PropertyLensBengaluru · invest
Indiabuild Realty · Yeshwanthpur / Tumkur Road / Nagasandra

ARTEMIS ADDRESS (In Association with MYTHREYI)

Sy No 153/3, 159/2, 163, 164/2, 164/3, 164/6 of Mantanakurchi Village , Kasaba Hobli, Nelamangala Taluk
Ready · rent from todayplot · midRERA registered+ CompareFull report ↗
1 · Which home?
2 · Which exit plan?

Score, growth and returns below are for the highlighted home and plan. Prices, rent and possession never mix across phases.

47
Investment score
47/100
Evidence confidence55%
Plot · 1200 sq ft
Price growth per year, next 5 yrs model
9.9%
likely range 6.5%–13.4% · over 10 yrs 9.5%/yr
Net-wealth CAGR, 8-yr hold
5.4%
your cash in → cash back incl. sale, per year
Cash-flow IRR, 8-yr hold
7.7%
with 75% loan · all-cash 8.1% · no interiors
Three numbers, three questions. Price growth: what will the home be worth? Net-wealth CAGR: what will my money have earned after every cost? Cash-flow IRR: the same, but counting when each rupee moves. Tap i on any of them.
Price · edit here or below assumed
₹Cr
₹ psf × 1,200 sq ft · as of Sep 2026
Price edits apply to ·
All-in cost
₹55.3 L
+ other charges 1.0 L, GST 0.0 L, stamp/reg 3.4 L
Gross rental yield assumed
0.0%
vacant plot: no rent assumed

All-in cost sheet this home, default assumptions

ItemBasisAmount
Base price₹4,200 per sq ft × 1,200 sq ft super built-up50.4 L
Other charges2.0% of base: floor-rise, preferred-location, car park, club, maintenance deposit, legal, corpus (edit in Assumptions)1.0 L
GST0.0% on an under-construction home — none is due on a ready home with an occupancy certificate, set GST to 0 if buying after OC0.0 L
Stamp duty and registration6.6% in Karnataka: 5% stamp duty + 1% registration + cess and surcharge on the agreement value3.4 L
All-in costwhat leaves your pocket and the bank's, before rent or resale₹55.3 L
Your own money75.0% loan at 8.5% for 20 years covers the rest; EMI 0.3 L a month₹46.4 L

Carpet area 1,200 sq ft against 1,200 sq ft super built-up: you pay for 0% that is common area and walls. Price per sq ft of carpet ≈ ₹4,200. Every percentage above is editable in Assumptions; the defaults are Karnataka rates as of 2026.

In plain words

Why 47 out of 100

Each home is marked on 11 things a careful buyer checks, then compared with every project we analyse in Bengaluru: 50 is the average project, 62 beats about five in six. Here is what lifts this one and what drags it:

  • +
    Metro, bus, rail & airport · 4/9 pts
    A metro station is a short walk away (~1000 m). Airport is about 108 minutes by road right now.
  • +
    Resale liquidity · 1/4 pts
    Plenty of buyers can afford a ₹50.4 L home, and homes in Yeshwanthpur / Tumkur Road / Nagasandra resell at a normal pace.
  • +
    Price vs comparables · 1/3 pts
    Cheaper than similar mid homes nearby: ₹4,200 vs about ₹7,600 per sq ft.
  • −
    Employment access · -10/10 pts
    Drive times right now: Hebbal (Kirloskar) 65 min, MG Road (CBD) 69 min, Manyata Tech Park 72 min; ITPL Whitefield 105 min. About 3 million sq ft of new offices are planned nearby in 3 years.
  • −
    Rental demand & yield · -5/8 pts
    A plot earns no rent, so this scores low by design.
  • −
    Layout, size, age, amenities, maintenance · -0/3 pts
    Moderately dense layout (60 homes per acre); about 72% of the area you pay for is usable carpet area. Maintenance ~₹3.5 per sq ft a month.
All 11 checks
  • +
    Price vs comparables · 1/3 pts
    Cheaper than similar mid homes nearby: ₹4,200 vs about ₹7,600 per sq ft.
  • −
    Rental demand & yield · -5/8 pts
    A plot earns no rent, so this scores low by design.
  • +
    Resale liquidity · 1/4 pts
    Plenty of buyers can afford a ₹50.4 L home, and homes in Yeshwanthpur / Tumkur Road / Nagasandra resell at a normal pace.
  • −
    Employment access · -10/10 pts
    Drive times right now: Hebbal (Kirloskar) 65 min, MG Road (CBD) 69 min, Manyata Tech Park 72 min; ITPL Whitefield 105 min. About 3 million sq ft of new offices are planned nearby in 3 years.
  • •
    Metro, bus, rail & airport · 4/9 pts
    A metro station is a short walk away (~1000 m). Airport is about 108 minutes by road right now.
  • +
    Schools, hospitals, daily needs · 1/3 pts
    Schools, hospitals and daily shopping are good in this area.
  • •
    Builder delivery & handover risk · 3/16 pts
    Indiabuild Realty has finished 17+ projects and delivered on time about 49% of the time. This home is ready, so there is no waiting risk.
  • •
    Layout, size, age, amenities, maintenance · -0/3 pts
    Moderately dense layout (60 homes per acre); about 72% of the area you pay for is usable carpet area. Maintenance ~₹3.5 per sq ft a month.
  • •
    Water, flooding, noise, infrastructure · 2/9 pts
    Low flood risk; water supply is partly piped, partly tankers; noticeable traffic or aircraft noise.
  • +
    Legal, title & approvals · 1/5 pts
    Registered with Karnataka RERA; no court cases reported; land title not yet verified by us, so get a lawyer to check. The due-diligence report below flags 1 item in red.
  • •
    Expected price growth (5-yr CAGR model) · 0/26 pts
    We expect prices here to rise about 9.9% a year for the next 5 years (explained below).
Why prices should grow ~9.9% a year for the next 5 years

We build the forecast step by step, starting from what Bengaluru homes normally do and adjusting for this area and this project:

  1. + 6.0%Start with 6.0% a year: the normal long-run growth of Bengaluru home prices.
  2. + 0.7%Add 0.7%: prices here rose 10.8% a year recently (2023-06 to 2026-06). Some of that pace continues, but it fades each year.
  3. + 0.0%Prices are still affordable enough that this does not slow growth.
  4. + 1.5%Add 1.5%: 3 million sq ft of new offices nearby means more people wanting homes here.
  5. + 0.0%Supply and demand are balanced here (16 months of unsold stock).
  6. + 0.2%Add 0.2% for new roads, metro and water lines, weighted by how likely they are to actually finish: Phase 3 (Orange/Red lines: JP Nagar–Kempapura, Hosahalli–Kadabagere) (construction, 2029); Bengaluru suburban rail (K-RIDE) (construction, 2029).
  7. + 1.5%No extra project-level adjustment.
  8. = 9.9%Result: about 9.9% a year, so a home worth ₹51.4 L today would be worth about ₹82.5 L in 5 years. We are 56% confident in the evidence behind this.

Highlights

  • Indiabuild Realty · Yeshwanthpur / Tumkur Road / Nagasandra · unit count not filed
  • Marked completed on RERA (completion date 2025-12-31)
  • No litigation declared · 0 complaints on this registration

Assumptions editable

Purchase

₹/sq ft
₹ Cr
sq ft
% of base
%
%
%
₹/sq ft

FinancingLoan 75% · cash 25% · EMI ₹33,460/mo

% loan
% p.a.
years
%

Rent & running costs

₹/sq ft/mo
% of rent
% of value

Interiors & exit

%
%
years
% p.a. (blank = model)
%
%

Returns over 8 years · no interiors

Cash you put in₹46.4 L
Exit value (yr 8)₹1.07 Cr
Net sale after loan & costs₹74.9 L
Net rent after opex₹-1.6 L
Loan (75% of price)₹38.6 L
EMI / month₹33,460
Year 0: ₹-17.0 L0Year 1: ₹-4.2 L1Year 2: ₹-4.2 L2Year 3: ₹-4.2 L3Year 4: ₹-4.2 L4Year 5: ₹-4.2 L5Year 6: ₹-4.2 L6Year 7: ₹-4.3 L7Year 8: ₹70.6 L8
YearPurchaseLoan inRent (net of vacancy)OpexDebt serviceSale − loanNet cash
Today-55.5 L38.6 L0.0 L0.0 L0.0 L0.0 L-17.0 L
Yr 10.0 L0.0 L0.0 L-0.2 L-4.0 L0.0 L-4.2 L
Yr 20.0 L0.0 L0.0 L-0.2 L-4.0 L0.0 L-4.2 L
Yr 30.0 L0.0 L0.0 L-0.2 L-4.0 L0.0 L-4.2 L
Yr 40.0 L0.0 L0.0 L-0.2 L-4.0 L0.0 L-4.2 L
Yr 50.0 L0.0 L0.0 L-0.2 L-4.0 L0.0 L-4.2 L
Yr 60.0 L0.0 L0.0 L-0.2 L-4.0 L0.0 L-4.2 L
Yr 70.0 L0.0 L0.0 L-0.2 L-4.0 L0.0 L-4.3 L
Yr 80.0 L0.0 L0.0 L-0.3 L-4.0 L74.9 L70.6 L

Pre-tax unless capital-gains tax is set. Rent enters the cash flows once. Net-wealth CAGR = (cash returned incl. sale ÷ cash put in)^(1/years) − 1. IRR uses the dated cash flows.

Score factors

Bars show points added or taken away versus the average analysed Bengaluru project (score 50).

Price vs comparables
+0.9 pts vs avg
this home 7.3/10 · Bengaluru average 6.2 · confidence 35%
₹4,200 psf vs mid comps ₹7,600 (-45%). Price is a model estimate, so this factor carries a third of its normal weight until a listed price is observed.
Rental demand & yield
−4.7 pts vs avg
this home 3.6/10 · Bengaluru average 6.0 · confidence 38%
Gross yield 0.0% (₹0 psf/month); locality rental demand 8/10.
Resale liquidity
+1.4 pts vs avg
this home 8.4/10 · Bengaluru average 7.6 · confidence 50%
Locality resale depth 8/10; ticket ₹0.50 Cr narrows the buyer pool.
Employment access
−10.0 pts vs avg
this home 0.3/10 · Bengaluru average 5.2 · confidence 85%
Drive times now (Google Maps, 2026-09-16): Hebbal (Kirloskar) 65 min, MG Road (CBD) 69 min, Manyata Tech Park 72 min, Koramangala (Forum) 74 min; 0 of 7 major hubs within 30 min; 3 msf office pipeline (3 yr).
Metro, bus, rail & airport
+3.8 pts vs avg
this home 6.9/10 · Bengaluru average 4.8 · confidence 60%
Green Line Yeshwanthpur–Nagasandra–Madavara; no planned station within 2 km; airport ~108 min by road now (Google Maps); .
Schools, hospitals, daily needs
+0.5 pts vs avg
this home 7.5/10 · Bengaluru average 7.0 · confidence 50%
Locality social-infrastructure index (interim, expert-set; POI distances pending Maps integration).
Builder delivery & handover risk
+2.5 pts vs avg
this home 4.7/10 · Bengaluru average 3.7 · confidence 60%
Indiabuild Realty: 17+ projects, on-time 49% (derived); ready.
Layout, size, age, amenities, maintenance
−0.4 pts vs avg
this home 7.0/10 · Bengaluru average 7.3 · confidence 50%
60 units/acre; carpet/SBA ~72%; maintenance ~₹3.5 psf/month (assumed).
Water, flooding, noise, infrastructure
+1.5 pts vs avg
this home 6.5/10 · Bengaluru average 5.8 · confidence 50%
Tumkur Road trucks and industrial noise; strong metro access
Legal, title & approvals
+1.3 pts vs avg
this home 8.0/10 · Bengaluru average 7.4 · confidence 55%
RERA registered; litigation: none reported; approvals: Plan NPA/LAO/115/2022-2023 dated 2023-06-08; title: not verified. Due-diligence report lists 1 red flag (−0.8 pts).
Expected price growth (5-yr CAGR model)
+0.4 pts vs avg
this home 6.0/10 · Bengaluru average 6.0 · confidence 56%
Model 5-yr price CAGR 9.9% (range 6.5–13.4%).

Price growth model, year by year

Nominal growth per year. Parts add up; momentum fades, infrastructure is weighted by delivery probability and dated.

ComponentYr 1Yr 2Yr 3Yr 4Yr 5Yr 6Confidence
Bengaluru long-run nominal trend6.06.06.06.06.06.080%
Locality momentum (mean-reverting)1.70.90.50.30.20.145%
Affordability ceiling0.00.00.00.00.00.060%
Employment access & office pipeline1.51.51.51.51.51.555%
Supply–demand balance0.00.00.00.00.00.050%
Infrastructure delivery (probability-weighted)0.00.30.30.30.00.055%
Project-specific adjustments1.51.51.51.51.51.550%
Total growth10.7%10.2%9.8%9.6%9.2%9.1%56%

Bengaluru long-run nominal trend: City-wide 2013-25 nominal residential trend ≈ inflation + real income growth.

Locality momentum (mean-reverting): Trailing 3.0-yr locality CAGR 10.8% vs 6.0% trend; 35% carried forward, halving each year.

Affordability ceiling: Ticket at ₹4,200 psf vs city median ₹9,500; buyer pool thins above ₹15k/₹20k psf and after >6pp excess growth.

Employment access & office pipeline: 3 msf office pipeline (3 yr) on 12 msf stock; 30-min jobs index 0.70.

Supply–demand balance: 16 months of unsold inventory; new-launch/absorption ratio 1.1.

Infrastructure delivery (probability-weighted): Phase 3 (Orange/Red lines: JP Nagar–Kempapura, Hosahalli–Kadabagere) (construction, 2029, p=0.55); Bengaluru suburban rail (K-RIDE) (construction, 2029, p=0.5)

Project-specific adjustments: Building age 1 yrs. Land in expansion corridors historically outpaces built stock; no depreciation.

Locality evidence: ₹7,200 (Jun 2023) → ₹9,800 (Jun 2026) = 10.8% p.a. Sources: Platform estimate (interim, not observed).

Financial & legal due diligence

What the public record says

Automated from the Karnataka RERA file PRM/KA/RERA/1250/307/PR/271023/006363 and 1 quarterly filing. Prices and rents are locality estimates, not verified listings. Compiled Sep 2026 from the Karnataka RERA file, company registers, rating agencies, tribunal records and press. Facts only; anything that deserves a written answer before signing is flagged.

Delivery timeline8/10
delivered on the original registration
Legal & complaints9/10
no litigation and no complaints on the RERA file
Money to finish8/10
finance cost is 0% of the registered budget; last quarter: collected ₹2.63 cr, withdrew ₹2.65 cr
Developer strength5/10
no public credit rating for the promoter

Meters are rule-based from the RERA file and public ratings (rules shown under each), not opinions.

Registration
PRM/KA/RERA/1250/307/PR/271023/006363 · INDIABUILD REAL ESTATES PVT LTD
Delivered
RegisteredOct 2023Original completionDec 2025TodaySep 2026
Money through the RERA account
Collected ₹2.63 CrWithdrawn ₹2.65 CrQ3 2025-262.63 Cr2.65 Cr
Collected from buyersWithdrawn for construction
Latest milestones
  • Ground Clearance/Formation Of Plots
    100%
  • Formation Of Road, Footpath
    100%
  • Construction Of Water Supply Infrastucture
    100%
  • Construction Of Sewage System Infrastuctur
    100%
  • Power Supply Work
    100%
  • Construction Of Storm Water Drainage
    100%
No litigation declaredNo complaintsEscrow: HDFCJoint-development land
Credit ratings of the people behind it

No public credit rating located for the promoter.

INDIABUILD REAL ESTATES PVT LTD: no public rating located

Complaints & disputes on record
On this project00 open
On the promoter entity0all projects
Court cases declared0no stay recorded
At a glance
Delivered

Delivered. RERA registration ran 2023-10-01 → 2025-12-31

No complaints on this project

No RERA complaints on this project; 0 on the promoter overall

No litigation declared

No litigation declared in RERA filings

The record, in pictures

RERA file · Registration

Registered project cost ₹45.63 cr — where it goes
Land ₹0 cr · 0%Approvals ₹0.5 cr · 1%Construction & on-site ₹27.4 cr · 60%Other / taxes ₹17.7 cr · 39%
No litigation declaredBorrowing declared: NoEscrow at HDFC8 recorded land-owner sharesOwners’ association: not formed

Red flags to resolve in writing

1
Legal

Joint-development land: confirm which units fall in the owners’ share.

Questions to put to the developer before you sign

  1. Share the latest CA Form 4 and architect Form 5 with the escrow deposit ratio.
  2. Confirm the price list, floor-rise and other charges for the exact unit.
  3. Provide the occupancy certificate, khata and title chain for the unit.
  4. Confirm there is no litigation on the land or approvals beyond the RERA declaration.
  5. What is the land owners’ share of built area and is the unit in the developer’s share?
Full record: every filed number, line by line1 sections · 11 items

RERA file · Registration

Registration
PRM/KA/RERA/1250/307/PR/271023/006363 · promoter INDIABUILD REAL ESTATES PVT LTD (Company) · U70100KA2015PTC080271
Dates
Start 2023-10-01 · original completion 2025-12-31 · no extensions
Status
Completed and occupied (per project status); RERA progress fields below are historical
Registered cost
Total ₹45.63 cr · land ₹0.00 cr · construction ₹27.42 cr
Borrowing / mortgage declared
Borrowing: No
RERA bank account
HDFC, RICHMOND ROAD, BENGALURU (70% construction account)
Plan sanction
NPA/LAO/115/2022-2023 dated 2023-06-08 · Local Planing Authority
Land owners / co-promoters
Mythreyi Infra Spaces LLP (52.0%, Sy 159/2); Mythreyi Infra Spaces LLP (52.0%, Sy 163); Mythreyi Infra Spaces LLP (52.0%, Sy 164/3); Shailesh Haran (53.0%, Sy 164/2); Shailesh Haran (53.0%, Sy 164/6); Total Number of Parks and open spaces (10%, Sy Total Area of Parks and Open Spaces); Total Number of CA Sites (2%, Sy Total Area of CA Sites); 14912 (3%, Sy 9.14X15.24)
Litigation declared
None declared in filings
K-RERA complaints
0 on this registration (0 open) · 0 on the promoter entity across all its projects
Owners’ association
Not yet formed

Source: Karnataka RERA project record PRM/KA/RERA/1250/307/PR/271023/006363, fetched 2026-09-15. Figures are the promoter’s own filings.

Sources & caveats2 sources
  • Karnataka RERA project record PRM/KA/RERA/1250/307/PR/271023/006363 (registration file, quarterly updates, complaint register), fetched 2026-09-15
  • PropertyLens locality model (market-level estimates)
  • Karnataka RERA project records PRM/KA/RERA/1250/307/PR/271023/006363 (registration file, quarterly updates, complaint register), fetched Sep 2026.

Caveats. Automated analysis: prices, rents and travel times are estimates until listings and Maps data are verified. RERA figures are the promoter’s own filings. Nothing here is legal, tax or investment advice.

Evidence

Location, jobs & transit3 hubs · metro walkable
Job hubs nearby
Peenya industrialBrigade Gateway / RajajinagarManyata 12 km
Measured drive times below
Office space
Existing12 msf
Coming in 3 yrs3 msf
Jobs within 30 min7/10
Getting around
Metro today
Green Line Yeshwanthpur–Nagasandra–Madavara
~1,000 m estimate
Metro planned
No station planned within 2 km
Rail
—
estimate
Airport
108 min by road now · 39.9 km
Google Maps
Buses
7/10 coverage
estimate
Drive times to job hubs
DestinationDrive nowRoad km
Hebbal (Kirloskar)65 min23.3
MG Road (CBD)69 min25.2
Manyata Tech Park72 min26
Koramangala (Forum)74 min27.1
ORR Bellandur (Ecospace)93 min34.3
Electronic City Ph-199 min36.6
ITPL Whitefield105 min38.7
Kempegowda Airport (KIA)108 min39.9

Google Maps driving time with live traffic, measured Sep 2026. Refreshed monthly.

Location used: Google Maps match “”. Bus coverage and planned-station distances are still interim estimates.

Price historylocality 10.8%/yr

No dated project-level price series yet; only the latest observation is on file.

Locality · average ₹/sq ft
Date₹ psfSourceConfidenceKind
Jun 20215,600Platform estimate (interim, not observed)40%derived
Jun 20237,200Platform estimate (interim, not observed)45%derived
Jun 20258,800Platform estimate (interim, not observed)50%derived
Jun 20269,800Platform estimate (interim, not observed)50%derived
Luxury comps₹12,500
Premium comps₹9,800
Mid comps₹7,600
Unsold stock16 months

Model backtest on this locality: 1-yr hold-out (Jun 2025→Jun 2026): predicted ₹9,646 vs actual ₹9,800 (-1.6%). Longer 3-yr hold-out (Jun 2023→Jun 2026): predicted 8.8% p.a. vs actual 10.8% p.a. — the model is deliberately mean-reverting and under-predicted the 2021–26 boom.

Environment, legal & productflood ok · water risk · RERA yes
Flood risklow
Water supplymixed
Quietnoisy
Roads & drainsgood

Tumkur Road trucks and industrial noise; strong metro access

Legal & approvals
Registration 006363
RERA PRM/KA/RERA/1250/307/PR/271023/006363
ready
Litigation
none reported
observed
Approvals
Plan NPA/LAO/115/2022-2023 dated 2023-06-08
observed
Title
not verified
assumed
Product
Landnull acres
Homesnull
Density60/acre
Launched2023
Sources & data gapswhat we know, from where, and what is missing

Automated analysis: unit mix and carpet areas come from the RERA inventory table; prices and rents are locality-model estimates until listings are verified.

FieldValueSource classDateConf.KindConflicting values
AddressSy No 153/3, 159/2, 163, 164/2, 164/3, 164/6 of Mantanakurchi Village , Kasaba Hobli, Nelamangala TalukKarnataka RERA (number as reported; registry lookup pending)Sep 202680%observed
Land area (acres)Platform estimate (interim, not observed)Sep 202620%assumed
Total unitsPlatform estimate (interim, not observed)Sep 202620%assumed
Launch year2023Karnataka RERA (number as reported; registry lookup pending)Sep 202670%observed
Possession · Registration 0063632025-12-31Karnataka RERA (number as reported; registry lookup pending)Sep 202670%observed
Price psf · Plot · 1200 sq ft4200Platform estimate (interim, not observed)Sep 202635%assumed
Ticket · Plot · 1200 sq ft5040000Platform estimate (interim, not observed)Sep 202635%derived
Rent · Plot · 1200 sq ft0Platform estimate (interim, not observed)Sep 202635%assumed
Carpet area1200Karnataka RERA (number as reported; registry lookup pending)Sep 202660%observed
Builder on-time rate0.49Karnataka RERA (number as reported; registry lookup pending)Sep 202660%derived
Litigationnone reportedKarnataka RERA (number as reported; registry lookup pending)Sep 202670%observed
ApprovalsPlan NPA/LAO/115/2022-2023 dated 2023-06-08Karnataka RERA (number as reported; registry lookup pending)Sep 202660%observed

Commercial listing portals are shown as “Listing portal (aggregated)”; full provenance is retained internally. Official developer and Karnataka RERA sources are named.

Other projects worth comparing

Same model, same date. Scores are out of 100, where 50 is the average analysed Bengaluru project.

Questions people ask about ARTEMIS ADDRESS (In Association with MYTHREYI)

Is ARTEMIS ADDRESS (In Association with MYTHREYI) a good investment?

On PropertyLens's evidence-based model ARTEMIS ADDRESS (In Association with MYTHREYI) scores 47/100, below the average analysed Bengaluru project (50 = average, 12 points = one standard deviation). The model projects price growth of about 9.9% a year over five years and a net-wealth CAGR of 5.4% after every cost on an 8-year hold with a 75.0% loan. That is research on public filings, not advice; the factor breakdown on this page shows what drives the score.

What is the price per sq ft at ARTEMIS ADDRESS (In Association with MYTHREYI)?

About ₹4,200 per sq ft of super built-up area, a model estimate from Yeshwanthpur / Tumkur Road / Nagasandra comparables that you can edit. The Plot home costs about ₹50.4 L before other charges, GST and stamp duty, and ₹55.3 L all-in.

When is ARTEMIS ADDRESS (In Association with MYTHREYI) ready for possession?

The project is marked ready to move in; confirm the occupancy certificate before paying.

Is ARTEMIS ADDRESS (In Association with MYTHREYI) RERA registered?

Yes. Karnataka RERA registration: PRM/KA/RERA/1250/307/PR/271023/006363. No complaints on this registration at K-RERA as of 2026-09-15.

How reliable is Indiabuild Realty on delivery?

49% of Indiabuild Realty's crawled Bengaluru registrations needed no extension (8 of 17 crawled Bengaluru registrations needed no extension). 17 registrations analysed. The developer scorecard compares this with every other Bengaluru developer.

What rent can ARTEMIS ADDRESS (In Association with MYTHREYI) earn?

Plots earn no rent; the return is price growth alone.

Answers are generated from the filings and the model for this home and change when you edit the assumptions above. See the Indiabuild Realty scorecard and the Yeshwanthpur / Tumkur Road / Nagasandra area page.

Go deeper

Share on WhatsApp