahaRERA file, company registers, rating agencies, tribunal records and press. Facts only; anything that deserves a written answer before signing is flagged.
Meters are rule-based from the RERA file and public ratings (rules shown under each), not opinions.
No public credit rating located for the promoter.
SAMARTH SAI BUILDERS & DEVELOPERS: credit rating not yet checked by PropertyLens
Registration extended 1× — from 2026-04-30 to 2026-12-31
No RERA complaints on this project; 0 on the promoter overall
No litigation declared in RERA filings
RERA file · Registration
Red flags to resolve in writing
Registration extended once: original completion 2026-04-30, now 2026-12-31.
Questions to put to the developer before you sign
- Share the latest quarterly progress filing and the architect and engineer certificates.
- Confirm the price list, floor-rise, parking and other charges for the exact unit.
- Which date is contractual, 2026-12-31 or the agreement's, and what is the delay compensation?
- Confirm there is no litigation on the land or approvals beyond the RERA declaration.
- Is the land owned by the promoter, or is this a joint development, and is any part mortgaged?
Full record: every filed number, line by line1 sections · 3 items
RERA file · Registration
Source: MahaRERA project record P51700077929, fetched 2026-11-10. Figures are the promoter’s own filings.
Sources & caveats2 sources
- MahaRERA project record P51700077929, fetched 2026-11-10
- PropertyLens Mumbai locality model (market-level estimates)
- MahaRERA project records P51700077929 (registration file, quarterly updates, complaint register), fetched Sep 2026.
Caveats. Automated analysis: prices, rents and travel times are estimates until listings and Maps data are verified. RERA figures are the promoter’s own filings. Nothing here is legal, tax or investment advice.
Evidence
Location, jobs & transit2 hubs · metro none nearby
| Destination | Drive now | Road km |
|---|---|---|
| Thane (Wagle Estate) | 53 min | 18.8 |
| Powai (Hiranandani) | 74 min | 26.9 |
| Navi Mumbai Airport | 78 min | 28.5 |
| Andheri SEEPZ | 81 min | 29.7 |
| Malad Mindspace | 86 min | 31.7 |
| BKC | 91 min | 33.6 |
| Lower Parel | 112 min | 41.7 |
| Nariman Point | 128 min | 47.5 |
Google Maps driving time with live traffic, measured Nov 2026. Refreshed monthly.
Location used: recorded coordinates (estimate). Bus coverage and planned-station distances are still interim estimates.
Price historylocality 8.6%/yr
No dated project-level price series yet; only the latest observation is on file.
| Date | ₹ psf | Source | Confidence | Kind |
|---|---|---|---|---|
| Jun 2021 | 6,200 | Platform estimate (interim, not observed) | 40% | derived |
| Jun 2023 | 6,800 | Platform estimate (interim, not observed) | 45% | derived |
| Jun 2025 | 8,000 | Platform estimate (interim, not observed) | 50% | derived |
| Jun 2026 | 8,700 | Platform estimate (interim, not observed) | 50% | derived |
Model backtest on this locality: 1-yr hold-out (Jun 2025→Jun 2026): predicted ₹8,427 vs actual ₹8,700 (-3.1%). Longer 3-yr hold-out (Jun 2023→Jun 2026): predicted 5.2% p.a. vs actual 8.6% p.a. — the model is deliberately mean-reverting and under-predicted the 2021–26 boom.
Environment, legal & productflood ok · water risk · RERA yes
Rail-commuter market; Ulhas river flooding in pockets
Sources & data gapswhat we know, from where, and what is missing
Automated analysis from MahaRERA's public register: unit sizes and prices are locality-model estimates until listings are verified.
| Field | Value | Source class | Date | Conf. | Kind | Conflicting values |
|---|---|---|---|---|---|---|
| Address | Kalyan, Thane, 421306 | MahaRERA | Nov 2026 | 70% | observed | |
| Land area (acres) | Platform estimate (interim, not observed) | Nov 2026 | 20% | assumed | ||
| Total units | Platform estimate (interim, not observed) | Nov 2026 | 20% | assumed | ||
| Launch year | 2024 | MahaRERA | Nov 2026 | 70% | observed | |
| Possession · Registration P51700077929 | 2026-12-31 | MahaRERA | Nov 2026 | 70% | observed | |
| Price psf · 2 BHK · ~650 sq ft carpet (assumed) | 6200 | Platform estimate (interim, not observed) | Nov 2026 | 30% | assumed | |
| Ticket · 2 BHK · ~650 sq ft carpet (assumed) | 4030000 | Platform estimate (interim, not observed) | Nov 2026 | 30% | derived | |
| Rent · 2 BHK · ~650 sq ft carpet (assumed) | 11500 | Platform estimate (interim, not observed) | Nov 2026 | 30% | assumed | |
| Carpet area | 650 | Platform estimate (interim, not observed) | Nov 2026 | 30% | assumed | |
| Builder on-time rate | 0.72 | MahaRERA | Nov 2026 | 60% | derived | |
| Litigation | not published on the public register | MahaRERA | Nov 2026 | 30% | assumed | |
| Approvals | MahaRERA registered | MahaRERA | Nov 2026 | 60% | observed |
Commercial listing portals are shown as “Listing portal (aggregated)”; full provenance is retained internally. Official developer and MahaRERA sources are named.
Other projects worth comparing
Same model, same date. Scores are out of 100, where 50 is the average analysed Mumbai project.
More in Kalyan / Titwala / Ulhasnagar All Kalyan / Titwala / Ulhasnagar →
More from Samarth Sai Builders & Developers Delivery record →
Around ₹40.3 L elsewhere in Mumbai All projects →
Questions people ask about Season Sahara Building No -6
Is Season Sahara Building No -6 a good investment?
On PropertyLens's evidence-based model Season Sahara Building No -6 scores 28/100, well below the average analysed Mumbai project (50 = average, 12 points = one standard deviation). The model projects price growth of about 6.6% a year over five years and a net-wealth CAGR of 0.1% after every cost on an 8-year hold with a 75.0% loan. That is research on public filings, not advice; the factor breakdown on this page shows what drives the score.
What is the price per sq ft at Season Sahara Building No -6?
About ₹6,200 per sq ft of super built-up area, a model estimate from Kalyan / Titwala / Ulhasnagar comparables that you can edit. The 2 BHK home costs about ₹40.3 L before other charges, GST and stamp duty, and ₹54.6 L all-in.
When is Season Sahara Building No -6 ready for possession?
The RERA registration commits to Dec 2026. 1 extension has been filed.
Is Season Sahara Building No -6 RERA registered?
Yes. MahaRERA registration: P51700077929. No complaints on this registration at MahaRERA as of 2026-11-10.
How reliable is Samarth Sai Builders & Developers on delivery?
72% of Samarth Sai Builders & Developers's crawled Mumbai registrations needed no extension (4 of 5 analysed Mumbai registrations needed no extension). 5 registrations analysed. The developer scorecard compares this with every other Mumbai developer.
What rent can Season Sahara Building No -6 earn?
About ₹11,500 a month for this home (a model estimate from Kalyan / Titwala / Ulhasnagar rents), a gross yield of 3.3% on the all-in cost. Nothing is earned before handover. Rent covers 40% of the EMI at the default loan.
Answers are generated from the filings and the model for this home and change when you edit the assumptions above. See the Samarth Sai Builders & Developers scorecard and the Kalyan / Titwala / Ulhasnagar area page.