PropertyLensBengaluru · invest
Birla Estates · Mysore Road / RR Nagar / Kengeri

Birla Apple Spire

SY NO.127/1 PANTHARAPALYA, NAYANDAHALLI MYSORE ROAD BANGALORE
Handover Sep 2019 · no rent beforeapartment · premiumRERA registered+ CompareFull report ↗
1 · Which home?
2 · Which exit plan?

Score, growth and returns below are for the highlighted home and plan. Prices, rent and possession never mix across phases.

54
Investment score
54/100
Evidence confidence56%
Residential Apartments · ~2,370 sq ft (1667 carpet)
Price growth per year, next 5 yrs model
9.9%
likely range 6.4%–13.3% · over 10 yrs 8.9%/yr
Net-wealth CAGR, 8-yr hold
4.1%
your cash in → cash back incl. sale, per year
Cash-flow IRR, 8-yr hold
5.4%
with 75% loan · all-cash 6.9% · with interiors
Three numbers, three questions. Price growth: what will the home be worth? Net-wealth CAGR: what will my money have earned after every cost? Cash-flow IRR: the same, but counting when each rupee moves. Tap i on any of them.
Price · edit here or below assumed
₹Cr
₹ psf × 2,370 sq ft · as of Sep 2026
Price edits apply to ·
All-in cost
₹2.72 Cr
+ other charges 7.4 L, GST 10.9 L, stamp/reg 14.4 L, interiors 28.4 L
Gross rental yield assumed
2.5%
rent starts in ~0.3 yr

All-in cost sheet this home, default assumptions

ItemBasisAmount
Base price₹8,900 per sq ft × 2,370 sq ft super built-up2.11 Cr
Other charges3.5% of base: floor-rise, preferred-location, car park, club, maintenance deposit, legal, corpus (edit in Assumptions)7.4 L
GST5.0% on an under-construction home10.9 L
Stamp duty and registration6.6% in Karnataka: 5% stamp duty + 1% registration + cess and surcharge on the agreement value14.4 L
Interiors₹1,200 per sq ft, needed before the home can be let28.4 L
All-in costwhat leaves your pocket and the bank's, before rent or resale₹2.72 Cr
Your own money75.0% loan at 8.5% for 20 years covers the rest; EMI 1.5 L a month₹2.06 Cr

Carpet area 1,667 sq ft against 2,370 sq ft super built-up: you pay for 30% that is common area and walls. Price per sq ft of carpet ≈ ₹12,653. Every percentage above is editable in Assumptions; the defaults are Karnataka rates as of 2026-09.

In plain words

Why 54 out of 100

Each home is marked on 11 things a careful buyer checks, then compared with every project we analyse in Bengaluru: 50 is the average project, 62 beats about five in six. Here is what lifts this one and what drags it:

  • +
    Metro, bus, rail & airport · 4/9 pts
    A metro station is a short walk away (~1200 m). Airport is about 94 minutes by road right now.
  • +
    Layout, size, age, amenities, maintenance · 1/3 pts
    Moderately dense layout (60 homes per acre); about 72% of the area you pay for is usable carpet area. Maintenance ~₹4.5 per sq ft a month.
  • +
    Employment access · 2/10 pts
    Drive times right now: Koramangala (Forum) 28 min, MG Road (CBD) 29 min, Hebbal (Kirloskar) 38 min; ITPL Whitefield 65 min. About 3 million sq ft of new offices are planned nearby in 3 years.
  • −
    Legal, title & approvals · -1/5 pts
    Registered with Karnataka RERA; no court cases reported; land title not yet verified by us, so get a lawyer to check. The due-diligence report below flags 1 item in red.
  • −
    Rental demand & yield · -2/8 pts
    Rent pays back 2.5% of the price every year, well below the usual 3% in Bengaluru. Tenant demand here is decent.
  • •
    Resale liquidity · -1/4 pts
    Plenty of buyers can afford a ₹2.11 Cr home, and homes in Mysore Road / RR Nagar / Kengeri resell at a normal pace. Reselling before handover needs the builder’s permission.
All 11 checks
  • •
    Price vs comparables · -0/3 pts
    Priced about the same as similar premium homes nearby (₹8,900 vs ~₹9,200 per sq ft).
  • •
    Rental demand & yield · -2/8 pts
    Rent pays back 2.5% of the price every year, well below the usual 3% in Bengaluru. Tenant demand here is decent.
  • +
    Resale liquidity · -1/4 pts
    Plenty of buyers can afford a ₹2.11 Cr home, and homes in Mysore Road / RR Nagar / Kengeri resell at a normal pace. Reselling before handover needs the builder’s permission.
  • •
    Employment access · 2/10 pts
    Drive times right now: Koramangala (Forum) 28 min, MG Road (CBD) 29 min, Hebbal (Kirloskar) 38 min; ITPL Whitefield 65 min. About 3 million sq ft of new offices are planned nearby in 3 years.
  • +
    Metro, bus, rail & airport · 4/9 pts
    A metro station is a short walk away (~1200 m). Airport is about 94 minutes by road right now.
  • +
    Schools, hospitals, daily needs · 1/3 pts
    Schools, hospitals and daily shopping are good in this area.
  • −
    Builder delivery & handover risk · -1/16 pts
    Birla Estates has finished 10+ projects and delivered on time about 75% of the time. This phase is 75% built, with handover promised for 2019-09-30: delays would push your rent start back.
  • +
    Layout, size, age, amenities, maintenance · 1/3 pts
    Moderately dense layout (60 homes per acre); about 72% of the area you pay for is usable carpet area. Maintenance ~₹4.5 per sq ft a month.
  • •
    Water, flooding, noise, infrastructure · 1/9 pts
    Low flood risk; water supply is partly piped, partly tankers; noise is manageable.
  • •
    Legal, title & approvals · -1/5 pts
    Registered with Karnataka RERA; no court cases reported; land title not yet verified by us, so get a lawyer to check. The due-diligence report below flags 1 item in red.
  • •
    Expected price growth (5-yr CAGR model) · 0/26 pts
    We expect prices here to rise about 9.9% a year for the next 5 years (explained below).
Why prices should grow ~9.9% a year for the next 5 years

We build the forecast step by step, starting from what Bengaluru homes normally do and adjusting for this area and this project:

  1. + 6.0%Start with 6.0% a year: the normal long-run growth of Bengaluru home prices.
  2. + 0.8%Add 0.8%: prices here rose 11.1% a year recently (2023-06 to 2026-06). Some of that pace continues, but it fades each year.
  3. + 0.0%Prices are still affordable enough that this does not slow growth.
  4. + 1.6%Add 1.6%: 3 million sq ft of new offices nearby means more people wanting homes here.
  5. + 0.5%Add 0.5%: few unsold homes in the area (13 months of stock), so sellers have the upper hand.
  6. + 0.2%Add 0.2% for new roads, metro and water lines, weighted by how likely they are to actually finish: Phase 3 (Orange/Red lines: JP Nagar–Kempapura, Hosahalli–Kadabagere) (construction, 2029); Bengaluru suburban rail (K-RIDE) (construction, 2029).
  7. + 0.8%Add 0.8% for this project itself: unfinished homes are worth more once they are complete.
  8. = 9.9%Result: about 9.9% a year, so a home worth ₹2.18 Cr today would be worth about ₹3.50 Cr in 5 years. We are 56% confident in the evidence behind this.

Which exit suits you?

For an unfinished flat the answer depends on whether you sell at handover or hold, and whether you spend on interiors. Same price, same loan; only the strategy changes:

StrategyHoldIRR / yrWealth CAGR / yrCash you put inNet rentNet saleApply
Sell at handover, no interiors
Take delivery in 2019-09-30 and sell the bare flat (1 yr hold). Needs builder NOC or registration first; no rent.
1 yrs-17.5%-17.5%₹72.6 L₹75,579₹77.0 L
Hold bare, rent unfurnished best IRR
Skip interiors; rent 12% lower than a fitted home; sell after 8 yrs with no interiors value.
8 yrs7.8%5.6%₹1.82 Cr₹19.4 L₹2.97 Cr
Hold, do interiors, rent & sell fitted selected
Spend ₹1,200/sq ft on interiors, earn full rent, recover ~40% of interiors cost at sale (fading over 10 yrs).
8 yrs5.4%4.1%₹2.06 Cr₹24.1 L₹2.99 Cr

IRR and CAGR are per year over the hold shown. A short hold can show a high IRR on a small absolute gain; compare the net-sale column too. Selling before registration usually needs the builder’s transfer NOC and a fee.

Highlights

  • Birla Estates · Mysore Road / RR Nagar / Kengeri · unit count not filed on 2.5 acres
  • Under construction: 75% complete, RERA completion 2019-09-30
  • No litigation declared · 3 complaints on this registration

Assumptions editable

Purchase

₹/sq ft
₹ Cr
sq ft
% of base
%
%
%
₹/sq ft

FinancingLoan 75% · cash 25% · EMI ₹1.5 L/mo

% loan
% p.a.
years
%

Rent & running costs

₹
% p.a.
%
months
months
₹/sq ft/mo
% of rent
% of rent
% of value

Interiors & exit

%
%
years
% p.a. (blank = model)
%
%

Returns over 8 years · with interiors

Cash you put in₹2.06 Cr
Exit value (yr 8)₹4.40 Cr
Net sale after loan & costs₹2.99 Cr
Net rent after opex₹24.1 L
Loan (75% of price)₹1.72 Cr
EMI / month₹1.5 L
Year 0: ₹-1.01 Cr0Year 1: ₹-16.8 L1Year 2: ₹-15.2 L2Year 3: ₹-15.0 L3Year 4: ₹-14.8 L4Year 5: ₹-14.6 L5Year 6: ₹-14.4 L6Year 7: ₹-14.2 L7Year 8: ₹2.85 Cr8
YearPurchaseLoan inRent (net of vacancy)OpexDebt serviceSale − loanNet cash
Today-2.73 Cr1.72 Cr0.0 L0.0 L0.0 L0.0 L-1.01 Cr
Yr 10.0 L0.0 L3.4 L-2.3 L-17.9 L0.0 L-16.8 L
Yr 20.0 L0.0 L5.4 L-2.7 L-17.9 L0.0 L-15.2 L
Yr 30.0 L0.0 L5.7 L-2.8 L-17.9 L0.0 L-15.0 L
Yr 40.0 L0.0 L5.9 L-2.9 L-17.9 L0.0 L-14.8 L
Yr 50.0 L0.0 L6.2 L-3.0 L-17.9 L0.0 L-14.6 L
Yr 60.0 L0.0 L6.5 L-3.1 L-17.9 L0.0 L-14.4 L
Yr 70.0 L0.0 L6.9 L-3.2 L-17.9 L0.0 L-14.2 L
Yr 80.0 L0.0 L7.2 L-3.3 L-17.9 L2.99 Cr2.85 Cr

Pre-tax unless capital-gains tax is set. Rent enters the cash flows once. Net-wealth CAGR = (cash returned incl. sale ÷ cash put in)^(1/years) − 1. IRR uses the dated cash flows.

Score factors

Bars show points added or taken away versus the average analysed Bengaluru project (score 50).

Price vs comparables
−0.3 pts vs avg
this home 5.9/10 · Bengaluru average 6.2 · confidence 35%
₹8,900 psf vs premium comps ₹9,200 (-3%; under-construction should price ~8% below ready). Price is a model estimate, so this factor carries a third of its normal weight until a listed price is observed.
Rental demand & yield
−1.6 pts vs avg
this home 5.2/10 · Bengaluru average 6.0 · confidence 38%
Gross yield 2.6% (₹19 psf/month); locality rental demand 7/10.
Resale liquidity
−0.8 pts vs avg
this home 7.2/10 · Bengaluru average 7.6 · confidence 50%
Locality resale depth 7/10; ticket ₹2.11 Cr narrows the buyer pool; UC resale needs builder NOC.
Employment access
+2.2 pts vs avg
this home 6.3/10 · Bengaluru average 5.2 · confidence 85%
Drive times now (Google Maps, 2026-09-16): Koramangala (Forum) 28 min, MG Road (CBD) 29 min, Hebbal (Kirloskar) 38 min, Manyata Tech Park 44 min; 2 of 7 major hubs within 30 min; 3 msf office pipeline (3 yr).
Metro, bus, rail & airport
+4.1 pts vs avg
this home 7.0/10 · Bengaluru average 4.8 · confidence 60%
Purple Line Kengeri / RR Nagar / Mysore Road; no planned station within 2 km; airport ~94 min by road now (Google Maps); .
Schools, hospitals, daily needs
+0.5 pts vs avg
this home 7.5/10 · Bengaluru average 7.0 · confidence 50%
Locality social-infrastructure index (interim, expert-set; POI distances pending Maps integration).
Builder delivery & handover risk
−0.9 pts vs avg
this home 3.4/10 · Bengaluru average 3.7 · confidence 60%
Birla Estates: 10+ projects, on-time 75% (derived); handover 2019-09-30 (RERA); 84 months past the RERA completion date, work behind schedule (-25 pts).
Layout, size, age, amenities, maintenance
+1.1 pts vs avg
this home 8.2/10 · Bengaluru average 7.3 · confidence 55%
60 units/acre; carpet/SBA ~72%; maintenance ~₹4.5 psf/month (assumed); filed construction cost ₹4,187 per sq ft (premium spec).
Water, flooding, noise, infrastructure
+1.0 pts vs avg
this home 6.3/10 · Bengaluru average 5.8 · confidence 50%
Vrishabhavathi valley pockets flood; metro and NICE road access
Legal, title & approvals
−1.2 pts vs avg
this home 6.8/10 · Bengaluru average 7.4 · confidence 55%
RERA registered; litigation: none reported; approvals: RERA registered; title: not verified. Due-diligence report lists 1 red flag (−1.7 pts).
Expected price growth (5-yr CAGR model)
+0.2 pts vs avg
this home 6.0/10 · Bengaluru average 6.0 · confidence 56%
Model 5-yr price CAGR 9.9% (range 6.4–13.3%).

Price growth model, year by year

Nominal growth per year. Parts add up; momentum fades, infrastructure is weighted by delivery probability and dated.

ComponentYr 1Yr 2Yr 3Yr 4Yr 5Yr 6Confidence
Bengaluru long-run nominal trend6.06.06.06.06.06.080%
Locality momentum (mean-reverting)1.81.00.50.30.20.145%
Affordability ceiling0.00.00.00.00.00.060%
Employment access & office pipeline1.61.61.61.61.61.655%
Supply–demand balance0.80.60.50.40.30.350%
Infrastructure delivery (probability-weighted)0.00.30.30.30.00.055%
Project-specific adjustments4.00.00.00.00.00.050%
Total growth14.2%9.6%9.0%8.6%8.1%8.0%56%

Bengaluru long-run nominal trend: City-wide 2013-25 nominal residential trend ≈ inflation + real income growth.

Locality momentum (mean-reverting): Trailing 3.0-yr locality CAGR 11.1% vs 6.0% trend; 35% carried forward, halving each year.

Affordability ceiling: Ticket at ₹8,900 psf vs city median ₹9,500; buyer pool thins above ₹15k/₹20k psf and after >6pp excess growth.

Employment access & office pipeline: 3 msf office pipeline (3 yr) on 10 msf stock; 30-min jobs index 0.60.

Supply–demand balance: 13 months of unsold inventory; new-launch/absorption ratio 0.86 (from 15 under-construction RERA filings in this locality: 2,487 unsold homes, 285.7 sold per month).

Infrastructure delivery (probability-weighted): Phase 3 (Orange/Red lines: JP Nagar–Kempapura, Hosahalli–Kadabagere) (construction, 2029, p=0.55); Bengaluru suburban rail (K-RIDE) (construction, 2029, p=0.5)

Project-specific adjustments: Remaining construction risk (25% work left) re-rates toward ready comps by handover (~2.0% over 0.5 yr).

Locality evidence: ₹6,700 (Jun 2023) → ₹9,200 (Jun 2026) = 11.1% p.a. Sources: Platform estimate (interim, not observed).

Financial & legal due diligence

What the public record says

Automated from the Karnataka RERA file PRM/KA/RERA/1251/310/PR/180111/000358. Prices and rents are locality estimates, not verified listings. Compiled Sep 2026 from the Karnataka RERA file, company registers, rating agencies, tribunal records and press. Facts only; anything that deserves a written answer before signing is flagged.

Delivery timeline7/10
a registration completion date has already passed (−2)
Legal & complaints7.5/10
3 RERA complaints on the project (−1.5)
Money to finish8/10
finance cost is 0% of the registered budget
Developer strength9/10
CRISIL AA/Stable (Birla Estates)

Meters are rule-based from the RERA file and public ratings (rules shown under each), not opinions.

Registration
PRM/KA/RERA/1251/310/PR/180111/000358 · Apple spire India LLP
Past RERA date
RegisteredJan 2014Original completionSep 2019TodaySep 2026
Construction75%
registration-time status
Collected (at registration)₹30.40 Cr
Spent₹30.40 Cr
Balance with promoter₹0
Delay declaredYesDELAY IN ACQUISITION OF LAND BY BMRCL FOR METRO
No litigation declared3 complaints · 0 openEscrow: SYNDICATE BANK
Credit ratings of the people behind it
AAAAAABBBBBBCDinvestment grade ◀▶ speculative gradeCRISIL AA / Stable · Birla Estates (Aditya Birla Real Estate) · Jun 2025
Complaints & disputes on record
On this project30 open
On the promoter entity18all projects
Court cases declared0no stay recorded
What complainants raise
  • Project not completed but RERA site shows that the project is complete. Revoke RERA Regist
  • WRONG ASSURANCES AS TO SIZE OF THE FLAT AND POSSESSION DATE.
  • Delayed project and expect complete refund immediately
At a glance
On its original RERA date

On its original RERA completion date: 2019-09-30

75% built

75% built per the latest filing

3 RERA complaints, 0 open

3 RERA complaints on this project (0 open); 18 on the promoter overall

No litigation declared

No litigation declared in RERA filings

The record, in pictures

RERA file · Registration

Registered project cost ₹197 cr — where it goes
Land ₹65.5 cr · 25%Construction & on-site ₹197 cr · 75%
No litigation declaredBorrowing declared: not statedEscrow at SYNDICATE BANK

Complaint log (K-RERA) · 3 on this project

  • Jan 2024Project not completed but RERA site shows that the project is complete. Revoke RERA Registation & update the cdisposed
  • Jun 2021WRONG ASSURANCES AS TO SIZE OF THE FLAT AND POSSESSION DATE.disposed
  • Oct 2020Delayed project and expect complete refund immediatelydisposed
Complaints by status
Disposed (Authority)
3

Red flags to resolve in writing

1
Timeline

RERA completion date 2019-09-30 has passed without a completion application.

Questions to put to the developer before you sign

  1. Share the latest CA Form 4 and architect Form 5 with the escrow deposit ratio.
  2. Confirm the price list, floor-rise and other charges for the exact unit.
  3. Which date is contractual — 2019-09-30 — and what is the per-month delay compensation?
  4. Confirm there is no litigation on the land or approvals beyond the RERA declaration.
  5. Is the land freehold with the developer, and is any part mortgaged?
Full record: every filed number, line by line2 sections · 13 items

RERA file · Registration

Registration
PRM/KA/RERA/1251/310/PR/180111/000358 · promoter Apple spire India LLP (Other) · Proposed Project End Date at the time of registration :
Dates
Start 2014-01-15 · original completion 2019-09-30 · no extensions · current date has passed
Progress
75% complete per registration-time status
Registered cost
Total ₹197 cr · land ₹65.54 cr · construction ₹197 cr
RERA bank account
SYNDICATE BANK, VIJAYANAGAR BRANCH BANGALORE (70% construction account)
Money at registration
collected ₹30.40 cr · used ₹30.40 cr · balance ₹0.00 cr · delay declared: Yes (DELAY IN ACQUISITION OF LAND BY BMRCL FOR METRO)
Land & towers
2.45 acres (9,918 sq m)
Litigation declared
None declared in filings
K-RERA complaints
3 on this registration (0 open) · 18 on the promoter entity across all its projects (a project-specific LLP; group-level complaints sit under other entities)
Completion applied
19/12/2020

Source: Karnataka RERA project record PRM/KA/RERA/1251/310/PR/180111/000358, fetched 2026-09-15. Figures are the promoter’s own filings.

Complaint log (K-RERA) · 3 on this project

2024-01-24 · 00116/2024
Project not completed but RERA site shows that the project is complete. Revoke RERA Registation & update the correct status of the project in RERA website. Impose penalty and punishment under sec 59 — DISPOSED AUTHORITY FULLBENCH (AUTHORITY)
2021-06-18 · CMP/210618/0008012
WRONG ASSURANCES AS TO SIZE OF THE FLAT AND POSSESSION DATE. — DISPOSED AUTHORITY BENCH6 (AUTHORITY)
2020-10-03 · CMP/201003/0006749
Delayed project and expect complete refund immediately — DISPOSED AUTHORITY BENCH6 (AUTHORITY)

Complaint subjects are as filed by complainants; a disposed complaint may have been decided either way.

Sources & caveats2 sources
  • Karnataka RERA project record PRM/KA/RERA/1251/310/PR/180111/000358 (registration file, quarterly updates, complaint register), fetched 2026-09-15
  • PropertyLens locality model (market-level estimates)
  • Karnataka RERA project records PRM/KA/RERA/1251/310/PR/180111/000358 (registration file, quarterly updates, complaint register), fetched Sep 2026.

Caveats. Automated analysis: prices, rents and travel times are estimates until listings and Maps data are verified. RERA figures are the promoter’s own filings. Nothing here is legal, tax or investment advice.

Evidence

Location, jobs & transit3 hubs · metro walkable
Job hubs nearby
Global Village Tech ParkBidadi industrialMajestic / CBD 12 km
Measured drive times below
Office space
Existing10 msf
Coming in 3 yrs3 msf
Jobs within 30 min6/10
Getting around
Metro today
Purple Line Kengeri / RR Nagar / Mysore Road
~1,200 m estimate
Metro planned
No station planned within 2 km
Rail
—
estimate
Airport
94 min by road now · 34.7 km
Google Maps
Buses
7/10 coverage
estimate
Drive times to job hubs
DestinationDrive nowRoad km
Koramangala (Forum)28 min9.2
MG Road (CBD)29 min9.5
Hebbal (Kirloskar)38 min13
Manyata Tech Park44 min15.5
ORR Bellandur (Ecospace)47 min16.6
Electronic City Ph-151 min18
ITPL Whitefield65 min23.3
Kempegowda Airport (KIA)94 min34.7

Google Maps driving time with live traffic, measured Sep 2026. Refreshed monthly.

Location used: Google Maps match “”. Bus coverage and planned-station distances are still interim estimates.

Price historylocality 11.1%/yr

No dated project-level price series yet; only the latest observation is on file.

Locality · average ₹/sq ft
Date₹ psfSourceConfidenceKind
Jun 20215,200Platform estimate (interim, not observed)40%derived
Jun 20236,700Platform estimate (interim, not observed)45%derived
Jun 20258,200Platform estimate (interim, not observed)50%derived
Jun 20269,200Platform estimate (interim, not observed)50%derived
Luxury comps₹11,000
Premium comps₹9,200
Mid comps₹7,200
Unsold stock13 months

Model backtest on this locality: 1-yr hold-out (Jun 2025→Jun 2026): predicted ₹9,064 vs actual ₹9,200 (-1.5%). Longer 3-yr hold-out (Jun 2023→Jun 2026): predicted 9.5% p.a. vs actual 11.1% p.a. — the model is deliberately mean-reverting and under-predicted the 2021–26 boom.

Environment, legal & productflood ok · water risk · RERA yes
Flood risklow
Water supplymixed
Quietok
Roads & drainspatchy

Vrishabhavathi valley pockets flood; metro and NICE road access

Legal & approvals
Registration 000358
RERA PRM/KA/RERA/1251/310/PR/180111/000358
possession Sep 2019
Litigation
none reported
observed
Approvals
RERA registered
observed
Title
not verified
assumed
Product
Land2.45 acres
Homesnull
Density60/acre
Launched2014
Sources & data gapswhat we know, from where, and what is missing

Automated analysis: unit mix and carpet areas come from the RERA inventory table; prices and rents are locality-model estimates until listings are verified.

FieldValueSource classDateConf.KindConflicting values
AddressSY NO.127/1 PANTHARAPALYA, NAYANDAHALLI MYSORE ROAD BANGALOREKarnataka RERA (number as reported; registry lookup pending)Sep 202680%observed
Land area (acres)2.45Karnataka RERA (number as reported; registry lookup pending)Sep 202680%observed
Total unitsPlatform estimate (interim, not observed)Sep 202620%assumed
Launch year2014Karnataka RERA (number as reported; registry lookup pending)Sep 202670%observed
Possession · Registration 0003582019-09-30Karnataka RERA (number as reported; registry lookup pending)Sep 202670%observed
Price psf · Residential Apartments · ~2,370 sq ft (1667 carpet)8900Platform estimate (interim, not observed)Sep 202635%assumed
Ticket · Residential Apartments · ~2,370 sq ft (1667 carpet)21093000Platform estimate (interim, not observed)Sep 202635%derived
Rent · Residential Apartments · ~2,370 sq ft (1667 carpet)45000Platform estimate (interim, not observed)Sep 202635%assumed
Carpet area1667Karnataka RERA (number as reported; registry lookup pending)Sep 202660%observed
Builder on-time rate0.75Karnataka RERA (number as reported; registry lookup pending)Sep 202660%derived
Litigationnone reportedKarnataka RERA (number as reported; registry lookup pending)Sep 202670%observed
ApprovalsRERA registeredKarnataka RERA (number as reported; registry lookup pending)Sep 202660%observed

Commercial listing portals are shown as “Listing portal (aggregated)”; full provenance is retained internally. Official developer and Karnataka RERA sources are named.

Other projects worth comparing

Same model, same date. Scores are out of 100, where 50 is the average analysed Bengaluru project.

Questions people ask about Birla Apple Spire

Is Birla Apple Spire a good investment?

On PropertyLens's evidence-based model Birla Apple Spire scores 54/100, below the average analysed Bengaluru project (50 = average, 12 points = one standard deviation). The model projects price growth of about 9.9% a year over five years and a net-wealth CAGR of 4.1% after every cost on an 8-year hold with a 75.0% loan. That is research on public filings, not advice; the factor breakdown on this page shows what drives the score.

What is the price per sq ft at Birla Apple Spire?

About ₹8,900 per sq ft of super built-up area, a model estimate from Mysore Road / RR Nagar / Kengeri comparables that you can edit. The Residential Apartments home costs about ₹2.11 Cr before other charges, GST and stamp duty, and ₹2.72 Cr all-in.

When is Birla Apple Spire ready for possession?

The RERA registration commits to Sep 2019. The project is 84 months past its original RERA completion date.

Is Birla Apple Spire RERA registered?

Yes. Karnataka RERA registration: PRM/KA/RERA/1251/310/PR/180111/000358. 3 complaints on this registration and 18 on the promoter across projects at K-RERA as of 2026-09-15.

How reliable is Birla Estates on delivery?

75% of Birla Estates's crawled Bengaluru registrations needed no extension (8 of 10 crawled Bengaluru registrations needed no extension). 10 registrations analysed. The developer scorecard compares this with every other Bengaluru developer.

What rent can Birla Apple Spire earn?

About ₹45,000 a month for this home (a model estimate from Mysore Road / RR Nagar / Kengeri rents), a gross yield of 2.5% on the all-in cost. Nothing is earned before handover. Rent covers 30% of the EMI at the default loan.

Answers are generated from the filings and the model for this home and change when you edit the assumptions above. See the Birla Estates scorecard and the Mysore Road / RR Nagar / Kengeri area page.

Go deeper

Share on WhatsApp