Is Kandivali / Borivali / Dahisar good for investment?
176 RERA-registered projects scored on one model, as of November 11, 2026. Prices, growth, yields, supply and the best-scored homes.
Kandivali / Borivali / Dahisar in one paragraph
On PropertyLens's model, Kandivali / Borivali / Dahisar is a better-than-average place to buy in Mumbai right now: the median analysed project scores 55/100 (above the Mumbai average), with projected price growth of 6.8% a year over five years and a median gross rental yield of 3.3%. Unsold homes would take about 22 months to absorb at the current sales pace, which is heavy supply and caps near-term price growth. 18 of 143 under-construction projects here are past their original RERA completion date, so weight the developer's record heavily.
Median of 176 projects; the spread inside the area is wide, so the ranked list below matters more than the average.
Best-scored projects in Kandivali / Borivali / Dahisar
All 176 analysed projects in Kandivali / Borivali / Dahisar
| Project | Score | Growth / yr | Net-wealth CAGR | Cash-flow IRR | Price / sq ft | Price | Status |
|---|---|---|---|---|---|---|---|
| Mahindra Vista Phase 1 Mahindra Lifespaces · Kandivali / Borivali / Dahisar | 65 | 7.6% | 3.5% | 5.9% | ₹20,500 est. | ₹1.33 Cr | Under construction Dec 2029 |
| Modirealty Rudraksh Modirealty Developers · Kandivali / Borivali / Dahisar | 63 | 7.9% | 3.5% | 5.9% | ₹16,050 est. | ₹1.04 Cr | Under construction Sep 2030 |
| Modern Roop-Kamal Co-Operative Housing Society Ltd Konark Structural Engineers · Kandivali / Borivali / Dahisar | 63 | 8.0% | 4.0% | 6.7% | ₹16,050 est. | ₹1.04 Cr | Under construction Dec 2029 |
| Godrej Reserve Wing 4 Godrej Properties · Kandivali / Borivali / Dahisar | 63 | 7.6% | 3.2% | 5.5% | ₹20,500 est. | ₹1.33 Cr | Under construction Jun 2030 |
| Godrej Reserve Wing 5 Godrej Properties · Kandivali / Borivali / Dahisar | 63 | 7.6% | 3.2% | 5.5% | ₹20,500 est. | ₹1.33 Cr | Under construction Jun 2030 |
| Godrej Reserve Wing 2 Godrej Properties · Kandivali / Borivali / Dahisar | 63 | 7.6% | 3.4% | 6.2% | ₹20,500 est. | ₹1.33 Cr | Under construction Jun 2031 |
| Empire Goldcrest Empire Realty · Kandivali / Borivali / Dahisar | 62 | 8.2% | 4.5% | 8.0% | ₹16,050 est. | ₹1.04 Cr | Under construction Oct 2030 |
| H. Rishabraj Evergreen Rishabraj Estate Developers · Kandivali / Borivali / Dahisar | 62 | 8.0% | 4.0% | 6.7% | ₹16,050 est. | ₹1.04 Cr | Under construction Dec 2029 |
| Avyukta Tattva Shivoham Infrahomes · Kandivali / Borivali / Dahisar | 62 | 8.2% | 4.4% | 7.7% | ₹16,050 est. | ₹1.04 Cr | Under construction Dec 2030 |
| Empire Heights Empire Realty · Kandivali / Borivali / Dahisar | 61 | 7.9% | 4.7% | 8.6% | ₹16,050 est. | ₹1.04 Cr | Under construction Oct 2031 |
| Hum Galaxy Heights Hum Developers · Kandivali / Borivali / Dahisar | 61 | 8.2% | 4.4% | 7.7% | ₹16,050 est. | ₹1.04 Cr | Under construction Dec 2030 |
| Hum Laxmi Hum Developers · Kandivali / Borivali / Dahisar | 61 | 8.2% | 4.4% | 7.7% | ₹16,050 est. | ₹1.04 Cr | Under construction Dec 2030 |
| Vasishtha Krupa Co-operative Housing Society Ltd. (redevelopment) Kaustubh Construction · Kandivali / Borivali / Dahisar | 61 | 6.4% | 3.2% | 4.1% | ₹17,100 est. | ₹1.11 Cr | Ready |
| Hum Sapphire Hum Developers · Kandivali / Borivali / Dahisar | 61 | 8.2% | 4.4% | 7.7% | ₹16,050 est. | ₹1.04 Cr | Under construction Dec 2030 |
| Krishnagiri Upavan Co-Operative Housing Society Limited Samarpan Homes & Developers · Kandivali / Borivali / Dahisar | 61 | 8.0% | 4.0% | 6.7% | ₹16,050 est. | ₹1.04 Cr | Under construction Dec 2029 |
| Sahakar Bliss Sahakar Builders & Developers · Kandivali / Borivali / Dahisar | 61 | 8.2% | 4.4% | 7.7% | ₹16,050 est. | ₹1.04 Cr | Under construction Dec 2030 |
| Ostwal Fermino Shree Ostwal Builders · Kandivali / Borivali / Dahisar | 61 | 8.2% | 4.4% | 7.7% | ₹16,050 est. | ₹1.04 Cr | Under construction Dec 2030 |
| Modirealty Asopalav Modirealty Developers · Kandivali / Borivali / Dahisar | 61 | 7.6% | 3.1% | 4.9% | ₹16,050 est. | ₹1.04 Cr | Under construction Sep 2029 |
| Empire Aashirwad Empire Realty · Kandivali / Borivali / Dahisar | 60 | 8.0% | 4.0% | 6.7% | ₹16,050 est. | ₹1.04 Cr | Under construction Dec 2029 |
| Rajesh Mandir Chsl (redevelopment) Pranav Constructions · Kandivali / Borivali / Dahisar | 60 | 7.2% | 2.7% | 4.0% | ₹16,050 est. | ₹1.04 Cr | Under construction Jul 2028 |
| Empire Greens Empire Realty · Kandivali / Borivali / Dahisar | 60 | 8.0% | 3.9% | 6.5% | ₹16,050 est. | ₹1.04 Cr | Under construction Mar 2030 |
| Rishabraj Vatsal H Rishabraj Realty · Kandivali / Borivali / Dahisar | 60 | 6.8% | 2.3% | 3.0% | ₹16,050 est. | ₹1.04 Cr | Under construction Dec 2026 |
| NP 1.2 A S D Corporation · Kandivali / Borivali / Dahisar | 60 | 7.6% | 4.9% | 9.5% | ₹16,050 est. | ₹1.04 Cr | Under construction Oct 2032 |
| NP 1.2 B S D Corporation · Kandivali / Borivali / Dahisar | 60 | 7.6% | 4.9% | 9.5% | ₹16,050 est. | ₹1.04 Cr | Under construction Oct 2032 |
| Sheetal Shashanka D.G.S Land Developers India · Kandivali / Borivali / Dahisar | 60 | 8.0% | 4.0% | 6.7% | ₹16,050 est. | ₹1.04 Cr | Under construction Dec 2029 |
| Hum Emerald Heights Hum Developers · Kandivali / Borivali / Dahisar | 60 | 8.0% | 4.0% | 6.7% | ₹16,050 est. | ₹1.04 Cr | Under construction Dec 2029 |
| Sheetal Raj Ratna D.G.S Land Developers India · Kandivali / Borivali / Dahisar | 60 | 8.0% | 4.0% | 6.7% | ₹16,050 est. | ₹1.04 Cr | Under construction Dec 2029 |
| Sky City Tower H Oberoi Realty · Kandivali / Borivali / Dahisar | 60 | 7.6% | 3.1% | 5.3% | ₹27,150 est. | ₹1.76 Cr | Under construction Jun 2030 |
| Rishabraj Forest Front Rishabraj Estate Developers · Kandivali / Borivali / Dahisar | 60 | 7.6% | 3.5% | 5.6% | ₹16,050 est. | ₹1.04 Cr | Under construction Dec 2028 |
| Khandelwal Luxor Wing A Shree Krishna Sai Development Corporation · Kandivali / Borivali / Dahisar | 60 | 8.0% | 4.0% | 6.7% | ₹16,050 est. | ₹1.04 Cr | Under construction Dec 2029 |
| Khandelwal Reserve Wing A Shree Krishna Sai Development Corporation · Kandivali / Borivali / Dahisar | 60 | 8.0% | 4.0% | 6.7% | ₹16,050 est. | ₹1.04 Cr | Under construction Dec 2029 |
| Neeldhara Co-Operative Housing Society Limited Konark Structural Engineers · Kandivali / Borivali / Dahisar | 60 | 8.1% | 4.1% | 7.3% | ₹16,050 est. | ₹1.04 Cr | Under construction Mar 2031 |
| Breeze 91 Kaustubh Construction · Kandivali / Borivali / Dahisar | 59 | 8.0% | 3.9% | 6.5% | ₹16,050 est. | ₹1.04 Cr | Under construction Mar 2030 |
| Kalpataru Vienta Tower B Kalpataru · Kandivali / Borivali / Dahisar | 59 | 6.5% | 1.5% | 2.1% | ₹20,500 est. | ₹1.33 Cr | Under construction Dec 2026 |
| Shreeji Sky Rise Tower Shreeji Construction · Kandivali / Borivali / Dahisar | 59 | 6.8% | 2.3% | 3.0% | ₹16,050 est. | ₹1.04 Cr | Under construction Dec 2026 |
| Kalpataru Advay Kalpataru · Kandivali / Borivali / Dahisar | 59 | 7.6% | 3.2% | 5.5% | ₹20,500 est. | ₹1.33 Cr | Under construction Jun 2030 |
| Kaustubh Park 91 Kaustubh Construction · Kandivali / Borivali / Dahisar | 59 | 8.2% | 4.4% | 7.7% | ₹16,050 est. | ₹1.04 Cr | Under construction Dec 2030 |
| Siennaa Wing F S D Corporation · Kandivali / Borivali / Dahisar | 59 | 7.2% | 3.0% | 4.4% | ₹16,050 est. | ₹1.04 Cr | Under construction Apr 2028 |
| Girnar Apartment Co-Operative Housing Society Limited Konark Structural Engineers · Kandivali / Borivali / Dahisar | 59 | 8.0% | 4.0% | 6.7% | ₹16,050 est. | ₹1.04 Cr | Under construction Dec 2029 |
| Kaustubh Capital Kaustubh Construction · Kandivali / Borivali / Dahisar | 59 | 7.9% | 3.5% | 5.9% | ₹16,050 est. | ₹1.04 Cr | Under construction Sep 2030 |
| Godrej Reserve Wing 1 Godrej Properties · Kandivali / Borivali / Dahisar | 59 | 7.6% | 3.2% | 5.5% | ₹20,500 est. | ₹1.33 Cr | Under construction Jun 2030 |
| Godrej Reserve Wing 3 Godrej Properties · Kandivali / Borivali / Dahisar | 59 | 7.6% | 3.2% | 5.5% | ₹20,500 est. | ₹1.33 Cr | Under construction Jun 2030 |
| Hum GS Heights Hum Developers · Kandivali / Borivali / Dahisar | 59 | 7.8% | 4.5% | 8.4% | ₹16,050 est. | ₹1.04 Cr | Under construction Dec 2031 |
| Shraddha Park City Shraddha Prime Projects · Kandivali / Borivali / Dahisar | 58 | 8.0% | 4.0% | 6.7% | ₹16,050 est. | ₹1.04 Cr | Under construction Dec 2029 |
| Prime Orchid Prime Group · Kandivali / Borivali / Dahisar | 58 | 8.0% | 4.0% | 6.7% | ₹16,050 est. | ₹1.04 Cr | Under construction Dec 2029 |
| Kalpataru Vienta Tower A Kalpataru · Kandivali / Borivali / Dahisar | 58 | 6.5% | 1.7% | 2.4% | ₹20,500 est. | ₹1.33 Cr | Under construction Jun 2027 |
| Sambhav Darshan Purshottam Park CO-OPERATIVE HOUSING SOCIETY LTD Samarpan Homes & Developers · Kandivali / Borivali / Dahisar | 58 | 7.2% | 3.1% | 4.6% | ₹16,050 est. | ₹1.04 Cr | Under construction Dec 2027 |
| Shree Krupa Chsl Amar Associates · Kandivali / Borivali / Dahisar | 58 | 6.8% | 2.3% | 3.0% | ₹16,050 est. | ₹1.04 Cr | Under construction Dec 2026 |
| TW Gardens The Wadhwa Group · Kandivali / Borivali / Dahisar | 58 | 6.8% | 2.4% | 3.7% | ₹20,500 est. | ₹1.33 Cr | Under construction Dec 2027 |
| Kanakia Privaasa Tower 1 & 2 Kanakia · Kandivali / Borivali / Dahisar | 58 | 7.6% | 3.4% | 6.2% | ₹20,500 est. | ₹1.33 Cr | Under construction Jun 2031 |
| Pratap Mithila Jpv Realtors · Kandivali / Borivali / Dahisar | 57 | 6.8% | 2.4% | 3.4% | ₹16,050 est. | ₹1.04 Cr | Under construction Jun 2027 |
| Nicco Vanashri And Nicco Heights New India Construction Company · Kandivali / Borivali / Dahisar | 57 | 7.6% | 3.5% | 5.6% | ₹16,050 est. | ₹1.04 Cr | Under construction Dec 2028 |
| H. Rishabraj Towers Rishabraj Estate Developers · Kandivali / Borivali / Dahisar | 57 | 7.6% | 4.7% | 9.2% | ₹16,050 est. | ₹1.04 Cr | Under construction Dec 2032 |
| Unique Regalia Unique Shanti · Kandivali / Borivali / Dahisar | 57 | 7.6% | 3.2% | 5.1% | ₹16,050 est. | ₹1.04 Cr | Under construction Jun 2029 |
| Empire Vrindavan Empire Realty · Kandivali / Borivali / Dahisar | 57 | 6.8% | 2.3% | 3.1% | ₹16,050 est. | ₹1.04 Cr | Under construction Nov 2026 |
| Rishabraj Astral Rishabraj Estate Developers · Kandivali / Borivali / Dahisar | 57 | 7.6% | 3.1% | 4.9% | ₹16,050 est. | ₹1.04 Cr | Under construction Aug 2029 |
| Sky City Tower G Oberoi Realty · Kandivali / Borivali / Dahisar | 57 | 6.8% | 2.1% | 3.2% | ₹27,150 est. | ₹1.76 Cr | Under construction Dec 2027 |
| Empire Fairmont Empire Realty · Kandivali / Borivali / Dahisar | 57 | 6.8% | 2.3% | 3.0% | ₹16,050 est. | ₹1.04 Cr | Under construction Dec 2026 |
| Giriraj Mandir Premises Co operative Society Limited Amar Associates · Kandivali / Borivali / Dahisar | 57 | 7.6% | 3.1% | 4.9% | ₹16,050 est. | ₹1.04 Cr | Under construction Sep 2029 |
| Kamla Borivali Lucky Kamla Homes And Lifestyles · Kandivali / Borivali / Dahisar | 57 | 7.2% | 3.1% | 4.6% | ₹16,050 est. | ₹1.04 Cr | Under construction Dec 2027 |
| Sahakar Vatika Sahakar Builders & Developers · Kandivali / Borivali / Dahisar | 57 | 7.2% | 3.1% | 4.6% | ₹16,050 est. | ₹1.04 Cr | Under construction Dec 2027 |
| Khandelwal Reserve Wing B Shree Krishna Sai Development Corporation · Kandivali / Borivali / Dahisar | 56 | 7.2% | 3.1% | 4.6% | ₹16,050 est. | ₹1.04 Cr | Under construction Dec 2027 |
| Khandelwal Luxor Wing B Shree Krishna Sai Development Corporation · Kandivali / Borivali / Dahisar | 56 | 7.2% | 3.1% | 4.6% | ₹16,050 est. | ₹1.04 Cr | Under construction Dec 2027 |
| Pratham - By Shraddha Shraddha Prime Projects · Kandivali / Borivali / Dahisar | 56 | 8.0% | 4.0% | 6.7% | ₹16,050 est. | ₹1.04 Cr | Under construction Dec 2029 |
| Lakshman Tower Chsl (redevelopment) Pranav Constructions · Kandivali / Borivali / Dahisar | 56 | 6.8% | 2.7% | 3.7% | ₹16,050 est. | ₹1.04 Cr | Under construction Mar 2027 |
| Sbi Emp Navjeevan Chsl (redevelopment) Pranav Constructions · Kandivali / Borivali / Dahisar | 56 | 7.2% | 2.7% | 4.0% | ₹16,050 est. | ₹1.04 Cr | Under construction Jul 2028 |
| Hum Solaris Hum Developers · Kandivali / Borivali / Dahisar | 56 | 6.8% | 2.3% | 3.0% | ₹16,050 est. | ₹1.04 Cr | Under construction Dec 2026 |
| Swanand Co-Operative Housing Society Limited Samarpan Homes & Developers · Kandivali / Borivali / Dahisar | 56 | 7.2% | 3.1% | 4.6% | ₹16,050 est. | ₹1.04 Cr | Under construction Dec 2027 |
| Megh Mahal Chsl Samarpan Homes & Developers · Kandivali / Borivali / Dahisar | 56 | 7.2% | 3.1% | 4.6% | ₹16,050 est. | ₹1.04 Cr | Under construction Dec 2027 |
| Gagansagar Hum Developers · Kandivali / Borivali / Dahisar | 56 | 6.8% | 2.3% | 3.0% | ₹16,050 est. | ₹1.04 Cr | Under construction Dec 2026 |
| Empire Meghna Empire Realty · Kandivali / Borivali / Dahisar | 56 | 6.8% | 2.7% | 3.7% | ₹16,050 est. | ₹1.04 Cr | Under construction Mar 2027 |
| Hum Durga Hum Developers · Kandivali / Borivali / Dahisar | 56 | 6.8% | 2.3% | 3.0% | ₹16,050 est. | ₹1.04 Cr | Under construction Dec 2026 |
| Empire Esther Empire Realty · Kandivali / Borivali / Dahisar | 56 | 6.8% | 2.7% | 3.7% | ₹16,050 est. | ₹1.04 Cr | Under construction Mar 2027 |
| Devendra Chsl Amar Associates · Kandivali / Borivali / Dahisar | 56 | 7.2% | 3.0% | 4.5% | ₹16,050 est. | ₹1.04 Cr | Under construction Mar 2028 |
| Modirealty Acacia Modirealty Developers · Kandivali / Borivali / Dahisar | 56 | 7.2% | 3.0% | 4.5% | ₹16,050 est. | ₹1.04 Cr | Under construction Mar 2028 |
| Mayfair Aangan Mayfair Housing · Kandivali / Borivali / Dahisar | 56 | 7.6% | 4.7% | 9.2% | ₹16,050 est. | ₹1.04 Cr | Under construction Dec 2032 |
| Rishabraj Phoenix Rishabraj Estate Developers · Kandivali / Borivali / Dahisar | 56 | 6.8% | 2.2% | 2.9% | ₹16,050 est. | ₹1.04 Cr | Under construction Feb 2027 |
| Amba Aashish CHS Empire Realty · Kandivali / Borivali / Dahisar | 56 | 6.4% | 3.2% | 4.1% | ₹17,100 est. | ₹1.11 Cr | Ready |
| Empire Valencia Empire Realty · Kandivali / Borivali / Dahisar | 56 | 6.4% | 3.2% | 4.1% | ₹17,100 est. | ₹1.11 Cr | Ready |
| Bhavik Darshan CHS Ltd And Gajmukh CHS Ltd Konark Structural Engineers · Kandivali / Borivali / Dahisar | 56 | 7.2% | 3.1% | 4.6% | ₹16,050 est. | ₹1.04 Cr | Under construction Dec 2027 |
| Gurukrupa Sharanam Gurukrupa Realcon Lifespaces · Kandivali / Borivali / Dahisar | 56 | 6.8% | 2.3% | 3.0% | ₹16,050 est. | ₹1.04 Cr | Under construction Dec 2026 |
| Altus Lodha (Macrotech) · Kandivali / Borivali / Dahisar | 56 | 7.8% | 3.8% | 6.8% | ₹27,150 est. | ₹1.76 Cr | Under construction Dec 2030 |
| Empire Preston Empire Realty · Kandivali / Borivali / Dahisar | 56 | 7.2% | 2.7% | 4.0% | ₹16,050 est. | ₹1.04 Cr | Under construction Jul 2028 |
| Alliance Eternis Alliance City Developers Realtors · Kandivali / Borivali / Dahisar | 56 | 6.8% | 2.6% | 3.7% | ₹16,050 est. | ₹1.04 Cr | Under construction Apr 2027 |
| Anand Co-Operative Housing Society Ltd Building No 2 Samarpan Homes & Developers · Kandivali / Borivali / Dahisar | 55 | 6.8% | 2.3% | 3.0% | ₹16,050 est. | ₹1.04 Cr | Under construction Dec 2026 |
| Samarpan Sankalp Samarpan Homes & Developers · Kandivali / Borivali / Dahisar | 55 | 6.8% | 2.3% | 3.0% | ₹16,050 est. | ₹1.04 Cr | Under construction Dec 2026 |
| Goldmist Co-Operative Housing Society Limited Samarpan Homes & Developers · Kandivali / Borivali / Dahisar | 55 | 6.8% | 2.3% | 3.0% | ₹16,050 est. | ₹1.04 Cr | Under construction Dec 2026 |
| Gautam Prabhu H Rishabraj Realty · Kandivali / Borivali / Dahisar | 55 | 6.8% | 2.6% | 3.7% | ₹16,050 est. | ₹1.04 Cr | Under construction Apr 2027 |
| Vishal-1 Hum Developers · Kandivali / Borivali / Dahisar | 55 | 6.4% | 3.2% | 4.1% | ₹17,100 est. | ₹1.11 Cr | Ready |
| Kamla Borivli Rajesh Kamla Homes And Lifestyles · Kandivali / Borivali / Dahisar | 55 | 6.8% | 2.7% | 3.7% | ₹16,050 est. | ₹1.04 Cr | Under construction Mar 2027 |
| The Vibe Sahakar Builders & Developers · Kandivali / Borivali / Dahisar | 55 | 7.2% | 2.7% | 4.1% | ₹16,050 est. | ₹1.04 Cr | Under construction Jun 2028 |
| Modirealty Ashvattha Modirealty Developers · Kandivali / Borivali / Dahisar | 55 | 6.8% | 2.7% | 3.7% | ₹16,050 est. | ₹1.04 Cr | Under construction Mar 2027 |
| Kasturi Milan H Rishabraj Realty · Kandivali / Borivali / Dahisar | 55 | 6.4% | 3.2% | 4.1% | ₹17,100 est. | ₹1.11 Cr | Ready |
| Avyukta Vedant Shivoham Infrahomes · Kandivali / Borivali / Dahisar | 55 | 7.6% | 3.4% | 5.4% | ₹16,050 est. | ₹1.04 Cr | Under construction Mar 2029 |
| Pratap Adinath Jpv Realtors · Kandivali / Borivali / Dahisar | 55 | 7.2% | 3.1% | 4.6% | ₹16,050 est. | ₹1.04 Cr | Under construction Dec 2027 |
| Avyukta Jayesh Shivoham Infrahomes · Kandivali / Borivali / Dahisar | 55 | 7.6% | 3.4% | 5.4% | ₹16,050 est. | ₹1.04 Cr | Under construction Mar 2029 |
| Avyukta Jay Abhilasha Shivoham Infrahomes · Kandivali / Borivali / Dahisar | 55 | 7.6% | 3.2% | 5.1% | ₹16,050 est. | ₹1.04 Cr | Under construction Jun 2029 |
| Kamla Valeon Kamla Homes And Lifestyles · Kandivali / Borivali / Dahisar | 55 | 6.4% | 3.2% | 4.1% | ₹17,100 est. | ₹1.11 Cr | Ready |
| Rishabraj Percy H Rishabraj Realty · Kandivali / Borivali / Dahisar | 55 | 6.4% | 3.2% | 4.1% | ₹17,100 est. | ₹1.11 Cr | Ready |
| Rishabraj Villa Stella H Rishabraj Realty · Kandivali / Borivali / Dahisar | 55 | 6.4% | 3.2% | 4.1% | ₹17,100 est. | ₹1.11 Cr | Ready |
| Avyukta Parijat Shivoham Infrahomes · Kandivali / Borivali / Dahisar | 55 | 8.0% | 3.9% | 6.5% | ₹16,050 est. | ₹1.04 Cr | Under construction Mar 2030 |
| Nirmaan Heights Chaitanya Developers · Kandivali / Borivali / Dahisar | 55 | 6.4% | 3.2% | 4.1% | ₹17,100 est. | ₹1.11 Cr | Ready |
| Palace Chsl Neelkanth · Kandivali / Borivali / Dahisar | 55 | 6.4% | 3.2% | 4.1% | ₹17,100 est. | ₹1.11 Cr | Ready |
| Samarth Arihant Neelkanth · Kandivali / Borivali / Dahisar | 55 | 6.4% | 3.2% | 4.1% | ₹17,100 est. | ₹1.11 Cr | Ready |
| Vraj Vihar C.H.S.L. Neelkanth · Kandivali / Borivali / Dahisar | 55 | 6.4% | 3.2% | 4.1% | ₹17,100 est. | ₹1.11 Cr | Ready |
| Om Siddharth Chsl Shree Developers · Kandivali / Borivali / Dahisar | 55 | 7.6% | 3.1% | 4.9% | ₹16,050 est. | ₹1.04 Cr | Under construction Sep 2029 |
| Anuraj Co-Operative Housing Society Limited Samarpan Homes & Developers · Kandivali / Borivali / Dahisar | 55 | 6.4% | 3.2% | 4.1% | ₹17,100 est. | ₹1.11 Cr | Ready |
| Nikunj Vihar Co-Operative Housing Society Limited Samarpan Homes & Developers · Kandivali / Borivali / Dahisar | 55 | 6.4% | 3.2% | 4.1% | ₹17,100 est. | ₹1.11 Cr | Ready |
| Hiranmay Niwas Co-Operative Housing Society Limited Samarpan Homes & Developers · Kandivali / Borivali / Dahisar | 55 | 6.4% | 3.2% | 4.1% | ₹17,100 est. | ₹1.11 Cr | Ready |
| Municipal Employees Akanksha Chsl Konark Structural Engineers · Kandivali / Borivali / Dahisar | 54 | 6.4% | 3.2% | 4.1% | ₹17,100 est. | ₹1.11 Cr | Ready |
| Shanti Kishan CHS LTD Konark Structural Engineers · Kandivali / Borivali / Dahisar | 54 | 6.4% | 3.2% | 4.1% | ₹17,100 est. | ₹1.11 Cr | Ready |
| Boirvali Samarpan CHS Ltd Konark Structural Engineers · Kandivali / Borivali / Dahisar | 54 | 6.4% | 3.2% | 4.1% | ₹17,100 est. | ₹1.11 Cr | Ready |
| Woods Tower 9 Lodha (Macrotech) · Kandivali / Borivali / Dahisar | 54 | 7.6% | 3.3% | 5.6% | ₹27,150 est. | ₹1.76 Cr | Under construction Dec 2029 |
| Shraddha Paradise Shraddha Prime Projects · Kandivali / Borivali / Dahisar | 54 | 7.6% | 3.5% | 5.6% | ₹16,050 est. | ₹1.04 Cr | Under construction Dec 2028 |
| Siennaa Wing E S D Corporation · Kandivali / Borivali / Dahisar | 54 | 7.2% | 3.1% | 4.6% | ₹16,050 est. | ₹1.04 Cr | Under construction Dec 2027 |
| Raj One Raj Realtors · Kandivali / Borivali / Dahisar | 54 | 6.8% | 2.3% | 3.3% | ₹16,050 est. | ₹1.04 Cr | Under construction Aug 2027 |
| Kesar Niketan Chsl (redevelopment) Pranav Constructions · Kandivali / Borivali / Dahisar | 54 | 6.8% | 2.4% | 3.1% | ₹16,050 est. | ₹1.04 Cr | Under construction Jan 2026 |
| Jessika Chs.Ltd. Vinayak Developers · Kandivali / Borivali / Dahisar | 53 | 6.4% | 3.2% | 4.1% | ₹17,100 est. | ₹1.11 Cr | Ready |
| Prime Classic Prime Group · Kandivali / Borivali / Dahisar | 53 | 6.4% | 3.2% | 4.1% | ₹17,100 est. | ₹1.11 Cr | Ready |
| Prime Audumbar Prime Group · Kandivali / Borivali / Dahisar | 53 | 6.4% | 3.2% | 4.1% | ₹17,100 est. | ₹1.11 Cr | Ready |
| Prime Group Project Grand Slam Prime Group · Kandivali / Borivali / Dahisar | 53 | 6.4% | 3.2% | 4.1% | ₹17,100 est. | ₹1.11 Cr | Ready |
| Prime Legacy Prime Group · Kandivali / Borivali / Dahisar | 53 | 6.4% | 3.2% | 4.1% | ₹17,100 est. | ₹1.11 Cr | Ready |
| Sanghvi Solitaire Sanghvi Premises · Kandivali / Borivali / Dahisar | 53 | 6.4% | 3.2% | 4.1% | ₹17,100 est. | ₹1.11 Cr | Ready |
| Mahindra Vista Phase 2 Mahindra Lifespaces · Kandivali / Borivali / Dahisar | 53 | 7.8% | 3.9% | 6.9% | ₹20,500 est. | ₹1.33 Cr | Under construction Dec 2030 |
| Lodha Kandivali Project - Tower 4 Lodha (Macrotech) · Kandivali / Borivali / Dahisar | 53 | 6.0% | 1.9% | 2.5% | ₹28,900 est. | ₹1.88 Cr | Ready |
| Rashmi Avenue Modi's Navnirman · Kandivali / Borivali / Dahisar | 53 | 7.6% | 3.1% | 4.9% | ₹16,050 est. | ₹1.04 Cr | Under construction Aug 2029 |
| Om Shri Jagannath Chsl Samarpan Homes & Developers · Kandivali / Borivali / Dahisar | 52 | 6.8% | 2.3% | 3.0% | ₹16,050 est. | ₹1.04 Cr | Under construction Dec 2026 |
| Siennaa Wing A S D Corporation · Kandivali / Borivali / Dahisar | 52 | 6.4% | 3.2% | 4.1% | ₹17,100 est. | ₹1.11 Cr | Ready |
| Siennaa Wing B S D Corporation · Kandivali / Borivali / Dahisar | 52 | 6.4% | 3.2% | 4.1% | ₹17,100 est. | ₹1.11 Cr | Ready |
| Siennaa Wing C S D Corporation · Kandivali / Borivali / Dahisar | 52 | 6.4% | 3.2% | 4.1% | ₹17,100 est. | ₹1.11 Cr | Ready |
| Lodha Woods - Tower 7 Lodha (Macrotech) · Kandivali / Borivali / Dahisar | 52 | 6.5% | 1.3% | 1.9% | ₹27,150 est. | ₹1.76 Cr | Under construction Jul 2027 |
| Rashmi Delight Modi's Navnirman · Kandivali / Borivali / Dahisar | 52 | 6.8% | 2.3% | 3.0% | ₹16,050 est. | ₹1.04 Cr | Under construction Dec 2026 |
| Sai Divine B And C Shreeji Developers · Kandivali / Borivali / Dahisar | 52 | 7.2% | 3.1% | 4.6% | ₹16,050 est. | ₹1.04 Cr | Under construction Dec 2027 |
| Sai Divine Shreeji Developers · Kandivali / Borivali / Dahisar | 52 | 7.2% | 3.1% | 4.6% | ₹16,050 est. | ₹1.04 Cr | Under construction Dec 2027 |
| Mahavir Krupa CHSL Ltd Neelkanth · Kandivali / Borivali / Dahisar | 52 | 6.8% | 2.7% | 3.7% | ₹16,050 est. | ₹1.04 Cr | Under construction Mar 2027 |
| Lodha Woods- Tower 8 Lodha (Macrotech) · Kandivali / Borivali / Dahisar | 52 | 7.2% | 2.7% | 4.3% | ₹27,150 est. | ₹1.76 Cr | Under construction Nov 2028 |
| Parvatraji Prime Group · Kandivali / Borivali / Dahisar | 52 | 7.2% | 2.7% | 4.1% | ₹16,050 est. | ₹1.04 Cr | Under construction Jun 2028 |
| Diwali Darshan Omkar Realtors · Kandivali / Borivali / Dahisar | 52 | 6.8% | 2.2% | 2.9% | ₹16,050 est. | ₹1.04 Cr | Under construction Feb 2027 |
| Madhuban Heights The Wadhwa Group · Kandivali / Borivali / Dahisar | 52 | 6.0% | 2.4% | 3.1% | ₹21,800 est. | ₹1.42 Cr | Ready |
| Jeandveekedarnath Je And Vee Infrastructure · Kandivali / Borivali / Dahisar | 51 | 6.4% | 3.2% | 4.1% | ₹17,100 est. | ₹1.11 Cr | Ready |
| Jeandveevishwanath Je And Vee Infrastructure · Kandivali / Borivali / Dahisar | 51 | 6.4% | 3.2% | 4.1% | ₹17,100 est. | ₹1.11 Cr | Ready |
| Rashmi Vasudeo Modi's Navnirman · Kandivali / Borivali / Dahisar | 51 | 6.4% | 3.2% | 4.1% | ₹17,100 est. | ₹1.11 Cr | Ready |
| Lodha Woods - Tower 6 Lodha (Macrotech) · Kandivali / Borivali / Dahisar | 51 | 6.8% | 2.1% | 3.2% | ₹27,150 est. | ₹1.76 Cr | Under construction Nov 2027 |
| Lodha Kandivali Project-Tower 1 Lodha (Macrotech) · Kandivali / Borivali / Dahisar | 51 | 6.8% | 2.0% | 3.1% | ₹27,150 est. | ₹1.76 Cr | Under construction Feb 2028 |
| Rustomjee Summit Rustomjee · Kandivali / Borivali / Dahisar | 50 | 6.8% | 2.4% | 3.7% | ₹20,500 est. | ₹1.33 Cr | Under construction Dec 2027 |
| State Sector Bank Employees CHS Ltd Kailas Building Konark Structural Engineers · Kandivali / Borivali / Dahisar | 49 | 6.8% | 2.7% | 3.7% | ₹16,050 est. | ₹1.04 Cr | Under construction Mar 2027 |
| Arkade Crown Arkade Developers · Kandivali / Borivali / Dahisar | 49 | 6.8% | 2.4% | 3.1% | ₹16,050 est. | ₹1.04 Cr | Under construction Dec 2025 |
| Vaayu Kolte-Patil · Kandivali / Borivali / Dahisar | 49 | 6.5% | 1.9% | 2.7% | ₹20,500 est. | ₹1.33 Cr | Under construction Apr 2027 |
| Siennaa Wing D S D Corporation · Kandivali / Borivali / Dahisar | 49 | 6.8% | 2.4% | 3.4% | ₹16,050 est. | ₹1.04 Cr | Under construction Jun 2027 |
| Empire Stella Empire Realty · Kandivali / Borivali / Dahisar | 49 | 6.8% | 2.4% | 3.1% | ₹16,050 est. | ₹1.04 Cr | Under construction Jun 2026 |
| Pratap Palace Jpv Realtors · Kandivali / Borivali / Dahisar | 48 | 6.4% | 3.2% | 4.1% | ₹17,100 est. | ₹1.11 Cr | Ready |
| Rishabraj Aradhana H Rishabraj Realty · Kandivali / Borivali / Dahisar | 48 | 6.8% | 2.4% | 3.1% | ₹16,050 est. | ₹1.04 Cr | Under construction Jul 2026 |
| Vanrai Kaustubh Construction · Kandivali / Borivali / Dahisar | 48 | 6.8% | 2.4% | 3.1% | ₹16,050 est. | ₹1.04 Cr | Under construction Jul 2026 |
| Primrose Kaustubh Construction · Kandivali / Borivali / Dahisar | 48 | 6.8% | 2.4% | 3.1% | ₹16,050 est. | ₹1.04 Cr | Under construction Jul 2026 |
| Rashmi Square Modi's Navnirman · Kandivali / Borivali / Dahisar | 48 | 6.8% | 2.4% | 3.4% | ₹16,050 est. | ₹1.04 Cr | Under construction May 2027 |
| New Avanti Chsl Balaji Enterprises · Kandivali / Borivali / Dahisar | 48 | 6.8% | 2.3% | 3.1% | ₹16,050 est. | ₹1.04 Cr | Under construction Oct 2026 |
| Rashmi Manorath Modi's Navnirman · Kandivali / Borivali / Dahisar | 47 | 6.8% | 2.3% | 3.3% | ₹16,050 est. | ₹1.04 Cr | Under construction Aug 2027 |
| Om Vasudev CHS Ltd. Amar Associates · Kandivali / Borivali / Dahisar | 47 | 6.8% | 2.4% | 3.1% | ₹16,050 est. | ₹1.04 Cr | Under construction Mar 2026 |
| Shiv Shakti Chsl Amar Associates · Kandivali / Borivali / Dahisar | 47 | 6.8% | 2.4% | 3.1% | ₹16,050 est. | ₹1.04 Cr | Under construction Mar 2026 |
| Parul Kunj CHS Ltd. Amar Associates · Kandivali / Borivali / Dahisar | 47 | 6.8% | 2.4% | 3.1% | ₹16,050 est. | ₹1.04 Cr | Under construction Mar 2026 |
| Aubburn Wing A S D Corporation · Kandivali / Borivali / Dahisar | 47 | 6.8% | 2.4% | 3.4% | ₹16,050 est. | ₹1.04 Cr | Under construction Jun 2027 |
| Aubburn Wing B S D Corporation · Kandivali / Borivali / Dahisar | 47 | 6.8% | 2.4% | 3.4% | ₹16,050 est. | ₹1.04 Cr | Under construction Jun 2027 |
| Aubburn Wing C S D Corporation · Kandivali / Borivali / Dahisar | 47 | 6.8% | 2.4% | 3.4% | ₹16,050 est. | ₹1.04 Cr | Under construction Jun 2027 |
| Modirealty Wisteria Modirealty Developers · Kandivali / Borivali / Dahisar | 47 | 6.8% | 2.4% | 3.1% | ₹16,050 est. | ₹1.04 Cr | Under construction Mar 2026 |
| Adinath Heights Neelkanth · Kandivali / Borivali / Dahisar | 47 | 6.8% | 2.4% | 3.1% | ₹16,050 est. | ₹1.04 Cr | Under construction Mar 2026 |
| Rishabraj Chambers Rishabraj Estate Developers · Kandivali / Borivali / Dahisar | 47 | 6.8% | 2.4% | 3.1% | ₹16,050 est. | ₹1.04 Cr | Under construction Dec 2025 |
| Rishabraj Park Vistas H Rishabraj Realty · Kandivali / Borivali / Dahisar | 46 | 6.8% | 2.4% | 3.1% | ₹16,050 est. | ₹1.04 Cr | Under construction Dec 2025 |
| RD Royalton Ravi Developments · Kandivali / Borivali / Dahisar | 46 | 7.6% | 3.5% | 5.6% | ₹16,050 est. | ₹1.04 Cr | Under construction Dec 2028 |
| Rashmi Celestia Modi's Navnirman · Kandivali / Borivali / Dahisar | 46 | 6.8% | 2.3% | 3.1% | ₹16,050 est. | ₹1.04 Cr | Under construction Oct 2026 |
| Rooprajat Enclave Siddhivinayak Developers · Kandivali / Borivali / Dahisar | 45 | 6.8% | 2.3% | 3.0% | ₹16,050 est. | ₹1.04 Cr | Under construction Dec 2026 |
| Avyukta Prakash Shivoham Infrahomes · Kandivali / Borivali / Dahisar | 45 | 6.8% | 2.4% | 3.1% | ₹16,050 est. | ₹1.04 Cr | Under construction Dec 2025 |
| Ajmera Manor Ajmera · Kandivali / Borivali / Dahisar | 44 | 6.5% | 1.7% | 2.2% | ₹20,500 est. | ₹1.33 Cr | Under construction Dec 2025 |
| Prime Aura Prime Group · Kandivali / Borivali / Dahisar | 43 | 6.8% | 2.4% | 3.1% | ₹16,050 est. | ₹1.04 Cr | Under construction Jun 2026 |
| Lodha Kandivali Project - Tower 2 Lodha (Macrotech) · Kandivali / Borivali / Dahisar | 43 | 6.5% | 1.2% | 1.7% | ₹27,150 est. | ₹1.76 Cr | Under construction Jul 2026 |
| Lodha Kandivali Project - Tower 5 Lodha (Macrotech) · Kandivali / Borivali / Dahisar | 43 | 6.5% | 1.2% | 1.7% | ₹27,150 est. | ₹1.76 Cr | Under construction Jul 2026 |
| Unique Vistas-Bldg. No. 4 Madhu Harshad Doshi · Kandivali / Borivali / Dahisar | 40 | 6.8% | 2.3% | 3.0% | ₹16,050 est. | ₹1.04 Cr | Under construction Dec 2026 |
Price per sq ft in Kandivali / Borivali / Dahisar: what the evidence says
| Date | ₹ / sq ft | Basis | Confidence |
|---|---|---|---|
| 2021-06 | ₹16,000 | mum (derived) | 40% |
| 2023-06 | ₹17,500 | mum (derived) | 45% |
| 2025-06 | ₹20,500 | mum (derived) | 50% |
| 2026-06 | ₹22,500 | mum (derived) | 50% |
That is 7.1% a year from 2021-06 to 2026-06. The model projects 6.8% a year from here; the growth story on each project page shows why.
Infrastructure pipeline
| Project | Type | Status | Expected | Chance it lands on time | Price effect if it does |
|---|---|---|---|---|---|
| Metro Lines 2A and 7 (2023) | metro | operational | 2023 | 100% | +0.6% / yr |
| Metro Line 9 Dahisar–Mira Bhayandar | metro | construction | 2026 | 75% | +1.0% / yr |
| Thane–Borivali twin tunnel | road | construction | 2029 | 50% | +0.6% / yr |
The growth model counts each event at its probability, not its promise. Dates are the latest public schedule.
Developers active in Kandivali / Borivali / Dahisar
Ranked lists for Kandivali / Borivali / Dahisar
Kandivali / Borivali / Dahisar compared with other areas
Questions people ask
Is Kandivali / Borivali / Dahisar good for investment?
On PropertyLens's model the median analysed project in Kandivali / Borivali / Dahisar scores 55/100 (above the Mumbai average), with projected price growth of 6.8% a year over five years, median price ₹16,050 per sq ft and gross rental yield 3.3%. 176 RERA-registered projects analysed as of November 11, 2026. The best-scored project is Mahindra Vista Phase 1 at 65.
What is the price per sq ft in Kandivali / Borivali / Dahisar?
Median ₹16,050 per sq ft of super built-up area across analysed projects, modelled from comparables where developers file no price. Entry price for an analysed home is about ₹1.04 Cr; the median home is ₹1.04 Cr.
What rental yield can I expect in Kandivali / Borivali / Dahisar?
Median gross yield 3.3% on the all-in cost of an analysed home, before maintenance, vacancy and tax. Net-wealth CAGR after every cost on an 8-year hold with a 75% loan is 3.1% at the median.
Are projects in Kandivali / Borivali / Dahisar delayed?
18 of 143 under-construction projects are past the completion date in their original RERA registration, and unsold stock equals about 22 months of sales. Each project page shows extensions, construction against bookings and complaints.
Scores and projections are model outputs built from dated public evidence (MahaRERA public filings, public ratings) and stated assumptions. Unit sizes and prices in this city are modelled estimates because the regulator does not publish unit inventories openly. They are research, not investment advice. How the numbers are built.