PropertyLensBengaluru · invest
Shravanthi · Kanakapura Road / Talaghattapura / Banashankari 6th

Shravanthi Atmosphere

IVC Rd, opp. CAE Devanahalli, Bengaluru
Handover Mar 2028 · no rent beforeplot · midRERA registered+ CompareFull report ↗
1 · Which home?
2 · Which exit plan?

Score, growth and returns below are for the highlighted home and plan. Prices, rent and possession never mix across phases.

54
Investment score
54/100
Evidence confidence55%
Plot · 1199 sq ft
Price growth per year, next 5 yrs model
11.2%
likely range 7.7%–14.7% · over 10 yrs 9.9%/yr
Net-wealth CAGR, 8-yr hold
7.4%
your cash in → cash back incl. sale, per year
Cash-flow IRR, 8-yr hold
11.8%
with 75% loan · all-cash 10.6% · no interiors
Three numbers, three questions. Price growth: what will the home be worth? Net-wealth CAGR: what will my money have earned after every cost? Cash-flow IRR: the same, but counting when each rupee moves. Tap i on any of them.
Price · edit here or below assumed
₹Cr
₹ psf × 1,200 sq ft · as of Sep 2026
Price edits apply to ·
All-in cost
₹50.9 L
+ other charges 0.9 L, GST 0.0 L, stamp/reg 3.2 L
Gross rental yield assumed
0.0%
vacant plot: no rent assumed

All-in cost sheet this home, default assumptions

ItemBasisAmount
Base price₹3,900 per sq ft × 1,200 sq ft super built-up46.8 L
Other charges2.0% of base: floor-rise, preferred-location, car park, club, maintenance deposit, legal, corpus (edit in Assumptions)0.9 L
GST0.0% on an under-construction home0.0 L
Stamp duty and registration6.6% in Karnataka: 5% stamp duty + 1% registration + cess and surcharge on the agreement value3.2 L
All-in costwhat leaves your pocket and the bank's, before rent or resale₹50.9 L
Your own money75.0% loan at 8.5% for 20 years covers the rest; EMI 0.3 L a month₹38.4 L

Carpet area 1,199 sq ft against 1,200 sq ft super built-up: you pay for 0% that is common area and walls. Price per sq ft of carpet ≈ ₹3,903. Every percentage above is editable in Assumptions; the defaults are Karnataka rates as of 2026-09.

In plain words

Why 54 out of 100

Each home is marked on 11 things a careful buyer checks, then compared with every project we analyse in Bengaluru: 50 is the average project, 62 beats about five in six. Here is what lifts this one and what drags it:

  • +
    Expected price growth (5-yr CAGR model) · 11/26 pts
    We expect prices here to rise about 11.2% a year for the next 5 years (explained below).
  • +
    Metro, bus, rail & airport · 4/9 pts
    A metro station is a short walk away (~1200 m). Airport is about 136 minutes by road right now.
  • +
    Water, flooding, noise, infrastructure · 2/9 pts
    Low flood risk; water supply is partly piped, partly tankers; noise is manageable.
  • −
    Employment access · -10/10 pts
    Drive times right now: Electronic City Ph-1 49 min, Koramangala (Forum) 56 min, ORR Bellandur (Ecospace) 66 min; ITPL Whitefield 90 min. About 2 million sq ft of new offices are planned nearby in 3 years.
  • −
    Rental demand & yield · -5/8 pts
    A plot earns no rent, so this scores low by design.
  • −
    Layout, size, age, amenities, maintenance · -0/3 pts
    Moderately dense layout (60 homes per acre); about 72% of the area you pay for is usable carpet area. Maintenance ~₹3.5 per sq ft a month.
All 11 checks
  • +
    Price vs comparables · 1/3 pts
    Cheaper than similar mid homes nearby: ₹3,900 vs about ₹7,500 per sq ft.
  • −
    Rental demand & yield · -5/8 pts
    A plot earns no rent, so this scores low by design.
  • +
    Resale liquidity · -0/4 pts
    Plenty of buyers can afford a ₹46.8 L home, and homes in Kanakapura Road / Talaghattapura / Banashankari 6th resell at a normal pace. Reselling before handover needs the builder’s permission.
  • −
    Employment access · -10/10 pts
    Drive times right now: Electronic City Ph-1 49 min, Koramangala (Forum) 56 min, ORR Bellandur (Ecospace) 66 min; ITPL Whitefield 90 min. About 2 million sq ft of new offices are planned nearby in 3 years.
  • •
    Metro, bus, rail & airport · 4/9 pts
    A metro station is a short walk away (~1200 m). Airport is about 136 minutes by road right now.
  • +
    Schools, hospitals, daily needs · 1/3 pts
    Schools, hospitals and daily shopping are good in this area.
  • −
    Builder delivery & handover risk · 1/16 pts
    Shravanthi has finished 7+ projects and delivered on time about 78% of the time. This phase is 0% built, with handover promised for 2028-03-31: delays would push your rent start back.
  • •
    Layout, size, age, amenities, maintenance · -0/3 pts
    Moderately dense layout (60 homes per acre); about 72% of the area you pay for is usable carpet area. Maintenance ~₹3.5 per sq ft a month.
  • +
    Water, flooding, noise, infrastructure · 2/9 pts
    Low flood risk; water supply is partly piped, partly tankers; noise is manageable.
  • +
    Legal, title & approvals · 1/5 pts
    Registered with Karnataka RERA; no court cases reported; land title not yet verified by us, so get a lawyer to check. The due-diligence report below flags 1 item in red.
  • +
    Expected price growth (5-yr CAGR model) · 11/26 pts
    We expect prices here to rise about 11.2% a year for the next 5 years (explained below).
Why prices should grow ~11.2% a year for the next 5 years

We build the forecast step by step, starting from what Bengaluru homes normally do and adjusting for this area and this project:

  1. + 6.0%Start with 6.0% a year: the normal long-run growth of Bengaluru home prices.
  2. + 0.7%Add 0.7%: prices here rose 10.8% a year recently (2023-06 to 2026-06). Some of that pace continues, but it fades each year.
  3. + 0.0%Prices are still affordable enough that this does not slow growth.
  4. + 1.4%Add 1.4%: 2 million sq ft of new offices nearby means more people wanting homes here.
  5. − 0.7%Subtract 0.7%: many new homes are being built here (20 months of unsold stock), which keeps prices in check.
  6. + 0.2%Add 0.2% for new roads, metro and water lines, weighted by how likely they are to actually finish: Phase 3 (Orange/Red lines: JP Nagar–Kempapura, Hosahalli–Kadabagere) (construction, 2029); Satellite Town Ring Road (construction, 2028).
  7. + 3.6%Add 3.6% for this project itself: unfinished homes are worth more once they are complete.
  8. = 11.2%Result: about 11.2% a year, so a home worth ₹47.7 L today would be worth about ₹81.2 L in 5 years. We are 56% confident in the evidence behind this.

Highlights

  • Shravanthi · Kanakapura Road / Talaghattapura / Banashankari 6th · unit count not filed
  • Under construction: 0% complete, RERA completion 2028-03-31
  • No litigation declared · 0 complaints on this registration

Assumptions editable

Purchase

₹/sq ft
₹ Cr
sq ft
% of base
%
%
%
₹/sq ft

FinancingLoan 75% · cash 25% · EMI ₹31,070/mo

% loan
% p.a.
years
%

Rent & running costs

₹/sq ft/mo
% of rent
% of value

Interiors & exit

%
%
years
% p.a. (blank = model)
%
%

Returns over 8 years · no interiors

Cash you put in₹38.4 L
Exit value (yr 8)₹1.04 Cr
Net sale after loan & costs₹71.9 L
Net rent after opex₹-1.4 L
Loan (75% of price)₹35.8 L
EMI / month₹31,070
Year 0: ₹-4.5 L0Year 1: ₹-6.4 L1Year 2: ₹-7.8 L2Year 3: ₹-3.9 L3Year 4: ₹-3.9 L4Year 5: ₹-3.9 L5Year 6: ₹-3.9 L6Year 7: ₹-4.0 L7Year 8: ₹68.0 L8
YearPurchaseLoan inRent (net of vacancy)OpexDebt serviceSale − loanNet cash
Today-8.1 L3.6 L0.0 L0.0 L0.0 L0.0 L-4.5 L
Yr 1-21.5 L16.1 L0.0 L0.0 L-1.0 L0.0 L-6.4 L
Yr 2-21.5 L16.1 L0.0 L-0.1 L-2.4 L0.0 L-7.8 L
Yr 30.0 L0.0 L0.0 L-0.2 L-3.7 L0.0 L-3.9 L
Yr 40.0 L0.0 L0.0 L-0.2 L-3.7 L0.0 L-3.9 L
Yr 50.0 L0.0 L0.0 L-0.2 L-3.7 L0.0 L-3.9 L
Yr 60.0 L0.0 L0.0 L-0.2 L-3.7 L0.0 L-3.9 L
Yr 70.0 L0.0 L0.0 L-0.2 L-3.7 L0.0 L-4.0 L
Yr 80.0 L0.0 L0.0 L-0.3 L-3.7 L71.9 L68.0 L

Pre-tax unless capital-gains tax is set. Rent enters the cash flows once. Net-wealth CAGR = (cash returned incl. sale ÷ cash put in)^(1/years) − 1. IRR uses the dated cash flows.

Score factors

Bars show points added or taken away versus the average analysed Bengaluru project (score 50).

Price vs comparables
+0.8 pts vs avg
this home 7.2/10 · Bengaluru average 6.2 · confidence 35%
₹3,900 psf vs mid comps ₹7,500 (-48%; under-construction should price ~8% below ready). Price is a model estimate, so this factor carries a third of its normal weight until a listed price is observed.
Rental demand & yield
−4.7 pts vs avg
this home 3.6/10 · Bengaluru average 6.0 · confidence 38%
Gross yield 0.0% (₹0 psf/month); locality rental demand 8/10.
Resale liquidity
−0.3 pts vs avg
this home 7.4/10 · Bengaluru average 7.6 · confidence 50%
Locality resale depth 8/10; ticket ₹0.47 Cr narrows the buyer pool; UC resale needs builder NOC.
Employment access
−10.2 pts vs avg
this home 0.2/10 · Bengaluru average 5.2 · confidence 85%
Drive times now (Google Maps, 2026-09-16): Electronic City Ph-1 49 min, Koramangala (Forum) 56 min, ORR Bellandur (Ecospace) 66 min, MG Road (CBD) 66 min; 0 of 7 major hubs within 30 min; 2 msf office pipeline (3 yr).
Metro, bus, rail & airport
+3.8 pts vs avg
this home 6.9/10 · Bengaluru average 4.8 · confidence 60%
Green Line Silk Institute / Vajarahalli / Talaghattapura; no planned station within 2 km; airport ~136 min by road now (Google Maps); .
Schools, hospitals, daily needs
+0.5 pts vs avg
this home 7.5/10 · Bengaluru average 7.0 · confidence 50%
Locality social-infrastructure index (interim, expert-set; POI distances pending Maps integration).
Builder delivery & handover risk
+0.6 pts vs avg
this home 4.0/10 · Bengaluru average 3.7 · confidence 60%
Shravanthi: 7+ projects, on-time 78% (derived); handover 2028-03-31 (RERA); within the RERA timeline, work on schedule (-6 pts).
Layout, size, age, amenities, maintenance
−0.4 pts vs avg
this home 7.0/10 · Bengaluru average 7.3 · confidence 50%
60 units/acre; carpet/SBA ~72%; maintenance ~₹3.5 psf/month (assumed).
Water, flooding, noise, infrastructure
+2.5 pts vs avg
this home 7.0/10 · Bengaluru average 5.8 · confidence 50%
NICE road access; metro at doorstep on the corridor
Legal, title & approvals
+0.6 pts vs avg
this home 7.7/10 · Bengaluru average 7.4 · confidence 55%
RERA registered; litigation: none reported; approvals: Plan 93.6.4 dated 2025-05-09; title: not verified. Due-diligence report lists 1 red flag (−0.8 pts).
Expected price growth (5-yr CAGR model)
+11.0 pts vs avg
this home 7.7/10 · Bengaluru average 6.0 · confidence 56%
Model 5-yr price CAGR 11.2% (range 7.7–14.7%).

Price growth model, year by year

Nominal growth per year. Parts add up; momentum fades, infrastructure is weighted by delivery probability and dated.

ComponentYr 1Yr 2Yr 3Yr 4Yr 5Yr 6Confidence
Bengaluru long-run nominal trend6.06.06.06.06.06.080%
Locality momentum (mean-reverting)1.70.90.50.30.20.145%
Affordability ceiling0.00.00.00.00.00.060%
Employment access & office pipeline1.41.41.41.41.41.455%
Supply–demand balance-1.0-0.8-0.6-0.5-0.4-0.350%
Infrastructure delivery (probability-weighted)0.10.30.30.20.00.055%
Project-specific adjustments6.86.81.51.51.51.550%
Total growth15.0%14.7%9.1%8.8%8.6%8.6%56%

Bengaluru long-run nominal trend: City-wide 2013-25 nominal residential trend ≈ inflation + real income growth.

Locality momentum (mean-reverting): Trailing 3.0-yr locality CAGR 10.8% vs 6.0% trend; 35% carried forward, halving each year.

Affordability ceiling: Ticket at ₹3,900 psf vs city median ₹9,500; buyer pool thins above ₹15k/₹20k psf and after >6pp excess growth.

Employment access & office pipeline: 2 msf office pipeline (3 yr) on 8 msf stock; 30-min jobs index 0.60.

Supply–demand balance: 20 months of unsold inventory; new-launch/absorption ratio 1.01 (from 22 under-construction RERA filings in this locality: 2,756 unsold homes, 118.9 sold per month).

Infrastructure delivery (probability-weighted): Phase 3 (Orange/Red lines: JP Nagar–Kempapura, Hosahalli–Kadabagere) (construction, 2029, p=0.55); Satellite Town Ring Road (construction, 2028, p=0.6)

Project-specific adjustments: Remaining construction risk (100% work left) re-rates toward ready comps by handover (~8.0% over 1.5 yr). Land in expansion corridors historically outpaces built stock; no depreciation.

Locality evidence: ₹7,200 (Jun 2023) → ₹9,800 (Jun 2026) = 10.8% p.a. Sources: Platform estimate (interim, not observed).

Financial & legal due diligence

What the public record says

Automated from the Karnataka RERA file PRM/KA/RERA/1251/310/PR/040726/008790. Prices and rents are locality estimates, not verified listings. Compiled Sep 2026 from the Karnataka RERA file, company registers, rating agencies, tribunal records and press. Facts only; anything that deserves a written answer before signing is flagged.

Delivery timeline9/10
no extensions, no overdue dates on the RERA file
Legal & complaints9/10
no litigation and no complaints on the RERA file
Money to finish8/10
finance cost is 0% of the registered budget
Developer strength5/10
no public credit rating for the promoter

Meters are rule-based from the RERA file and public ratings (rules shown under each), not opinions.

Registration
PRM/KA/RERA/1251/310/PR/040726/008790 · SHRAVANTHI SHELTHERS
On original date
TodaySep 2026RegisteredDec 2026Original completionMar 2028
Construction0%
registration-time status
No litigation declaredNo complaintsEscrow: INDIAN OVERSEAS BANKJoint-development land
Credit ratings of the people behind it

No public credit rating located for the promoter.

SHRAVANTHI SHELTHERS: no public rating located

Complaints & disputes on record
On this project00 open
On the promoter entity0all projects
Court cases declared0no stay recorded
At a glance
On its original RERA date

On its original RERA completion date: 2028-03-31

0% built

0% built per the latest filing

No complaints on this project

No RERA complaints on this project; 0 on the promoter overall

No litigation declared

No litigation declared in RERA filings

The record, in pictures

RERA file · Registration

Registered project cost ₹39.36 cr — where it goes
Land ₹0 cr · 0%Approvals ₹1.1 cr · 3%Construction & on-site ₹20.7 cr · 53%Other / taxes ₹17.6 cr · 45%
No litigation declaredBorrowing declared: NoEscrow at INDIAN OVERSEAS BANK7 recorded land-owner shares

Red flags to resolve in writing

1
Legal

Joint-development land: confirm which units fall in the owners’ share.

Questions to put to the developer before you sign

  1. Share the latest CA Form 4 and architect Form 5 with the escrow deposit ratio.
  2. Confirm the price list, floor-rise and other charges for the exact unit.
  3. Which date is contractual — 2028-03-31 — and what is the per-month delay compensation?
  4. Confirm there is no litigation on the land or approvals beyond the RERA declaration.
  5. What is the land owners’ share of built area and is the unit in the developer’s share?
Full record: every filed number, line by line1 sections · 10 items

RERA file · Registration

Registration
PRM/KA/RERA/1251/310/PR/040726/008790 · promoter SHRAVANTHI SHELTHERS (Partnership Firm) · 85/2000-01
Dates
Start 2026-12-15 · original completion 2028-03-31 · no extensions
Progress
0% complete per registration-time status
Registered cost
Total ₹39.36 cr · land ₹0.00 cr · construction ₹20.69 cr
Borrowing / mortgage declared
Borrowing: No
RERA bank account
INDIAN OVERSEAS BANK, Eastend main road (70% construction account)
Plan sanction
93.6.4 dated 2025-05-09 · Kanakapura Planning Authority
Land owners / co-promoters
Shravanthi shelters (100.0%, Sy 124); Shravanthi shelters (100.0%, Sy 125); Total Number of Parks and open spaces (3%, Sy Total Area of Parks and Open Spaces); Total Number of CA Sites (1%, Sy Total Area of CA Sites); ODD SIZE (29%, Sy 4386); 3899 (3%, Sy 9.14X15.24M); 12.19X15.24M (6%, Sy 1115)
Litigation declared
None declared in filings
Completion applied
19/12/2020

Source: Karnataka RERA project record PRM/KA/RERA/1251/310/PR/040726/008790, fetched 2026-09-15. Figures are the promoter’s own filings.

Sources & caveats2 sources
  • Karnataka RERA project record PRM/KA/RERA/1251/310/PR/040726/008790 (registration file, quarterly updates, complaint register), fetched 2026-09-15
  • PropertyLens locality model (market-level estimates)
  • Karnataka RERA project records PRM/KA/RERA/1251/310/PR/040726/008790 (registration file, quarterly updates, complaint register), fetched Sep 2026.

Caveats. Automated analysis: prices, rents and travel times are estimates until listings and Maps data are verified. RERA figures are the promoter’s own filings. Nothing here is legal, tax or investment advice.

Evidence

Location, jobs & transit3 hubs · metro walkable
Job hubs nearby
Global Village Tech Park 8 kmElectronic City 18 kmJayanagar / JP Nagar
Measured drive times below
Office space
Existing8 msf
Coming in 3 yrs2 msf
Jobs within 30 min6/10
Getting around
Metro today
Green Line Silk Institute / Vajarahalli / Talaghattapura
~1,200 m estimate
Metro planned
No station planned within 2 km
Rail
—
estimate
Airport
136 min by road now · 50.8 km
Google Maps
Buses
7/10 coverage
estimate
Drive times to job hubs
DestinationDrive nowRoad km
Electronic City Ph-149 min17.1
Koramangala (Forum)56 min19.9
ORR Bellandur (Ecospace)66 min23.8
MG Road (CBD)66 min23.7
Hebbal (Kirloskar)81 min29.6
Manyata Tech Park86 min31.5
ITPL Whitefield90 min33
Kempegowda Airport (KIA)136 min50.8

Google Maps driving time with live traffic, measured Sep 2026. Refreshed monthly.

Location used: Google Maps match “”. Bus coverage and planned-station distances are still interim estimates.

Price historylocality 10.8%/yr

No dated project-level price series yet; only the latest observation is on file.

Locality · average ₹/sq ft
Date₹ psfSourceConfidenceKind
Jun 20215,600Platform estimate (interim, not observed)40%derived
Jun 20237,200Platform estimate (interim, not observed)45%derived
Jun 20258,800Platform estimate (interim, not observed)50%derived
Jun 20269,800Platform estimate (interim, not observed)50%derived
Luxury comps₹12,000
Premium comps₹9,800
Mid comps₹7,500
Unsold stock20 months

Model backtest on this locality: 1-yr hold-out (Jun 2025→Jun 2026): predicted ₹9,546 vs actual ₹9,800 (-2.6%). Longer 3-yr hold-out (Jun 2023→Jun 2026): predicted 7.8% p.a. vs actual 10.8% p.a. — the model is deliberately mean-reverting and under-predicted the 2021–26 boom.

Environment, legal & productflood ok · water risk · RERA yes
Flood risklow
Water supplymixed
Quietok
Roads & drainsgood

NICE road access; metro at doorstep on the corridor

Legal & approvals
Registration 008790
RERA PRM/KA/RERA/1251/310/PR/040726/008790
possession Mar 2028
Litigation
none reported
observed
Approvals
Plan 93.6.4 dated 2025-05-09
observed
Title
not verified
assumed
Product
Landnull acres
Homesnull
Density60/acre
Launched2026
Sources & data gapswhat we know, from where, and what is missing

Automated analysis: unit mix and carpet areas come from the RERA inventory table; prices and rents are locality-model estimates until listings are verified.

FieldValueSource classDateConf.KindConflicting values
AddressIVC Rd, opp. CAE Devanahalli, BengaluruKarnataka RERA (number as reported; registry lookup pending)Sep 202680%observed
Land area (acres)Platform estimate (interim, not observed)Sep 202620%assumed
Total unitsPlatform estimate (interim, not observed)Sep 202620%assumed
Launch year2026Karnataka RERA (number as reported; registry lookup pending)Sep 202670%observed
Possession · Registration 0087902028-03-31Karnataka RERA (number as reported; registry lookup pending)Sep 202670%observed
Price psf · Plot · 1199 sq ft3900Platform estimate (interim, not observed)Sep 202635%assumed
Ticket · Plot · 1199 sq ft4680000Platform estimate (interim, not observed)Sep 202635%derived
Rent · Plot · 1199 sq ft0Platform estimate (interim, not observed)Sep 202635%assumed
Carpet area1199Karnataka RERA (number as reported; registry lookup pending)Sep 202660%observed
Builder on-time rate0.78Karnataka RERA (number as reported; registry lookup pending)Sep 202660%derived
Litigationnone reportedKarnataka RERA (number as reported; registry lookup pending)Sep 202670%observed
ApprovalsPlan 93.6.4 dated 2025-05-09Karnataka RERA (number as reported; registry lookup pending)Sep 202660%observed

Commercial listing portals are shown as “Listing portal (aggregated)”; full provenance is retained internally. Official developer and Karnataka RERA sources are named.

Other projects worth comparing

Same model, same date. Scores are out of 100, where 50 is the average analysed Bengaluru project.

Questions people ask about Shravanthi Atmosphere

Is Shravanthi Atmosphere a good investment?

On PropertyLens's evidence-based model Shravanthi Atmosphere scores 54/100, below the average analysed Bengaluru project (50 = average, 12 points = one standard deviation). The model projects price growth of about 11.2% a year over five years and a net-wealth CAGR of 7.4% after every cost on an 8-year hold with a 75.0% loan. That is research on public filings, not advice; the factor breakdown on this page shows what drives the score.

What is the price per sq ft at Shravanthi Atmosphere?

About ₹3,900 per sq ft of super built-up area, a model estimate from Kanakapura Road / Talaghattapura / Banashankari 6th comparables that you can edit. The Plot home costs about ₹46.8 L before other charges, GST and stamp duty, and ₹50.9 L all-in.

When is Shravanthi Atmosphere ready for possession?

The RERA registration commits to Mar 2028.

Is Shravanthi Atmosphere RERA registered?

Yes. Karnataka RERA registration: PRM/KA/RERA/1251/310/PR/040726/008790. No complaints on this registration at K-RERA as of 2026-09-15.

How reliable is Shravanthi on delivery?

78% of Shravanthi's crawled Bengaluru registrations needed no extension (6 of 7 crawled Bengaluru registrations needed no extension). 7 registrations analysed. The developer scorecard compares this with every other Bengaluru developer.

What rent can Shravanthi Atmosphere earn?

Plots earn no rent; the return is price growth alone.

Answers are generated from the filings and the model for this home and change when you edit the assumptions above. See the Shravanthi scorecard and the Kanakapura Road / Talaghattapura / Banashankari 6th area page.

Go deeper

Share on WhatsApp