Is OMR IT corridor good for investment?
91 RERA-registered projects scored on one model, as of November 11, 2026. Prices, growth, yields, supply and the best-scored homes.
OMR IT corridor in one paragraph
On PropertyLens's model, OMR IT corridor is an average place to buy in Chennai right now: the median analysed project scores 50/100 (below the Chennai average), with projected price growth of 6.8% a year over five years and a median gross rental yield of 3.4%. Unsold homes would take about 22 months to absorb at the current sales pace, which is heavy supply and caps near-term price growth. 21 of 65 under-construction projects here are past their original RERA completion date, so weight the developer's record heavily.
Median of 91 projects; the spread inside the area is wide, so the ranked list below matters more than the average.
Best-scored projects in OMR IT corridor
All 91 analysed projects in OMR IT corridor
| Project | Score | Growth / yr | Net-wealth CAGR | Cash-flow IRR | Price / sq ft | Price | Status |
|---|---|---|---|---|---|---|---|
| Radiance Eternity Radiance Realty · OMR IT corridor | 60 | 8.0% | 1.7% | 2.9% | ₹7,900 est. | ₹1.03 Cr | Under construction May 2030 |
| Brigade Altius Brigade Group · OMR IT corridor | 60 | 7.9% | 2.6% | 5.0% | ₹7,900 est. | ₹1.03 Cr | Under construction Dec 2031 |
| Project Name changed from "Jains Antareeksh" to "Jains Seven77" - Construction o Jain Housing · OMR IT corridor | 58 | 7.6% | 1.5% | 2.3% | ₹7,900 est. | ₹85.3 L | Under construction Dec 2028 |
| Enchanted Baashyaam · OMR IT corridor | 58 | 7.7% | 2.1% | 4.0% | ₹7,900 est. | ₹1.03 Cr | Under construction Sep 2032 |
| The Summit Lancor · OMR IT corridor | 57 | 8.0% | 1.8% | 3.1% | ₹6,200 est. | ₹79.4 L | Under construction Oct 2029 |
| DRA Trinity DRA Homes · OMR IT corridor | 55 | 6.4% | 1.3% | 1.6% | ₹8,400 est. | ₹90.7 L | Ready |
| Sagar Springs Sagar Grandhi Sagar Grandhi Constructions · OMR IT corridor | 55 | 8.0% | 1.8% | 3.0% | ₹6,200 est. | ₹79.4 L | Under construction Dec 2029 |
| Antares Sri Kirthika Builders · OMR IT corridor | 54 | 8.0% | 1.7% | 2.8% | ₹6,200 est. | ₹79.4 L | Under construction Mar 2030 |
| Ramaniyam Zen World Ramaniyam · OMR IT corridor | 54 | 6.4% | 1.3% | 1.6% | ₹8,400 est. | ₹90.7 L | Ready |
| Casagrand Hola Chennai Casagrand · OMR IT corridor | 54 | 7.6% | 1.1% | 1.8% | ₹7,900 est. | ₹1.03 Cr | Under construction May 2029 |
| Tango Akshaya · OMR IT corridor | 54 | 6.4% | 1.3% | 1.6% | ₹8,400 est. | ₹90.7 L | Ready |
| Urbando Evorise Urbando Housing · OMR IT corridor | 53 | 7.6% | 2.6% | 5.5% | ₹6,200 est. | ₹79.4 L | Under construction Dec 2032 |
| Adityaram Palace City Royal Adityaram · OMR IT corridor | 53 | 8.1% | 1.9% | 3.5% | ₹6,200 est. | ₹79.4 L | Under construction Mar 2031 |
| DRA Skylantis DRA Homes · OMR IT corridor | 53 | 7.2% | 0.9% | 1.4% | ₹7,900 est. | ₹85.3 L | Under construction Jan 2028 |
| Bhaggyam Athulya Bhaggyam Constructions · OMR IT corridor | 52 | 6.4% | 1.5% | 1.9% | ₹6,600 est. | ₹70.3 L | Ready |
| Swathi's Tara Swathi Builders Rep By Its Tharayil Scaria Jose Sheeba Joseph And Elizabeth Joseph · OMR IT corridor | 52 | 8.0% | 1.4% | 2.4% | ₹6,200 est. | ₹79.4 L | Under construction Aug 2030 |
| Bluemoon Yash Proteck Machinery · OMR IT corridor | 52 | 8.0% | 1.8% | 3.0% | ₹6,200 est. | ₹79.4 L | Under construction Dec 2029 |
| Jain’s Anukriti Jain Housing · OMR IT corridor | 52 | 6.4% | 1.3% | 1.6% | ₹8,400 est. | ₹90.7 L | Ready |
| SAS Perungudi Prece Grip · OMR IT corridor | 52 | 7.6% | 1.4% | 2.2% | ₹6,200 est. | ₹66.0 L | Under construction Dec 2028 |
| Risington Phase Doshi Housing · OMR IT corridor | 52 | 7.8% | 2.2% | 4.3% | ₹6,200 est. | ₹79.4 L | Under construction Feb 2032 |
| Casagrand Cloud Casagrand · OMR IT corridor | 52 | 6.8% | 0.2% | 0.2% | ₹7,900 est. | ₹85.3 L | Under construction Oct 2026 |
| Meera’s Landmark Meera Homes Rep By Its Proprietor K.Siva Kumar · OMR IT corridor | 52 | 8.2% | 2.1% | 3.9% | ₹6,200 est. | ₹79.4 L | Under construction Dec 2030 |
| Sree Guru Atulya Sree Guru Foundations · OMR IT corridor | 52 | 6.4% | 1.5% | 1.9% | ₹6,600 est. | ₹70.3 L | Ready |
| Pearl Aster Pearlconstruction Chennai · OMR IT corridor | 51 | 6.8% | 0.3% | 0.5% | ₹6,200 est. | ₹79.4 L | Under construction Mar 2027 |
| Aprita Samprathy Developers · OMR IT corridor | 51 | 6.4% | 1.5% | 1.9% | ₹6,600 est. | ₹70.3 L | Ready |
| Grand Sharps Grand Style Constructions · OMR IT corridor | 51 | 6.4% | 1.5% | 1.9% | ₹6,600 est. | ₹70.3 L | Ready |
| Grand Deeps Grand Style Constructions · OMR IT corridor | 51 | 6.4% | 1.5% | 1.9% | ₹6,600 est. | ₹70.3 L | Ready |
| Grand Excelencia Grand Style Constructions · OMR IT corridor | 51 | 6.4% | 1.5% | 1.9% | ₹6,600 est. | ₹70.3 L | Ready |
| D Elite DRA Homes · OMR IT corridor | 51 | 6.4% | 1.3% | 1.6% | ₹8,400 est. | ₹90.7 L | Ready |
| Humming Tree Kamlesh Builders · OMR IT corridor | 51 | 8.0% | 1.7% | 3.2% | ₹6,200 est. | ₹66.0 L | Under construction Jun 2031 |
| Avyaa Stepsstone Promoters · OMR IT corridor | 51 | 7.6% | 1.4% | 2.2% | ₹6,200 est. | ₹66.0 L | Under construction Dec 2028 |
| Anans Block Stepsstone Promoters – Promoter · OMR IT corridor | 51 | 7.6% | 1.4% | 2.2% | ₹6,200 est. | ₹66.0 L | Under construction Dec 2028 |
| Avvaa Block Stepsstone Promoters · OMR IT corridor | 51 | 7.6% | 1.4% | 2.2% | ₹6,200 est. | ₹66.0 L | Under construction Dec 2028 |
| Anans Block Stepsstone Promoters – Promoter · OMR IT corridor | 51 | 7.6% | 1.4% | 2.2% | ₹6,200 est. | ₹66.0 L | Under construction Dec 2028 |
| North Star E Aa Builders · OMR IT corridor | 51 | 7.6% | 1.4% | 2.2% | ₹6,200 est. | ₹66.0 L | Under construction Dec 2028 |
| Marutham Pebbles Marutham Apartment · OMR IT corridor | 51 | 7.6% | 1.4% | 2.2% | ₹6,200 est. | ₹66.0 L | Under construction Dec 2028 |
| Raj Anaira Raj Homes · OMR IT corridor | 51 | 7.6% | 1.4% | 2.2% | ₹6,200 est. | ₹66.0 L | Under construction Dec 2028 |
| Hanu Homes Ms Hanu Homes Rep By Its Mr D Mohanraj And Mr D Devaraj · OMR IT corridor | 51 | 8.0% | 1.8% | 3.0% | ₹6,200 est. | ₹79.4 L | Under construction Dec 2029 |
| Sagar The One Sagar Grandhi Constructions · OMR IT corridor | 50 | 7.5% | 2.1% | 4.6% | ₹6,200 est. | ₹79.4 L | Under construction Jul 2033 |
| Polestar Sri Kirthika Builders · OMR IT corridor | 50 | 7.6% | 0.9% | 1.5% | ₹6,200 est. | ₹79.4 L | Under construction Jul 2029 |
| Radiance Sapphire Radiance Realty · OMR IT corridor | 50 | 6.4% | 1.3% | 1.6% | ₹8,400 est. | ₹90.7 L | Ready |
| S&s Centris S & S Foundations Owner & Thiru Sundararaj Gpa Holder · OMR IT corridor | 50 | 7.2% | 0.7% | 1.1% | ₹6,200 est. | ₹79.4 L | Under construction Mar 2028 |
| Urbando Eterna Urbando Housing · OMR IT corridor | 50 | 6.4% | 1.5% | 1.9% | ₹6,600 est. | ₹70.3 L | Ready |
| Sagar Valley Sagar Grandhi Constructions · OMR IT corridor | 50 | 6.4% | 1.5% | 1.9% | ₹6,600 est. | ₹70.3 L | Ready |
| Arihant Vaayu Arihanth Foundations & Housing · OMR IT corridor | 50 | 6.4% | 1.5% | 1.9% | ₹6,600 est. | ₹70.3 L | Ready |
| World Trade Centre Chennai Perungudi Real Estates · OMR IT corridor | 50 | 6.4% | 1.5% | 1.9% | ₹6,600 est. | ₹70.3 L | Ready |
| Project Name changed from "Urban Point" to "Aadya" - Construction of Stilt + 4 F Centwin Estates & Industries · OMR IT corridor | 50 | 6.4% | 1.5% | 1.9% | ₹6,600 est. | ₹70.3 L | Ready |
| Solara Pg Investments · OMR IT corridor | 50 | 6.4% | 1.5% | 1.9% | ₹6,600 est. | ₹70.3 L | Ready |
| Urban Square Centwin Housing · OMR IT corridor | 50 | 6.4% | 1.5% | 1.9% | ₹6,600 est. | ₹70.3 L | Ready |
| Tagros House Tagros Chemicals India P · OMR IT corridor | 50 | 6.4% | 1.5% | 1.9% | ₹6,600 est. | ₹70.3 L | Ready |
| Ocean Breeze Ocean Lifespaces India · OMR IT corridor | 49 | 6.8% | 0.3% | 0.5% | ₹6,200 est. | ₹79.4 L | Under construction Mar 2027 |
| Geetham Apartments Sri Padmavathi Promoters R.Chandini And R.Abirami · OMR IT corridor | 49 | 7.2% | 0.8% | 1.2% | ₹6,200 est. | ₹79.4 L | Under construction Dec 2027 |
| Rishab Apartments Vjr Builders Represented By Its · OMR IT corridor | 49 | 7.2% | 0.8% | 1.2% | ₹6,200 est. | ₹79.4 L | Under construction Dec 2027 |
| Green Views Samy Builders Rep By Its Managing Director Mr S Periyasamy · OMR IT corridor | 49 | 7.6% | 2.4% | 5.1% | ₹6,200 est. | ₹79.4 L | Under construction Mar 2033 |
| Nahar Arista Nahar Foundation's · OMR IT corridor | 48 | 7.2% | 0.7% | 1.1% | ₹6,200 est. | ₹79.4 L | Under construction Mar 2028 |
| East Star K Aa Builders · OMR IT corridor | 48 | 7.6% | 1.4% | 2.2% | ₹6,200 est. | ₹66.0 L | Under construction Dec 2028 |
| Golden Elephant Kcs Foundations · OMR IT corridor | 48 | 7.6% | 1.4% | 2.2% | ₹6,200 est. | ₹66.0 L | Under construction Dec 2028 |
| Harmony Sree Homes · OMR IT corridor | 48 | 6.4% | 1.5% | 1.9% | ₹6,600 est. | ₹70.3 L | Ready |
| VSR Rakesh Ramakrishnan Priya Constructions · OMR IT corridor | 48 | 6.4% | 1.5% | 1.9% | ₹6,600 est. | ₹70.3 L | Ready |
| Sankalp Kriya Infrastructure · OMR IT corridor | 48 | 6.4% | 1.5% | 1.9% | ₹6,600 est. | ₹70.3 L | Ready |
| Grand Wides Grand Style Constructions P · OMR IT corridor | 48 | 6.4% | 1.5% | 1.9% | ₹6,600 est. | ₹70.3 L | Ready |
| Sai Gredam Jaya Sathya Constructions · OMR IT corridor | 48 | 6.8% | 0.3% | 0.3% | ₹6,200 est. | ₹66.0 L | Under construction Oct 2026 |
| Hanu Home K.Gopalakrishnan · OMR IT corridor | 48 | 7.6% | 1.3% | 2.0% | ₹6,200 est. | ₹79.4 L | Under construction Dec 2028 |
| Hanu Aishwaryam Hanu Homes · OMR IT corridor | 47 | 6.8% | 0.2% | 0.2% | ₹6,200 est. | ₹66.0 L | Under construction Dec 2026 |
| Ksa Ananya Ksa Construction · OMR IT corridor | 47 | 6.8% | 0.0% | 0.1% | ₹6,200 est. | ₹79.4 L | Under construction Aug 2027 |
| Signature Towers NCC Urban Infrastructure · OMR IT corridor | 46 | 6.8% | 0.1% | 0.2% | ₹6,200 est. | ₹66.0 L | Under construction Jan 2027 |
| DAC Silicon Valley Dac Developers · OMR IT corridor | 46 | 6.4% | 1.5% | 1.9% | ₹6,600 est. | ₹70.3 L | Ready |
| Rajashree Apartments P.B.Ravi Gpa Holder Of Tmt Rajashree Ravi · OMR IT corridor | 46 | 6.4% | 1.5% | 1.9% | ₹6,600 est. | ₹70.3 L | Ready |
| Hanu Luxe Palace Ms Hanu Homes No: 9d Jeyachandran Nagar 3rd Main Road Jalladiyanpet Medavakkam Chennai Tamil Nadu-600100 · OMR IT corridor | 45 | 7.4% | 3.6% | 6.3% | ₹6,200 est. | ₹79.4 L | Under construction Mar 2034 |
| Deccan Kalpavriksha Deccan Estates · OMR IT corridor | 45 | 6.8% | 0.2% | 0.3% | ₹6,200 est. | ₹66.0 L | Under construction Nov 2026 |
| Nutech Gardens Of Gaia Nutech Realty Project · OMR IT corridor | 44 | 7.2% | 0.6% | 0.9% | ₹6,200 est. | ₹66.0 L | Under construction Jun 2028 |
| Rhythm Akshaya · OMR IT corridor | 42 | 6.8% | 0.2% | 0.3% | ₹7,900 est. | ₹85.3 L | Under construction Feb 2026 |
| Casa Grand Royale Casagrand · OMR IT corridor | 40 | 6.8% | 0.2% | 0.3% | ₹7,900 est. | ₹85.3 L | Under construction Nov 2022 |
| Project Name: "Adityaram Palace City Paradise" Project Details and Address Adityaram · OMR IT corridor | 40 | 6.8% | 0.3% | 0.4% | ₹6,200 est. | ₹66.0 L | Under construction Apr 2026 |
| Project Name: "Adityaram Palace City Paradise" Project Details and Address Adityaram · OMR IT corridor | 40 | 6.8% | 0.3% | 0.4% | ₹6,200 est. | ₹66.0 L | Under construction Apr 2026 |
| Ridgewood Condos Shri Raman Developers · OMR IT corridor | 40 | 6.8% | 0.3% | 0.4% | ₹6,200 est. | ₹66.0 L | Under construction Dec 2021 |
| GVR Classic Sagar Grandhi Constructions · OMR IT corridor | 39 | 6.8% | 0.3% | 0.4% | ₹6,200 est. | ₹66.0 L | Under construction Sep 2022 |
| Green Kubera Green Homes · OMR IT corridor | 39 | 6.8% | 0.3% | 0.4% | ₹6,200 est. | ₹66.0 L | Under construction Apr 2024 |
| Sagar Palace Sagar Grandhi Constructions · OMR IT corridor | 39 | 6.8% | 0.3% | 0.4% | ₹6,200 est. | ₹66.0 L | Under construction Sep 2025 |
| Vilasa Kalyani Property Developers · OMR IT corridor | 38 | 6.8% | 0.1% | 0.1% | ₹6,200 est. | ₹79.4 L | Under construction Mar 2026 |
| Ayyan Advith Sri Ayyan Homes Developer · OMR IT corridor | 37 | 6.8% | 0.3% | 0.4% | ₹6,200 est. | ₹66.0 L | Under construction Oct 2025 |
| Bluemoon Callisto Bluemoon Properties & Verda Real Estates · OMR IT corridor | 36 | 6.8% | 0.3% | 0.4% | ₹6,200 est. | ₹66.0 L | Under construction Sep 2023 |
| Tharaka Lsr Homes · OMR IT corridor | 36 | 6.8% | 0.3% | 0.4% | ₹6,200 est. | ₹66.0 L | Under construction Jun 2023 |
| North Star Aa Builders - Promoter · OMR IT corridor | 36 | 6.8% | 0.3% | 0.4% | ₹6,200 est. | ₹66.0 L | Under construction Jan 2025 |
| North Star Aa Builders - Promoter · OMR IT corridor | 36 | 6.8% | 0.3% | 0.4% | ₹6,200 est. | ₹66.0 L | Under construction Jan 2025 |
| Raj Ahalya Raj Homes · OMR IT corridor | 36 | 6.8% | 0.3% | 0.4% | ₹6,200 est. | ₹66.0 L | Under construction May 2025 |
| Arcadia Sannareddy Homes · OMR IT corridor | 35 | 6.8% | 0.1% | 0.1% | ₹6,200 est. | ₹79.4 L | Under construction Dec 2025 |
| ALPS Lake View The Alps Incorporation · OMR IT corridor | 34 | 6.8% | 0.3% | 0.4% | ₹6,200 est. | ₹66.0 L | Under construction Jun 2025 |
| GVR Supreme Gandhi Balaji · OMR IT corridor | 34 | 6.8% | 0.3% | 0.4% | ₹6,200 est. | ₹66.0 L | Under construction Mar 2024 |
| Sai Anantha Sai Shrine Housing · OMR IT corridor | 31 | 6.8% | 0.3% | 0.4% | ₹6,200 est. | ₹66.0 L | Under construction Mar 2023 |
| Sai Selva Sai Shrine Housing · OMR IT corridor | 29 | 6.8% | 0.3% | 0.4% | ₹6,200 est. | ₹66.0 L | Under construction Apr 2024 |
Price per sq ft in OMR IT corridor: what the evidence says
| Date | ₹ / sq ft | Basis | Confidence |
|---|---|---|---|
| 2021-06 | ₹6,200 | che (derived) | 40% |
| 2023-06 | ₹6,800 | che (derived) | 45% |
| 2025-06 | ₹8,000 | che (derived) | 50% |
| 2026-06 | ₹8,700 | che (derived) | 50% |
That is 7.0% a year from 2021-06 to 2026-06. The model projects 6.8% a year from here; the growth story on each project page shows why.
Infrastructure pipeline
| Project | Type | Status | Expected | Chance it lands on time | Price effect if it does |
|---|---|---|---|---|---|
| OMR elevated corridor and Phase 2 metro along OMR | metro | construction | 2027 | 60% | +1.0% / yr |
| Chennai Metro Phase 2 (Corridors 3, 4, 5: Madhavaram–SIPCOT, Light House–Poonamallee, Madhavaram–Sholinganallur) | metro | construction | 2027 | 60% | +1.2% / yr |
The growth model counts each event at its probability, not its promise. Dates are the latest public schedule.
Developers active in OMR IT corridor
Ranked lists for OMR IT corridor
OMR IT corridor compared with other areas
Questions people ask
Is OMR IT corridor good for investment?
On PropertyLens's model the median analysed project in OMR IT corridor scores 50/100 (below the Chennai average), with projected price growth of 6.8% a year over five years, median price ₹6,200 per sq ft and gross rental yield 3.4%. 91 RERA-registered projects analysed as of November 11, 2026. The best-scored project is Radiance Eternity at 60.
What is the price per sq ft in OMR IT corridor?
Median ₹6,200 per sq ft of super built-up area across analysed projects, modelled from comparables where developers file no price. Entry price for an analysed home is about ₹66.0 L; the median home is ₹70.3 L.
What rental yield can I expect in OMR IT corridor?
Median gross yield 3.4% on the all-in cost of an analysed home, before maintenance, vacancy and tax. Net-wealth CAGR after every cost on an 8-year hold with a 75% loan is 1.4% at the median.
Are projects in OMR IT corridor delayed?
21 of 65 under-construction projects are past the completion date in their original RERA registration, and unsold stock equals about 22 months of sales. Each project page shows extensions, construction against bookings and complaints.
Scores and projections are model outputs built from dated public evidence (Tamil Nadu RERA public filings, public ratings) and stated assumptions. They are research, not investment advice. How the numbers are built.