Kalyan–Dombivli, Mumbai · Kalyan / Titwala / Ulhasnagar

Is Kalyan / Titwala / Ulhasnagar good for investment?

148 RERA-registered projects scored on one model, as of November 11, 2026. Prices, growth, yields, supply and the best-scored homes.

Straight answer · as of November 11, 2026

Kalyan / Titwala / Ulhasnagar in one paragraph

On PropertyLens's model, Kalyan / Titwala / Ulhasnagar is a weaker-than-average place to buy in Mumbai right now: the median analysed project scores 33/100 (well below the Mumbai average), with projected price growth of 7.0% a year over five years and a median gross rental yield of 3.3%. Unsold homes would take about 28 months to absorb at the current sales pace, which is heavy supply and caps near-term price growth. 16 of 114 under-construction projects here are past their original RERA completion date, so weight the developer's record heavily.

Median of 148 projects; the spread inside the area is wide, so the ranked list below matters more than the average.

Projects analysed
148
34 ready · 114 under construction
Median score
33
well below the Mumbai average
Projected growth / yr
7.0%
5-yr; 10-yr 6.8%
Median price / sq ft
₹6,200
modelled from comparables
Gross rental yield
3.3%
median, on all-in cost
Net-wealth CAGR
1.4%
8-yr hold, 75% loan, after all costs
Months of inventory
28
RERA filings
Past RERA date
16 / 114
under-construction projects overdue
Entry price
₹40.3 L
median ₹40.3 L

Best-scored projects in Kalyan / Titwala / Ulhasnagar

All 148 analysed projects in Kalyan / Titwala / Ulhasnagar

ProjectScoreGrowth / yrNet-wealth CAGRCash-flow IRRPrice / sq ftPriceStatus
Shreeji Landmark
Vinayak Developers · Kalyan / Titwala / Ulhasnagar
467.8%2.0%3.4%₹6,200 est.₹40.3 LUnder construction
Dec 2029
Mangeshi Neptune
Mangesh Dashrath Gaikar · Kalyan / Titwala / Ulhasnagar
437.0%1.0%1.4%₹6,200 est.₹40.3 LUnder construction
Dec 2027
Rustomjee Urban Woods - Banyan
Keyblue Realtors · Kalyan / Titwala / Ulhasnagar
398.1%2.5%4.6%₹6,200 est.₹40.3 LUnder construction
Oct 2030
Arihant Aayan Phase I
Arihant Superstructures · Kalyan / Titwala / Ulhasnagar
398.0%2.4%4.4%₹6,200 est.₹40.3 LUnder construction
Dec 2030
Mahindra Happinest Kalyan - 2 Project B
Mahindra Lifespaces · Kalyan / Titwala / Ulhasnagar
387.4%1.5%2.4%₹7,900 est.₹51.4 LUnder construction
Dec 2028
Davakhar Sereno Phase I
Davakhar Infrastructure · Kalyan / Titwala / Ulhasnagar
387.8%2.0%3.4%₹6,200 est.₹40.3 LUnder construction
Dec 2029
Kohinoor Eden B8
Kgi Realty · Kalyan / Titwala / Ulhasnagar
377.8%2.0%3.4%₹6,200 est.₹40.3 LUnder construction
Dec 2029
Ritz Europa Tower A
Vikas Harakchand Jain · Kalyan / Titwala / Ulhasnagar
378.0%2.4%4.4%₹6,200 est.₹40.3 LUnder construction
Dec 2030
Ritz Europa Tower B
Vikas Harakchand Jain · Kalyan / Titwala / Ulhasnagar
378.0%2.4%4.4%₹6,200 est.₹40.3 LUnder construction
Dec 2030
Ritz Europa Tower C
Vikas Harakchand Jain · Kalyan / Titwala / Ulhasnagar
378.0%2.4%4.4%₹6,200 est.₹40.3 LUnder construction
Dec 2030
Ritz Europa Tower D
Vikas Harakchand Jain · Kalyan / Titwala / Ulhasnagar
378.0%2.4%4.4%₹6,200 est.₹40.3 LUnder construction
Dec 2030
Davakhar Sereno Phase III C
Davakhar Infrastructure · Kalyan / Titwala / Ulhasnagar
378.0%2.4%4.4%₹6,200 est.₹40.3 LUnder construction
Dec 2030
Tharwani Parkglen Phase I
Tharwani Realtors · Kalyan / Titwala / Ulhasnagar
377.8%1.9%3.6%₹6,200 est.₹40.3 LUnder construction
Jun 2031
Kohinoor Uptown T1 & T6
Kgi Realty · Kalyan / Titwala / Ulhasnagar
377.8%1.9%3.2%₹6,200 est.₹40.3 LUnder construction
Mar 2030
Sunteck Crescent Park -1
Sunteck Realty · Kalyan / Titwala / Ulhasnagar
367.8%2.1%3.7%₹7,900 est.₹51.4 LUnder construction
Dec 2029
Regency Antilia Phase X
Regency Group · Kalyan / Titwala / Ulhasnagar
367.8%1.8%3.2%₹6,200 est.₹40.3 LUnder construction
Apr 2030
Neelkanth Palms
Neelkanth · Kalyan / Titwala / Ulhasnagar
367.4%1.4%2.3%₹6,200 est.₹40.3 LUnder construction
Dec 2028
Davakhar Sereno Phase III
Davakhar Infrastructure · Kalyan / Titwala / Ulhasnagar
367.8%2.0%3.4%₹6,200 est.₹40.3 LUnder construction
Dec 2029
Ritz Tower G
Vikas Harakchand Jain · Kalyan / Titwala / Ulhasnagar
367.8%2.0%3.4%₹6,200 est.₹40.3 LUnder construction
Dec 2029
RITZ - Tower H
Vikas Harakchand Jain · Kalyan / Titwala / Ulhasnagar
367.8%2.0%3.4%₹6,200 est.₹40.3 LUnder construction
Dec 2029
Ritz Tower I
Vikas Harakchand Jain · Kalyan / Titwala / Ulhasnagar
367.8%2.0%3.4%₹6,200 est.₹40.3 LUnder construction
Dec 2029
Lifestyle City Kalyan - Applause B
Nirmal Lifestyle · Kalyan / Titwala / Ulhasnagar
366.2%1.4%1.8%₹6,600 est.₹42.9 LReady
Junomoneta - Jupiter
Palika Infratech · Kalyan / Titwala / Ulhasnagar
367.7%2.5%5.1%₹6,200 est.₹40.3 LUnder construction
Dec 2031
Junomoneta - Lovis Lake View
Palika Infratech · Kalyan / Titwala / Ulhasnagar
367.7%2.5%5.1%₹6,200 est.₹40.3 LUnder construction
Dec 2031
Junomoneta - Apollo
Palika Infratech · Kalyan / Titwala / Ulhasnagar
367.7%2.5%5.1%₹6,200 est.₹40.3 LUnder construction
Dec 2031
Junomoneta - Pluto
Palika Infratech · Kalyan / Titwala / Ulhasnagar
367.7%2.5%5.1%₹6,200 est.₹40.3 LUnder construction
Dec 2031
Vedant Mayfair
Shree Ganesh Developers · Kalyan / Titwala / Ulhasnagar
367.8%1.7%2.9%₹6,200 est.₹40.3 LUnder construction
Jun 2030
Rai S Galaxy
Rai Residency · Kalyan / Titwala / Ulhasnagar
357.8%2.0%3.4%₹6,200 est.₹40.3 LUnder construction
Dec 2029
Davakhar Sereno Phase III B
Davakhar Infrastructure · Kalyan / Titwala / Ulhasnagar
357.8%1.9%3.2%₹6,200 est.₹40.3 LUnder construction
Mar 2030
Earth Park Building No 1
Aastha Housing Corporation · Kalyan / Titwala / Ulhasnagar
357.7%2.5%5.1%₹6,200 est.₹40.3 LUnder construction
Dec 2031
Earth Park Building No 2
Aastha Housing Corporation · Kalyan / Titwala / Ulhasnagar
357.7%2.5%5.1%₹6,200 est.₹40.3 LUnder construction
Dec 2031
Earth Park Building No 3
Aastha Housing Corporation · Kalyan / Titwala / Ulhasnagar
357.7%2.5%5.1%₹6,200 est.₹40.3 LUnder construction
Dec 2031
Earth Park Building No 4
Aastha Housing Corporation · Kalyan / Titwala / Ulhasnagar
357.7%2.5%5.1%₹6,200 est.₹40.3 LUnder construction
Dec 2031
Earth Park Building No 5
Aastha Housing Corporation · Kalyan / Titwala / Ulhasnagar
357.7%2.5%5.1%₹6,200 est.₹40.3 LUnder construction
Dec 2031
Mohan Prestige
Mohan Group · Kalyan / Titwala / Ulhasnagar
357.7%2.5%5.1%₹6,200 est.₹40.3 LUnder construction
Dec 2031
Sai Gokul Vihar
Shree Sai Developers · Kalyan / Titwala / Ulhasnagar
357.4%1.4%2.3%₹6,200 est.₹40.3 LUnder construction
Dec 2028
Mahindra Happinest Kalyan-2 Project A
Mahindra Lifespaces · Kalyan / Titwala / Ulhasnagar
357.4%1.5%2.4%₹7,900 est.₹51.4 LUnder construction
Dec 2028
Tharwani Parkglen Phase II
Tharwani Realtors · Kalyan / Titwala / Ulhasnagar
357.6%2.1%4.4%₹6,200 est.₹40.3 LUnder construction
Jun 2032
Sai Paradise
Sai Enterprises · Kalyan / Titwala / Ulhasnagar
357.4%1.4%2.3%₹6,200 est.₹40.3 LUnder construction
Dec 2028
Haware Paramount Kalyan Phase 1
Haware Properties · Kalyan / Titwala / Ulhasnagar
357.4%1.4%2.3%₹6,200 est.₹40.3 LUnder construction
Dec 2028
Haware Palms Kalyan Phase 1
Haware Properties · Kalyan / Titwala / Ulhasnagar
357.4%1.4%2.3%₹6,200 est.₹40.3 LUnder construction
Dec 2028
Siyara Signature
Shakti Realty · Kalyan / Titwala / Ulhasnagar
357.4%1.1%1.8%₹6,200 est.₹40.3 LUnder construction
Jul 2029
Haware Paramount Kalyan Phase- III
Haware Properties · Kalyan / Titwala / Ulhasnagar
357.4%1.4%2.3%₹6,200 est.₹40.3 LUnder construction
Dec 2028
Kohinoor Anaya
Kgi Realty · Kalyan / Titwala / Ulhasnagar
357.4%1.4%2.3%₹6,200 est.₹40.3 LUnder construction
Dec 2028
Haware Paramount Kalyan Phase IV
Haware Properties · Kalyan / Titwala / Ulhasnagar
357.4%1.4%2.3%₹6,200 est.₹40.3 LUnder construction
Dec 2028
Haware Palms Kalyan Phase II
Haware Properties · Kalyan / Titwala / Ulhasnagar
357.4%1.4%2.3%₹6,200 est.₹40.3 LUnder construction
Dec 2028
Rustomjee Urban Woods - Palm
Keyblue Realtors · Kalyan / Titwala / Ulhasnagar
347.4%1.2%1.9%₹6,200 est.₹40.3 LUnder construction
May 2029
Rustomjee Urban Woods - Maple
Keyblue Realtors · Kalyan / Titwala / Ulhasnagar
347.4%1.2%1.9%₹6,200 est.₹40.3 LUnder construction
May 2029
Rustomjee Urban Woods - Walnut
Keyblue Realtors · Kalyan / Titwala / Ulhasnagar
347.4%1.3%2.1%₹6,200 est.₹40.3 LUnder construction
Apr 2029
Rustomjee Urban Woods - Oak
Keyblue Realtors · Kalyan / Titwala / Ulhasnagar
347.4%1.3%2.1%₹6,200 est.₹40.3 LUnder construction
Apr 2029
Kohinoor Uptown T7
Kgi Realty · Kalyan / Titwala / Ulhasnagar
347.4%1.4%2.3%₹6,200 est.₹40.3 LUnder construction
Dec 2028
Kohinoor Gardens
Kgi Realty · Kalyan / Titwala / Ulhasnagar
347.0%1.0%1.5%₹6,200 est.₹40.3 LUnder construction
Nov 2027
Rai s Heaven
Rai Residency · Kalyan / Titwala / Ulhasnagar
348.0%2.4%4.4%₹6,200 est.₹40.3 LUnder construction
Dec 2030
Kohinoor Uptown Kalyan
Kgi Realty · Kalyan / Titwala / Ulhasnagar
347.0%1.0%1.4%₹6,200 est.₹40.3 LUnder construction
Dec 2027
Om Sai Home
Infini Developers · Kalyan / Titwala / Ulhasnagar
346.2%1.4%1.8%₹6,600 est.₹42.9 LReady
Om Sai Home-D
Infini Developers · Kalyan / Titwala / Ulhasnagar
346.2%1.4%1.8%₹6,600 est.₹42.9 LReady
Kohinoor Eden B4
Kgi Realty · Kalyan / Titwala / Ulhasnagar
346.6%0.1%0.2%₹6,200 est.₹40.3 LUnder construction
Dec 2026
Charms City B And C Wing
Charms Developers · Kalyan / Titwala / Ulhasnagar
337.4%1.4%2.3%₹6,200 est.₹40.3 LUnder construction
Dec 2028
Mohan Altezza III
Mohan Group · Kalyan / Titwala / Ulhasnagar
337.0%1.0%1.4%₹6,200 est.₹40.3 LUnder construction
Dec 2027
Raunak City Sector VI - F1
Raunak Group · Kalyan / Titwala / Ulhasnagar
337.4%1.4%2.3%₹6,200 est.₹40.3 LUnder construction
Dec 2028
Raunak City Sector VI - F2
Raunak Group · Kalyan / Titwala / Ulhasnagar
337.4%1.4%2.3%₹6,200 est.₹40.3 LUnder construction
Dec 2028
Raunak City Sector VI - F3
Raunak Group · Kalyan / Titwala / Ulhasnagar
337.4%1.4%2.3%₹6,200 est.₹40.3 LUnder construction
Dec 2028
Rustomjee Urban Woods - Wing A
Keyblue Realtors · Kalyan / Titwala / Ulhasnagar
337.0%0.9%1.3%₹6,200 est.₹40.3 LUnder construction
Mar 2028
Ritz Life Tower J
Vikas Harakchand Jain · Kalyan / Titwala / Ulhasnagar
337.4%1.4%2.3%₹6,200 est.₹40.3 LUnder construction
Dec 2028
Mangeshi Heaven
Mangesh Dashrath Gaikar · Kalyan / Titwala / Ulhasnagar
337.0%1.0%1.4%₹6,200 est.₹40.3 LUnder construction
Dec 2027
Mangeshi Star
Mangesh Dashrath Gaikar · Kalyan / Titwala / Ulhasnagar
337.0%1.0%1.4%₹6,200 est.₹40.3 LUnder construction
Dec 2027
Vedant Empire Phase I Wing A-Eagleton
Mohan Group · Kalyan / Titwala / Ulhasnagar
337.0%1.0%1.4%₹6,200 est.₹40.3 LUnder construction
Dec 2027
Vedant Empire Phase II Wing B-Hampton
Mohan Group · Kalyan / Titwala / Ulhasnagar
337.0%1.0%1.4%₹6,200 est.₹40.3 LUnder construction
Dec 2027
Lifestyle City Kalyan Riviera A
Nirmal Lifestyle · Kalyan / Titwala / Ulhasnagar
336.2%1.4%1.8%₹6,600 est.₹42.9 LReady
Lifestyle City Kalyan Riviera B
Nirmal Lifestyle · Kalyan / Titwala / Ulhasnagar
336.2%1.4%1.8%₹6,600 est.₹42.9 LReady
Lifestyle City Kalyan Riviera C
Nirmal Lifestyle · Kalyan / Titwala / Ulhasnagar
336.2%1.4%1.8%₹6,600 est.₹42.9 LReady
Lifestyle City Kalyan Riviera D
Nirmal Lifestyle · Kalyan / Titwala / Ulhasnagar
336.2%1.4%1.8%₹6,600 est.₹42.9 LReady
Seasons Harmony
Shree Sai Developers · Kalyan / Titwala / Ulhasnagar
336.2%1.4%1.8%₹6,600 est.₹42.9 LReady
Siyara Heights
Shakti Realty · Kalyan / Titwala / Ulhasnagar
337.4%1.3%2.1%₹6,200 est.₹40.3 LUnder construction
Mar 2029
Regency Antilia Phase VIII Avana
Regency Group · Kalyan / Titwala / Ulhasnagar
336.6%0.1%0.2%₹6,200 est.₹40.3 LUnder construction
Dec 2026
Seasons Sahara Building No. 1
Samarth Sai Builders & Developers · Kalyan / Titwala / Ulhasnagar
337.4%1.4%2.3%₹6,200 est.₹40.3 LUnder construction
Dec 2028
Vedant Millenia Happiness Phase II Wing E
Mohan Group · Kalyan / Titwala / Ulhasnagar
337.8%2.0%3.4%₹6,200 est.₹40.3 LUnder construction
Dec 2029
Vedant Connect
Mohan Group · Kalyan / Titwala / Ulhasnagar
336.6%0.1%0.2%₹6,200 est.₹40.3 LUnder construction
Dec 2026
Vedant Millenia happiness Phase II Wing C
Mohan Group · Kalyan / Titwala / Ulhasnagar
337.0%1.0%1.4%₹6,200 est.₹40.3 LUnder construction
Dec 2027
Tulip Heights
Om Sai Developers · Kalyan / Titwala / Ulhasnagar
336.6%0.2%0.3%₹6,200 est.₹40.3 LUnder construction
Jun 2027
Wadhwa Regalia Phase-I
The Wadhwa Group · Kalyan / Titwala / Ulhasnagar
336.2%1.2%1.6%₹8,400 est.₹54.6 LReady
Ashtami
Rai Residency · Kalyan / Titwala / Ulhasnagar
327.0%1.0%1.4%₹6,200 est.₹40.3 LUnder construction
Dec 2027
Kohinoor Eden B5
Kgi Realty · Kalyan / Titwala / Ulhasnagar
326.6%0.2%0.3%₹6,200 est.₹40.3 LUnder construction
Jun 2027
Regency Antilia Phase IX Avana
Regency Group · Kalyan / Titwala / Ulhasnagar
327.0%0.8%1.2%₹6,200 est.₹40.3 LUnder construction
Apr 2028
Kohinoor Eden Ph 2
Kgi Realty · Kalyan / Titwala / Ulhasnagar
326.6%0.2%0.3%₹6,200 est.₹40.3 LUnder construction
Sep 2026
Lifestyle City Kalyan-Amazon A
Nirmal Lifestyle · Kalyan / Titwala / Ulhasnagar
326.2%1.4%1.8%₹6,600 est.₹42.9 LReady
Lifestyle City Kalyan Amazon B
Nirmal Lifestyle · Kalyan / Titwala / Ulhasnagar
326.2%1.4%1.8%₹6,600 est.₹42.9 LReady
Lifestyle City Kalyan Amazon D
Nirmal Lifestyle · Kalyan / Titwala / Ulhasnagar
326.2%1.4%1.8%₹6,600 est.₹42.9 LReady
Lifestyle City Kalyan Amazon C
Nirmal Lifestyle · Kalyan / Titwala / Ulhasnagar
326.2%1.4%1.8%₹6,600 est.₹42.9 LReady
Lifestyle City Kalyan-Platano D
Nirmal Lifestyle · Kalyan / Titwala / Ulhasnagar
326.2%1.4%1.8%₹6,600 est.₹42.9 LReady
Lifestyle City Kalyan-Platano E
Nirmal Lifestyle · Kalyan / Titwala / Ulhasnagar
326.2%1.4%1.8%₹6,600 est.₹42.9 LReady
Lifestyle City Kalyan - Glory A
Nirmal Lifestyle · Kalyan / Titwala / Ulhasnagar
326.2%1.4%1.8%₹6,600 est.₹42.9 LReady
Lifestyle City Kalyan - Glory B
Nirmal Lifestyle · Kalyan / Titwala / Ulhasnagar
326.2%1.4%1.8%₹6,600 est.₹42.9 LReady
Lifestyle City Kalyan-Cypress A
Nirmal Lifestyle · Kalyan / Titwala / Ulhasnagar
326.2%1.4%1.8%₹6,600 est.₹42.9 LReady
Lifestyle City Kalyan-Cypress B
Nirmal Lifestyle · Kalyan / Titwala / Ulhasnagar
326.2%1.4%1.8%₹6,600 est.₹42.9 LReady
Vardhaman Towerz
Mahavir Enterprises · Kalyan / Titwala / Ulhasnagar
326.2%1.4%1.8%₹6,600 est.₹42.9 LReady
RITZ Tower D Residential
Vikas Harakchand Jain · Kalyan / Titwala / Ulhasnagar
326.6%0.1%0.2%₹6,200 est.₹40.3 LUnder construction
Dec 2026
RITZ Tower E
Vikas Harakchand Jain · Kalyan / Titwala / Ulhasnagar
326.6%0.1%0.2%₹6,200 est.₹40.3 LUnder construction
Dec 2026
RITZ Tower F
Vikas Harakchand Jain · Kalyan / Titwala / Ulhasnagar
326.6%0.1%0.2%₹6,200 est.₹40.3 LUnder construction
Dec 2026
Sunteck Crescent Park -2
Sunteck Realty · Kalyan / Titwala / Ulhasnagar
327.7%2.9%5.7%₹7,900 est.₹51.4 LUnder construction
Dec 2031
Regency Antilia Phase VII
Regency Group · Kalyan / Titwala / Ulhasnagar
326.2%1.4%1.8%₹6,600 est.₹42.9 LReady
Vedant Empire Phase III Wing C-Cliffton
Mohan Group · Kalyan / Titwala / Ulhasnagar
326.2%1.4%1.8%₹6,600 est.₹42.9 LReady
Vedant Palacia Phase V Wing C-Cassius
Tharwani Properties · Kalyan / Titwala / Ulhasnagar
327.0%1.0%1.4%₹6,200 est.₹40.3 LUnder construction
Dec 2027
The Pyramid One
Pyramid Developers · Kalyan / Titwala / Ulhasnagar
326.6%0.2%0.3%₹6,200 est.₹40.3 LUnder construction
Sep 2026
Sai Leela Galaxy D Wing
Rai Residency · Kalyan / Titwala / Ulhasnagar
327.0%0.9%1.3%₹6,200 est.₹40.3 LUnder construction
Mar 2028
Regency Antilia Phase IV
Regency Group · Kalyan / Titwala / Ulhasnagar
326.2%1.4%1.8%₹6,600 est.₹42.9 LReady
Shree Om Shivshakti
Rai Residency · Kalyan / Titwala / Ulhasnagar
326.6%0.1%0.2%₹6,200 est.₹40.3 LUnder construction
Dec 2026
Vedant Millenia Blue Moon Phase IV
Mohan Group · Kalyan / Titwala / Ulhasnagar
327.0%0.7%1.0%₹6,200 est.₹40.3 LUnder construction
Jun 2028
Sai Srushti
Shakti Realty · Kalyan / Titwala / Ulhasnagar
316.2%1.4%1.8%₹6,600 est.₹42.9 LReady
Charms City A12
Charms Developers · Kalyan / Titwala / Ulhasnagar
316.2%1.4%1.8%₹6,600 est.₹42.9 LReady
Charms Padamavati Royal Phase 1
Charms Developers · Kalyan / Titwala / Ulhasnagar
316.6%0.4%0.6%₹6,200 est.₹40.3 LUnder construction
Apr 2027
Charms Padamavati Royal Phase 2
Charms Developers · Kalyan / Titwala / Ulhasnagar
316.6%0.4%0.6%₹6,200 est.₹40.3 LUnder construction
Apr 2027
Vedant Millenia Happiness Phase II Wing D
Mohan Group · Kalyan / Titwala / Ulhasnagar
317.0%0.6%0.9%₹6,200 est.₹40.3 LUnder construction
Jul 2028
Charms Heights Phase-III B2-B3
Charms Developers · Kalyan / Titwala / Ulhasnagar
316.2%1.4%1.8%₹6,600 est.₹42.9 LReady
Sai Regency
Sai Developers · Kalyan / Titwala / Ulhasnagar
316.2%1.4%1.8%₹6,600 est.₹42.9 LReady
Davakhar Elegance
Davakhar Infrastructure · Kalyan / Titwala / Ulhasnagar
316.2%1.4%1.8%₹6,600 est.₹42.9 LReady
Vedant Palacia Phase IV Wing B-Brutus
Tharwani Properties · Kalyan / Titwala / Ulhasnagar
316.6%0.1%0.2%₹6,200 est.₹40.3 LUnder construction
Dec 2026
SEASONS SAHARA NANO BUILDING NO A and B
Samarth Sai Builders & Developers · Kalyan / Titwala / Ulhasnagar
316.6%0.1%0.2%₹6,200 est.₹40.3 LUnder construction
Dec 2026
Mohan Altezza II
Mohan Group · Kalyan / Titwala / Ulhasnagar
316.2%1.4%1.8%₹6,600 est.₹42.9 LReady
Trishan Enclave
Omkar Realtors · Kalyan / Titwala / Ulhasnagar
317.4%1.4%2.3%₹6,200 est.₹40.3 LUnder construction
Dec 2028
Junomoneta - Triton
Palika Infratech · Kalyan / Titwala / Ulhasnagar
317.1%11.0%18.0%₹6,200 est.₹40.3 LUnder construction
Dec 2035
Kairali Park
Rai Residency · Kalyan / Titwala / Ulhasnagar
316.2%1.4%1.8%₹6,600 est.₹42.9 LReady
Sai Sagar Residency
Om Sai Construction · Kalyan / Titwala / Ulhasnagar
316.6%0.2%0.3%₹6,200 est.₹40.3 LUnder construction
Jun 2027
Seasons Sahara Nano Building No. C
Samarth Sai Builders & Developers · Kalyan / Titwala / Ulhasnagar
317.0%0.7%1.0%₹6,200 est.₹40.3 LUnder construction
Jun 2028
Vedant Palacia Phase I Wing A1 PROPSERA
Tharwani Properties · Kalyan / Titwala / Ulhasnagar
306.2%1.4%1.8%₹6,600 est.₹42.9 LReady
Vedant Palacia Phase II Wing A2-PROTICA
Tharwani Properties · Kalyan / Titwala / Ulhasnagar
306.2%1.4%1.8%₹6,600 est.₹42.9 LReady
Bharat Residency C Wing
Shiv Sai Developers · Kalyan / Titwala / Ulhasnagar
306.2%1.4%1.8%₹6,600 est.₹42.9 LReady
Riddhi Siddhi Park
Shree Ganesh Developers · Kalyan / Titwala / Ulhasnagar
297.4%1.1%1.7%₹6,200 est.₹40.3 LUnder construction
Sep 2029
Kohinoor Eden
Kgi Realty · Kalyan / Titwala / Ulhasnagar
296.6%0.2%0.3%₹6,200 est.₹40.3 LUnder construction
Sep 2026
Vedant Palacia Phase III Wing A-AETIUS
Tharwani Properties · Kalyan / Titwala / Ulhasnagar
296.2%1.4%1.8%₹6,600 est.₹42.9 LReady
Regency Sarvam Phase 13
Regency Group · Kalyan / Titwala / Ulhasnagar
296.6%0.2%0.3%₹6,200 est.₹40.3 LUnder construction
Oct 2026
Season Sahara Building No -6
Samarth Sai Builders & Developers · Kalyan / Titwala / Ulhasnagar
286.6%0.1%0.2%₹6,200 est.₹40.3 LUnder construction
Dec 2026
Ritz Tower B
Vikas Harakchand Jain · Kalyan / Titwala / Ulhasnagar
276.6%0.1%0.2%₹6,200 est.₹40.3 LUnder construction
Sep 2027
Ritz Tower C
Vikas Harakchand Jain · Kalyan / Titwala / Ulhasnagar
276.6%0.1%0.2%₹6,200 est.₹40.3 LUnder construction
Sep 2027
Sunshine Avenue
Shree Ganesh Enterprises · Kalyan / Titwala / Ulhasnagar
276.6%0.2%0.3%₹6,200 est.₹40.3 LUnder construction
Sep 2026
Kaushalya Heights
Balaji Enterprises · Kalyan / Titwala / Ulhasnagar
266.6%0.5%0.6%₹6,200 est.₹40.3 LUnder construction
Mar 2027
Kohinoor Eden B6
Kgi Realty · Kalyan / Titwala / Ulhasnagar
266.6%0.2%0.3%₹6,200 est.₹40.3 LUnder construction
Jun 2026
Mangeshi Ambar
Mangesh Dashrath Gaikar · Kalyan / Titwala / Ulhasnagar
256.6%0.2%0.3%₹6,200 est.₹40.3 LUnder construction
Jul 2026
Mangeshi Tulip
Mangesh Dashrath Gaikar · Kalyan / Titwala / Ulhasnagar
256.6%0.2%0.3%₹6,200 est.₹40.3 LUnder construction
Jul 2026
Shreejii Icon
Shreeji Construction · Kalyan / Titwala / Ulhasnagar
256.6%0.2%0.3%₹6,200 est.₹40.3 LUnder construction
Jun 2026
Mangeshi Marvel
Mangesh Dashrath Gaikar · Kalyan / Titwala / Ulhasnagar
256.6%0.2%0.3%₹6,200 est.₹40.3 LUnder construction
May 2026
Mangeshi Royale
Mangesh Dashrath Gaikar · Kalyan / Titwala / Ulhasnagar
256.6%0.2%0.3%₹6,200 est.₹40.3 LUnder construction
May 2026
Mangeshi Woods
Mangesh Dashrath Gaikar · Kalyan / Titwala / Ulhasnagar
236.6%0.2%0.3%₹6,200 est.₹40.3 LUnder construction
Nov 2025
Regency Antilia Phase VI Avana
Regency Group · Kalyan / Titwala / Ulhasnagar
236.6%0.2%0.3%₹6,200 est.₹40.3 LUnder construction
Nov 2025
Season Sahara Building No 4 And 5
Samarth Sai Builders & Developers · Kalyan / Titwala / Ulhasnagar
216.6%0.2%0.3%₹6,200 est.₹40.3 LUnder construction
Dec 2025
Vedant Millenia Happiness Phase II Wing B
Mohan Group · Kalyan / Titwala / Ulhasnagar
206.6%0.2%0.3%₹6,200 est.₹40.3 LUnder construction
Dec 2025
Davakhar Elegance Phase II
Davakhar Infrastructure · Kalyan / Titwala / Ulhasnagar
186.6%0.2%0.3%₹6,200 est.₹40.3 LUnder construction
Apr 2026
Royal Meadows C 1 , C 2
Siddhivinayak Developers · Kalyan / Titwala / Ulhasnagar
166.6%0.2%0.3%₹6,200 est.₹40.3 LUnder construction
Dec 2025

Price per sq ft in Kalyan / Titwala / Ulhasnagar: what the evidence says

Date₹ / sq ftBasisConfidence
2021-06₹6,200mum (derived)40%
2023-06₹6,800mum (derived)45%
2025-06₹8,000mum (derived)50%
2026-06₹8,700mum (derived)50%

That is 7.0% a year from 2021-06 to 2026-06. The model projects 7.0% a year from here; the growth story on each project page shows why.

Infrastructure pipeline

ProjectTypeStatusExpectedChance it lands on timePrice effect if it does
Metro Line 5 Thane–Bhiwandi–Kalyanmetroconstruction202850%+1.0% / yr
Metro Line 12 Kalyan–Talojametroplanned202945%+0.8% / yr

The growth model counts each event at its probability, not its promise. Dates are the latest public schedule.

Developers active in Kalyan / Titwala / Ulhasnagar

Ranked lists for Kalyan / Titwala / Ulhasnagar

Kalyan / Titwala / Ulhasnagar compared with other areas

Questions people ask

Is Kalyan / Titwala / Ulhasnagar good for investment?

On PropertyLens's model the median analysed project in Kalyan / Titwala / Ulhasnagar scores 33/100 (well below the Mumbai average), with projected price growth of 7.0% a year over five years, median price ₹6,200 per sq ft and gross rental yield 3.3%. 148 RERA-registered projects analysed as of November 11, 2026. The best-scored project is Shreeji Landmark at 46.

What is the price per sq ft in Kalyan / Titwala / Ulhasnagar?

Median ₹6,200 per sq ft of super built-up area across analysed projects, modelled from comparables where developers file no price. Entry price for an analysed home is about ₹40.3 L; the median home is ₹40.3 L.

What rental yield can I expect in Kalyan / Titwala / Ulhasnagar?

Median gross yield 3.3% on the all-in cost of an analysed home, before maintenance, vacancy and tax. Net-wealth CAGR after every cost on an 8-year hold with a 75% loan is 1.4% at the median.

Are projects in Kalyan / Titwala / Ulhasnagar delayed?

16 of 114 under-construction projects are past the completion date in their original RERA registration, and unsold stock equals about 28 months of sales. Each project page shows extensions, construction against bookings and complaints.

Scores and projections are model outputs built from dated public evidence (MahaRERA public filings, public ratings) and stated assumptions. Unit sizes and prices in this city are modelled estimates because the regulator does not publish unit inventories openly. They are research, not investment advice. How the numbers are built.