West, Pune · Kothrud / Erandwane / Bavdhan

Is Kothrud / Erandwane / Bavdhan good for investment?

145 RERA-registered projects scored on one model, as of November 11, 2026. Prices, growth, yields, supply and the best-scored homes.

Straight answer · as of November 11, 2026

Kothrud / Erandwane / Bavdhan in one paragraph

On PropertyLens's model, Kothrud / Erandwane / Bavdhan is a better-than-average place to buy in Pune right now: the median analysed project scores 58/100 (above the Pune average), with projected price growth of 7.8% a year over five years and a median gross rental yield of 3.5%. Unsold homes would take about 16 months to absorb at the current sales pace, a balanced market. 17 of 114 under-construction projects here are past their original RERA completion date, so weight the developer's record heavily.

Median of 145 projects; the spread inside the area is wide, so the ranked list below matters more than the average.

Projects analysed
145
31 ready · 114 under construction
Median score
58
above the Pune average
Projected growth / yr
7.8%
5-yr; 10-yr 7.5%
Median price / sq ft
₹10,700
modelled from comparables
Gross rental yield
3.5%
median, on all-in cost
Net-wealth CAGR
4.0%
8-yr hold, 75% loan, after all costs
Months of inventory
16
RERA filings
Past RERA date
17 / 114
under-construction projects overdue
Entry price
₹80.3 L
median ₹80.3 L

Best-scored projects in Kothrud / Erandwane / Bavdhan

All 145 analysed projects in Kothrud / Erandwane / Bavdhan

ProjectScoreGrowth / yrNet-wealth CAGRCash-flow IRRPrice / sq ftPriceStatus
Pratik Nagar Palladio Kothrud Central
Vilas Javdekar · Kothrud / Erandwane / Bavdhan
659.2%5.4%9.5%₹13,700 est.₹1.03 CrUnder construction
Dec 2030
Livience Aleenta Phase III
Livience Lifespace · Kothrud / Erandwane / Bavdhan
649.2%5.3%9.3%₹10,700 est.₹80.3 LUnder construction
Dec 2030
M Soul Strings Wing D
Malpani Estates · Kothrud / Erandwane / Bavdhan
649.2%5.3%9.3%₹10,700 est.₹80.3 LUnder construction
Dec 2030
New Friends
Majestique Landmarks · Kothrud / Erandwane / Bavdhan
649.0%5.0%8.3%₹13,700 est.₹1.03 CrUnder construction
Dec 2029
M Soul Strings Wing C
Malpani Estates · Kothrud / Erandwane / Bavdhan
639.0%5.0%8.2%₹10,700 est.₹80.3 LUnder construction
Dec 2029
M Soul Strings Wing A
Malpani Estates · Kothrud / Erandwane / Bavdhan
639.0%5.0%8.2%₹10,700 est.₹80.3 LUnder construction
Dec 2029
24K Stargaze
Kolte-Patil · Kothrud / Erandwane / Bavdhan
627.4%3.9%5.1%₹14,600 est.₹1.09 CrReady
24K Stargaze - J Building
Kolte-Patil · Kothrud / Erandwane / Bavdhan
627.4%3.9%5.1%₹14,600 est.₹1.09 CrReady
Vtp Skylights Mhada
Prasanna Developers · Kothrud / Erandwane / Bavdhan
629.2%5.3%9.3%₹10,700 est.₹80.3 LUnder construction
Dec 2030
Kiran Sora
Kiran Creators And Developers · Kothrud / Erandwane / Bavdhan
629.0%4.6%7.6%₹10,700 est.₹80.3 LUnder construction
Jul 2030
Clover Co Operative Housing Society Limited
Vilas Javdekar · Kothrud / Erandwane / Bavdhan
618.6%4.4%7.0%₹13,700 est.₹1.03 CrUnder construction
Dec 2028
Vidurkrupa
Gangotree Homes · Kothrud / Erandwane / Bavdhan
618.6%4.5%7.1%₹10,700 est.₹80.3 LUnder construction
Oct 2028
Shivanand
Joshi Buildcon Landmarks · Kothrud / Erandwane / Bavdhan
618.6%4.5%7.0%₹10,700 est.₹80.3 LUnder construction
Dec 2028
Madhughat
Ranjekar Realty · Kothrud / Erandwane / Bavdhan
619.0%4.9%8.1%₹10,700 est.₹80.3 LUnder construction
Jan 2030
Mantra Mesmer Phase 2
Mantra Properties · Kothrud / Erandwane / Bavdhan
617.8%3.3%4.2%₹10,700 est.₹80.3 LUnder construction
Dec 2026
Kothrud Pune -Tower A
Lodha (Macrotech) · Kothrud / Erandwane / Bavdhan
618.4%3.7%5.9%₹18,050 est.₹1.35 CrUnder construction
Sep 2029
Soumitra
Urban Realty · Kothrud / Erandwane / Bavdhan
608.6%4.5%7.0%₹10,700 est.₹80.3 LUnder construction
Dec 2028
Livience Aleenta- Mhada
Livience Lifespace · Kothrud / Erandwane / Bavdhan
608.6%4.5%7.0%₹10,700 est.₹80.3 LUnder construction
Dec 2028
Mrunmayee CHS
Niwas Enterprises · Kothrud / Erandwane / Bavdhan
608.6%4.0%6.3%₹10,700 est.₹80.3 LUnder construction
Sep 2029
Sukhada Garden Co Operative Housing Society Ltd
Fortune Developers · Kothrud / Erandwane / Bavdhan
608.2%4.0%5.8%₹10,700 est.₹80.3 LUnder construction
Mar 2028
Navswati Co-operative Housing Society Ltd
Trisha Developers · Kothrud / Erandwane / Bavdhan
608.6%4.3%6.8%₹10,700 est.₹80.3 LUnder construction
Mar 2029
Tulip
Gangotree Homes · Kothrud / Erandwane / Bavdhan
608.2%4.1%5.9%₹10,700 est.₹80.3 LUnder construction
Dec 2027
Aashish
Joshi Buildcon Landmarks · Kothrud / Erandwane / Bavdhan
608.2%4.1%5.9%₹10,700 est.₹80.3 LUnder construction
Dec 2027
Shree Ganesh Park Chsl
Gokhale Constructions · Kothrud / Erandwane / Bavdhan
609.0%4.8%8.5%₹10,700 est.₹80.3 LUnder construction
Jun 2031
Vishwambhar Co-Operative Housing Society Limited
Fortune Developers · Kothrud / Erandwane / Bavdhan
607.8%3.3%4.2%₹10,700 est.₹80.3 LUnder construction
Dec 2026
Shwetambarishree Co-operative Housing Society Limited
Ranade Realtors · Kothrud / Erandwane / Bavdhan
608.6%4.3%6.8%₹10,700 est.₹80.3 LUnder construction
Mar 2029
Geras Isle Royale Tower 4 and 5
Gera Developments · Kothrud / Erandwane / Bavdhan
609.2%5.4%9.5%₹13,700 est.₹1.03 CrUnder construction
Dec 2030
Sobha Nesara Block-1
Sobha · Kothrud / Erandwane / Bavdhan
607.4%3.9%5.1%₹14,600 est.₹1.09 CrReady
Sobha Nesara Block-2
Sobha · Kothrud / Erandwane / Bavdhan
607.4%3.9%5.1%₹14,600 est.₹1.09 CrReady
Sobha Nesara Block-3
Sobha · Kothrud / Erandwane / Bavdhan
607.4%3.9%5.1%₹14,600 est.₹1.09 CrReady
Surekha
Trisha Developers · Kothrud / Erandwane / Bavdhan
608.2%4.0%5.9%₹10,700 est.₹80.3 LUnder construction
Jan 2028
Ganeshbaug Co-Operative Housing Society Ltd. And Suchitra Terrace Co-Operative Housing Society Ltd.
D & T Properties · Kothrud / Erandwane / Bavdhan
608.2%4.1%5.9%₹10,700 est.₹80.3 LUnder construction
Dec 2027
Venkatesh Serenique- Phase -1
Shree Venkatesh Buildcon · Kothrud / Erandwane / Bavdhan
608.9%4.6%8.2%₹10,700 est.₹80.3 LUnder construction
Sep 2031
Kiran Swastik Building B
Kiran Creators And Developers · Kothrud / Erandwane / Bavdhan
608.6%4.5%7.1%₹10,700 est.₹80.3 LUnder construction
Oct 2028
Guruseva
Trisha Developers · Kothrud / Erandwane / Bavdhan
608.2%4.0%5.8%₹10,700 est.₹80.3 LUnder construction
Mar 2028
Wisteria
Trimurti Developers · Kothrud / Erandwane / Bavdhan
608.2%4.1%5.9%₹10,700 est.₹80.3 LUnder construction
Dec 2027
Anand Terrace
Pravin Keshav Badhekar · Kothrud / Erandwane / Bavdhan
598.6%4.0%6.3%₹10,700 est.₹80.3 LUnder construction
Sep 2029
Lalnath
Shri Laxmi Narayan Properties · Kothrud / Erandwane / Bavdhan
598.2%3.7%5.4%₹10,700 est.₹80.3 LUnder construction
Jun 2028
Parikshit
Belvalkar Housing · Kothrud / Erandwane / Bavdhan
598.6%4.5%7.1%₹10,700 est.₹80.3 LUnder construction
Oct 2028
Prathamesh Co-Oprative Housing Society Limited
D & T Properties · Kothrud / Erandwane / Bavdhan
597.8%3.3%4.2%₹10,700 est.₹80.3 LUnder construction
Dec 2026
Pranali
Gangotree Homes · Kothrud / Erandwane / Bavdhan
598.6%4.5%7.0%₹10,700 est.₹80.3 LUnder construction
Dec 2028
Audumbar
Belvalkar Housing · Kothrud / Erandwane / Bavdhan
598.6%4.5%7.0%₹10,700 est.₹80.3 LUnder construction
Dec 2028
Anamay Apartments
Nestcon · Kothrud / Erandwane / Bavdhan
597.8%3.3%4.2%₹10,700 est.₹80.3 LUnder construction
Dec 2026
Ganeshdeep
Gangotree Homes Formerly Known As Gangotree Greenbuild · Kothrud / Erandwane / Bavdhan
598.2%4.1%5.9%₹10,700 est.₹80.3 LUnder construction
Dec 2027
Dashabhuja
Gangotree Homes Formerly Known As Gangotree Greenbuild · Kothrud / Erandwane / Bavdhan
598.2%4.1%5.9%₹10,700 est.₹80.3 LUnder construction
Dec 2027
Livience Aleenta- Phase II
Livience Lifespace · Kothrud / Erandwane / Bavdhan
598.2%3.7%5.5%₹10,700 est.₹80.3 LUnder construction
May 2028
Rajhans
Joshi Buildcon Landmarks · Kothrud / Erandwane / Bavdhan
597.8%3.4%4.7%₹10,700 est.₹80.3 LUnder construction
May 2027
Smita Heights
Ashwamedh Spaces · Kothrud / Erandwane / Bavdhan
598.6%4.0%6.3%₹10,700 est.₹80.3 LUnder construction
Sep 2029
Prathamesh Aakruti
Prathamesh Constructions · Kothrud / Erandwane / Bavdhan
598.6%4.3%6.7%₹10,700 est.₹80.3 LUnder construction
Apr 2029
Peninsula C
Kumar Agro Products · Kothrud / Erandwane / Bavdhan
597.4%4.2%5.4%₹11,400 est.₹85.5 LReady
Priyadarshan - J
Kumar Agro Products · Kothrud / Erandwane / Bavdhan
597.4%4.2%5.4%₹11,400 est.₹85.5 LReady
61 Ideal
Samarth Builders · Kothrud / Erandwane / Bavdhan
597.4%4.2%5.4%₹11,400 est.₹85.5 LReady
Charuhas
Joshi Buildcon Landmarks · Kothrud / Erandwane / Bavdhan
597.4%4.2%5.4%₹11,400 est.₹85.5 LReady
Priyadarshan - I
Kumar Agro Products · Kothrud / Erandwane / Bavdhan
597.4%4.2%5.4%₹11,400 est.₹85.5 LReady
Peninsula - D
Kumar Agro Products · Kothrud / Erandwane / Bavdhan
597.4%4.2%5.4%₹11,400 est.₹85.5 LReady
Nivedita
Amol Ajit Ravetkar · Kothrud / Erandwane / Bavdhan
598.6%4.3%6.8%₹10,700 est.₹80.3 LUnder construction
Mar 2029
Shivsudha
Amol Ajit Ravetkar · Kothrud / Erandwane / Bavdhan
598.6%4.1%6.5%₹10,700 est.₹80.3 LUnder construction
Jun 2029
Shree
Skyline Enterprises · Kothrud / Erandwane / Bavdhan
597.4%4.2%5.4%₹11,400 est.₹85.5 LReady
Dwarkakunj
Joshi Buildcon Landmarks · Kothrud / Erandwane / Bavdhan
597.8%3.3%4.3%₹10,700 est.₹80.3 LUnder construction
Oct 2026
Shree Chsl
Kotibhaskar Infrastructures &Developers · Kothrud / Erandwane / Bavdhan
588.6%4.5%7.0%₹10,700 est.₹80.3 LUnder construction
Dec 2028
Meera Apartments
Belvalkar Housing · Kothrud / Erandwane / Bavdhan
588.2%4.1%5.9%₹10,700 est.₹80.3 LUnder construction
Dec 2027
Kirloskar Oil Engine Kaamgar Co Op Housing Society Ltd
Belvalkar Housing · Kothrud / Erandwane / Bavdhan
588.2%4.1%5.9%₹10,700 est.₹80.3 LUnder construction
Dec 2027
Ankur Heights
Pravin Keshav Badhekar · Kothrud / Erandwane / Bavdhan
588.2%3.7%5.4%₹10,700 est.₹80.3 LUnder construction
Jun 2028
Pushpalata
Gangotree Homes Formerly Known As Gangotree Greenbuild · Kothrud / Erandwane / Bavdhan
587.8%3.3%4.2%₹10,700 est.₹80.3 LUnder construction
Dec 2026
Manisha Park
Gangotree Homes Formerly Known As Gangotree Greenbuild · Kothrud / Erandwane / Bavdhan
587.8%3.3%4.2%₹10,700 est.₹80.3 LUnder construction
Dec 2026
Aditya
Kotibhaskar Infrastructures &Developers · Kothrud / Erandwane / Bavdhan
588.2%4.1%6.1%₹10,700 est.₹80.3 LUnder construction
Oct 2027
Rakhi
Ranjekar Realty · Kothrud / Erandwane / Bavdhan
588.6%4.4%6.8%₹10,700 est.₹80.3 LUnder construction
Feb 2029
Sarthak
Parulekar Realty · Kothrud / Erandwane / Bavdhan
588.2%4.1%5.9%₹10,700 est.₹80.3 LUnder construction
Dec 2027
Mrudgandha
Pravin Keshav Badhekar · Kothrud / Erandwane / Bavdhan
587.4%4.2%5.4%₹11,400 est.₹85.5 LReady
Dwarka
Pravin Keshav Badhekar · Kothrud / Erandwane / Bavdhan
587.4%4.2%5.4%₹11,400 est.₹85.5 LReady
Tungabhadra Co Op Hsg Soc
Pravin Keshav Badhekar · Kothrud / Erandwane / Bavdhan
587.4%4.2%5.4%₹11,400 est.₹85.5 LReady
Ramchandra
Pravin Keshav Badhekar · Kothrud / Erandwane / Bavdhan
587.4%4.2%5.4%₹11,400 est.₹85.5 LReady
Shri Keshavlaxmi
Amol Ajit Ravetkar · Kothrud / Erandwane / Bavdhan
588.2%4.0%5.8%₹10,700 est.₹80.3 LUnder construction
Mar 2028
Gloria Grand
Paranjape Schemes · Kothrud / Erandwane / Bavdhan
587.8%3.1%4.1%₹13,700 est.₹1.03 CrUnder construction
Dec 2026
Umashankar Prasad
Ranjekar Realty · Kothrud / Erandwane / Bavdhan
578.2%4.0%5.8%₹10,700 est.₹80.3 LUnder construction
Feb 2028
Tirth
Ranjekar Realty · Kothrud / Erandwane / Bavdhan
578.2%4.0%5.8%₹10,700 est.₹80.3 LUnder construction
Mar 2028
Nav Shailaja
Parulekar Realty · Kothrud / Erandwane / Bavdhan
577.8%3.3%4.2%₹10,700 est.₹80.3 LUnder construction
Dec 2026
Manodeep
Gokhale Constructions · Kothrud / Erandwane / Bavdhan
578.6%4.2%6.5%₹10,700 est.₹80.3 LUnder construction
May 2029
Kaivalya Chsl
Kotibhaskar Infrastructures &Developers · Kothrud / Erandwane / Bavdhan
577.8%3.3%4.3%₹10,700 est.₹80.3 LUnder construction
Nov 2026
Aditi
Amol Ajit Ravetkar · Kothrud / Erandwane / Bavdhan
577.8%3.6%5.0%₹10,700 est.₹80.3 LUnder construction
Mar 2027
Avantika
Ranjekar Realty · Kothrud / Erandwane / Bavdhan
577.8%3.3%4.2%₹10,700 est.₹80.3 LUnder construction
Dec 2026
Hillview Residency Building H
Kumar Beharay Properties · Kothrud / Erandwane / Bavdhan
577.8%3.3%4.2%₹10,700 est.₹80.3 LUnder construction
Dec 2026
Samarth Park
Teerth Developers · Kothrud / Erandwane / Bavdhan
578.6%4.5%7.0%₹10,700 est.₹80.3 LUnder construction
Dec 2028
Sulochan Park
Ashwamedh Spaces · Kothrud / Erandwane / Bavdhan
577.4%4.2%5.4%₹11,400 est.₹85.5 LReady
Hillview Residency Building I
Kumar Beharay Properties · Kothrud / Erandwane / Bavdhan
577.8%3.3%4.2%₹10,700 est.₹80.3 LUnder construction
Dec 2026
Shantibramha Co-Operative Housing Society Ltd
Belvalkar Housing · Kothrud / Erandwane / Bavdhan
577.8%3.6%5.0%₹10,700 est.₹80.3 LUnder construction
Mar 2027
Nirmitee Vihar
Amol Ajit Ravetkar · Kothrud / Erandwane / Bavdhan
578.2%3.6%5.3%₹10,700 est.₹80.3 LUnder construction
Aug 2028
70 West Avenue
Amol Ajit Ravetkar · Kothrud / Erandwane / Bavdhan
577.4%4.2%5.4%₹11,400 est.₹85.5 LReady
Anushree
Amol Ajit Ravetkar · Kothrud / Erandwane / Bavdhan
577.4%4.2%5.4%₹11,400 est.₹85.5 LReady
Marwa Apartments
Archway Properties · Kothrud / Erandwane / Bavdhan
578.6%4.5%7.0%₹10,700 est.₹80.3 LUnder construction
Dec 2028
Kalpak Co Op Hsg Society
Belvalkar Housing · Kothrud / Erandwane / Bavdhan
577.4%4.2%5.4%₹11,400 est.₹85.5 LReady
Vtp Sierra Phase 3
Prasanna Developers · Kothrud / Erandwane / Bavdhan
568.2%3.7%5.4%₹10,700 est.₹80.3 LUnder construction
Jun 2028
Yash
Ranjekar Realty · Kothrud / Erandwane / Bavdhan
567.4%4.2%5.4%₹11,400 est.₹85.5 LReady
Ratnankur
Ranjekar Realty · Kothrud / Erandwane / Bavdhan
567.4%4.2%5.4%₹11,400 est.₹85.5 LReady
Vaishnavi Apartment
Parulekar Realty · Kothrud / Erandwane / Bavdhan
567.8%3.3%4.6%₹10,700 est.₹80.3 LUnder construction
Jun 2027
Pune Baner Project-Tower 4 and 5
Goel Ganga · Kothrud / Erandwane / Bavdhan
569.0%4.6%7.7%₹10,700 est.₹80.3 LUnder construction
Jun 2030
Kotibhaskar Business Court And Mahati Residency
Kotibhaskar Infrastructures &Developers · Kothrud / Erandwane / Bavdhan
567.4%4.2%5.4%₹11,400 est.₹85.5 LReady
Kajal Co operative Housing Society Ltd
Kotibhaskar Infrastructures &Developers · Kothrud / Erandwane / Bavdhan
567.4%4.2%5.4%₹11,400 est.₹85.5 LReady
Sarita Chsl
Kotibhaskar Infrastructures &Developers · Kothrud / Erandwane / Bavdhan
567.4%4.2%5.4%₹11,400 est.₹85.5 LReady
Shubhashree
Kotibhaskar Infrastructures &Developers · Kothrud / Erandwane / Bavdhan
567.4%4.2%5.4%₹11,400 est.₹85.5 LReady
Hillview Residency Building D
Kumar Beharay Properties · Kothrud / Erandwane / Bavdhan
567.8%3.3%4.6%₹10,700 est.₹80.3 LUnder construction
Jun 2027
Hillview Residency Building E
Kumar Beharay Properties · Kothrud / Erandwane / Bavdhan
567.8%3.3%4.6%₹10,700 est.₹80.3 LUnder construction
Jun 2027
Ganga Legend Building B6
Goel Ganga · Kothrud / Erandwane / Bavdhan
567.8%3.3%4.2%₹10,700 est.₹80.3 LUnder construction
Dec 2026
Shree Ganesh Avantika Chsl
Gokhale Constructions · Kothrud / Erandwane / Bavdhan
557.8%3.3%4.6%₹10,700 est.₹80.3 LUnder construction
Jun 2027
Gulab Srushti
Buttepatil Properties · Kothrud / Erandwane / Bavdhan
557.4%4.2%5.4%₹11,400 est.₹85.5 LReady
Janhavi
Amol Ajit Ravetkar · Kothrud / Erandwane / Bavdhan
557.8%3.3%4.3%₹10,700 est.₹80.3 LUnder construction
Nov 2026
Ganga Legend B2
Goel Ganga · Kothrud / Erandwane / Bavdhan
557.4%4.2%5.4%₹11,400 est.₹85.5 LReady
Snehshilp
Belvalkar Housing · Kothrud / Erandwane / Bavdhan
557.8%3.3%4.2%₹10,700 est.₹80.3 LUnder construction
Dec 2026
Anjaneya Co-Operative Housing Society Ltd.
Deshpande Landmark · Kothrud / Erandwane / Bavdhan
547.8%3.6%5.0%₹10,700 est.₹80.3 LUnder construction
Mar 2027
Kumar Prakruti
Kumar Properties · Kothrud / Erandwane / Bavdhan
547.8%3.1%4.2%₹13,700 est.₹1.03 CrUnder construction
Oct 2026
Rising Hills
Pravin Keshav Badhekar · Kothrud / Erandwane / Bavdhan
547.4%4.2%5.4%₹11,400 est.₹85.5 LReady
Neeraj
Pravin Keshav Badhekar · Kothrud / Erandwane / Bavdhan
547.8%3.3%4.5%₹10,700 est.₹80.3 LUnder construction
Aug 2027
Ketan Heights Chsl
Kotibhaskar Infrastructures &Developers · Kothrud / Erandwane / Bavdhan
547.8%3.3%4.2%₹10,700 est.₹80.3 LUnder construction
Dec 2026
Anant
Kotibhaskar Infrastructures &Developers · Kothrud / Erandwane / Bavdhan
547.8%3.3%4.2%₹10,700 est.₹80.3 LUnder construction
Dec 2026
Anupam Heights Cooperative Housing Society Limited
Ranjekar Realty · Kothrud / Erandwane / Bavdhan
548.2%3.7%5.5%₹10,700 est.₹80.3 LUnder construction
May 2028
Vtp Sierra Phase-2
Prasanna Developers · Kothrud / Erandwane / Bavdhan
547.8%3.3%4.2%₹10,700 est.₹80.3 LUnder construction
Dec 2026
Abhiramshree Chsl
Deshpande Landmark · Kothrud / Erandwane / Bavdhan
547.8%3.3%4.5%₹10,700 est.₹80.3 LUnder construction
Jul 2027
Shri Deodoot
Parulekar Realty · Kothrud / Erandwane / Bavdhan
537.8%3.3%4.3%₹10,700 est.₹80.3 LUnder construction
Oct 2026
State Bank Of India Snehdeep Chsl
Kotibhaskar Infrastructures &Developers · Kothrud / Erandwane / Bavdhan
537.8%3.3%4.3%₹10,700 est.₹80.3 LUnder construction
Sep 2026
Ayodhyanagar
Gokhale Constructions · Kothrud / Erandwane / Bavdhan
527.8%3.3%4.3%₹10,700 est.₹80.3 LUnder construction
Oct 2026
Kiran Swastik Building A
Kiran Creators And Developers · Kothrud / Erandwane / Bavdhan
527.8%3.6%5.0%₹10,700 est.₹80.3 LUnder construction
Mar 2027
Ved Vihar Phase II - Building No. 4
Pate Developers · Kothrud / Erandwane / Bavdhan
527.4%4.2%5.4%₹11,400 est.₹85.5 LReady
Tejalkunj No.2
Gokhale Constructions · Kothrud / Erandwane / Bavdhan
527.8%3.3%4.6%₹10,700 est.₹80.3 LUnder construction
Jun 2027
Purva Aspire
Puravankara · Kothrud / Erandwane / Bavdhan
527.8%3.2%4.1%₹13,700 est.₹1.03 CrUnder construction
Sep 2026
Sneh
Badhekar Properties · Kothrud / Erandwane / Bavdhan
527.4%4.2%5.4%₹11,400 est.₹85.5 LReady
Yashodhan
Ranade Realtors · Kothrud / Erandwane / Bavdhan
527.8%3.3%4.3%₹10,700 est.₹80.3 LUnder construction
Jun 2026
Shrinivas Apartment
Deshpande Landmark · Kothrud / Erandwane / Bavdhan
517.8%3.3%4.3%₹10,700 est.₹80.3 LUnder construction
Oct 2026
Mont Vert Belcreek
Mont Vert Homes · Kothrud / Erandwane / Bavdhan
508.6%4.5%7.0%₹10,700 est.₹80.3 LUnder construction
Dec 2028
Mayura
Badhekar Properties · Kothrud / Erandwane / Bavdhan
507.8%3.3%4.2%₹10,700 est.₹80.3 LUnder construction
Dec 2026
Reshma Heights Co-Operative Housing Society Ltd.
Nestcon · Kothrud / Erandwane / Bavdhan
497.8%3.3%4.3%₹10,700 est.₹80.3 LUnder construction
Dec 2025
Ravikeshar
Nestcon · Kothrud / Erandwane / Bavdhan
497.8%3.3%4.3%₹10,700 est.₹80.3 LUnder construction
Dec 2025
Krushnakunj
Pravin Keshav Badhekar · Kothrud / Erandwane / Bavdhan
497.8%3.3%4.3%₹10,700 est.₹80.3 LUnder construction
Dec 2025
Arunali
Badhekar Properties · Kothrud / Erandwane / Bavdhan
487.8%3.3%4.3%₹10,700 est.₹80.3 LUnder construction
Sep 2026
Harshada Co-Op Society
Badhekar Properties · Kothrud / Erandwane / Bavdhan
487.8%3.3%4.6%₹10,700 est.₹80.3 LUnder construction
Jun 2027
Yoganand Park 2
Belvalkar Housing · Kothrud / Erandwane / Bavdhan
487.8%3.3%4.3%₹10,700 est.₹80.3 LUnder construction
Dec 2025
Manasi
Abhilasha Developers · Kothrud / Erandwane / Bavdhan
487.8%3.3%4.3%₹10,700 est.₹80.3 LUnder construction
Dec 2025
Indukiran Co-Op Housing Society Limited
Kotibhaskar Infrastructures &Developers · Kothrud / Erandwane / Bavdhan
477.8%3.3%4.3%₹10,700 est.₹80.3 LUnder construction
Nov 2025
Gokhale Business Corner
Gokhale Constructions · Kothrud / Erandwane / Bavdhan
477.8%3.3%4.3%₹10,700 est.₹80.3 LUnder construction
Dec 2025
Pashupati
Ashwamedh Spaces · Kothrud / Erandwane / Bavdhan
477.8%3.2%4.2%₹10,700 est.₹80.3 LUnder construction
Jan 2027
Keshar
Badhekar Properties · Kothrud / Erandwane / Bavdhan
467.8%3.3%4.5%₹10,700 est.₹80.3 LUnder construction
Aug 2027
Ratnaprabha
Ashwamedh Spaces · Kothrud / Erandwane / Bavdhan
467.8%3.3%4.3%₹10,700 est.₹80.3 LUnder construction
Feb 2026
Shri Laxmi Chhaya Sahakari Grahrachana Sanstha Marayadit
Archway Properties · Kothrud / Erandwane / Bavdhan
447.8%3.3%4.3%₹10,700 est.₹80.3 LUnder construction
Jun 2026
Suparn
Badhekar Properties · Kothrud / Erandwane / Bavdhan
437.8%3.3%4.3%₹10,700 est.₹80.3 LUnder construction
Dec 2025
Chandra Apartment
Deshpande Landmark · Kothrud / Erandwane / Bavdhan
437.8%3.3%4.3%₹10,700 est.₹80.3 LUnder construction
Aug 2026
Anand
Archway Properties · Kothrud / Erandwane / Bavdhan
417.8%3.3%4.3%₹10,700 est.₹80.3 LUnder construction
Dec 2025

Price per sq ft in Kothrud / Erandwane / Bavdhan: what the evidence says

Date₹ / sq ftBasisConfidence
2021-06₹11,000pun (derived)40%
2023-06₹12,000pun (derived)45%
2025-06₹14,000pun (derived)50%
2026-06₹15,000pun (derived)50%

That is 6.4% a year from 2021-06 to 2026-06. The model projects 7.8% a year from here; the growth story on each project page shows why.

Infrastructure pipeline

ProjectTypeStatusExpectedChance it lands on timePrice effect if it does
Pune Metro Purple and Aqua lines (PCMC–Swargate, Vanaz–Ramwadi), open 2022–24metrooperational2024100%+0.8% / yr

The growth model counts each event at its probability, not its promise. Dates are the latest public schedule.

Developers active in Kothrud / Erandwane / Bavdhan

Ranked lists for Kothrud / Erandwane / Bavdhan

Kothrud / Erandwane / Bavdhan compared with other areas

Questions people ask

Is Kothrud / Erandwane / Bavdhan good for investment?

On PropertyLens's model the median analysed project in Kothrud / Erandwane / Bavdhan scores 58/100 (above the Pune average), with projected price growth of 7.8% a year over five years, median price ₹10,700 per sq ft and gross rental yield 3.5%. 145 RERA-registered projects analysed as of November 11, 2026. The best-scored project is Pratik Nagar Palladio Kothrud Central at 65.

What is the price per sq ft in Kothrud / Erandwane / Bavdhan?

Median ₹10,700 per sq ft of super built-up area across analysed projects, modelled from comparables where developers file no price. Entry price for an analysed home is about ₹80.3 L; the median home is ₹80.3 L.

What rental yield can I expect in Kothrud / Erandwane / Bavdhan?

Median gross yield 3.5% on the all-in cost of an analysed home, before maintenance, vacancy and tax. Net-wealth CAGR after every cost on an 8-year hold with a 75% loan is 4.0% at the median.

Are projects in Kothrud / Erandwane / Bavdhan delayed?

17 of 114 under-construction projects are past the completion date in their original RERA registration, and unsold stock equals about 16 months of sales. Each project page shows extensions, construction against bookings and complaints.

Scores and projections are model outputs built from dated public evidence (MahaRERA public filings, public ratings) and stated assumptions. Unit sizes and prices in this city are modelled estimates because the regulator does not publish unit inventories openly. They are research, not investment advice. How the numbers are built.

Share on WhatsApp