Thane, Mumbai · Thane West (Ghodbunder Road / Majiwada / Pokhran)

Is Thane West good for investment?

218 RERA-registered projects scored on one model, as of November 11, 2026. Prices, growth, yields, supply and the best-scored homes.

Straight answer · as of November 11, 2026

Thane West in one paragraph

On PropertyLens's model, Thane West is a better-than-average place to buy in Mumbai right now: the median analysed project scores 56/100 (above the Mumbai average), with projected price growth of 7.7% a year over five years and a median gross rental yield of 3.0%. Unsold homes would take about 22 months to absorb at the current sales pace, which is heavy supply and caps near-term price growth. 23 of 169 under-construction projects here are past their original RERA completion date, so weight the developer's record heavily.

Median of 218 projects; the spread inside the area is wide, so the ranked list below matters more than the average.

Projects analysed
218
49 ready · 169 under construction
Median score
56
above the Mumbai average
Projected growth / yr
7.7%
5-yr; 10-yr 7.3%
Median price / sq ft
₹13,300
modelled from comparables
Gross rental yield
3.0%
median, on all-in cost
Net-wealth CAGR
3.5%
8-yr hold, 75% loan, after all costs
Months of inventory
22
RERA filings
Past RERA date
23 / 169
under-construction projects overdue
Entry price
₹81.3 L
median ₹86.5 L

Best-scored projects in Thane West

All 218 analysed projects in Thane West

ProjectScoreGrowth / yrNet-wealth CAGRCash-flow IRRPrice / sq ftPriceStatus
IKIGAI Phase 2
Puraniks · Thane West
658.7%4.7%8.3%₹16,000 est.₹1.04 CrUnder construction
Dec 2030
The Address by GS Tower E
Raymond Realty · Thane West
638.5%4.2%7.0%₹16,000 est.₹1.04 CrUnder construction
Mar 2030
Invictus by GS Tower B
Raymond Realty · Thane West
638.5%4.1%7.3%₹16,000 est.₹1.04 CrUnder construction
Aug 2031
Primera
Agile Real Estate · Thane West
638.7%4.5%7.5%₹12,500 est.₹81.3 LUnder construction
Dec 2029
The Address by GS Tower F
Raymond Realty · Thane West
638.4%5.1%9.3%₹16,000 est.₹1.04 CrUnder construction
Oct 2031
Godrej Ascend Phase 3
Godrej Properties · Thane West
638.5%4.3%7.2%₹16,000 est.₹1.04 CrUnder construction
Oct 2029
Tenx District 9 Tower A
Raymond Realty · Thane West
638.4%5.0%9.1%₹16,000 est.₹1.04 CrUnder construction
Dec 2031
Tenx District 9 Tower B
Raymond Realty · Thane West
638.4%5.0%9.1%₹16,000 est.₹1.04 CrUnder construction
Dec 2031
Empire Dynasty
Lakhani Builders · Thane West
628.9%4.9%8.6%₹12,500 est.₹81.3 LUnder construction
Dec 2030
Veer Hills
Yash Infra · Thane West
628.9%4.9%8.6%₹12,500 est.₹81.3 LUnder construction
Dec 2030
Tenx District 9 Tower C
Raymond Realty · Thane West
628.3%4.9%9.0%₹16,000 est.₹1.04 CrUnder construction
Jan 2032
Dosti Primus-Phase 1
Dosti Realty · Thane West
628.5%4.3%7.1%₹16,000 est.₹1.04 CrUnder construction
Dec 2029
Invictus By Gs
Raymond Realty · Thane West
618.1%3.8%6.0%₹16,000 est.₹1.04 CrUnder construction
Oct 2028
Rustomjee Verdant Vistas Wing A
Kapstone · Thane West
618.7%4.5%7.4%₹12,500 est.₹81.3 LUnder construction
Jan 2030
Rustomjee Verdant Vistas Wing B
Kapstone · Thane West
618.7%4.4%7.4%₹12,500 est.₹81.3 LUnder construction
Feb 2030
The Address By Gs Tower C
Raymond Realty · Thane West
618.1%3.7%5.9%₹16,000 est.₹1.04 CrUnder construction
Dec 2028
RUSTOMJEE LA VIE Wing D
Kapstone · Thane West
618.7%4.3%7.7%₹12,500 est.₹81.3 LUnder construction
Jul 2031
TEN X ERA Raymond Realty Tower B
Raymond Realty · Thane West
618.1%3.7%5.8%₹16,000 est.₹1.04 CrUnder construction
Jan 2029
TEN X ERA Raymond Realty Tower C
Raymond Realty · Thane West
618.1%3.7%5.8%₹16,000 est.₹1.04 CrUnder construction
Jan 2029
Dosti 604
Dosti Realty · Thane West
618.1%5.3%10.1%₹16,000 est.₹1.04 CrUnder construction
Dec 2032
TEN X ERA Raymond Realty Tower A
Raymond Realty · Thane West
608.1%3.4%5.3%₹16,000 est.₹1.04 CrUnder construction
Aug 2029
The Address by GS Tower D
Raymond Realty · Thane West
608.1%3.6%5.7%₹16,000 est.₹1.04 CrUnder construction
Mar 2029
Nishigandha Co-Operative Housing Society Ltd
Padmanabh Developers · Thane West
607.9%3.4%5.1%₹12,500 est.₹81.3 LUnder construction
Mar 2028
Rustomjee La Vie Wing H
Kapstone · Thane West
608.4%5.5%10.6%₹12,500 est.₹81.3 LUnder construction
Oct 2032
Stella-Tower B
Lodha (Macrotech) · Thane West
608.4%4.3%7.5%₹21,100 est.₹1.37 CrUnder construction
Dec 2030
Code Name-Enchanted
Runwal · Thane West
607.7%2.9%4.4%₹16,000 est.₹1.04 CrUnder construction
Jun 2028
Ashar Merac Phase 3
Ashar Group · Thane West
608.4%5.0%9.1%₹16,000 est.₹1.04 CrUnder construction
Dec 2031
The Address By GS Tower B
Raymond Realty · Thane West
607.7%3.1%4.7%₹16,000 est.₹1.04 CrUnder construction
Mar 2028
The Address by GS Tower A
Raymond Realty · Thane West
607.3%2.3%3.1%₹16,000 est.₹1.04 CrUnder construction
Dec 2026
Nav Omkar
Omkar Realtors · Thane West
608.3%4.0%6.3%₹12,500 est.₹81.3 LUnder construction
Dec 2028
25HOURLIFE - Tower A1
Runwal · Thane West
598.7%4.7%8.3%₹16,000 est.₹1.04 CrUnder construction
Dec 2030
Mangeshi heights
Mangesh Dashrath Gaikar · Thane West
598.8%4.7%8.2%₹12,500 est.₹81.3 LUnder construction
Mar 2031
Narang Privado - C
Narang Realty · Thane West
598.3%4.0%6.3%₹12,500 est.₹81.3 LUnder construction
Dec 2028
Dosti Westcounty - Phase 6 - Dosti Maple
Dosti Realty · Thane West
598.1%3.7%5.9%₹16,000 est.₹1.04 CrUnder construction
Dec 2028
Shapoorji Pallonji Skyraa at Northern Lights
Jaykali Developers · Thane West
597.9%3.5%5.3%₹12,500 est.₹81.3 LUnder construction
Dec 2027
OGC Thane Phase 1
Oberoi Realty · Thane West
598.2%3.9%6.8%₹21,100 est.₹1.37 CrUnder construction
Jun 2031
TEN X HABITAT Raymond Realty Tower K
Raymond Realty · Thane West
596.9%3.1%4.2%₹17,000 est.₹1.10 CrReady
Aashiyana
Raymond Realty · Thane West
596.9%3.1%4.2%₹17,000 est.₹1.10 CrReady
Mahavir Vista And Vista Point
Vinayak Developers · Thane West
598.3%4.0%6.3%₹12,500 est.₹81.3 LUnder construction
Dec 2028
Damji Shamji Galleria
Vinayak Developers · Thane West
598.3%4.0%6.3%₹12,500 est.₹81.3 LUnder construction
Dec 2028
Narang Privado A
Narang Realty · Thane West
598.3%3.9%6.1%₹12,500 est.₹81.3 LUnder construction
Mar 2029
Smruti Co-Operative Housing Society Ltd
Padmanabh Developers · Thane West
597.9%3.5%5.3%₹12,500 est.₹81.3 LUnder construction
Dec 2027
Rustomjee La Vie Wing A
Kapstone · Thane West
598.3%4.0%6.3%₹12,500 est.₹81.3 LUnder construction
Dec 2028
Shri Laxmi Nivas Co Op Hsg Soc Ltd
Ojass Govind Infra · Thane West
597.9%3.5%5.3%₹12,500 est.₹81.3 LUnder construction
Dec 2027
Pankaj Co-Op Housing Society Ltd.
Aditya Associates · Thane West
597.1%3.6%4.7%₹13,300 est.₹86.5 LReady
Godrej Ascend Phase 4
Godrej Properties · Thane West
598.5%4.3%7.1%₹16,000 est.₹1.04 CrUnder construction
Dec 2029
Ashar Pulse
Ashar Group · Thane West
598.1%3.7%5.9%₹16,000 est.₹1.04 CrUnder construction
Dec 2028
Dosti Greater Thane - Sector 3A - Cluster 1B - Phase 3
Adrika Developers · Thane West
599.0%5.0%8.8%₹12,500 est.₹81.3 LUnder construction
Oct 2030
Shree Yogesh Co-Operative Housing Society Ltd
Padmanabh Developers · Thane West
597.9%3.5%5.3%₹12,500 est.₹81.3 LUnder construction
Dec 2027
One Dosti
Dosti Realty · Thane West
598.6%4.5%7.9%₹16,000 est.₹1.04 CrUnder construction
Mar 2031
Dosti West County - Phase 4- Dosti Pine
Dosti Realty · Thane West
597.7%3.2%4.8%₹16,000 est.₹1.04 CrUnder construction
Dec 2027
Lodha Sterling - Tower C
Lodha (Macrotech) · Thane West
598.2%3.7%6.2%₹21,100 est.₹1.37 CrUnder construction
Mar 2030
Dosti West County - Dosti Nest - Phase 4
Dosti Realty · Thane West
597.7%3.2%4.8%₹16,000 est.₹1.04 CrUnder construction
Dec 2027
Ashar Merac Phase I
Ashar Group · Thane West
598.1%3.7%5.9%₹16,000 est.₹1.04 CrUnder construction
Dec 2028
Rustomjee La Vie Wing B
Kapstone · Thane West
588.3%3.9%6.2%₹12,500 est.₹81.3 LUnder construction
Feb 2029
Rustomjee La Vie Wing C
Kapstone · Thane West
588.3%3.9%6.2%₹12,500 est.₹81.3 LUnder construction
Feb 2029
Runwal Lands End - Breeze
Runwal · Thane West
588.6%4.4%7.8%₹16,000 est.₹1.04 CrUnder construction
Apr 2031
Purva Panorama Tower D
Puravankara · Thane West
588.4%5.0%9.1%₹16,000 est.₹1.04 CrUnder construction
Dec 2031
Mahavir Spring -Daffodils-P3
Vinayak Developers · Thane West
587.9%3.5%5.3%₹12,500 est.₹81.3 LUnder construction
Dec 2027
Zen
Neelkanth · Thane West
587.5%2.7%3.6%₹12,500 est.₹81.3 LUnder construction
Dec 2026
Park Avenue
Raymond Realty · Thane West
587.3%2.4%3.4%₹16,000 est.₹1.04 CrUnder construction
Jul 2027
Narang Privado - B
Narang Realty · Thane West
587.9%3.4%5.1%₹12,500 est.₹81.3 LUnder construction
Mar 2028
Sector B- Tower A and B
Agile Real Estate · Thane West
588.6%5.1%9.4%₹12,500 est.₹81.3 LUnder construction
Dec 2031
Bliss
Kapstone · Thane West
588.3%3.9%6.1%₹12,500 est.₹81.3 LUnder construction
Mar 2029
Raunak Serene
Raunak Group · Thane West
588.3%3.9%6.0%₹12,500 est.₹81.3 LUnder construction
Apr 2029
25HOURLIFE - Tower B1
Runwal · Thane West
588.5%4.3%7.1%₹16,000 est.₹1.04 CrUnder construction
Dec 2029
25HOURLIFE - Tower C1
Runwal · Thane West
588.5%4.3%7.1%₹16,000 est.₹1.04 CrUnder construction
Dec 2029
Deepjyoti Co. Op. Housing Society
Aditya Associates · Thane West
587.9%3.5%5.2%₹12,500 est.₹81.3 LUnder construction
Jan 2028
IKIGAI - Phase 1
Puraniks · Thane West
588.4%5.0%9.1%₹16,000 est.₹1.04 CrUnder construction
Dec 2031
Yashwant Niwas
Vijayraj Developers · Thane West
587.5%3.1%4.3%₹12,500 est.₹81.3 LUnder construction
Mar 2027
Veer Yashodeep
Yash Infra · Thane West
587.9%3.5%5.2%₹12,500 est.₹81.3 LUnder construction
Jan 2028
Bharat Ecovistas Phase II
Bharat Realty Venture · Thane West
587.1%3.6%4.7%₹13,300 est.₹86.5 LReady
Raunak Bliss B4
Unnathi Associates · Thane West
588.9%4.9%8.6%₹12,500 est.₹81.3 LUnder construction
Dec 2030
Raunak Bliss B5
Unnathi Associates · Thane West
588.9%4.9%8.6%₹12,500 est.₹81.3 LUnder construction
Dec 2030
Raunak Bliss B6
Unnathi Associates · Thane West
588.9%4.9%8.6%₹12,500 est.₹81.3 LUnder construction
Dec 2030
Nakhawa Enclave
Sai Shrushti Enterprises · Thane West
587.1%3.6%4.7%₹13,300 est.₹86.5 LReady
Orion - Northern Lights
Jaykali Developers · Thane West
587.1%3.6%4.7%₹13,300 est.₹86.5 LReady
Omega - Northern Lights
Jaykali Developers · Thane West
587.1%3.6%4.7%₹13,300 est.₹86.5 LReady
Oyster - Shapoorji Pallonji Northern Lights
Jaykali Developers · Thane West
587.1%3.6%4.7%₹13,300 est.₹86.5 LReady
Shapoorji Pallonji The Impulse- Phase 1
Jaykali Developers · Thane West
587.1%3.6%4.7%₹13,300 est.₹86.5 LReady
Lakeview
Neelkanth · Thane West
587.1%3.6%4.7%₹13,300 est.₹86.5 LReady
Rustomjee La Familia - Wing A
Kapstone · Thane West
587.5%2.7%3.6%₹12,500 est.₹81.3 LUnder construction
Dec 2026
Rustomjee La Familia - Wing B
Kapstone · Thane West
587.5%2.7%3.6%₹12,500 est.₹81.3 LUnder construction
Dec 2026
Shapoorji Pallonji The Impulse- Phase 2
Jaykali Developers · Thane West
577.1%3.6%4.7%₹13,300 est.₹86.5 LReady
Estella - Tower C and D
Agile Real Estate · Thane West
578.5%4.6%8.7%₹12,500 est.₹81.3 LUnder construction
Jun 2032
Elanor Tower 6
Lodha (Macrotech) · Thane West
578.0%4.5%8.3%₹21,100 est.₹1.37 CrUnder construction
Jan 2032
Ashar Axis
Ashar Group · Thane West
577.3%2.3%3.1%₹16,000 est.₹1.04 CrUnder construction
Dec 2026
Shubhanand Co-operative Housing Society LTD
Padmanabh Developers · Thane West
577.1%3.6%4.7%₹13,300 est.₹86.5 LReady
Puraniks Unicorn Phase 2
Puraniks · Thane West
578.5%4.3%7.1%₹16,000 est.₹1.04 CrUnder construction
Dec 2029
Ashirwad Co-Operative Housing Society Ltd
Padmanabh Developers · Thane West
577.5%2.8%3.6%₹12,500 est.₹81.3 LUnder construction
Oct 2026
Rameshwar Co-Op Housing Society Ltd.
Aditya Associates · Thane West
577.5%3.1%4.3%₹12,500 est.₹81.3 LUnder construction
Mar 2027
Dosti West County - Dosti Nest - Phase 2
Dosti Realty · Thane West
577.3%2.4%3.5%₹16,000 est.₹1.04 CrUnder construction
Jun 2027
Madhu Milind Co-Op Housing Society Ltd
Aditya Associates · Thane West
577.1%3.6%4.7%₹13,300 est.₹86.5 LReady
Rustomjee Azziano Wing L
Kapstone · Thane West
577.1%3.6%4.7%₹13,300 est.₹86.5 LReady
Rustomjee Azziano Wing D
Kapstone · Thane West
577.1%3.6%4.7%₹13,300 est.₹86.5 LReady
Dosti West County - Dosti Tulip
Dosti Realty · Thane West
577.3%2.4%3.2%₹16,000 est.₹1.04 CrUnder construction
Oct 2026
Dosti West County - Dosti Nest - Phase 1
Dosti Realty · Thane West
577.3%2.4%3.5%₹16,000 est.₹1.04 CrUnder construction
Jun 2027
Dosti West County - Phase 5 - Dosti Olive - Wing B
Dosti Realty · Thane West
577.7%2.8%4.2%₹16,000 est.₹1.04 CrUnder construction
Sep 2028
Dosti West County - Phase 5 - Dosti Olive - Wing A
Dosti Realty · Thane West
577.7%2.8%4.2%₹16,000 est.₹1.04 CrUnder construction
Sep 2028
Sanyog
Aditya Associates · Thane West
577.1%3.6%4.7%₹13,300 est.₹86.5 LReady
Arvind Co-Op Housing Society Ltd
Aditya Associates · Thane West
577.5%2.8%3.9%₹12,500 est.₹81.3 LUnder construction
Jun 2027
Purva Panorama Tower C
Puravankara · Thane West
578.6%4.5%7.9%₹16,000 est.₹1.04 CrUnder construction
Mar 2031
Satej Premises Co-operative Society Limited
Ojass Govind Infra · Thane West
577.9%3.5%5.3%₹12,500 est.₹81.3 LUnder construction
Dec 2027
Paramount E
Kalpataru · Thane West
566.9%3.1%4.2%₹17,000 est.₹1.10 CrReady
Paramount C
Kalpataru · Thane West
566.9%3.1%4.2%₹17,000 est.₹1.10 CrReady
Paramount A
Kalpataru · Thane West
566.9%3.1%4.2%₹17,000 est.₹1.10 CrReady
Paramount F
Kalpataru · Thane West
566.9%3.1%4.2%₹17,000 est.₹1.10 CrReady
Paramount B
Kalpataru · Thane West
566.9%3.1%4.2%₹17,000 est.₹1.10 CrReady
Rustomjee La Familia- Wing C
Kapstone · Thane West
567.5%2.8%3.9%₹12,500 est.₹81.3 LUnder construction
Jun 2027
Dosti West County - Dosti Nest - Phase 3
Dosti Realty · Thane West
567.3%2.4%3.4%₹16,000 est.₹1.04 CrUnder construction
Aug 2027
F Neelkanth Greens
Neelkanth · Thane West
567.9%3.4%5.1%₹12,500 est.₹81.3 LUnder construction
Mar 2028
Dosti West County - Phase 7 - Dosti Willow
Dosti Realty · Thane West
567.7%3.1%4.7%₹16,000 est.₹1.04 CrUnder construction
Mar 2028
Sector 5 - Wing D, E and F
Agile Real Estate · Thane West
567.9%3.5%5.3%₹12,500 est.₹81.3 LUnder construction
Dec 2027
Sector 5 - Wing A
Agile Real Estate · Thane West
567.9%3.5%5.3%₹12,500 est.₹81.3 LUnder construction
Dec 2027
Sector 5 - Wing B
Agile Real Estate · Thane West
567.9%3.5%5.3%₹12,500 est.₹81.3 LUnder construction
Dec 2027
Sector 5 - Wing C
Agile Real Estate · Thane West
567.9%3.5%5.3%₹12,500 est.₹81.3 LUnder construction
Dec 2027
Sector 5 - Wing J and K
Agile Real Estate · Thane West
567.9%3.5%5.3%₹12,500 est.₹81.3 LUnder construction
Dec 2027
Raunak Bliss B1
Unnathi Associates · Thane West
568.7%4.5%7.5%₹12,500 est.₹81.3 LUnder construction
Dec 2029
Raunak Bliss B2
Unnathi Associates · Thane West
568.7%4.5%7.5%₹12,500 est.₹81.3 LUnder construction
Dec 2029
Raunak Bliss B3
Unnathi Associates · Thane West
568.7%4.5%7.5%₹12,500 est.₹81.3 LUnder construction
Dec 2029
Godrej Ascend Phase 2
Godrej Properties · Thane West
568.1%3.7%5.9%₹16,000 est.₹1.04 CrUnder construction
Dec 2028
Raunak Bliss A4
Unnathi Associates · Thane West
568.7%4.5%7.5%₹12,500 est.₹81.3 LUnder construction
Dec 2029
Sheth Zuri
Sheth / Transcon · Thane West
567.5%2.7%3.6%₹12,500 est.₹81.3 LUnder construction
Dec 2026
Lodha Amara Tower 49 and 50
Lodha (Macrotech) · Thane West
567.8%3.1%4.9%₹21,100 est.₹1.37 CrUnder construction
Dec 2028
Gautam Vihar Co-operative Housing Society Ltd.
Ojass Govind Infra · Thane West
567.9%3.2%4.8%₹12,500 est.₹81.3 LUnder construction
May 2028
Garden Estate Phase -II
Shree Balaji Developers · Thane West
567.1%3.6%4.7%₹13,300 est.₹86.5 LReady
Empire Heritage
Lakhani Builders · Thane West
567.5%2.8%3.9%₹12,500 est.₹81.3 LUnder construction
Jul 2027
Lodha Signet B - Kolshet
Lodha (Macrotech) · Thane West
567.4%2.5%3.8%₹21,100 est.₹1.37 CrUnder construction
Nov 2027
Lodha Amara Tower 47 and 48
Lodha (Macrotech) · Thane West
557.8%2.8%4.6%₹21,100 est.₹1.37 CrUnder construction
Jun 2029
Sheth Cnergy Ph 1 - Upto 11th Floor
Sheth / Transcon · Thane West
557.1%3.6%4.7%₹13,300 est.₹86.5 LReady
Thane Project
Lodha (Macrotech) · Thane West
557.8%2.8%4.5%₹21,100 est.₹1.37 CrUnder construction
Jul 2029
Lodha Amara -Tower 42 and 43
Lodha (Macrotech) · Thane West
557.4%2.5%3.8%₹21,100 est.₹1.37 CrUnder construction
Dec 2027
Forestville - Phase 1
Oberoi Realty · Thane West
558.2%3.7%6.3%₹21,100 est.₹1.37 CrUnder construction
Dec 2029
Runwal Lands End
Runwal · Thane West
558.1%3.4%5.4%₹16,000 est.₹1.04 CrUnder construction
Jun 2029
Harshal Co-Op Housing Society Ltd
Veena Developers · Thane West
557.1%3.6%4.7%₹13,300 est.₹86.5 LReady
Godrej Ascend Phase 1
Godrej Properties · Thane West
557.7%3.1%4.6%₹16,000 est.₹1.04 CrUnder construction
Apr 2028
Lodha Amara Tower 24 and 25
Lodha (Macrotech) · Thane West
557.4%2.4%3.7%₹21,100 est.₹1.37 CrUnder construction
Mar 2028
Sheth Avalon - Phase 1
Sheth / Transcon · Thane West
557.1%3.6%4.7%₹13,300 est.₹86.5 LReady
Rumah Bali Phase 4
Puraniks · Thane West
558.1%3.7%5.9%₹16,000 est.₹1.04 CrUnder construction
Dec 2028
Dosti Greater Thane - Sector 3A - Cluster 1B - Phase 2
Adrika Developers · Thane West
558.3%4.1%6.4%₹12,500 est.₹81.3 LUnder construction
Oct 2028
Highland Springs B4 D Wing
Siddhi Real Estate Developers · Thane West
547.5%2.7%3.6%₹12,500 est.₹81.3 LUnder construction
Dec 2026
Lodha Amara - Wing 40 and 41
Lodha (Macrotech) · Thane West
546.6%2.3%3.1%₹22,450 est.₹1.46 CrReady
Lodha Amara Tower 44
Lodha (Macrotech) · Thane West
547.4%2.2%3.4%₹21,100 est.₹1.37 CrUnder construction
Jun 2028
Puranik City Reserva Phase 1
Puraniks · Thane West
548.1%3.6%5.7%₹16,000 est.₹1.04 CrUnder construction
Mar 2029
Lodha Amara - Tower 46
Lodha (Macrotech) · Thane West
546.6%2.3%3.1%₹22,450 est.₹1.46 CrReady
Lodha Majiwada - Tower 5
Lodha (Macrotech) · Thane West
546.6%2.3%3.1%₹22,450 est.₹1.46 CrReady
Lodha Amara - Tower 23
Lodha (Macrotech) · Thane West
546.6%2.3%3.1%₹22,450 est.₹1.46 CrReady
Lodha Sterling - Tower G
Lodha (Macrotech) · Thane West
546.6%2.3%3.1%₹22,450 est.₹1.46 CrReady
Lodha Sterling - Tower H
Lodha (Macrotech) · Thane West
546.6%2.3%3.1%₹22,450 est.₹1.46 CrReady
Lodha Quality Home Tower 1
Lodha (Macrotech) · Thane West
546.6%2.3%3.1%₹22,450 est.₹1.46 CrReady
Lodha Quality Home Tower 2
Lodha (Macrotech) · Thane West
546.6%2.3%3.1%₹22,450 est.₹1.46 CrReady
Lodha Quality Home Tower 3
Lodha (Macrotech) · Thane West
546.6%2.3%3.1%₹22,450 est.₹1.46 CrReady
Lodha Quality Home Tower 4
Lodha (Macrotech) · Thane West
546.6%2.3%3.1%₹22,450 est.₹1.46 CrReady
Lodha Quality Home Tower 6
Lodha (Macrotech) · Thane West
546.6%2.3%3.1%₹22,450 est.₹1.46 CrReady
Lodha Quality Home Tower - 5
Lodha (Macrotech) · Thane West
546.6%2.3%3.1%₹22,450 est.₹1.46 CrReady
iThink Tower-A
Lodha (Macrotech) · Thane West
546.6%2.3%3.1%₹22,450 est.₹1.46 CrReady
HG- A1
Siddhi Real Estate Developers · Thane West
547.1%3.6%4.7%₹13,300 est.₹86.5 LReady
Sheth Avalon - Phase 2
Sheth / Transcon · Thane West
547.9%3.5%5.3%₹12,500 est.₹81.3 LUnder construction
Dec 2027
Highland Springs B4- A Wing
Siddhi Real Estate Developers · Thane West
547.1%3.6%4.7%₹13,300 est.₹86.5 LReady
Highland Springs B4- B Wing
Siddhi Real Estate Developers · Thane West
547.1%3.6%4.7%₹13,300 est.₹86.5 LReady
DGT - Sector 3A - Cluster 2 - Phase 1
Adrika Developers · Thane West
537.9%3.5%5.3%₹12,500 est.₹81.3 LUnder construction
Dec 2027
Lodha Crown Kolshet - Tower 2
Lodha (Macrotech) · Thane West
537.0%1.7%2.5%₹21,100 est.₹1.37 CrUnder construction
Jul 2027
Zenith
Runwal · Thane West
537.7%2.8%4.2%₹16,000 est.₹1.04 CrUnder construction
Sep 2028
Phatak Wada
Aditya Associates · Thane West
537.5%2.8%3.6%₹12,500 est.₹81.3 LUnder construction
Oct 2026
Tokyo Bay Phase - 2A
Puraniks · Thane West
536.9%3.1%4.2%₹17,000 est.₹1.10 CrReady
Elanor - Tower 1
Lodha (Macrotech) · Thane West
538.0%4.6%8.4%₹21,100 est.₹1.37 CrUnder construction
Dec 2031
Empire Presidency
Lakhani Builders · Thane West
537.5%2.8%3.9%₹12,500 est.₹81.3 LUnder construction
Jul 2027
Sheth Vasant Lawns
Sheth / Transcon · Thane West
527.9%3.5%5.3%₹12,500 est.₹81.3 LUnder construction
Dec 2027
Vihang Marina
Balaji Enterprises · Thane West
528.7%4.5%7.5%₹12,500 est.₹81.3 LUnder construction
Dec 2029
TEN X HABITAT Raymond Realty Tower G
Raymond Realty · Thane West
527.3%2.4%3.2%₹16,000 est.₹1.04 CrUnder construction
Jun 2026
Raunak Bliss Phase A
Unnathi Associates · Thane West
527.1%3.6%4.7%₹13,300 est.₹86.5 LReady
Raunak Imperial
Raunak Group · Thane West
517.5%2.7%3.6%₹12,500 est.₹81.3 LUnder construction
Dec 2026
Rumah Bali Phase 5
Puraniks · Thane West
517.7%11.3%18.4%₹16,000 est.₹1.04 CrUnder construction
Dec 2035
Runwal Pearl
Runwal · Thane West
516.9%3.1%4.2%₹17,000 est.₹1.10 CrReady
Rumah Bali Phase 6
Puraniks · Thane West
517.7%11.2%18.3%₹16,000 est.₹1.04 CrUnder construction
Jun 2036
Laxmi Narayan Co Op Housing Society Ltd
Ojass Govind Infra · Thane West
517.5%2.8%3.6%₹12,500 est.₹81.3 LUnder construction
Dec 2025
Lodha Crown Kolshet - Tower 3
Lodha (Macrotech) · Thane West
507.4%2.2%3.3%₹21,100 est.₹1.37 CrUnder construction
Sep 2028
Lodha Crown Kolshet-Tower 1
Lodha (Macrotech) · Thane West
507.0%1.6%2.2%₹21,100 est.₹1.37 CrUnder construction
Sep 2026
Runwal Eirene - Part I
Runwal · Thane West
506.9%3.1%4.2%₹17,000 est.₹1.10 CrReady
Highland Springs B4- C Wing
Siddhi Real Estate Developers · Thane West
507.5%2.7%3.6%₹12,500 est.₹81.3 LUnder construction
Nov 2026
Sector 5 - Wing G and H
Agile Real Estate · Thane West
507.9%3.5%5.3%₹12,500 est.₹81.3 LUnder construction
Dec 2027
Satyaneelayam Co Op HSg Society
Yash Infra · Thane West
507.5%2.8%3.6%₹12,500 est.₹81.3 LUnder construction
Dec 2025
Raunak White House
Raunak Group · Thane West
508.3%4.0%6.3%₹12,500 est.₹81.3 LUnder construction
Dec 2028
Lodha Bellavista - Wing B2
Lodha (Macrotech) · Thane West
497.4%2.2%3.4%₹21,100 est.₹1.37 CrUnder construction
Jul 2028
TEN X HABITAT Raymond Realty Tower F
Raymond Realty · Thane West
497.3%2.4%3.2%₹16,000 est.₹1.04 CrUnder construction
Aug 2026
Runwal One- Tower D2
Runwal · Thane West
498.5%4.2%7.4%₹16,000 est.₹1.04 CrUnder construction
Jul 2031
One Park Avenue - Avenue 1
Puravankara · Thane West
497.3%2.3%3.1%₹16,000 est.₹1.04 CrUnder construction
Dec 2026
One Park Avenue - Avenue 6
Puravankara · Thane West
497.3%2.3%3.1%₹16,000 est.₹1.04 CrUnder construction
Dec 2026
Elanor - Tower 2
Lodha (Macrotech) · Thane West
498.0%4.6%8.4%₹21,100 est.₹1.37 CrUnder construction
Dec 2031
Arihant City Phase-II - M Building
Arihant Enterprises · Thane West
498.3%4.0%6.3%₹12,500 est.₹81.3 LUnder construction
Dec 2028
Arihant City Phase-II - N Building
Arihant Enterprises · Thane West
498.3%4.0%6.3%₹12,500 est.₹81.3 LUnder construction
Dec 2028
Godrej Exquisite
Godrej Properties · Thane West
487.7%3.2%4.8%₹16,000 est.₹1.04 CrUnder construction
Dec 2027
Wadhwa Rhodesia Phase-II
The Wadhwa Group · Thane West
486.9%3.1%4.2%₹17,000 est.₹1.10 CrReady
Mahavir Breeze Phase 1
Damji Shamji / Mahavir · Thane West
488.6%5.1%9.4%₹12,500 est.₹81.3 LUnder construction
Dec 2031
Mahavir Spring - Tulip - Phase 1
Vinayak Developers · Thane West
487.5%2.8%3.6%₹12,500 est.₹81.3 LUnder construction
Dec 2025
Mahavir Spring - Daffodils - Phase 2
Vinayak Developers · Thane West
487.5%2.8%3.6%₹12,500 est.₹81.3 LUnder construction
Dec 2025
Lodha Splendora - River View
Lodha (Macrotech) · Thane West
486.6%2.3%3.1%₹22,450 est.₹1.46 CrReady
Wadhwa Rhodesia
The Wadhwa Group · Thane West
486.9%3.1%4.2%₹17,000 est.₹1.10 CrReady
Mahavir Kalpavruksha - J Wing
Damji Shamji / Mahavir · Thane West
487.1%3.6%4.7%₹13,300 est.₹86.5 LReady
Lodha Crown Kolshet-Tower 4
Lodha (Macrotech) · Thane West
467.0%1.6%2.2%₹21,100 est.₹1.37 CrUnder construction
May 2026
Veer Galaxy
Yash Infra · Thane West
467.5%2.8%3.6%₹12,500 est.₹81.3 LUnder construction
Jul 2026
Raunak 108
Unnathi Associates · Thane West
467.5%2.8%3.9%₹12,500 est.₹81.3 LUnder construction
Jun 2027
Lodha Quality Home Tower 7
Lodha (Macrotech) · Thane West
467.0%1.6%2.2%₹21,100 est.₹1.37 CrUnder construction
Mar 2026
Immensa A
Agile Real Estate · Thane West
467.5%2.8%3.6%₹12,500 est.₹81.3 LUnder construction
Dec 2025
Immensa B
Agile Real Estate · Thane West
467.5%2.8%3.6%₹12,500 est.₹81.3 LUnder construction
Dec 2025
Immensa C
Agile Real Estate · Thane West
467.5%2.8%3.6%₹12,500 est.₹81.3 LUnder construction
Dec 2025
Immensa D
Agile Real Estate · Thane West
467.5%2.8%3.6%₹12,500 est.₹81.3 LUnder construction
Dec 2025
Immensa E
Agile Real Estate · Thane West
467.5%2.8%3.6%₹12,500 est.₹81.3 LUnder construction
Dec 2025
Immensa F
Agile Real Estate · Thane West
467.5%2.8%3.6%₹12,500 est.₹81.3 LUnder construction
Dec 2025
Immensa G
Agile Real Estate · Thane West
467.5%2.8%3.6%₹12,500 est.₹81.3 LUnder construction
Dec 2025
Immensa H
Agile Real Estate · Thane West
467.5%2.8%3.6%₹12,500 est.₹81.3 LUnder construction
Dec 2025
Godrej Emerald Thane
Godrej Properties · Thane West
447.3%2.4%3.2%₹16,000 est.₹1.04 CrUnder construction
Jun 2026
Arihant City Phase-II - K Building
Arihant Enterprises · Thane West
438.3%4.0%6.3%₹12,500 est.₹81.3 LUnder construction
Dec 2028
Unique Vistas-Bldg. No. 5
Madhu Harshad Doshi · Thane West
427.5%2.7%3.6%₹12,500 est.₹81.3 LUnder construction
Dec 2026
Raunak Bliss Phase A - A3
Unnathi Associates · Thane West
417.5%2.8%3.6%₹12,500 est.₹81.3 LUnder construction
Jun 2026
Unique Vistas Mhada Building No. 1,2,3
Madhu Harshad Doshi · Thane West
417.5%2.8%3.6%₹12,500 est.₹81.3 LUnder construction
Sep 2026
Unique Vistas Mhada Buildingno. 4 5 6 7
Madhu Harshad Doshi · Thane West
417.5%2.8%3.6%₹12,500 est.₹81.3 LUnder construction
Sep 2026
Unique Vistas-Bldg. No. 3
Madhu Harshad Doshi · Thane West
407.5%2.7%3.6%₹12,500 est.₹81.3 LUnder construction
Dec 2026

Price per sq ft in Thane West: what the evidence says

Date₹ / sq ftBasisConfidence
2021-06₹12,000mum (derived)40%
2023-06₹13,500mum (derived)45%
2025-06₹16,000mum (derived)50%
2026-06₹17,500mum (derived)50%

That is 7.8% a year from 2021-06 to 2026-06. The model projects 7.7% a year from here; the growth story on each project page shows why.

Infrastructure pipeline

ProjectTypeStatusExpectedChance it lands on timePrice effect if it does
Metro Line 4 Wadala–Ghatkopar–Thane–Kasarvadavalimetroconstruction202760%+1.0% / yr
Metro Line 5 Thane–Bhiwandi–Kalyanmetroconstruction202850%+1.0% / yr
Thane–Borivali twin tunnelroadconstruction202950%+0.6% / yr

The growth model counts each event at its probability, not its promise. Dates are the latest public schedule.

Developers active in Thane West

Ranked lists for Thane West

Thane West compared with other areas

Questions people ask

Is Thane West good for investment?

On PropertyLens's model the median analysed project in Thane West scores 56/100 (above the Mumbai average), with projected price growth of 7.7% a year over five years, median price ₹13,300 per sq ft and gross rental yield 3.0%. 218 RERA-registered projects analysed as of November 11, 2026. The best-scored project is IKIGAI Phase 2 at 65.

What is the price per sq ft in Thane West?

Median ₹13,300 per sq ft of super built-up area across analysed projects, modelled from comparables where developers file no price. Entry price for an analysed home is about ₹81.3 L; the median home is ₹86.5 L.

What rental yield can I expect in Thane West?

Median gross yield 3.0% on the all-in cost of an analysed home, before maintenance, vacancy and tax. Net-wealth CAGR after every cost on an 8-year hold with a 75% loan is 3.5% at the median.

Are projects in Thane West delayed?

23 of 169 under-construction projects are past the completion date in their original RERA registration, and unsold stock equals about 22 months of sales. Each project page shows extensions, construction against bookings and complaints.

Scores and projections are model outputs built from dated public evidence (MahaRERA public filings, public ratings) and stated assumptions. Unit sizes and prices in this city are modelled estimates because the regulator does not publish unit inventories openly. They are research, not investment advice. How the numbers are built.

Share on WhatsApp