Casagrand Boulevard

Survey nos. 45, 46 and 47 of Chikkagubbi village, Bidarahalli Hobli, Bengaluru… · Hennur Road / Kothanur / Kalyan Nagar
Handover Dec 2024 · no rent beforeapartment · premiumRERA registered+ CompareFull report ↗
1 · Which home?
2 · Which exit plan?

Score, growth and returns below are for the highlighted home and plan. Prices, rent and possession never mix across phases.

43
Investment score
43/100
Evidence confidence56%
Residential Apartments · ~1,215 sq ft (855 carpet)
Price growth per year, next 5 yrs model
9.3%
likely range 5.8%–12.7% · over 10 yrs 8.6%/yr
Net-wealth CAGR, 8-yr hold
4.7%
your cash in → cash back incl. sale, per year
Cash-flow IRR, 8-yr hold
6.1%
with 75% loan · all-cash 7.3% · with interiors
Three numbers, three questions. Price growth: what will the home be worth? Net-wealth CAGR: what will my money have earned after every cost? Cash-flow IRR: the same, but counting when each rupee moves. Tap i on any of them.
Price · edit here or below assumed
₹Cr
₹ psf × 1,215 sq ft · as of Sep 2026
Price edits apply to ·
All-in cost
₹1.60 Cr
+ other charges 4.4 L, GST 6.5 L, stamp/reg 8.6 L, interiors 14.6 L
Gross rental yield assumed
3.2%
rent starts in ~0.3 yr

All-in cost sheet this home, default assumptions

ItemBasisAmount
Base price₹10,350 per sq ft × 1,215 sq ft super built-up1.26 Cr
Other charges3.5% of base: floor-rise, preferred-location, car park, club, maintenance deposit, legal, corpus (edit in Assumptions)4.4 L
GST5.0% on an under-construction home6.5 L
Stamp duty and registration6.6% in Karnataka: 5% stamp duty + 1% registration + cess and surcharge on the agreement value8.6 L
Interiors₹1,200 per sq ft, needed before the home can be let14.6 L
All-in costwhat leaves your pocket and the bank's, before rent or resale₹1.60 Cr
Your own money75.0% loan at 8.5% for 20 years covers the rest; EMI 0.9 L a month₹1.14 Cr

Carpet area 855 sq ft against 1,215 sq ft super built-up: you pay for 30% that is common area and walls. Price per sq ft of carpet ≈ ₹14,708. Every percentage above is editable in Assumptions; the defaults are Karnataka rates as of 2026-09.

In plain words

Why 43 out of 100

Each home is marked on 11 things a careful buyer checks, then compared with every project we analyse in Bengaluru: 50 is the average project, 62 beats about five in six. Here is what lifts this one and what drags it:

  • +
    Schools, hospitals, daily needs · 1/3 pts
    Schools, hospitals and daily shopping are good in this area.
  • +
    Employment access · 3/10 pts
    Drive times right now: Manyata Tech Park 18 min, Hebbal (Kirloskar) 25 min, MG Road (CBD) 37 min; Electronic City Ph-1 71 min. About 6 million sq ft of new offices are planned nearby in 3 years.
  • +
    Resale liquidity · 1/4 pts
    Plenty of buyers can afford a ₹1.26 Cr home, and homes in Hennur Road / Kothanur / Kalyan Nagar resell at a normal pace. Reselling before handover needs the builder’s permission.
  • −
    Legal, title & approvals · -4/5 pts
    Registered with Karnataka RERA; no court cases reported; land title not yet verified by us, so get a lawyer to check. The due-diligence report below flags 2 items in red.
  • −
    Builder delivery & handover risk · -5/16 pts
    Casagrand has finished 22+ projects and delivered on time about 67% of the time. This phase is still under construction, with handover promised for 2024-12-31: delays would push your rent start back.
  • −
    Expected price growth (5-yr CAGR model) · -5/26 pts
    We expect prices here to rise about 9.3% a year for the next 5 years (explained below).
All 11 checks
  • •
    Price vs comparables · -0/3 pts
    Priced about the same as similar premium homes nearby (₹10,350 vs ~₹11,000 per sq ft).
  • •
    Rental demand & yield · 1/8 pts
    Rent pays back 3.2% of the price every year, close to the usual 3% in Bengaluru. Tenant demand here is very strong.
  • +
    Resale liquidity · 1/4 pts
    Plenty of buyers can afford a ₹1.26 Cr home, and homes in Hennur Road / Kothanur / Kalyan Nagar resell at a normal pace. Reselling before handover needs the builder’s permission.
  • •
    Employment access · 3/10 pts
    Drive times right now: Manyata Tech Park 18 min, Hebbal (Kirloskar) 25 min, MG Road (CBD) 37 min; Electronic City Ph-1 71 min. About 6 million sq ft of new offices are planned nearby in 3 years.
  • •
    Metro, bus, rail & airport · 1/9 pts
    No working metro nearby (nearest 4 km). Airport is about 42 minutes by road right now.
  • +
    Schools, hospitals, daily needs · 1/3 pts
    Schools, hospitals and daily shopping are good in this area.
  • −
    Builder delivery & handover risk · -5/16 pts
    Casagrand has finished 22+ projects and delivered on time about 67% of the time. This phase is still under construction, with handover promised for 2024-12-31: delays would push your rent start back.
  • +
    Layout, size, age, amenities, maintenance · 0/3 pts
    Moderately dense layout (69 homes per acre); about 72% of the area you pay for is usable carpet area. Maintenance ~₹4.5 per sq ft a month.
  • •
    Water, flooding, noise, infrastructure · 0/9 pts
    Some flood risk in heavy rain; water supply is partly piped, partly tankers; noise is manageable.
  • •
    Legal, title & approvals · -4/5 pts
    Registered with Karnataka RERA; no court cases reported; land title not yet verified by us, so get a lawyer to check. The due-diligence report below flags 2 items in red.
  • •
    Expected price growth (5-yr CAGR model) · -5/26 pts
    We expect prices here to rise about 9.3% a year for the next 5 years (explained below).
Why prices should grow ~9.3% a year for the next 5 years

We build the forecast step by step, starting from what Bengaluru homes normally do and adjusting for this area and this project:

  1. + 6.0%Start with 6.0% a year: the normal long-run growth of Bengaluru home prices.
  2. + 1.0%Add 1.0%: prices here rose 12.9% a year recently (2023-06 to 2026-06). Some of that pace continues, but it fades each year.
  3. − 0.2%Subtract 0.2%: at ₹10,350 per sq ft, fewer families can afford to buy here, which slows further rises.
  4. + 1.8%Add 1.8%: 6 million sq ft of new offices nearby means more people wanting homes here.
  5. + 0.0%Supply and demand are balanced here (16 months of unsold stock).
  6. + 0.2%Add 0.2% for new roads, metro and water lines, weighted by how likely they are to actually finish: Pink Line Kalena Agrahara–Nagawara (construction, 2027); Blue Line KR Puram–Hebbal–Airport (construction, 2027).
  7. + 0.4%Add 0.4% for this project itself: unfinished homes are worth more once they are complete.
  8. = 9.3%Result: about 9.3% a year, so a home worth ₹1.30 Cr today would be worth about ₹2.03 Cr in 5 years. We are 56% confident in the evidence behind this.

Which exit suits you?

For an unfinished flat the answer depends on whether you sell at handover or hold, and whether you spend on interiors. Same price, same loan; only the strategy changes:

StrategyHoldIRR / yrWealth CAGR / yrCash you put inNet rentNet saleApply
Sell at handover, no interiors
Take delivery in 2024-12-31 and sell the bare flat (1 yr hold). Needs builder NOC or registration first; no rent.
1 yrs-21.7%-21.7%₹43.3 L₹99,433₹43.6 L
Hold bare, rent unfurnished best IRR
Skip interiors; rent 12% lower than a fitted home; sell after 8 yrs with no interiors value.
8 yrs8.1%6.0%₹1.02 Cr₹18.4 L₹1.71 Cr
Hold, do interiors, rent & sell fitted selected
Spend ₹1,200/sq ft on interiors, earn full rent, recover ~40% of interiors cost at sale (fading over 10 yrs).
8 yrs6.1%4.7%₹1.14 Cr₹22.1 L₹1.72 Cr

IRR and CAGR are per year over the hold shown. A short hold can show a high IRR on a small absolute gain; compare the net-sale column too. Selling before registration usually needs the builder’s transfer NOC and a fee.

Highlights

  • Casagrand · Hennur Road / Kothanur / Kalyan Nagar · 528 homes on 7.7 acres
  • Under construction: progress not filed, RERA completion 2024-12-31
  • No litigation declared · 29 complaints on this registration

Assumptions editable

Purchase

₹/sq ft
₹ Cr
sq ft
% of base
%
%
%
₹/sq ft

FinancingLoan 75% · cash 25% · EMI ₹88,949/mo

% loan
% p.a.
years
%

Rent & running costs

₹
% p.a.
%
months
months
₹/sq ft/mo
% of rent
% of rent
% of value

Interiors & exit

%
%
years
% p.a. (blank = model)
%
%

Returns over 8 years · with interiors

Cash you put in₹1.14 Cr
Exit value (yr 8)₹2.56 Cr
Net sale after loan & costs₹1.72 Cr
Net rent after opex₹22.1 L
Loan (75% of price)₹1.02 Cr
EMI / month₹88,949
Year 0: ₹-57.8 L0Year 1: ₹-9.4 L1Year 2: ₹-8.2 L2Year 3: ₹-8.0 L3Year 4: ₹-7.9 L4Year 5: ₹-7.7 L5Year 6: ₹-7.5 L6Year 7: ₹-7.4 L7Year 8: ₹1.65 Cr8
YearPurchaseLoan inRent (net of vacancy)OpexDebt serviceSale − loanNet cash
Today-1.60 Cr1.02 Cr0.0 L0.0 L0.0 L0.0 L-57.8 L
Yr 10.0 L0.0 L2.6 L-1.4 L-10.7 L0.0 L-9.4 L
Yr 20.0 L0.0 L4.1 L-1.6 L-10.7 L0.0 L-8.2 L
Yr 30.0 L0.0 L4.3 L-1.7 L-10.7 L0.0 L-8.0 L
Yr 40.0 L0.0 L4.6 L-1.8 L-10.7 L0.0 L-7.9 L
Yr 50.0 L0.0 L4.8 L-1.8 L-10.7 L0.0 L-7.7 L
Yr 60.0 L0.0 L5.0 L-1.9 L-10.7 L0.0 L-7.5 L
Yr 70.0 L0.0 L5.3 L-2.0 L-10.7 L0.0 L-7.4 L
Yr 80.0 L0.0 L5.5 L-2.0 L-10.7 L1.72 Cr1.65 Cr

Pre-tax unless capital-gains tax is set. Rent enters the cash flows once. Net-wealth CAGR = (cash returned incl. sale ÷ cash put in)^(1/years) − 1. IRR uses the dated cash flows.

Score factors

Bars show points added or taken away versus the average analysed Bengaluru project (score 50).

Price vs comparables
−0.2 pts vs avg
this home 5.9/10 · Bengaluru average 6.2 · confidence 35%
₹10,350 psf vs premium comps ₹11,000 (-6%; under-construction should price ~8% below ready). Price is a model estimate, so this factor carries a third of its normal weight until a listed price is observed.
Rental demand & yield
+1.4 pts vs avg
this home 6.7/10 · Bengaluru average 6.0 · confidence 38%
Gross yield 3.3% (₹28 psf/month); locality rental demand 8/10.
Resale liquidity
+1.1 pts vs avg
this home 8.2/10 · Bengaluru average 7.6 · confidence 50%
Locality resale depth 8/10; ticket ₹1.26 Cr narrows the buyer pool; UC resale needs builder NOC; 528-home project gives deep resale comps.
Employment access
+2.8 pts vs avg
this home 6.6/10 · Bengaluru average 5.2 · confidence 85%
Drive times now (Google Maps, 2026-09-16): Manyata Tech Park 18 min, Hebbal (Kirloskar) 25 min, MG Road (CBD) 37 min, ITPL Whitefield 38 min; 2 of 7 major hubs within 30 min; 6 msf office pipeline (3 yr).
Metro, bus, rail & airport
+0.8 pts vs avg
this home 5.2/10 · Bengaluru average 4.8 · confidence 60%
none operational; Pink Line Nagawara terminal under construction; Nagawara (Pink Line) ~2027; airport ~42 min by road now (Google Maps); .
Schools, hospitals, daily needs
+1.0 pts vs avg
this home 8.0/10 · Bengaluru average 7.0 · confidence 50%
Locality social-infrastructure index (interim, expert-set; POI distances pending Maps integration).
Builder delivery & handover risk
−5.0 pts vs avg
this home 1.8/10 · Bengaluru average 3.7 · confidence 60%
Casagrand: 22+ projects, on-time 67% (derived); handover 2024-12-31 (RERA); 20 months past the RERA completion date.
Layout, size, age, amenities, maintenance
+0.0 pts vs avg
this home 7.4/10 · Bengaluru average 7.3 · confidence 55%
69 units/acre; carpet/SBA ~72%; maintenance ~₹4.5 psf/month (assumed); filed construction cost ₹2,890 per sq ft (standard spec).
Water, flooding, noise, infrastructure
+0.0 pts vs avg
this home 5.8/10 · Bengaluru average 5.8 · confidence 50%
Hennur Road widening incomplete; Kothanur lake flooding
Legal, title & approvals
−4.1 pts vs avg
this home 5.4/10 · Bengaluru average 7.4 · confidence 55%
RERA registered; litigation: none reported; approvals: RERA registered; title: not verified. Due-diligence report lists 2 red flags (−3.1 pts).
Expected price growth (5-yr CAGR model)
−4.9 pts vs avg
this home 5.2/10 · Bengaluru average 6.0 · confidence 56%
Model 5-yr price CAGR 9.3% (range 5.8–12.7%).

Price growth model, year by year

Nominal growth per year. Parts add up; momentum fades, infrastructure is weighted by delivery probability and dated.

ComponentYr 1Yr 2Yr 3Yr 4Yr 5Yr 6Confidence
Bengaluru long-run nominal trend6.06.06.06.06.06.080%
Locality momentum (mean-reverting)2.41.30.70.40.20.145%
Affordability ceiling-0.3-0.2-0.2-0.1-0.1-0.160%
Employment access & office pipeline1.81.81.81.81.81.855%
Supply–demand balance0.00.00.00.00.00.050%
Infrastructure delivery (probability-weighted)0.50.50.00.00.00.255%
Project-specific adjustments2.00.00.00.00.00.050%
Total growth12.4%9.4%8.4%8.1%8.0%8.1%56%

Bengaluru long-run nominal trend: City-wide 2013-25 nominal residential trend ≈ inflation + real income growth.

Locality momentum (mean-reverting): Trailing 3.0-yr locality CAGR 12.9% vs 6.0% trend; 35% carried forward, halving each year.

Affordability ceiling: Ticket at ₹10,350 psf vs city median ₹9,500; buyer pool thins above ₹15k/₹20k psf and after >6pp excess growth.

Employment access & office pipeline: 6 msf office pipeline (3 yr) on 20 msf stock; 30-min jobs index 0.75.

Supply–demand balance: 16 months of unsold inventory; new-launch/absorption ratio 1.01 (from 26 under-construction RERA filings in this locality: 2,249 unsold homes, 140.4 sold per month).

Infrastructure delivery (probability-weighted): Pink Line Kalena Agrahara–Nagawara (construction, 2027, p=0.6); Blue Line KR Puram–Hebbal–Airport (construction, 2027, p=0.65); Phase 3A Sarjapur–Hebbal (planned, 2033, p=0.45)

Project-specific adjustments: Remaining construction risk (13% work left) re-rates toward ready comps by handover (~1.0% over 0.5 yr).

Locality evidence: ₹7,500 (Jun 2023) → ₹10,800 (Jun 2026) = 12.9% p.a. Sources: Platform estimate (interim, not observed).

Financial & legal due diligence

What the public record says

Automated from the Karnataka RERA file PRM/KA/RERA/1251/446/PR/201001/003629. Prices and rents are locality estimates, not verified listings. Compiled Sep 2026 from the Karnataka RERA file, company registers, rating agencies, tribunal records and press. Facts only; anything that deserves a written answer before signing is flagged.

Delivery timeline7/10
a registration completion date has already passed (−2)
Legal & complaints6/10
29 RERA complaints on the project (−3); 5 still open
Money to finish8/10
finance cost is 0% of the registered budget
Developer strength7.6/10
ICRA A-/Stable (Casagrand Builder)

Meters are rule-based from the RERA file and public ratings (rules shown under each), not opinions.

Registration
PRM/KA/RERA/1251/446/PR/201001/003629 · GAZY MAG PVT LTD
Past RERA date
RegisteredOct 2020Original completionDec 2024TodaySep 2026
No litigation declared29 complaints · 5 openEscrow: ICICI Bank
Credit ratings of the people behind it
AAAAAABBBBBBCDinvestment grade ◀▶ speculative gradeICRA A- / Stable · Casagrand Builder · May 2025
Complaints & disputes on record
On this project295 open
On the promoter entity29all projects
Court cases declared0no stay recorded
What complainants raise
  • 3 YEAR DELAY , INCOMPLETE WORK, WORK STILL NOT COMPLETE AND UNDUE CHARGE OF LATE PAYMENT
  • Respondents must register the conveyance deed, as the Complainant does not wish to withdra
  • Refund with interest for wrongful denial of unit allotment and failure to honour NOC and a
  • (i) Unexplained delay between booking and handover of the flat (ii) Unauthorised excess co
At a glance
On its original RERA date

On its original RERA completion date: 2024-12-31

29 RERA complaints, 5 open

29 RERA complaints on this project (5 open); 29 on the promoter overall

No litigation declared

No litigation declared in RERA filings

The record, in pictures

RERA file · Registration

Registered project cost ₹260 cr — where it goes
Land ₹84 cr · 32%Construction & on-site ₹176 cr · 68%
No litigation declaredBorrowing declared: not statedEscrow at ICICI Bank

Complaint log (K-RERA) · 29 on this project

  • Jun 20263 YEAR DELAY , INCOMPLETE WORK, WORK STILL NOT COMPLETE AND UNDUE CHARGE OF LATE PAYMENTopen
  • Dec 2025Respondents must register the conveyance deed, as the Complainant does not wish to withdraw from the project aopen
  • Oct 2025Refund with interest for wrongful denial of unit allotment and failure to honour NOC and agreement terms.open
  • Sep 2025(i) Unexplained delay between booking and handover of the flat (ii) Unauthorised excess collection.n of GSTopen
  • Sep 2025Interest for Delay in Possession : Builder delayed handover by 14 months and denied paying interest for delay open
  • Aug 2025Interest on delay period in handing over the flat to the Allottees as per the Sale Agreement, dated 18.11.2022disposed
  • Jun 2025Compensation for delay in handing over the flat to the Allottees as per the Sale Agreement, dated 9.4.2021disposed
  • May 2025Interest on delay in delivering Possessiondisposed
  • May 2025Delay in possession, Harassment and penaltydisposed
  • Mar 2025Delay in delivery of possession of flat by 1 yeardisposed
  • Feb 2025Delay in handover as per sale agreementdisposed
  • Feb 2025Delay in handing over the flat to the Allottees as per the sale agreement 31.03.2022disposed
Complaints by status
Open / under enquiry
5
Disposed (Authority)
22
Disposed (adjudicating officer)
2

Red flags to resolve in writing

1
Timeline

RERA completion date 2024-12-31 has passed without a completion application.

2
Timeline

29 K-RERA complaints on this registration.

Questions to put to the developer before you sign

  1. Share the latest CA Form 4 and architect Form 5 with the escrow deposit ratio.
  2. Confirm the price list, floor-rise and other charges for the exact unit.
  3. Which date is contractual — 2024-12-31 — and what is the per-month delay compensation?
  4. Confirm there is no litigation on the land or approvals beyond the RERA declaration.
  5. Is the land freehold with the developer, and is any part mortgaged?
Full record: every filed number, line by line2 sections · 32 items

RERA file · Registration

Registration
PRM/KA/RERA/1251/446/PR/201001/003629 · promoter GAZY MAG PVT LTD (Company) · Proposed Project End Date at the time of registration :
Dates
Start 2020-10-01 · original completion 2024-12-31 · no extensions · current date has passed
Registered cost
Total ₹260 cr · land ₹83.97 cr · construction ₹176 cr
RERA bank account
ICICI Bank, MG ROAD (70% construction account)
Land & towers
7.67 acres (31,059 sq m) · Casagrand Boulavard 528 homes, 4 floors
Litigation declared
None declared in filings
K-RERA complaints
29 on this registration (5 open) · 29 on the promoter entity across all its projects

Source: Karnataka RERA project record PRM/KA/RERA/1251/446/PR/201001/003629, fetched 2026-09-15. Figures are the promoter’s own filings.

Complaint log (K-RERA) · 29 on this project

2026-06-29 · 00758/2026
3 YEAR DELAY , INCOMPLETE WORK, WORK STILL NOT COMPLETE AND UNDUE CHARGE OF LATE PAYMENT — UNDER ENQUIRY AUTHORITY BENCH6
2025-12-29 · 01548/2025
Respondents must register the conveyance deed, as the Complainant does not wish to withdraw from the project and requests monthly interest for delay until possession under Section 18(1) of this Act. — POSTED FOR ORDERS AUTHORITY BENCH4
2025-10-28 · 01311/2025
Refund with interest for wrongful denial of unit allotment and failure to honour NOC and agreement terms. — UNDER ENQUIRY AUTHORITY BENCH4
2025-09-24 · 01220/2025
(i) Unexplained delay between booking and handover of the flat (ii) Unauthorised excess collection.n of GST — POSTED FOR ORDERS AUTHORITY BENCH4
2025-09-22 · 01212/2025
Interest for Delay in Possession : Builder delayed handover by 14 months and denied paying interest for delay in possession — UNDER ENQUIRY AUTHORITY BENCH4
2025-08-29 · 01100/2025
Interest on delay period in handing over the flat to the Allottees as per the Sale Agreement, dated 18.11.2022 — DISPOSED AUTHORITY BENCH4 (AUTHORITY)
2025-06-17 · 00845/2025
Compensation for delay in handing over the flat to the Allottees as per the Sale Agreement, dated 9.4.2021 — DISPOSED AUTHORITY BENCH4 (AUTHORITY)
2025-05-28 · 00785/2025
Interest on delay in delivering Possession — DISPOSED AUTHORITY BENCH4 (AUTHORITY)
2025-05-12 · 00725/2025
Delay in possession, Harassment and penalty — DISPOSED AO (ADJUDICATING OFFICER)
2025-03-03 · 00364/2025
Delay in delivery of possession of flat by 1 year — DISPOSED AUTHORITY BENCH4 (AUTHORITY)
2025-02-27 · 00343/2025
Delay in handover as per sale agreement — DISPOSED AUTHORITY BENCH4 (AUTHORITY)
2025-02-13 · 00297/2025
Delay in handing over the flat to the Allottees as per the sale agreement 31.03.2022 — DISPOSED AUTHORITY BENCH4 (AUTHORITY)
2025-02-11 · 00279/2025
Interest on delay period — DISPOSED AUTHORITY BENCH4 (AUTHORITY)
2025-02-03 · 00236/2025
Interest on Delay Period — DISPOSED AUTHORITY BENCH4 (AUTHORITY)
2025-01-28 · 00207/2025
Delay in handover as per sale Deed — DISPOSED AUTHORITY BENCH4 (AUTHORITY)
2025-01-21 · 00151/2025
Compensation for delay in handover — DISPOSED AUTHORITY BENCH4 (AUTHORITY)
2025-01-18 · 00135/2025
Compensation for delay in handing over the flat to the Allottees as per the Sale Agreement, dated 9.5.2023 — DISPOSED AUTHORITY BENCH4 (AUTHORITY)
2024-12-19 · 01315/2024
Delay Charges Denied — DISPOSED AUTHORITY BENCH4 (AUTHORITY)
2024-12-18 · 01288/2024
Builder has signed an agreement for handover as Oct'23 but project is not handed over still and not in living condition causing lot of inconvenience to buyer — DISPOSED AUTHORITY BENCH4 (AUTHORITY)
2024-11-26 · 01246/2024
Customer Harassment — DISPOSED AUTHORITY BENCH4 (AUTHORITY)
2024-10-19 · 01032/2024
Basic water is not provided and delay in completion of property and seeking for compension — DISPOSED AUTHORITY FULLBENCH (AUTHORITY)
2024-09-10 · 00854/2024
Compensation for delay in handover — DISPOSED AUTHORITY BENCH4 (AUTHORITY)
2024-06-15 · 00603/2024
As per my Sales Agreement, the builder is supposed to handover in Oct 2023+ 3M. They have taken 95% of the cost and we are having to pay complete EMI's, and the handover date mentioned was Oct 2023+3M — DISPOSED AO (ADJUDICATING OFFICER)
2024-05-02 · 00421/2024
Delay in Handover of the Apartment — DISPOSED AUTHORITY BENCH4 (AUTHORITY)
2024-04-30 · 00420/2024
Interest on Delay of Possession in Hon’ble RERA AUTHORITY Court — DISPOSED AUTHORITY BENCH4 (AUTHORITY)

Showing the latest 25 of 29.

Sources & caveats2 sources
  • Karnataka RERA project record PRM/KA/RERA/1251/446/PR/201001/003629 (registration file, quarterly updates, complaint register), fetched 2026-09-15
  • PropertyLens locality model (market-level estimates)
  • Karnataka RERA project records PRM/KA/RERA/1251/446/PR/201001/003629 (registration file, quarterly updates, complaint register), fetched Sep 2026.

Caveats. Automated analysis: prices, rents and travel times are estimates until listings and Maps data are verified. RERA figures are the promoter’s own filings. Nothing here is legal, tax or investment advice.

Evidence

Location, jobs & transit3 hubs · metro 4.0 km
Job hubs nearby
Manyata Tech Park 5 kmKirloskar Business ParkBagmane / KR Puram 10 km
Measured drive times below
Office space
Existing20 msf
Coming in 3 yrs6 msf
Jobs within 30 min8/10
Getting around
Metro today
none operational; Pink Line Nagawara terminal under construction
~4,000 m estimate
Metro planned
Nagawara (Pink Line)
~2027 60% likely ~3,000 m estimate
Rail
—
estimate
Airport
42 min by road now · 14.5 km
Google Maps
Buses
7/10 coverage
estimate
Drive times to job hubs
DestinationDrive nowRoad km
Manyata Tech Park18 min5.4
Hebbal (Kirloskar)25 min8.1
MG Road (CBD)37 min12.7
ITPL Whitefield38 min13.2
Kempegowda Airport (KIA)42 min14.5
ORR Bellandur (Ecospace)48 min17.1
Koramangala (Forum)48 min16.7
Electronic City Ph-171 min25.9

Google Maps driving time with live traffic, measured Sep 2026. Refreshed monthly.

Location used: Google Maps match “”. Bus coverage and planned-station distances are still interim estimates.

Price historylocality 12.9%/yr

No dated project-level price series yet; only the latest observation is on file.

Locality · average ₹/sq ft
Date₹ psfSourceConfidenceKind
Jun 20215,800Platform estimate (interim, not observed)40%derived
Jun 20237,500Platform estimate (interim, not observed)45%derived
Jun 20259,500Platform estimate (interim, not observed)50%derived
Jun 202610,800Platform estimate (interim, not observed)50%derived
Luxury comps₹14,000
Premium comps₹11,000
Mid comps₹8,500
Unsold stock16 months

Model backtest on this locality: 1-yr hold-out (Jun 2025→Jun 2026): predicted ₹10,445 vs actual ₹10,800 (-3.3%). Longer 3-yr hold-out (Jun 2023→Jun 2026): predicted 9.1% p.a. vs actual 12.9% p.a. — the model is deliberately mean-reverting and under-predicted the 2021–26 boom.

Environment, legal & productflood ok · water risk · RERA yes
Flood risksome risk
Water supplymixed
Quietok
Roads & drainspatchy

Hennur Road widening incomplete; Kothanur lake flooding

Legal & approvals
Registration 003629
RERA PRM/KA/RERA/1251/446/PR/201001/003629
possession Dec 2024
Litigation
none reported
observed
Approvals
RERA registered
observed
Title
not verified
assumed
Product
Land7.67 acres
Homes528
Density69/acre
Launched2020
Sources & data gapswhat we know, from where, and what is missing

Automated analysis: unit mix and carpet areas come from the RERA inventory table; prices and rents are locality-model estimates until listings are verified.

FieldValueSource classDateConf.KindConflicting values
AddressSy no 45,46 and 47 of Chikkagubbi village, Bidarahalli Hobli, Bengaluru, Bengaluru East Taluk, Bangalore District 560077Karnataka RERA (number as reported; registry lookup pending)Sep 202680%observed
Land area (acres)7.67Karnataka RERA (number as reported; registry lookup pending)Sep 202680%observed
Total units528Karnataka RERA (number as reported; registry lookup pending)Sep 202680%observed
Launch year2020Karnataka RERA (number as reported; registry lookup pending)Sep 202670%observed
Possession · Registration 0036292024-12-31Karnataka RERA (number as reported; registry lookup pending)Sep 202670%observed
Price psf · Residential Apartments · ~1,215 sq ft (855 carpet)10350Platform estimate (interim, not observed)Sep 202635%assumed
Ticket · Residential Apartments · ~1,215 sq ft (855 carpet)12575250Platform estimate (interim, not observed)Sep 202635%derived
Rent · Residential Apartments · ~1,215 sq ft (855 carpet)34500Platform estimate (interim, not observed)Sep 202635%assumed
Carpet area855Karnataka RERA (number as reported; registry lookup pending)Sep 202660%observed
Builder on-time rate0.67Karnataka RERA (number as reported; registry lookup pending)Sep 202660%derived
Litigationnone reportedKarnataka RERA (number as reported; registry lookup pending)Sep 202670%observed
ApprovalsRERA registeredKarnataka RERA (number as reported; registry lookup pending)Sep 202660%observed

Commercial listing portals are shown as “Listing portal (aggregated)”; full provenance is retained internally. Official developer and Karnataka RERA sources are named.

Other projects worth comparing

Same model, same date. Scores are out of 100, where 50 is the average analysed Bengaluru project.

Questions people ask about Casagrand Boulevard

Is Casagrand Boulevard a good investment?

On PropertyLens's evidence-based model Casagrand Boulevard scores 43/100, below the average analysed Bengaluru project (50 = average, 12 points = one standard deviation). The model projects price growth of about 9.3% a year over five years and a net-wealth CAGR of 4.7% after every cost on an 8-year hold with a 75.0% loan. That is research on public filings, not advice; the factor breakdown on this page shows what drives the score.

What is the price per sq ft at Casagrand Boulevard?

About ₹10,350 per sq ft of super built-up area, a model estimate from Hennur Road / Kothanur / Kalyan Nagar comparables that you can edit. The Residential Apartments home costs about ₹1.26 Cr before other charges, GST and stamp duty, and ₹1.60 Cr all-in.

When is Casagrand Boulevard ready for possession?

The RERA registration commits to Dec 2024. The project is 20 months past its original RERA completion date.

Is Casagrand Boulevard RERA registered?

Yes. Karnataka RERA registration: PRM/KA/RERA/1251/446/PR/201001/003629. 29 complaints on this registration and 29 on the promoter across projects at K-RERA as of 2026-09-15.

How reliable is Casagrand on delivery?

67% of Casagrand's crawled Bengaluru registrations needed no extension (15 of 22 crawled Bengaluru registrations needed no extension). 22 registrations analysed. The developer scorecard compares this with every other Bengaluru developer.

What rent can Casagrand Boulevard earn?

About ₹34,500 a month for this home (a model estimate from Hennur Road / Kothanur / Kalyan Nagar rents), a gross yield of 3.2% on the all-in cost. Nothing is earned before handover. Rent covers 39% of the EMI at the default loan.

Answers are generated from the filings and the model for this home and change when you edit the assumptions above. See the Casagrand scorecard and the Hennur Road / Kothanur / Kalyan Nagar area page.