Sudhanshu Infrastructures · Mulund / Bhandup / Kanjurmarg

Vishnu Bhaskar CHS Ltd

Kurla, Mumbai Suburban, 400042
Ready · rent from todayapartment · midRERA registered+ CompareFull report ↗
1 · Which home?
2 · Which exit plan?

Score, growth and returns below are for the highlighted home and plan. Prices, rent and possession never mix across phases.

62
Investment score
62/100
Evidence confidence55%
2 BHK · ~650 sq ft carpet (assumed)
Price growth per year, next 5 yrs model
7.1%
likely range 3.6%–10.5% · over 10 yrs 7.1%/yr
Net-wealth CAGR, 8-yr hold
4.3%
your cash in → cash back incl. sale, per year
Cash-flow IRR, 8-yr hold
5.6%
with 75% loan · all-cash 7.1% · with interiors
Three numbers, three questions. Price growth: what will the home be worth? Net-wealth CAGR: what will my money have earned after every cost? Cash-flow IRR: the same, but counting when each rupee moves. Tap i on any of them.
Price · edit here or below assumed
₹Cr
₹ psf × 650 sq ft · as of Nov 2026
Price edits apply to ·
All-in cost
₹1.34 Cr
+ other charges 4.1 L, GST 0.0 L, stamp/reg 7.5 L, interiors 5.2 L
Gross rental yield assumed
3.1%
rent starts in ~0.3 yr

All-in cost sheet this home, default assumptions

ItemBasisAmount
Base price₹17,900 per sq ft × 650 sq ft carpet1.16 Cr
Other charges3.5% of base: floor-rise, preferred-location, car park, club, maintenance deposit, legal, corpus (edit in Assumptions)4.1 L
GST0.0% on an under-construction home — none is due on a ready home with an occupancy certificate, set GST to 0 if buying after OC0.0 L
Stamp duty and registration6.2% in Maharashtra: 6% stamp duty including 1% metro cess inside BMC limits (7% in Thane, Navi Mumbai and other corporations), plus 1% registration capped at ₹30,0007.5 L
Interiors₹800 per sq ft, needed before the home can be let5.2 L
All-in costwhat leaves your pocket and the bank's, before rent or resale₹1.34 Cr
Your own money75.0% loan at 8.5% for 20 years covers the rest; EMI 0.8 L a month₹91.2 L

Prices here are per sq ft of RERA carpet area (650 sq ft), the way homes are sold in Mumbai; there is no super built-up loading to discount. Every percentage above is editable in Assumptions; the defaults are Maharashtra rates as of 2026.

In plain words

Why 62 out of 100

Each home is marked on 11 things a careful buyer checks, then compared with every project we analyse in Mumbai: 50 is the average project, 62 beats about five in six. Here is what lifts this one and what drags it:

  • +
    Employment access · 7/11 pts
    Drive times right now: Powai (Hiranandani) 13 min, Andheri SEEPZ 22 min, Thane (Wagle Estate) 25 min; Nariman Point 72 min. About 3 million sq ft of new offices are planned nearby in 3 years.
  • +
    Resale liquidity · 2/4 pts
    Plenty of buyers can afford a ₹1.16 Cr home, and homes in Mulund / Bhandup / Kanjurmarg resell quickly.
  • +
    Schools, hospitals, daily needs · 1/2 pts
    Schools, hospitals and daily shopping are excellent in this area.
  • •
    Layout, size, age, amenities, maintenance · -1/2 pts
    Moderately dense layout (60 homes per acre); about 100% of the area you pay for is usable carpet area. Maintenance ~₹3.5 per sq ft a month.
  • −
    Expected price growth (5-yr CAGR model) · -2/43 pts
    We expect prices here to rise about 7.1% a year for the next 5 years (explained below).
  • −
    Price vs comparables · 0/3 pts
    Priced about the same as similar mid homes nearby (₹17,900 vs ~₹17,900 per sq ft).
All 11 checks
  • •
    Price vs comparables · 0/3 pts
    Priced about the same as similar mid homes nearby (₹17,900 vs ~₹17,900 per sq ft).
  • •
    Rental demand & yield · 1/7 pts
    Rent pays back 3.1% of the price every year, close to the usual 2.8% in Mumbai. Tenant demand here is very strong.
  • +
    Resale liquidity · 2/4 pts
    Plenty of buyers can afford a ₹1.16 Cr home, and homes in Mulund / Bhandup / Kanjurmarg resell quickly.
  • +
    Employment access · 7/11 pts
    Drive times right now: Powai (Hiranandani) 13 min, Andheri SEEPZ 22 min, Thane (Wagle Estate) 25 min; Nariman Point 72 min. About 3 million sq ft of new offices are planned nearby in 3 years.
  • •
    Metro, bus, rail & airport · 2/8 pts
    The nearest working metro is ~2.0 km away; Line 4 Mulund / Bhandup is planned for ~2027. Airport is about 59 minutes by road right now.
  • +
    Schools, hospitals, daily needs · 1/2 pts
    Schools, hospitals and daily shopping are excellent in this area.
  • •
    Builder delivery & handover risk · 0/11 pts
    Sudhanshu Infrastructures has finished 6+ projects and delivered on time about 64% of the time. This home is ready, so there is no waiting risk.
  • +
    Layout, size, age, amenities, maintenance · -1/2 pts
    Moderately dense layout (60 homes per acre); about 100% of the area you pay for is usable carpet area. Maintenance ~₹3.5 per sq ft a month.
  • •
    Water, flooding, noise, infrastructure · 1/8 pts
    Some flood risk in heavy rain; water supply is reliable piped supply; noticeable traffic or aircraft noise.
  • •
    Legal, title & approvals · 1/8 pts
    Registered with MahaRERA; court cases not disclosed on the public register; land title not yet verified by us, so get a lawyer to check. The due-diligence report below flags 0 items in red.
  • −
    Expected price growth (5-yr CAGR model) · -2/43 pts
    We expect prices here to rise about 7.1% a year for the next 5 years (explained below).
Why prices should grow ~7.1% a year for the next 5 years

We build the forecast step by step, starting from what Mumbai homes normally do and adjusting for this area and this project:

  1. + 5.5%Start with 5.5% a year: the normal long-run growth of Mumbai home prices.
  2. + 0.6%Add 0.6%: prices here rose 9.3% a year recently (2023-06 to 2026-06). Some of that pace continues, but it fades each year.
  3. − 0.2%Subtract 0.2%: at ₹17,900 per sq ft, fewer families can afford to buy here, which slows further rises.
  4. + 1.8%Add 1.8%: 3 million sq ft of new offices nearby means more people wanting homes here.
  5. − 0.7%Subtract 0.7%: many new homes are being built here (22 months of unsold stock), which keeps prices in check.
  6. + 0.1%Add 0.1% for new roads, metro and water lines, weighted by how likely they are to actually finish: Metro Line 4 Wadala–Ghatkopar–Thane–Kasarvadavali (construction, 2027); Goregaon–Mulund Link Road (construction, 2028).
  7. + 0.0%No extra project-level adjustment.
  8. = 7.1%Result: about 7.1% a year, so a home worth ₹1.20 Cr today would be worth about ₹1.70 Cr in 5 years. We are 56% confident in the evidence behind this.

Which exit suits you?

Interiors change both the rent you get and what you recover at sale. Same price, same loan; only the strategy changes:

StrategyHoldIRR / yrWealth CAGR / yrCash you put inNet rentNet saleApply
No interiors, rent unfurnished best IRR
Skip interiors; rent 12% lower than a fitted home; sell after 8 yrs with no interiors value.
8 yrs6.1%4.5%₹88.8 L₹19.3 L₹1.33 Cr
Do interiors, rent & sell fitted selected
Spend ₹800/sq ft on interiors, earn full rent, recover ~40% of interiors cost at sale (fading over 10 yrs).
8 yrs5.6%4.3%₹91.2 L₹22.6 L₹1.33 Cr

IRR and CAGR are per year over the hold shown. A short hold can show a high IRR on a small absolute gain; compare the net-sale column too. Selling before registration usually needs the builder’s transfer NOC and a fee.

Highlights

  • Sudhanshu Infrastructures · Mulund / Bhandup / Kanjurmarg · unit count not on the public register
  • Registered completion date passed (2019-09-10)
  • Registered with MahaRERA as P51800015748

Assumptions editable

Purchase

₹/sq ft
₹ Cr
sq ft
% of base
%
%
%
₹/sq ft

FinancingLoan 75% · cash 25% · EMI ₹78,379/mo

% loan
% p.a.
years
%

Rent & running costs

₹
% p.a.
%
months
months
₹/sq ft/mo
% of rent
% of rent
% of value

Interiors & exit

%
%
years
% p.a. (blank = model)
%
%

Returns over 8 years · with interiors

Cash you put in₹91.2 L
Exit value (yr 8)₹2.08 Cr
Net sale after loan & costs₹1.33 Cr
Net rent after opex₹22.6 L
Loan (75% of price)₹90.3 L
EMI / month₹78,379
Year 0: ₹-44.4 L0Year 1: ₹-8.0 L1Year 2: ₹-6.8 L2Year 3: ₹-6.7 L3Year 4: ₹-6.6 L4Year 5: ₹-6.4 L5Year 6: ₹-6.2 L6Year 7: ₹-6.1 L7Year 8: ₹1.28 Cr8
YearPurchaseLoan inRent (net of vacancy)OpexDebt serviceSale − loanNet cash
Today-1.35 Cr90.3 L0.0 L0.0 L0.0 L0.0 L-44.4 L
Yr 10.0 L0.0 L2.4 L-0.9 L-9.4 L0.0 L-8.0 L
Yr 20.0 L0.0 L3.7 L-1.1 L-9.4 L0.0 L-6.8 L
Yr 30.0 L0.0 L3.9 L-1.2 L-9.4 L0.0 L-6.7 L
Yr 40.0 L0.0 L4.1 L-1.2 L-9.4 L0.0 L-6.6 L
Yr 50.0 L0.0 L4.3 L-1.3 L-9.4 L0.0 L-6.4 L
Yr 60.0 L0.0 L4.5 L-1.3 L-9.4 L0.0 L-6.2 L
Yr 70.0 L0.0 L4.7 L-1.4 L-9.4 L0.0 L-6.1 L
Yr 80.0 L0.0 L5.0 L-1.5 L-9.4 L1.33 Cr1.28 Cr

Pre-tax unless capital-gains tax is set. Rent enters the cash flows once. Net-wealth CAGR = (cash returned incl. sale ÷ cash put in)^(1/years) − 1. IRR uses the dated cash flows.

Score factors

Bars show points added or taken away versus the average analysed Mumbai project (score 50).

Price vs comparables
+0.0 pts vs avg
this home 6.0/10 · Mumbai average 6.0 · confidence 30%
₹17,900 psf vs mid comps ₹17,900 (0%). Price is a model estimate, so this factor carries a third of its normal weight until a listed price is observed.
Rental demand & yield
+0.5 pts vs avg
this home 6.5/10 · Mumbai average 6.2 · confidence 34%
Gross yield 3.2% (₹48 psf/month); locality rental demand 8/10.
Resale liquidity
+2.0 pts vs avg
this home 8.7/10 · Mumbai average 7.4 · confidence 50%
Locality resale depth 8/10; ticket ₹1.16 Cr narrows the buyer pool.
Employment access
+7.3 pts vs avg
this home 8.3/10 · Mumbai average 4.4 · confidence 85%
Drive times now (Google Maps, 2026-11-11): Powai (Hiranandani) 13 min, Andheri SEEPZ 22 min, Thane (Wagle Estate) 25 min, BKC 31 min; 3 of 7 major hubs within 30 min; 3 msf office pipeline (3 yr).
Metro, bus, rail & airport
+2.2 pts vs avg
this home 6.8/10 · Mumbai average 5.5 · confidence 60%
none yet; Line 4 along LBS Road; Line 4 Mulund / Bhandup ~2027; airport ~59 min by road now (Google Maps); .
Schools, hospitals, daily needs
+0.6 pts vs avg
this home 8.5/10 · Mumbai average 7.8 · confidence 50%
Locality social-infrastructure index (interim, expert-set; POI distances pending Maps integration).
Builder delivery & handover risk
+0.4 pts vs avg
this home 5.6/10 · Mumbai average 5.5 · confidence 60%
Sudhanshu Infrastructures: 6+ projects, on-time 64% (derived); ready.
Layout, size, age, amenities, maintenance
−0.8 pts vs avg
this home 7.2/10 · Mumbai average 7.9 · confidence 50%
60 units/acre; carpet/SBA ~100%; maintenance ~₹3.5 psf/month (assumed).
Water, flooding, noise, infrastructure
+0.9 pts vs avg
this home 6.4/10 · Mumbai average 5.8 · confidence 50%
Mature residential; GMLR will link to Goregaon
Legal, title & approvals
+0.7 pts vs avg
this home 6.3/10 · Mumbai average 5.9 · confidence 55%
RERA registered; litigation: not published on the public register; approvals: MahaRERA registered; title: not verified. Due-diligence report lists 0 red flags (−0.0 pts).
Expected price growth (5-yr CAGR model)
−2.0 pts vs avg
this home 2.4/10 · Mumbai average 2.7 · confidence 56%
Model 5-yr price CAGR 7.1% (range 3.6–10.5%).

Price growth model, year by year

Nominal growth per year. Parts add up; momentum fades, infrastructure is weighted by delivery probability and dated.

ComponentYr 1Yr 2Yr 3Yr 4Yr 5Yr 6Confidence
Mumbai long-run nominal trend5.55.55.55.55.55.580%
Locality momentum (mean-reverting)1.30.70.40.20.10.145%
Affordability ceiling-0.4-0.3-0.2-0.1-0.1-0.160%
Employment access & office pipeline1.81.81.81.81.81.855%
Supply–demand balance-1.0-0.8-0.6-0.5-0.4-0.350%
Infrastructure delivery (probability-weighted)0.30.30.10.00.00.055%
Project-specific adjustments0.00.00.00.00.00.050%
Total growth7.5%7.2%6.9%6.9%6.9%7.0%56%

Mumbai long-run nominal trend: City-wide 2013-25 nominal residential trend ≈ inflation + real income growth.

Locality momentum (mean-reverting): Trailing 3.0-yr locality CAGR 9.3% vs 5.5% trend; 35% carried forward, halving each year.

Affordability ceiling: Ticket at ₹17,900 psf vs city median ₹14,500; buyer pool thins above ₹15k/₹20k psf and after >6pp excess growth.

Employment access & office pipeline: 3 msf office pipeline (3 yr) on 10 msf stock; 30-min jobs index 0.70.

Supply–demand balance: 22 months of unsold inventory; new-launch/absorption ratio 1.1.

Infrastructure delivery (probability-weighted): Metro Line 4 Wadala–Ghatkopar–Thane–Kasarvadavali (construction, 2027, p=0.6); Goregaon–Mulund Link Road (construction, 2028, p=0.5)

Project-specific adjustments: Building age 7 yrs.

Locality evidence: ₹18,000 (Jun 2023) → ₹23,500 (Jun 2026) = 9.3% p.a. Sources: Platform estimate (interim, not observed).

Financial & legal due diligence

What the public record says

Automated from MahaRERA's public register entry and registration certificate for P51800015748. Prices and rents are locality estimates, not verified listings. Compiled Nov 2026 from the MahaRERA file, company registers, rating agencies, tribunal records and press. Facts only; anything that deserves a written answer before signing is flagged.

Delivery timeline8/10
delivered on the original registration
Legal & complaints9/10
no litigation and no complaints on the RERA file
Money to finish8/10
Developer strength5/10
no public credit rating for the promoter

Meters are rule-based from the RERA file and public ratings (rules shown under each), not opinions.

Registration
P51800015748 · SUDHANSHU INFRASTRUCTURES PVT LTD
Delivered
RegisteredMar 2018Original completionSep 2019TodaySep 2026
No litigation declaredNo complaints
Credit ratings of the people behind it

No public credit rating located for the promoter.

SUDHANSHU INFRASTRUCTURES PVT LTD: credit rating not yet checked by PropertyLens

Complaints & disputes on record
On this project00 open
On the promoter entity0all projects
Court cases declared0no stay recorded
At a glance
Delivered

Delivered. RERA registration ran 2018-03-22 → 2019-09-10

No complaints on this project

No RERA complaints on this project; 0 on the promoter overall

No litigation declared

No litigation declared in RERA filings

The record, in pictures

RERA file · Registration

No litigation declaredBorrowing declared: not stated

Red flags to resolve in writing

Questions to put to the developer before you sign

  1. Share the latest quarterly progress filing and the architect and engineer certificates.
  2. Confirm the price list, floor-rise, parking and other charges for the exact unit.
  3. Provide the occupancy certificate and the title chain for the unit.
  4. Confirm there is no litigation on the land or approvals beyond the RERA declaration.
  5. Is the land owned by the promoter, or is this a joint development, and is any part mortgaged?
Full record: every filed number, line by line1 sections · 4 items

RERA file · Registration

Registration
P51800015748 · promoter SUDHANSHU INFRASTRUCTURES PVT LTD
Dates
Start 2018-03-22 · original completion 2019-09-10 · no extensions
Status
Completed and occupied (per project status); RERA progress fields below are historical
Litigation declared
None declared in filings

Source: MahaRERA project record P51800015748, fetched 2026-11-10. Figures are the promoter’s own filings.

Sources & caveats2 sources
  • MahaRERA project record P51800015748, fetched 2026-11-10
  • PropertyLens Mumbai locality model (market-level estimates)
  • MahaRERA project records P51800015748 (registration file, quarterly updates, complaint register), fetched Sep 2026.

Caveats. Automated analysis: prices, rents and travel times are estimates until listings and Maps data are verified. RERA figures are the promoter’s own filings. Nothing here is legal, tax or investment advice.

Evidence

Location, jobs & transit3 hubs · metro 2.0 km
Job hubs nearby
Powai 6 kmThane offices 5 kmVikhroli
Measured drive times below
Office space
Existing10 msf
Coming in 3 yrs3 msf
Jobs within 30 min7/10
Getting around
Metro today
none yet; Line 4 along LBS Road
~2,000 m estimate
Metro planned
Line 4 Mulund / Bhandup
~2027 60% likely ~800 m estimate
Rail
—
estimate
Airport
59 min by road now · 21.1 km
Google Maps
Buses
7/10 coverage
estimate
Drive times to job hubs
DestinationDrive nowRoad km
Powai (Hiranandani)13 min3.6
Andheri SEEPZ22 min6.8
Thane (Wagle Estate)25 min8.1
BKC31 min10.6
Malad Mindspace35 min12
Lower Parel54 min19.2
Navi Mumbai Airport59 min21.1
Nariman Point72 min26.1

Google Maps driving time with live traffic, measured Nov 2026. Refreshed monthly.

Location used: Google Maps match “”. Bus coverage and planned-station distances are still interim estimates.

Price historylocality 9.3%/yr

No dated project-level price series yet; only the latest observation is on file.

Locality · average ₹/sq ft
Date₹ psfSourceConfidenceKind
Jun 202116,000Platform estimate (interim, not observed)40%derived
Jun 202318,000Platform estimate (interim, not observed)45%derived
Jun 202521,500Platform estimate (interim, not observed)50%derived
Jun 202623,500Platform estimate (interim, not observed)50%derived
Luxury comps₹28,700
Premium comps₹22,800
Mid comps₹17,900
Unsold stock22 months

Model backtest on this locality: 1-yr hold-out (Jun 2025→Jun 2026): predicted ₹22,798 vs actual ₹23,500 (-3%). Longer 3-yr hold-out (Jun 2023→Jun 2026): predicted 6.3% p.a. vs actual 9.3% p.a. — the model is deliberately mean-reverting and under-predicted the 2021–26 boom.

Environment, legal & productflood ok · piped water · RERA yes
Flood risksome risk
Water supplypiped
Quietnoisy
Roads & drainsgood

Mature residential; GMLR will link to Goregaon

Legal & approvals
Registration P51800015748
RERA P51800015748
ready
Litigation
not published on the public register
assumed
Approvals
MahaRERA registered
observed
Title
not verified
assumed
Product
Landnot filed
Homesnot filed
Densitynot filed
Launched2018
Sources & data gapswhat we know, from where, and what is missing

Automated analysis from MahaRERA's public register: unit sizes and prices are locality-model estimates until listings are verified.

FieldValueSource classDateConf.KindConflicting values
AddressKurla, Mumbai Suburban, 400042MahaRERANov 202670%observed
Land area (acres)Platform estimate (interim, not observed)Nov 202620%assumed
Total unitsPlatform estimate (interim, not observed)Nov 202620%assumed
Launch year2018MahaRERANov 202670%observed
Possession · Registration P518000157482019-09-10MahaRERANov 202640%assumed
Price psf · 2 BHK · ~650 sq ft carpet (assumed)17900Platform estimate (interim, not observed)Nov 202630%assumed
Ticket · 2 BHK · ~650 sq ft carpet (assumed)11635000Platform estimate (interim, not observed)Nov 202630%derived
Rent · 2 BHK · ~650 sq ft carpet (assumed)31000Platform estimate (interim, not observed)Nov 202630%assumed
Carpet area650Platform estimate (interim, not observed)Nov 202630%assumed
Builder on-time rate0.64MahaRERANov 202660%derived
Litigationnot published on the public registerMahaRERANov 202630%assumed
ApprovalsMahaRERA registeredMahaRERANov 202660%observed

Commercial listing portals are shown as “Listing portal (aggregated)”; full provenance is retained internally. Official developer and MahaRERA sources are named.

Other projects worth comparing

Same model, same date. Scores are out of 100, where 50 is the average analysed Mumbai project.

Questions people ask about Vishnu Bhaskar CHS Ltd

Is Vishnu Bhaskar CHS Ltd a good investment?

On PropertyLens's evidence-based model Vishnu Bhaskar CHS Ltd scores 62/100, above the average analysed Mumbai project (50 = average, 12 points = one standard deviation). The model projects price growth of about 7.1% a year over five years and a net-wealth CAGR of 4.3% after every cost on an 8-year hold with a 75.0% loan. That is research on public filings, not advice; the factor breakdown on this page shows what drives the score.

What is the price per sq ft at Vishnu Bhaskar CHS Ltd?

About ₹17,900 per sq ft of super built-up area, a model estimate from Mulund / Bhandup / Kanjurmarg comparables that you can edit. The 2 BHK home costs about ₹1.16 Cr before other charges, GST and stamp duty, and ₹1.34 Cr all-in.

When is Vishnu Bhaskar CHS Ltd ready for possession?

The project is marked ready to move in; confirm the occupancy certificate before paying.

Is Vishnu Bhaskar CHS Ltd RERA registered?

Yes. MahaRERA registration: P51800015748. No complaints on this registration at MahaRERA as of 2026-11-10.

How reliable is Sudhanshu Infrastructures on delivery?

64% of Sudhanshu Infrastructures's crawled Mumbai registrations needed no extension (4 of 6 analysed Mumbai registrations needed no extension). 6 registrations analysed. The developer scorecard compares this with every other Mumbai developer.

What rent can Vishnu Bhaskar CHS Ltd earn?

About ₹31,000 a month for this home (a model estimate from Mulund / Bhandup / Kanjurmarg rents), a gross yield of 3.1% on the all-in cost. Rent covers 40% of the EMI at the default loan.

Answers are generated from the filings and the model for this home and change when you edit the assumptions above. See the Sudhanshu Infrastructures scorecard and the Mulund / Bhandup / Kanjurmarg area page.

Go deeper

Share on WhatsApp