Lodha (Macrotech) · Thane West (Ghodbunder Road / Majiwada / Pokhran)

Lodha Amara -Tower 42 and 43

Thane, Thane, 400607
Handover Dec 2027 · no rent beforeapartment · luxuryRERA registered+ CompareFull report ↗
1 · Which home?
2 · Which exit plan?

Score, growth and returns below are for the highlighted home and plan. Prices, rent and possession never mix across phases.

55
Investment score
55/100
Evidence confidence55%
2 BHK · ~650 sq ft carpet (assumed)
Price growth per year, next 5 yrs model
7.4%
likely range 3.9%–10.8% · over 10 yrs 7.1%/yr
Net-wealth CAGR, 8-yr hold
2.5%
your cash in → cash back incl. sale, per year
Cash-flow IRR, 8-yr hold
3.8%
with 75% loan · all-cash 6.7% · with interiors
Three numbers, three questions. Price growth: what will the home be worth? Net-wealth CAGR: what will my money have earned after every cost? Cash-flow IRR: the same, but counting when each rupee moves. Tap i on any of them.
Price · edit here or below assumed
₹Cr
₹ psf × 650 sq ft · as of Nov 2026
Price edits apply to ·
All-in cost
₹1.67 Cr
+ other charges 4.8 L, GST 7.1 L, stamp/reg 10.2 L, interiors 7.8 L
Gross rental yield assumed
2.2%
rent starts in ~1.6 yr

All-in cost sheet this home, default assumptions

ItemBasisAmount
Base price₹21,100 per sq ft × 650 sq ft carpet1.37 Cr
Other charges3.5% of base: floor-rise, preferred-location, car park, club, maintenance deposit, legal, corpus (edit in Assumptions)4.8 L
GST5.0% on an under-construction home7.1 L
Stamp duty and registration7.2% in Maharashtra: 6% stamp duty including 1% metro cess inside BMC limits (7% in Thane, Navi Mumbai and other corporations), plus 1% registration capped at ₹30,00010.2 L
Interiors₹1,200 per sq ft, needed before the home can be let7.8 L
All-in costwhat leaves your pocket and the bank's, before rent or resale₹1.67 Cr
Your own money75.0% loan at 8.5% for 20 years covers the rest; EMI 1.0 L a month₹1.14 Cr

Prices here are per sq ft of RERA carpet area (650 sq ft), the way homes are sold in Mumbai; there is no super built-up loading to discount. Every percentage above is editable in Assumptions; the defaults are Maharashtra rates as of 2026.

In plain words

Why 55 out of 100

Each home is marked on 11 things a careful buyer checks, then compared with every project we analyse in Mumbai: 50 is the average project, 62 beats about five in six. Here is what lifts this one and what drags it:

  • +
    Builder delivery & handover risk · 4/11 pts
    Lodha (Macrotech) has finished 204+ projects and delivered on time about 80% of the time. This phase is still under construction, with handover promised for 2027-12-31: delays would push your rent start back.
  • +
    Schools, hospitals, daily needs · 1/2 pts
    Schools, hospitals and daily shopping are excellent in this area.
  • +
    Layout, size, age, amenities, maintenance · 0/2 pts
    Moderately dense layout (60 homes per acre); about 100% of the area you pay for is usable carpet area. Maintenance ~₹7 per sq ft a month.
  • −
    Rental demand & yield · -2/7 pts
    Rent pays back 2.2% of the price every year, well below the usual 2.8% in Mumbai. Tenant demand here is very strong.
  • −
    Metro, bus, rail & airport · -1/8 pts
    The nearest working metro is ~3.0 km away; Line 4 Thane / Ghodbunder stations is planned for ~2027. Airport is about 78 minutes by road right now.
  • −
    Price vs comparables · -0/3 pts
    Priced about the same as similar luxury homes nearby (₹21,100 vs ~₹21,400 per sq ft).
All 11 checks
  • •
    Price vs comparables · -0/3 pts
    Priced about the same as similar luxury homes nearby (₹21,100 vs ~₹21,400 per sq ft).
  • •
    Rental demand & yield · -2/7 pts
    Rent pays back 2.2% of the price every year, well below the usual 2.8% in Mumbai. Tenant demand here is very strong.
  • +
    Resale liquidity · 0/4 pts
    Plenty of buyers can afford a ₹1.37 Cr home, and homes in Thane West resell quickly. Reselling before handover needs the builder’s permission.
  • •
    Employment access · 2/11 pts
    Drive times right now: Thane (Wagle Estate) 13 min, Powai (Hiranandani) 41 min, Andheri SEEPZ 45 min; Nariman Point 101 min. About 4 million sq ft of new offices are planned nearby in 3 years.
  • •
    Metro, bus, rail & airport · -1/8 pts
    The nearest working metro is ~3.0 km away; Line 4 Thane / Ghodbunder stations is planned for ~2027. Airport is about 78 minutes by road right now.
  • +
    Schools, hospitals, daily needs · 1/2 pts
    Schools, hospitals and daily shopping are excellent in this area.
  • +
    Builder delivery & handover risk · 4/11 pts
    Lodha (Macrotech) has finished 204+ projects and delivered on time about 80% of the time. This phase is still under construction, with handover promised for 2027-12-31: delays would push your rent start back.
  • +
    Layout, size, age, amenities, maintenance · 0/2 pts
    Moderately dense layout (60 homes per acre); about 100% of the area you pay for is usable carpet area. Maintenance ~₹7 per sq ft a month.
  • •
    Water, flooding, noise, infrastructure · 1/8 pts
    Low flood risk; water supply is partly piped, partly tankers; noticeable traffic or aircraft noise.
  • •
    Legal, title & approvals · 0/8 pts
    Registered with MahaRERA; court cases not disclosed on the public register; land title not yet verified by us, so get a lawyer to check. The due-diligence report below flags 0 items in red.
  • −
    Expected price growth (5-yr CAGR model) · 0/43 pts
    We expect prices here to rise about 7.4% a year for the next 5 years (explained below).
Why prices should grow ~7.4% a year for the next 5 years

We build the forecast step by step, starting from what Mumbai homes normally do and adjusting for this area and this project:

  1. + 5.5%Start with 5.5% a year: the normal long-run growth of Mumbai home prices.
  2. + 0.5%Add 0.5%: prices here rose 9.0% a year recently (2023-06 to 2026-06). Some of that pace continues, but it fades each year.
  3. − 0.6%Subtract 0.6%: at ₹21,100 per sq ft, fewer families can afford to buy here, which slows further rises.
  4. + 1.5%Add 1.5%: 4 million sq ft of new offices nearby means more people wanting homes here.
  5. − 0.7%Subtract 0.7%: many new homes are being built here (22 months of unsold stock), which keeps prices in check.
  6. + 0.2%Add 0.2% for new roads, metro and water lines, weighted by how likely they are to actually finish: Metro Line 4 Wadala–Ghatkopar–Thane–Kasarvadavali (construction, 2027); Metro Line 5 Thane–Bhiwandi–Kalyan (construction, 2028); Thane–Borivali twin tunnel (construction, 2029).
  7. + 0.8%Add 0.8% for this project itself: unfinished homes are worth more once they are complete.
  8. = 7.4%Result: about 7.4% a year, so a home worth ₹1.42 Cr today would be worth about ₹2.03 Cr in 5 years. We are 56% confident in the evidence behind this.

Which exit suits you?

For an unfinished flat the answer depends on whether you sell at handover or hold, and whether you spend on interiors. Same price, same loan; only the strategy changes:

StrategyHoldIRR / yrWealth CAGR / yrCash you put inNet rentNet saleApply
Sell at handover, no interiors
Take delivery in 2027-12-31 and sell the bare flat (2 yr hold). Needs builder NOC or registration first; no rent.
2 yrs-9.9%-7.0%₹34.4 L₹49,217₹53.3 L
Hold bare, rent unfurnished best IRR
Skip interiors; rent 12% lower than a fitted home; sell after 8 yrs with no interiors value.
8 yrs4.7%3.0%₹1.08 Cr₹10.7 L₹1.46 Cr
Hold, do interiors, rent & sell fitted selected
Spend ₹1,200/sq ft on interiors, earn full rent, recover ~40% of interiors cost at sale (fading over 10 yrs).
8 yrs3.8%2.5%₹1.14 Cr₹13.0 L₹1.48 Cr

IRR and CAGR are per year over the hold shown. A short hold can show a high IRR on a small absolute gain; compare the net-sale column too. Selling before registration usually needs the builder’s transfer NOC and a fee.

Highlights

  • Lodha (Macrotech) · Thane West (Ghodbunder Road / Majiwada / Pokhran) · unit count not on the public register
  • Under construction: progress not on the public register, MahaRERA completion 2027-12-31
  • Registered with MahaRERA as P51700020164

Assumptions editable

Purchase

₹/sq ft
₹ Cr
sq ft
% of base
%
%
%
₹/sq ft

FinancingLoan 75% · cash 25% · EMI ₹97,010/mo

% loan
% p.a.
years
%

Rent & running costs

₹
% p.a.
%
months
months
₹/sq ft/mo
% of rent
% of rent
% of value

Interiors & exit

%
%
years
% p.a. (blank = model)
%
%

Returns over 8 years · with interiors

Cash you put in₹1.14 Cr
Exit value (yr 8)₹2.46 Cr
Net sale after loan & costs₹1.48 Cr
Net rent after opex₹13.0 L
Loan (75% of price)₹1.12 Cr
EMI / month₹97,010
Year 0: ₹-14.5 L0Year 1: ₹-19.9 L1Year 2: ₹-31.3 L2Year 3: ₹-9.9 L3Year 4: ₹-9.8 L4Year 5: ₹-9.6 L5Year 6: ₹-9.5 L6Year 7: ₹-9.4 L7Year 8: ₹1.38 Cr8
YearPurchaseLoan inRent (net of vacancy)OpexDebt serviceSale − loanNet cash
Today-25.7 L11.2 L0.0 L0.0 L0.0 L0.0 L-14.5 L
Yr 1-67.1 L50.3 L0.0 L0.0 L-3.1 L0.0 L-19.9 L
Yr 2-74.9 L50.3 L1.3 L-0.6 L-7.4 L0.0 L-31.3 L
Yr 30.0 L0.0 L3.2 L-1.4 L-11.6 L0.0 L-9.9 L
Yr 40.0 L0.0 L3.3 L-1.5 L-11.6 L0.0 L-9.8 L
Yr 50.0 L0.0 L3.5 L-1.5 L-11.6 L0.0 L-9.6 L
Yr 60.0 L0.0 L3.7 L-1.6 L-11.6 L0.0 L-9.5 L
Yr 70.0 L0.0 L3.9 L-1.6 L-11.6 L0.0 L-9.4 L
Yr 80.0 L0.0 L4.0 L-1.7 L-11.6 L1.48 Cr1.38 Cr

Pre-tax unless capital-gains tax is set. Rent enters the cash flows once. Net-wealth CAGR = (cash returned incl. sale ÷ cash put in)^(1/years) − 1. IRR uses the dated cash flows.

Score factors

Bars show points added or taken away versus the average analysed Mumbai project (score 50).

Price vs comparables
−0.1 pts vs avg
this home 5.8/10 · Mumbai average 6.0 · confidence 30%
₹21,100 psf vs luxury comps ₹21,400 (-1%; under-construction should price ~8% below ready). Price is a model estimate, so this factor carries a third of its normal weight until a listed price is observed.
Rental demand & yield
−2.1 pts vs avg
this home 5.1/10 · Mumbai average 6.2 · confidence 34%
Gross yield 2.3% (₹41 psf/month); locality rental demand 8/10.
Resale liquidity
+0.4 pts vs avg
this home 7.7/10 · Mumbai average 7.4 · confidence 50%
Locality resale depth 8/10; ticket ₹1.37 Cr narrows the buyer pool; UC resale needs builder NOC.
Employment access
+1.8 pts vs avg
this home 5.4/10 · Mumbai average 4.4 · confidence 85%
Drive times now (Google Maps, 2026-11-11): Thane (Wagle Estate) 13 min, Powai (Hiranandani) 41 min, Andheri SEEPZ 45 min, Malad Mindspace 45 min; 1 of 7 major hubs within 30 min; 4 msf office pipeline (3 yr).
Metro, bus, rail & airport
−1.0 pts vs avg
this home 4.8/10 · Mumbai average 5.5 · confidence 60%
none yet; Line 4 along Ghodbunder Road; Line 4 Thane / Ghodbunder stations ~2027; airport ~78 min by road now (Google Maps); .
Schools, hospitals, daily needs
+0.6 pts vs avg
this home 8.5/10 · Mumbai average 7.8 · confidence 50%
Locality social-infrastructure index (interim, expert-set; POI distances pending Maps integration).
Builder delivery & handover risk
+3.9 pts vs avg
this home 7.1/10 · Mumbai average 5.5 · confidence 60%
Lodha (Macrotech): 204+ projects, on-time 80% (derived); handover 2027-12-31 (reported); within the RERA timeline.
Layout, size, age, amenities, maintenance
+0.5 pts vs avg
this home 8.3/10 · Mumbai average 7.9 · confidence 50%
60 units/acre; carpet/SBA ~100%; maintenance ~₹7 psf/month (assumed).
Water, flooding, noise, infrastructure
+1.0 pts vs avg
this home 6.4/10 · Mumbai average 5.8 · confidence 50%
Ghodbunder Road congestion; Yeoor hills edge
Legal, title & approvals
+0.2 pts vs avg
this home 6.0/10 · Mumbai average 5.9 · confidence 55%
RERA registered; litigation: not published on the public register; approvals: MahaRERA registered; title: not verified. Due-diligence report lists 0 red flags (−0.0 pts).
Expected price growth (5-yr CAGR model)
+0.2 pts vs avg
this home 2.8/10 · Mumbai average 2.7 · confidence 56%
Model 5-yr price CAGR 7.4% (range 3.9–10.8%).

Price growth model, year by year

Nominal growth per year. Parts add up; momentum fades, infrastructure is weighted by delivery probability and dated.

ComponentYr 1Yr 2Yr 3Yr 4Yr 5Yr 6Confidence
Mumbai long-run nominal trend5.55.55.55.55.55.580%
Locality momentum (mean-reverting)1.20.70.40.20.10.145%
Affordability ceiling-1.0-0.7-0.5-0.3-0.2-0.260%
Employment access & office pipeline1.51.51.51.51.51.555%
Supply–demand balance-1.0-0.8-0.6-0.5-0.4-0.350%
Infrastructure delivery (probability-weighted)0.40.50.30.10.00.055%
Project-specific adjustments2.02.00.00.00.00.050%
Total growth8.6%8.7%6.6%6.5%6.5%6.6%56%

Mumbai long-run nominal trend: City-wide 2013-25 nominal residential trend ≈ inflation + real income growth.

Locality momentum (mean-reverting): Trailing 3.0-yr locality CAGR 9.0% vs 5.5% trend; 35% carried forward, halving each year.

Affordability ceiling: Ticket at ₹21,100 psf vs city median ₹14,500; buyer pool thins above ₹15k/₹20k psf and after >6pp excess growth.

Employment access & office pipeline: 4 msf office pipeline (3 yr) on 15 msf stock; 30-min jobs index 0.65.

Supply–demand balance: 22 months of unsold inventory; new-launch/absorption ratio 1.4.

Infrastructure delivery (probability-weighted): Metro Line 4 Wadala–Ghatkopar–Thane–Kasarvadavali (construction, 2027, p=0.6); Metro Line 5 Thane–Bhiwandi–Kalyan (construction, 2028, p=0.5); Thane–Borivali twin tunnel (construction, 2029, p=0.5)

Project-specific adjustments: Remaining construction risk (31% work left) re-rates toward ready comps by handover (~2.5% over 1.3 yr).

Locality evidence: ₹13,500 (Jun 2023) → ₹17,500 (Jun 2026) = 9.0% p.a. Sources: Platform estimate (interim, not observed).

Financial & legal due diligence

What the public record says

Automated from MahaRERA's public register entry and registration certificate for P51700020164. Prices and rents are locality estimates, not verified listings. Compiled Nov 2026 from the MahaRERA file, company registers, rating agencies, tribunal records and press. Facts only; anything that deserves a written answer before signing is flagged.

Delivery timeline9/10
no extensions, no overdue dates on the RERA file
Legal & complaints9/10
no litigation and no complaints on the RERA file
Money to finish8/10
Developer strength9/10
CRISIL AA/Stable (Macrotech Developers)

Meters are rule-based from the RERA file and public ratings (rules shown under each), not opinions.

Registration
P51700020164 · LODHA DEVELOPERS LIMITED
On original date
RegisteredMar 2019TodaySep 2026Original completionDec 2027
No litigation declaredNo complaints
Credit ratings of the people behind it
AAAAAABBBBBBCDinvestment grade ◀▶ speculative gradeCRISIL AA / Stable ▲ · Macrotech Developers · Aug 2025
Complaints & disputes on record
On this project00 open
On the promoter entity0all projects
Court cases declared0no stay recorded
At a glance
On its original RERA date

On its original RERA completion date: 2027-12-31

No complaints on this project

No RERA complaints on this project; 0 on the promoter overall

No litigation declared

No litigation declared in RERA filings

The record, in pictures

RERA file · Registration

No litigation declaredBorrowing declared: not stated

Red flags to resolve in writing

Questions to put to the developer before you sign

  1. Share the latest quarterly progress filing and the architect and engineer certificates.
  2. Confirm the price list, floor-rise, parking and other charges for the exact unit.
  3. Which date is contractual, 2027-12-31 or the agreement's, and what is the delay compensation?
  4. Confirm there is no litigation on the land or approvals beyond the RERA declaration.
  5. Is the land owned by the promoter, or is this a joint development, and is any part mortgaged?
Full record: every filed number, line by line1 sections · 3 items

RERA file · Registration

Registration
P51700020164 · promoter LODHA DEVELOPERS LIMITED
Dates
Start 2019-03-29 · original completion 2027-12-31 · no extensions
Litigation declared
None declared in filings

Source: MahaRERA project record P51700020164, fetched 2026-11-10. Figures are the promoter’s own filings.

Sources & caveats2 sources
  • MahaRERA project record P51700020164, fetched 2026-11-10
  • PropertyLens Mumbai locality model (market-level estimates)
  • MahaRERA project records P51700020164 (registration file, quarterly updates, complaint register), fetched Sep 2026.

Caveats. Automated analysis: prices, rents and travel times are estimates until listings and Maps data are verified. RERA figures are the promoter’s own filings. Nothing here is legal, tax or investment advice.

Evidence

Location, jobs & transit3 hubs · metro 3.0 km
Job hubs nearby
Wagle Estate / Thane IT parksAiroli 8 kmPowai 15 km
Measured drive times below
Office space
Existing15 msf
Coming in 3 yrs4 msf
Jobs within 30 min7/10
Getting around
Metro today
none yet; Line 4 along Ghodbunder Road
~3,000 m estimate
Metro planned
Line 4 Thane / Ghodbunder stations
~2027 60% likely ~900 m estimate
Rail
—
estimate
Airport
78 min by road now · 28.5 km
Google Maps
Buses
7/10 coverage
estimate
Drive times to job hubs
DestinationDrive nowRoad km
Thane (Wagle Estate)13 min3.5
Powai (Hiranandani)41 min14.3
Andheri SEEPZ45 min15.6
Malad Mindspace45 min15.7
BKC60 min21.4
Navi Mumbai Airport78 min28.5
Lower Parel83 min30.2
Nariman Point101 min37.4

Google Maps driving time with live traffic, measured Nov 2026. Refreshed monthly.

Location used: recorded coordinates (estimate). Bus coverage and planned-station distances are still interim estimates.

Price historylocality 9.0%/yr

No dated project-level price series yet; only the latest observation is on file.

Locality · average ₹/sq ft
Date₹ psfSourceConfidenceKind
Jun 202112,000Platform estimate (interim, not observed)40%derived
Jun 202313,500Platform estimate (interim, not observed)45%derived
Jun 202516,000Platform estimate (interim, not observed)50%derived
Jun 202617,500Platform estimate (interim, not observed)50%derived
Luxury comps₹21,400
Premium comps₹17,000
Mid comps₹13,300
Unsold stock22 months

Model backtest on this locality: 1-yr hold-out (Jun 2025→Jun 2026): predicted ₹17,013 vs actual ₹17,500 (-2.8%). Longer 3-yr hold-out (Jun 2023→Jun 2026): predicted 6.4% p.a. vs actual 9% p.a. — the model is deliberately mean-reverting and under-predicted the 2021–26 boom.

Environment, legal & productflood ok · water risk · RERA yes
Flood risklow
Water supplymixed
Quietnoisy
Roads & drainsgood

Ghodbunder Road congestion; Yeoor hills edge

Legal & approvals
Registration P51700020164
RERA P51700020164
possession Dec 2027
Litigation
not published on the public register
assumed
Approvals
MahaRERA registered
observed
Title
not verified
assumed
Product
Landnot filed
Homesnot filed
Densitynot filed
Launched2019
Sources & data gapswhat we know, from where, and what is missing

Automated analysis from MahaRERA's public register: unit sizes and prices are locality-model estimates until listings are verified.

FieldValueSource classDateConf.KindConflicting values
AddressThane, Thane, 400607MahaRERANov 202670%observed
Land area (acres)Platform estimate (interim, not observed)Nov 202620%assumed
Total unitsPlatform estimate (interim, not observed)Nov 202620%assumed
Launch year2019MahaRERANov 202670%observed
Possession · Registration P517000201642027-12-31MahaRERANov 202670%observed
Price psf · 2 BHK · ~650 sq ft carpet (assumed)21100Platform estimate (interim, not observed)Nov 202630%assumed
Ticket · 2 BHK · ~650 sq ft carpet (assumed)13715000Platform estimate (interim, not observed)Nov 202630%derived
Rent · 2 BHK · ~650 sq ft carpet (assumed)26500Platform estimate (interim, not observed)Nov 202630%assumed
Carpet area650Platform estimate (interim, not observed)Nov 202630%assumed
Builder on-time rate0.8MahaRERANov 202660%derived
Litigationnot published on the public registerMahaRERANov 202630%assumed
ApprovalsMahaRERA registeredMahaRERANov 202660%observed

Commercial listing portals are shown as “Listing portal (aggregated)”; full provenance is retained internally. Official developer and MahaRERA sources are named.

Other projects worth comparing

Same model, same date. Scores are out of 100, where 50 is the average analysed Mumbai project.

Questions people ask about Lodha Amara -Tower 42 and 43

Is Lodha Amara -Tower 42 and 43 a good investment?

On PropertyLens's evidence-based model Lodha Amara -Tower 42 and 43 scores 55/100, above the average analysed Mumbai project (50 = average, 12 points = one standard deviation). The model projects price growth of about 7.4% a year over five years and a net-wealth CAGR of 2.5% after every cost on an 8-year hold with a 75.0% loan. That is research on public filings, not advice; the factor breakdown on this page shows what drives the score.

What is the price per sq ft at Lodha Amara -Tower 42 and 43?

About ₹21,100 per sq ft of super built-up area, a model estimate from Thane West comparables that you can edit. The 2 BHK home costs about ₹1.37 Cr before other charges, GST and stamp duty, and ₹1.67 Cr all-in.

When is Lodha Amara -Tower 42 and 43 ready for possession?

The RERA registration commits to Dec 2027.

Is Lodha Amara -Tower 42 and 43 RERA registered?

Yes. MahaRERA registration: P51700020164. No complaints on this registration at MahaRERA as of 2026-11-10.

How reliable is Lodha (Macrotech) on delivery?

80% of Lodha (Macrotech)'s crawled Mumbai registrations needed no extension (164 of 204 analysed Mumbai registrations needed no extension). 204 registrations analysed. The developer scorecard compares this with every other Mumbai developer.

What rent can Lodha Amara -Tower 42 and 43 earn?

About ₹26,500 a month for this home (a model estimate from Thane West rents), a gross yield of 2.2% on the all-in cost. Nothing is earned before handover. Rent covers 27% of the EMI at the default loan.

Answers are generated from the filings and the model for this home and change when you edit the assumptions above. See the Lodha (Macrotech) scorecard and the Thane West area page.

Go deeper

Share on WhatsApp