Is Thane West good for investment?
218 RERA-registered projects scored on one model, as of November 11, 2026. Prices, growth, yields, supply and the best-scored homes.
Thane West in one paragraph
On PropertyLens's model, Thane West is a better-than-average place to buy in Mumbai right now: the median analysed project scores 56/100 (above the Mumbai average), with projected price growth of 7.7% a year over five years and a median gross rental yield of 3.0%. Unsold homes would take about 22 months to absorb at the current sales pace, which is heavy supply and caps near-term price growth. 23 of 169 under-construction projects here are past their original RERA completion date, so weight the developer's record heavily.
Median of 218 projects; the spread inside the area is wide, so the ranked list below matters more than the average.
Best-scored projects in Thane West
All 218 analysed projects in Thane West
| Project | Score | Growth / yr | Net-wealth CAGR | Cash-flow IRR | Price / sq ft | Price | Status |
|---|---|---|---|---|---|---|---|
| IKIGAI Phase 2 Puraniks · Thane West | 65 | 8.7% | 4.7% | 8.3% | ₹16,000 est. | ₹1.04 Cr | Under construction Dec 2030 |
| The Address by GS Tower E Raymond Realty · Thane West | 63 | 8.5% | 4.2% | 7.0% | ₹16,000 est. | ₹1.04 Cr | Under construction Mar 2030 |
| Invictus by GS Tower B Raymond Realty · Thane West | 63 | 8.5% | 4.1% | 7.3% | ₹16,000 est. | ₹1.04 Cr | Under construction Aug 2031 |
| Primera Agile Real Estate · Thane West | 63 | 8.7% | 4.5% | 7.5% | ₹12,500 est. | ₹81.3 L | Under construction Dec 2029 |
| The Address by GS Tower F Raymond Realty · Thane West | 63 | 8.4% | 5.1% | 9.3% | ₹16,000 est. | ₹1.04 Cr | Under construction Oct 2031 |
| Godrej Ascend Phase 3 Godrej Properties · Thane West | 63 | 8.5% | 4.3% | 7.2% | ₹16,000 est. | ₹1.04 Cr | Under construction Oct 2029 |
| Tenx District 9 Tower A Raymond Realty · Thane West | 63 | 8.4% | 5.0% | 9.1% | ₹16,000 est. | ₹1.04 Cr | Under construction Dec 2031 |
| Tenx District 9 Tower B Raymond Realty · Thane West | 63 | 8.4% | 5.0% | 9.1% | ₹16,000 est. | ₹1.04 Cr | Under construction Dec 2031 |
| Empire Dynasty Lakhani Builders · Thane West | 62 | 8.9% | 4.9% | 8.6% | ₹12,500 est. | ₹81.3 L | Under construction Dec 2030 |
| Veer Hills Yash Infra · Thane West | 62 | 8.9% | 4.9% | 8.6% | ₹12,500 est. | ₹81.3 L | Under construction Dec 2030 |
| Tenx District 9 Tower C Raymond Realty · Thane West | 62 | 8.3% | 4.9% | 9.0% | ₹16,000 est. | ₹1.04 Cr | Under construction Jan 2032 |
| Dosti Primus-Phase 1 Dosti Realty · Thane West | 62 | 8.5% | 4.3% | 7.1% | ₹16,000 est. | ₹1.04 Cr | Under construction Dec 2029 |
| Invictus By Gs Raymond Realty · Thane West | 61 | 8.1% | 3.8% | 6.0% | ₹16,000 est. | ₹1.04 Cr | Under construction Oct 2028 |
| Rustomjee Verdant Vistas Wing A Kapstone · Thane West | 61 | 8.7% | 4.5% | 7.4% | ₹12,500 est. | ₹81.3 L | Under construction Jan 2030 |
| Rustomjee Verdant Vistas Wing B Kapstone · Thane West | 61 | 8.7% | 4.4% | 7.4% | ₹12,500 est. | ₹81.3 L | Under construction Feb 2030 |
| The Address By Gs Tower C Raymond Realty · Thane West | 61 | 8.1% | 3.7% | 5.9% | ₹16,000 est. | ₹1.04 Cr | Under construction Dec 2028 |
| RUSTOMJEE LA VIE Wing D Kapstone · Thane West | 61 | 8.7% | 4.3% | 7.7% | ₹12,500 est. | ₹81.3 L | Under construction Jul 2031 |
| TEN X ERA Raymond Realty Tower B Raymond Realty · Thane West | 61 | 8.1% | 3.7% | 5.8% | ₹16,000 est. | ₹1.04 Cr | Under construction Jan 2029 |
| TEN X ERA Raymond Realty Tower C Raymond Realty · Thane West | 61 | 8.1% | 3.7% | 5.8% | ₹16,000 est. | ₹1.04 Cr | Under construction Jan 2029 |
| Dosti 604 Dosti Realty · Thane West | 61 | 8.1% | 5.3% | 10.1% | ₹16,000 est. | ₹1.04 Cr | Under construction Dec 2032 |
| TEN X ERA Raymond Realty Tower A Raymond Realty · Thane West | 60 | 8.1% | 3.4% | 5.3% | ₹16,000 est. | ₹1.04 Cr | Under construction Aug 2029 |
| The Address by GS Tower D Raymond Realty · Thane West | 60 | 8.1% | 3.6% | 5.7% | ₹16,000 est. | ₹1.04 Cr | Under construction Mar 2029 |
| Nishigandha Co-Operative Housing Society Ltd Padmanabh Developers · Thane West | 60 | 7.9% | 3.4% | 5.1% | ₹12,500 est. | ₹81.3 L | Under construction Mar 2028 |
| Rustomjee La Vie Wing H Kapstone · Thane West | 60 | 8.4% | 5.5% | 10.6% | ₹12,500 est. | ₹81.3 L | Under construction Oct 2032 |
| Stella-Tower B Lodha (Macrotech) · Thane West | 60 | 8.4% | 4.3% | 7.5% | ₹21,100 est. | ₹1.37 Cr | Under construction Dec 2030 |
| Code Name-Enchanted Runwal · Thane West | 60 | 7.7% | 2.9% | 4.4% | ₹16,000 est. | ₹1.04 Cr | Under construction Jun 2028 |
| Ashar Merac Phase 3 Ashar Group · Thane West | 60 | 8.4% | 5.0% | 9.1% | ₹16,000 est. | ₹1.04 Cr | Under construction Dec 2031 |
| The Address By GS Tower B Raymond Realty · Thane West | 60 | 7.7% | 3.1% | 4.7% | ₹16,000 est. | ₹1.04 Cr | Under construction Mar 2028 |
| The Address by GS Tower A Raymond Realty · Thane West | 60 | 7.3% | 2.3% | 3.1% | ₹16,000 est. | ₹1.04 Cr | Under construction Dec 2026 |
| Nav Omkar Omkar Realtors · Thane West | 60 | 8.3% | 4.0% | 6.3% | ₹12,500 est. | ₹81.3 L | Under construction Dec 2028 |
| 25HOURLIFE - Tower A1 Runwal · Thane West | 59 | 8.7% | 4.7% | 8.3% | ₹16,000 est. | ₹1.04 Cr | Under construction Dec 2030 |
| Mangeshi heights Mangesh Dashrath Gaikar · Thane West | 59 | 8.8% | 4.7% | 8.2% | ₹12,500 est. | ₹81.3 L | Under construction Mar 2031 |
| Narang Privado - C Narang Realty · Thane West | 59 | 8.3% | 4.0% | 6.3% | ₹12,500 est. | ₹81.3 L | Under construction Dec 2028 |
| Dosti Westcounty - Phase 6 - Dosti Maple Dosti Realty · Thane West | 59 | 8.1% | 3.7% | 5.9% | ₹16,000 est. | ₹1.04 Cr | Under construction Dec 2028 |
| Shapoorji Pallonji Skyraa at Northern Lights Jaykali Developers · Thane West | 59 | 7.9% | 3.5% | 5.3% | ₹12,500 est. | ₹81.3 L | Under construction Dec 2027 |
| OGC Thane Phase 1 Oberoi Realty · Thane West | 59 | 8.2% | 3.9% | 6.8% | ₹21,100 est. | ₹1.37 Cr | Under construction Jun 2031 |
| TEN X HABITAT Raymond Realty Tower K Raymond Realty · Thane West | 59 | 6.9% | 3.1% | 4.2% | ₹17,000 est. | ₹1.10 Cr | Ready |
| Aashiyana Raymond Realty · Thane West | 59 | 6.9% | 3.1% | 4.2% | ₹17,000 est. | ₹1.10 Cr | Ready |
| Mahavir Vista And Vista Point Vinayak Developers · Thane West | 59 | 8.3% | 4.0% | 6.3% | ₹12,500 est. | ₹81.3 L | Under construction Dec 2028 |
| Damji Shamji Galleria Vinayak Developers · Thane West | 59 | 8.3% | 4.0% | 6.3% | ₹12,500 est. | ₹81.3 L | Under construction Dec 2028 |
| Narang Privado A Narang Realty · Thane West | 59 | 8.3% | 3.9% | 6.1% | ₹12,500 est. | ₹81.3 L | Under construction Mar 2029 |
| Smruti Co-Operative Housing Society Ltd Padmanabh Developers · Thane West | 59 | 7.9% | 3.5% | 5.3% | ₹12,500 est. | ₹81.3 L | Under construction Dec 2027 |
| Rustomjee La Vie Wing A Kapstone · Thane West | 59 | 8.3% | 4.0% | 6.3% | ₹12,500 est. | ₹81.3 L | Under construction Dec 2028 |
| Shri Laxmi Nivas Co Op Hsg Soc Ltd Ojass Govind Infra · Thane West | 59 | 7.9% | 3.5% | 5.3% | ₹12,500 est. | ₹81.3 L | Under construction Dec 2027 |
| Pankaj Co-Op Housing Society Ltd. Aditya Associates · Thane West | 59 | 7.1% | 3.6% | 4.7% | ₹13,300 est. | ₹86.5 L | Ready |
| Godrej Ascend Phase 4 Godrej Properties · Thane West | 59 | 8.5% | 4.3% | 7.1% | ₹16,000 est. | ₹1.04 Cr | Under construction Dec 2029 |
| Ashar Pulse Ashar Group · Thane West | 59 | 8.1% | 3.7% | 5.9% | ₹16,000 est. | ₹1.04 Cr | Under construction Dec 2028 |
| Dosti Greater Thane - Sector 3A - Cluster 1B - Phase 3 Adrika Developers · Thane West | 59 | 9.0% | 5.0% | 8.8% | ₹12,500 est. | ₹81.3 L | Under construction Oct 2030 |
| Shree Yogesh Co-Operative Housing Society Ltd Padmanabh Developers · Thane West | 59 | 7.9% | 3.5% | 5.3% | ₹12,500 est. | ₹81.3 L | Under construction Dec 2027 |
| One Dosti Dosti Realty · Thane West | 59 | 8.6% | 4.5% | 7.9% | ₹16,000 est. | ₹1.04 Cr | Under construction Mar 2031 |
| Dosti West County - Phase 4- Dosti Pine Dosti Realty · Thane West | 59 | 7.7% | 3.2% | 4.8% | ₹16,000 est. | ₹1.04 Cr | Under construction Dec 2027 |
| Lodha Sterling - Tower C Lodha (Macrotech) · Thane West | 59 | 8.2% | 3.7% | 6.2% | ₹21,100 est. | ₹1.37 Cr | Under construction Mar 2030 |
| Dosti West County - Dosti Nest - Phase 4 Dosti Realty · Thane West | 59 | 7.7% | 3.2% | 4.8% | ₹16,000 est. | ₹1.04 Cr | Under construction Dec 2027 |
| Ashar Merac Phase I Ashar Group · Thane West | 59 | 8.1% | 3.7% | 5.9% | ₹16,000 est. | ₹1.04 Cr | Under construction Dec 2028 |
| Rustomjee La Vie Wing B Kapstone · Thane West | 58 | 8.3% | 3.9% | 6.2% | ₹12,500 est. | ₹81.3 L | Under construction Feb 2029 |
| Rustomjee La Vie Wing C Kapstone · Thane West | 58 | 8.3% | 3.9% | 6.2% | ₹12,500 est. | ₹81.3 L | Under construction Feb 2029 |
| Runwal Lands End - Breeze Runwal · Thane West | 58 | 8.6% | 4.4% | 7.8% | ₹16,000 est. | ₹1.04 Cr | Under construction Apr 2031 |
| Purva Panorama Tower D Puravankara · Thane West | 58 | 8.4% | 5.0% | 9.1% | ₹16,000 est. | ₹1.04 Cr | Under construction Dec 2031 |
| Mahavir Spring -Daffodils-P3 Vinayak Developers · Thane West | 58 | 7.9% | 3.5% | 5.3% | ₹12,500 est. | ₹81.3 L | Under construction Dec 2027 |
| Zen Neelkanth · Thane West | 58 | 7.5% | 2.7% | 3.6% | ₹12,500 est. | ₹81.3 L | Under construction Dec 2026 |
| Park Avenue Raymond Realty · Thane West | 58 | 7.3% | 2.4% | 3.4% | ₹16,000 est. | ₹1.04 Cr | Under construction Jul 2027 |
| Narang Privado - B Narang Realty · Thane West | 58 | 7.9% | 3.4% | 5.1% | ₹12,500 est. | ₹81.3 L | Under construction Mar 2028 |
| Sector B- Tower A and B Agile Real Estate · Thane West | 58 | 8.6% | 5.1% | 9.4% | ₹12,500 est. | ₹81.3 L | Under construction Dec 2031 |
| Bliss Kapstone · Thane West | 58 | 8.3% | 3.9% | 6.1% | ₹12,500 est. | ₹81.3 L | Under construction Mar 2029 |
| Raunak Serene Raunak Group · Thane West | 58 | 8.3% | 3.9% | 6.0% | ₹12,500 est. | ₹81.3 L | Under construction Apr 2029 |
| 25HOURLIFE - Tower B1 Runwal · Thane West | 58 | 8.5% | 4.3% | 7.1% | ₹16,000 est. | ₹1.04 Cr | Under construction Dec 2029 |
| 25HOURLIFE - Tower C1 Runwal · Thane West | 58 | 8.5% | 4.3% | 7.1% | ₹16,000 est. | ₹1.04 Cr | Under construction Dec 2029 |
| Deepjyoti Co. Op. Housing Society Aditya Associates · Thane West | 58 | 7.9% | 3.5% | 5.2% | ₹12,500 est. | ₹81.3 L | Under construction Jan 2028 |
| IKIGAI - Phase 1 Puraniks · Thane West | 58 | 8.4% | 5.0% | 9.1% | ₹16,000 est. | ₹1.04 Cr | Under construction Dec 2031 |
| Yashwant Niwas Vijayraj Developers · Thane West | 58 | 7.5% | 3.1% | 4.3% | ₹12,500 est. | ₹81.3 L | Under construction Mar 2027 |
| Veer Yashodeep Yash Infra · Thane West | 58 | 7.9% | 3.5% | 5.2% | ₹12,500 est. | ₹81.3 L | Under construction Jan 2028 |
| Bharat Ecovistas Phase II Bharat Realty Venture · Thane West | 58 | 7.1% | 3.6% | 4.7% | ₹13,300 est. | ₹86.5 L | Ready |
| Raunak Bliss B4 Unnathi Associates · Thane West | 58 | 8.9% | 4.9% | 8.6% | ₹12,500 est. | ₹81.3 L | Under construction Dec 2030 |
| Raunak Bliss B5 Unnathi Associates · Thane West | 58 | 8.9% | 4.9% | 8.6% | ₹12,500 est. | ₹81.3 L | Under construction Dec 2030 |
| Raunak Bliss B6 Unnathi Associates · Thane West | 58 | 8.9% | 4.9% | 8.6% | ₹12,500 est. | ₹81.3 L | Under construction Dec 2030 |
| Nakhawa Enclave Sai Shrushti Enterprises · Thane West | 58 | 7.1% | 3.6% | 4.7% | ₹13,300 est. | ₹86.5 L | Ready |
| Orion - Northern Lights Jaykali Developers · Thane West | 58 | 7.1% | 3.6% | 4.7% | ₹13,300 est. | ₹86.5 L | Ready |
| Omega - Northern Lights Jaykali Developers · Thane West | 58 | 7.1% | 3.6% | 4.7% | ₹13,300 est. | ₹86.5 L | Ready |
| Oyster - Shapoorji Pallonji Northern Lights Jaykali Developers · Thane West | 58 | 7.1% | 3.6% | 4.7% | ₹13,300 est. | ₹86.5 L | Ready |
| Shapoorji Pallonji The Impulse- Phase 1 Jaykali Developers · Thane West | 58 | 7.1% | 3.6% | 4.7% | ₹13,300 est. | ₹86.5 L | Ready |
| Lakeview Neelkanth · Thane West | 58 | 7.1% | 3.6% | 4.7% | ₹13,300 est. | ₹86.5 L | Ready |
| Rustomjee La Familia - Wing A Kapstone · Thane West | 58 | 7.5% | 2.7% | 3.6% | ₹12,500 est. | ₹81.3 L | Under construction Dec 2026 |
| Rustomjee La Familia - Wing B Kapstone · Thane West | 58 | 7.5% | 2.7% | 3.6% | ₹12,500 est. | ₹81.3 L | Under construction Dec 2026 |
| Shapoorji Pallonji The Impulse- Phase 2 Jaykali Developers · Thane West | 57 | 7.1% | 3.6% | 4.7% | ₹13,300 est. | ₹86.5 L | Ready |
| Estella - Tower C and D Agile Real Estate · Thane West | 57 | 8.5% | 4.6% | 8.7% | ₹12,500 est. | ₹81.3 L | Under construction Jun 2032 |
| Elanor Tower 6 Lodha (Macrotech) · Thane West | 57 | 8.0% | 4.5% | 8.3% | ₹21,100 est. | ₹1.37 Cr | Under construction Jan 2032 |
| Ashar Axis Ashar Group · Thane West | 57 | 7.3% | 2.3% | 3.1% | ₹16,000 est. | ₹1.04 Cr | Under construction Dec 2026 |
| Shubhanand Co-operative Housing Society LTD Padmanabh Developers · Thane West | 57 | 7.1% | 3.6% | 4.7% | ₹13,300 est. | ₹86.5 L | Ready |
| Puraniks Unicorn Phase 2 Puraniks · Thane West | 57 | 8.5% | 4.3% | 7.1% | ₹16,000 est. | ₹1.04 Cr | Under construction Dec 2029 |
| Ashirwad Co-Operative Housing Society Ltd Padmanabh Developers · Thane West | 57 | 7.5% | 2.8% | 3.6% | ₹12,500 est. | ₹81.3 L | Under construction Oct 2026 |
| Rameshwar Co-Op Housing Society Ltd. Aditya Associates · Thane West | 57 | 7.5% | 3.1% | 4.3% | ₹12,500 est. | ₹81.3 L | Under construction Mar 2027 |
| Dosti West County - Dosti Nest - Phase 2 Dosti Realty · Thane West | 57 | 7.3% | 2.4% | 3.5% | ₹16,000 est. | ₹1.04 Cr | Under construction Jun 2027 |
| Madhu Milind Co-Op Housing Society Ltd Aditya Associates · Thane West | 57 | 7.1% | 3.6% | 4.7% | ₹13,300 est. | ₹86.5 L | Ready |
| Rustomjee Azziano Wing L Kapstone · Thane West | 57 | 7.1% | 3.6% | 4.7% | ₹13,300 est. | ₹86.5 L | Ready |
| Rustomjee Azziano Wing D Kapstone · Thane West | 57 | 7.1% | 3.6% | 4.7% | ₹13,300 est. | ₹86.5 L | Ready |
| Dosti West County - Dosti Tulip Dosti Realty · Thane West | 57 | 7.3% | 2.4% | 3.2% | ₹16,000 est. | ₹1.04 Cr | Under construction Oct 2026 |
| Dosti West County - Dosti Nest - Phase 1 Dosti Realty · Thane West | 57 | 7.3% | 2.4% | 3.5% | ₹16,000 est. | ₹1.04 Cr | Under construction Jun 2027 |
| Dosti West County - Phase 5 - Dosti Olive - Wing B Dosti Realty · Thane West | 57 | 7.7% | 2.8% | 4.2% | ₹16,000 est. | ₹1.04 Cr | Under construction Sep 2028 |
| Dosti West County - Phase 5 - Dosti Olive - Wing A Dosti Realty · Thane West | 57 | 7.7% | 2.8% | 4.2% | ₹16,000 est. | ₹1.04 Cr | Under construction Sep 2028 |
| Sanyog Aditya Associates · Thane West | 57 | 7.1% | 3.6% | 4.7% | ₹13,300 est. | ₹86.5 L | Ready |
| Arvind Co-Op Housing Society Ltd Aditya Associates · Thane West | 57 | 7.5% | 2.8% | 3.9% | ₹12,500 est. | ₹81.3 L | Under construction Jun 2027 |
| Purva Panorama Tower C Puravankara · Thane West | 57 | 8.6% | 4.5% | 7.9% | ₹16,000 est. | ₹1.04 Cr | Under construction Mar 2031 |
| Satej Premises Co-operative Society Limited Ojass Govind Infra · Thane West | 57 | 7.9% | 3.5% | 5.3% | ₹12,500 est. | ₹81.3 L | Under construction Dec 2027 |
| Paramount E Kalpataru · Thane West | 56 | 6.9% | 3.1% | 4.2% | ₹17,000 est. | ₹1.10 Cr | Ready |
| Paramount C Kalpataru · Thane West | 56 | 6.9% | 3.1% | 4.2% | ₹17,000 est. | ₹1.10 Cr | Ready |
| Paramount A Kalpataru · Thane West | 56 | 6.9% | 3.1% | 4.2% | ₹17,000 est. | ₹1.10 Cr | Ready |
| Paramount F Kalpataru · Thane West | 56 | 6.9% | 3.1% | 4.2% | ₹17,000 est. | ₹1.10 Cr | Ready |
| Paramount B Kalpataru · Thane West | 56 | 6.9% | 3.1% | 4.2% | ₹17,000 est. | ₹1.10 Cr | Ready |
| Rustomjee La Familia- Wing C Kapstone · Thane West | 56 | 7.5% | 2.8% | 3.9% | ₹12,500 est. | ₹81.3 L | Under construction Jun 2027 |
| Dosti West County - Dosti Nest - Phase 3 Dosti Realty · Thane West | 56 | 7.3% | 2.4% | 3.4% | ₹16,000 est. | ₹1.04 Cr | Under construction Aug 2027 |
| F Neelkanth Greens Neelkanth · Thane West | 56 | 7.9% | 3.4% | 5.1% | ₹12,500 est. | ₹81.3 L | Under construction Mar 2028 |
| Dosti West County - Phase 7 - Dosti Willow Dosti Realty · Thane West | 56 | 7.7% | 3.1% | 4.7% | ₹16,000 est. | ₹1.04 Cr | Under construction Mar 2028 |
| Sector 5 - Wing D, E and F Agile Real Estate · Thane West | 56 | 7.9% | 3.5% | 5.3% | ₹12,500 est. | ₹81.3 L | Under construction Dec 2027 |
| Sector 5 - Wing A Agile Real Estate · Thane West | 56 | 7.9% | 3.5% | 5.3% | ₹12,500 est. | ₹81.3 L | Under construction Dec 2027 |
| Sector 5 - Wing B Agile Real Estate · Thane West | 56 | 7.9% | 3.5% | 5.3% | ₹12,500 est. | ₹81.3 L | Under construction Dec 2027 |
| Sector 5 - Wing C Agile Real Estate · Thane West | 56 | 7.9% | 3.5% | 5.3% | ₹12,500 est. | ₹81.3 L | Under construction Dec 2027 |
| Sector 5 - Wing J and K Agile Real Estate · Thane West | 56 | 7.9% | 3.5% | 5.3% | ₹12,500 est. | ₹81.3 L | Under construction Dec 2027 |
| Raunak Bliss B1 Unnathi Associates · Thane West | 56 | 8.7% | 4.5% | 7.5% | ₹12,500 est. | ₹81.3 L | Under construction Dec 2029 |
| Raunak Bliss B2 Unnathi Associates · Thane West | 56 | 8.7% | 4.5% | 7.5% | ₹12,500 est. | ₹81.3 L | Under construction Dec 2029 |
| Raunak Bliss B3 Unnathi Associates · Thane West | 56 | 8.7% | 4.5% | 7.5% | ₹12,500 est. | ₹81.3 L | Under construction Dec 2029 |
| Godrej Ascend Phase 2 Godrej Properties · Thane West | 56 | 8.1% | 3.7% | 5.9% | ₹16,000 est. | ₹1.04 Cr | Under construction Dec 2028 |
| Raunak Bliss A4 Unnathi Associates · Thane West | 56 | 8.7% | 4.5% | 7.5% | ₹12,500 est. | ₹81.3 L | Under construction Dec 2029 |
| Sheth Zuri Sheth / Transcon · Thane West | 56 | 7.5% | 2.7% | 3.6% | ₹12,500 est. | ₹81.3 L | Under construction Dec 2026 |
| Lodha Amara Tower 49 and 50 Lodha (Macrotech) · Thane West | 56 | 7.8% | 3.1% | 4.9% | ₹21,100 est. | ₹1.37 Cr | Under construction Dec 2028 |
| Gautam Vihar Co-operative Housing Society Ltd. Ojass Govind Infra · Thane West | 56 | 7.9% | 3.2% | 4.8% | ₹12,500 est. | ₹81.3 L | Under construction May 2028 |
| Garden Estate Phase -II Shree Balaji Developers · Thane West | 56 | 7.1% | 3.6% | 4.7% | ₹13,300 est. | ₹86.5 L | Ready |
| Empire Heritage Lakhani Builders · Thane West | 56 | 7.5% | 2.8% | 3.9% | ₹12,500 est. | ₹81.3 L | Under construction Jul 2027 |
| Lodha Signet B - Kolshet Lodha (Macrotech) · Thane West | 56 | 7.4% | 2.5% | 3.8% | ₹21,100 est. | ₹1.37 Cr | Under construction Nov 2027 |
| Lodha Amara Tower 47 and 48 Lodha (Macrotech) · Thane West | 55 | 7.8% | 2.8% | 4.6% | ₹21,100 est. | ₹1.37 Cr | Under construction Jun 2029 |
| Sheth Cnergy Ph 1 - Upto 11th Floor Sheth / Transcon · Thane West | 55 | 7.1% | 3.6% | 4.7% | ₹13,300 est. | ₹86.5 L | Ready |
| Thane Project Lodha (Macrotech) · Thane West | 55 | 7.8% | 2.8% | 4.5% | ₹21,100 est. | ₹1.37 Cr | Under construction Jul 2029 |
| Lodha Amara -Tower 42 and 43 Lodha (Macrotech) · Thane West | 55 | 7.4% | 2.5% | 3.8% | ₹21,100 est. | ₹1.37 Cr | Under construction Dec 2027 |
| Forestville - Phase 1 Oberoi Realty · Thane West | 55 | 8.2% | 3.7% | 6.3% | ₹21,100 est. | ₹1.37 Cr | Under construction Dec 2029 |
| Runwal Lands End Runwal · Thane West | 55 | 8.1% | 3.4% | 5.4% | ₹16,000 est. | ₹1.04 Cr | Under construction Jun 2029 |
| Harshal Co-Op Housing Society Ltd Veena Developers · Thane West | 55 | 7.1% | 3.6% | 4.7% | ₹13,300 est. | ₹86.5 L | Ready |
| Godrej Ascend Phase 1 Godrej Properties · Thane West | 55 | 7.7% | 3.1% | 4.6% | ₹16,000 est. | ₹1.04 Cr | Under construction Apr 2028 |
| Lodha Amara Tower 24 and 25 Lodha (Macrotech) · Thane West | 55 | 7.4% | 2.4% | 3.7% | ₹21,100 est. | ₹1.37 Cr | Under construction Mar 2028 |
| Sheth Avalon - Phase 1 Sheth / Transcon · Thane West | 55 | 7.1% | 3.6% | 4.7% | ₹13,300 est. | ₹86.5 L | Ready |
| Rumah Bali Phase 4 Puraniks · Thane West | 55 | 8.1% | 3.7% | 5.9% | ₹16,000 est. | ₹1.04 Cr | Under construction Dec 2028 |
| Dosti Greater Thane - Sector 3A - Cluster 1B - Phase 2 Adrika Developers · Thane West | 55 | 8.3% | 4.1% | 6.4% | ₹12,500 est. | ₹81.3 L | Under construction Oct 2028 |
| Highland Springs B4 D Wing Siddhi Real Estate Developers · Thane West | 54 | 7.5% | 2.7% | 3.6% | ₹12,500 est. | ₹81.3 L | Under construction Dec 2026 |
| Lodha Amara - Wing 40 and 41 Lodha (Macrotech) · Thane West | 54 | 6.6% | 2.3% | 3.1% | ₹22,450 est. | ₹1.46 Cr | Ready |
| Lodha Amara Tower 44 Lodha (Macrotech) · Thane West | 54 | 7.4% | 2.2% | 3.4% | ₹21,100 est. | ₹1.37 Cr | Under construction Jun 2028 |
| Puranik City Reserva Phase 1 Puraniks · Thane West | 54 | 8.1% | 3.6% | 5.7% | ₹16,000 est. | ₹1.04 Cr | Under construction Mar 2029 |
| Lodha Amara - Tower 46 Lodha (Macrotech) · Thane West | 54 | 6.6% | 2.3% | 3.1% | ₹22,450 est. | ₹1.46 Cr | Ready |
| Lodha Majiwada - Tower 5 Lodha (Macrotech) · Thane West | 54 | 6.6% | 2.3% | 3.1% | ₹22,450 est. | ₹1.46 Cr | Ready |
| Lodha Amara - Tower 23 Lodha (Macrotech) · Thane West | 54 | 6.6% | 2.3% | 3.1% | ₹22,450 est. | ₹1.46 Cr | Ready |
| Lodha Sterling - Tower G Lodha (Macrotech) · Thane West | 54 | 6.6% | 2.3% | 3.1% | ₹22,450 est. | ₹1.46 Cr | Ready |
| Lodha Sterling - Tower H Lodha (Macrotech) · Thane West | 54 | 6.6% | 2.3% | 3.1% | ₹22,450 est. | ₹1.46 Cr | Ready |
| Lodha Quality Home Tower 1 Lodha (Macrotech) · Thane West | 54 | 6.6% | 2.3% | 3.1% | ₹22,450 est. | ₹1.46 Cr | Ready |
| Lodha Quality Home Tower 2 Lodha (Macrotech) · Thane West | 54 | 6.6% | 2.3% | 3.1% | ₹22,450 est. | ₹1.46 Cr | Ready |
| Lodha Quality Home Tower 3 Lodha (Macrotech) · Thane West | 54 | 6.6% | 2.3% | 3.1% | ₹22,450 est. | ₹1.46 Cr | Ready |
| Lodha Quality Home Tower 4 Lodha (Macrotech) · Thane West | 54 | 6.6% | 2.3% | 3.1% | ₹22,450 est. | ₹1.46 Cr | Ready |
| Lodha Quality Home Tower 6 Lodha (Macrotech) · Thane West | 54 | 6.6% | 2.3% | 3.1% | ₹22,450 est. | ₹1.46 Cr | Ready |
| Lodha Quality Home Tower - 5 Lodha (Macrotech) · Thane West | 54 | 6.6% | 2.3% | 3.1% | ₹22,450 est. | ₹1.46 Cr | Ready |
| iThink Tower-A Lodha (Macrotech) · Thane West | 54 | 6.6% | 2.3% | 3.1% | ₹22,450 est. | ₹1.46 Cr | Ready |
| HG- A1 Siddhi Real Estate Developers · Thane West | 54 | 7.1% | 3.6% | 4.7% | ₹13,300 est. | ₹86.5 L | Ready |
| Sheth Avalon - Phase 2 Sheth / Transcon · Thane West | 54 | 7.9% | 3.5% | 5.3% | ₹12,500 est. | ₹81.3 L | Under construction Dec 2027 |
| Highland Springs B4- A Wing Siddhi Real Estate Developers · Thane West | 54 | 7.1% | 3.6% | 4.7% | ₹13,300 est. | ₹86.5 L | Ready |
| Highland Springs B4- B Wing Siddhi Real Estate Developers · Thane West | 54 | 7.1% | 3.6% | 4.7% | ₹13,300 est. | ₹86.5 L | Ready |
| DGT - Sector 3A - Cluster 2 - Phase 1 Adrika Developers · Thane West | 53 | 7.9% | 3.5% | 5.3% | ₹12,500 est. | ₹81.3 L | Under construction Dec 2027 |
| Lodha Crown Kolshet - Tower 2 Lodha (Macrotech) · Thane West | 53 | 7.0% | 1.7% | 2.5% | ₹21,100 est. | ₹1.37 Cr | Under construction Jul 2027 |
| Zenith Runwal · Thane West | 53 | 7.7% | 2.8% | 4.2% | ₹16,000 est. | ₹1.04 Cr | Under construction Sep 2028 |
| Phatak Wada Aditya Associates · Thane West | 53 | 7.5% | 2.8% | 3.6% | ₹12,500 est. | ₹81.3 L | Under construction Oct 2026 |
| Tokyo Bay Phase - 2A Puraniks · Thane West | 53 | 6.9% | 3.1% | 4.2% | ₹17,000 est. | ₹1.10 Cr | Ready |
| Elanor - Tower 1 Lodha (Macrotech) · Thane West | 53 | 8.0% | 4.6% | 8.4% | ₹21,100 est. | ₹1.37 Cr | Under construction Dec 2031 |
| Empire Presidency Lakhani Builders · Thane West | 53 | 7.5% | 2.8% | 3.9% | ₹12,500 est. | ₹81.3 L | Under construction Jul 2027 |
| Sheth Vasant Lawns Sheth / Transcon · Thane West | 52 | 7.9% | 3.5% | 5.3% | ₹12,500 est. | ₹81.3 L | Under construction Dec 2027 |
| Vihang Marina Balaji Enterprises · Thane West | 52 | 8.7% | 4.5% | 7.5% | ₹12,500 est. | ₹81.3 L | Under construction Dec 2029 |
| TEN X HABITAT Raymond Realty Tower G Raymond Realty · Thane West | 52 | 7.3% | 2.4% | 3.2% | ₹16,000 est. | ₹1.04 Cr | Under construction Jun 2026 |
| Raunak Bliss Phase A Unnathi Associates · Thane West | 52 | 7.1% | 3.6% | 4.7% | ₹13,300 est. | ₹86.5 L | Ready |
| Raunak Imperial Raunak Group · Thane West | 51 | 7.5% | 2.7% | 3.6% | ₹12,500 est. | ₹81.3 L | Under construction Dec 2026 |
| Rumah Bali Phase 5 Puraniks · Thane West | 51 | 7.7% | 11.3% | 18.4% | ₹16,000 est. | ₹1.04 Cr | Under construction Dec 2035 |
| Runwal Pearl Runwal · Thane West | 51 | 6.9% | 3.1% | 4.2% | ₹17,000 est. | ₹1.10 Cr | Ready |
| Rumah Bali Phase 6 Puraniks · Thane West | 51 | 7.7% | 11.2% | 18.3% | ₹16,000 est. | ₹1.04 Cr | Under construction Jun 2036 |
| Laxmi Narayan Co Op Housing Society Ltd Ojass Govind Infra · Thane West | 51 | 7.5% | 2.8% | 3.6% | ₹12,500 est. | ₹81.3 L | Under construction Dec 2025 |
| Lodha Crown Kolshet - Tower 3 Lodha (Macrotech) · Thane West | 50 | 7.4% | 2.2% | 3.3% | ₹21,100 est. | ₹1.37 Cr | Under construction Sep 2028 |
| Lodha Crown Kolshet-Tower 1 Lodha (Macrotech) · Thane West | 50 | 7.0% | 1.6% | 2.2% | ₹21,100 est. | ₹1.37 Cr | Under construction Sep 2026 |
| Runwal Eirene - Part I Runwal · Thane West | 50 | 6.9% | 3.1% | 4.2% | ₹17,000 est. | ₹1.10 Cr | Ready |
| Highland Springs B4- C Wing Siddhi Real Estate Developers · Thane West | 50 | 7.5% | 2.7% | 3.6% | ₹12,500 est. | ₹81.3 L | Under construction Nov 2026 |
| Sector 5 - Wing G and H Agile Real Estate · Thane West | 50 | 7.9% | 3.5% | 5.3% | ₹12,500 est. | ₹81.3 L | Under construction Dec 2027 |
| Satyaneelayam Co Op HSg Society Yash Infra · Thane West | 50 | 7.5% | 2.8% | 3.6% | ₹12,500 est. | ₹81.3 L | Under construction Dec 2025 |
| Raunak White House Raunak Group · Thane West | 50 | 8.3% | 4.0% | 6.3% | ₹12,500 est. | ₹81.3 L | Under construction Dec 2028 |
| Lodha Bellavista - Wing B2 Lodha (Macrotech) · Thane West | 49 | 7.4% | 2.2% | 3.4% | ₹21,100 est. | ₹1.37 Cr | Under construction Jul 2028 |
| TEN X HABITAT Raymond Realty Tower F Raymond Realty · Thane West | 49 | 7.3% | 2.4% | 3.2% | ₹16,000 est. | ₹1.04 Cr | Under construction Aug 2026 |
| Runwal One- Tower D2 Runwal · Thane West | 49 | 8.5% | 4.2% | 7.4% | ₹16,000 est. | ₹1.04 Cr | Under construction Jul 2031 |
| One Park Avenue - Avenue 1 Puravankara · Thane West | 49 | 7.3% | 2.3% | 3.1% | ₹16,000 est. | ₹1.04 Cr | Under construction Dec 2026 |
| One Park Avenue - Avenue 6 Puravankara · Thane West | 49 | 7.3% | 2.3% | 3.1% | ₹16,000 est. | ₹1.04 Cr | Under construction Dec 2026 |
| Elanor - Tower 2 Lodha (Macrotech) · Thane West | 49 | 8.0% | 4.6% | 8.4% | ₹21,100 est. | ₹1.37 Cr | Under construction Dec 2031 |
| Arihant City Phase-II - M Building Arihant Enterprises · Thane West | 49 | 8.3% | 4.0% | 6.3% | ₹12,500 est. | ₹81.3 L | Under construction Dec 2028 |
| Arihant City Phase-II - N Building Arihant Enterprises · Thane West | 49 | 8.3% | 4.0% | 6.3% | ₹12,500 est. | ₹81.3 L | Under construction Dec 2028 |
| Godrej Exquisite Godrej Properties · Thane West | 48 | 7.7% | 3.2% | 4.8% | ₹16,000 est. | ₹1.04 Cr | Under construction Dec 2027 |
| Wadhwa Rhodesia Phase-II The Wadhwa Group · Thane West | 48 | 6.9% | 3.1% | 4.2% | ₹17,000 est. | ₹1.10 Cr | Ready |
| Mahavir Breeze Phase 1 Damji Shamji / Mahavir · Thane West | 48 | 8.6% | 5.1% | 9.4% | ₹12,500 est. | ₹81.3 L | Under construction Dec 2031 |
| Mahavir Spring - Tulip - Phase 1 Vinayak Developers · Thane West | 48 | 7.5% | 2.8% | 3.6% | ₹12,500 est. | ₹81.3 L | Under construction Dec 2025 |
| Mahavir Spring - Daffodils - Phase 2 Vinayak Developers · Thane West | 48 | 7.5% | 2.8% | 3.6% | ₹12,500 est. | ₹81.3 L | Under construction Dec 2025 |
| Lodha Splendora - River View Lodha (Macrotech) · Thane West | 48 | 6.6% | 2.3% | 3.1% | ₹22,450 est. | ₹1.46 Cr | Ready |
| Wadhwa Rhodesia The Wadhwa Group · Thane West | 48 | 6.9% | 3.1% | 4.2% | ₹17,000 est. | ₹1.10 Cr | Ready |
| Mahavir Kalpavruksha - J Wing Damji Shamji / Mahavir · Thane West | 48 | 7.1% | 3.6% | 4.7% | ₹13,300 est. | ₹86.5 L | Ready |
| Lodha Crown Kolshet-Tower 4 Lodha (Macrotech) · Thane West | 46 | 7.0% | 1.6% | 2.2% | ₹21,100 est. | ₹1.37 Cr | Under construction May 2026 |
| Veer Galaxy Yash Infra · Thane West | 46 | 7.5% | 2.8% | 3.6% | ₹12,500 est. | ₹81.3 L | Under construction Jul 2026 |
| Raunak 108 Unnathi Associates · Thane West | 46 | 7.5% | 2.8% | 3.9% | ₹12,500 est. | ₹81.3 L | Under construction Jun 2027 |
| Lodha Quality Home Tower 7 Lodha (Macrotech) · Thane West | 46 | 7.0% | 1.6% | 2.2% | ₹21,100 est. | ₹1.37 Cr | Under construction Mar 2026 |
| Immensa A Agile Real Estate · Thane West | 46 | 7.5% | 2.8% | 3.6% | ₹12,500 est. | ₹81.3 L | Under construction Dec 2025 |
| Immensa B Agile Real Estate · Thane West | 46 | 7.5% | 2.8% | 3.6% | ₹12,500 est. | ₹81.3 L | Under construction Dec 2025 |
| Immensa C Agile Real Estate · Thane West | 46 | 7.5% | 2.8% | 3.6% | ₹12,500 est. | ₹81.3 L | Under construction Dec 2025 |
| Immensa D Agile Real Estate · Thane West | 46 | 7.5% | 2.8% | 3.6% | ₹12,500 est. | ₹81.3 L | Under construction Dec 2025 |
| Immensa E Agile Real Estate · Thane West | 46 | 7.5% | 2.8% | 3.6% | ₹12,500 est. | ₹81.3 L | Under construction Dec 2025 |
| Immensa F Agile Real Estate · Thane West | 46 | 7.5% | 2.8% | 3.6% | ₹12,500 est. | ₹81.3 L | Under construction Dec 2025 |
| Immensa G Agile Real Estate · Thane West | 46 | 7.5% | 2.8% | 3.6% | ₹12,500 est. | ₹81.3 L | Under construction Dec 2025 |
| Immensa H Agile Real Estate · Thane West | 46 | 7.5% | 2.8% | 3.6% | ₹12,500 est. | ₹81.3 L | Under construction Dec 2025 |
| Godrej Emerald Thane Godrej Properties · Thane West | 44 | 7.3% | 2.4% | 3.2% | ₹16,000 est. | ₹1.04 Cr | Under construction Jun 2026 |
| Arihant City Phase-II - K Building Arihant Enterprises · Thane West | 43 | 8.3% | 4.0% | 6.3% | ₹12,500 est. | ₹81.3 L | Under construction Dec 2028 |
| Unique Vistas-Bldg. No. 5 Madhu Harshad Doshi · Thane West | 42 | 7.5% | 2.7% | 3.6% | ₹12,500 est. | ₹81.3 L | Under construction Dec 2026 |
| Raunak Bliss Phase A - A3 Unnathi Associates · Thane West | 41 | 7.5% | 2.8% | 3.6% | ₹12,500 est. | ₹81.3 L | Under construction Jun 2026 |
| Unique Vistas Mhada Building No. 1,2,3 Madhu Harshad Doshi · Thane West | 41 | 7.5% | 2.8% | 3.6% | ₹12,500 est. | ₹81.3 L | Under construction Sep 2026 |
| Unique Vistas Mhada Buildingno. 4 5 6 7 Madhu Harshad Doshi · Thane West | 41 | 7.5% | 2.8% | 3.6% | ₹12,500 est. | ₹81.3 L | Under construction Sep 2026 |
| Unique Vistas-Bldg. No. 3 Madhu Harshad Doshi · Thane West | 40 | 7.5% | 2.7% | 3.6% | ₹12,500 est. | ₹81.3 L | Under construction Dec 2026 |
Price per sq ft in Thane West: what the evidence says
| Date | ₹ / sq ft | Basis | Confidence |
|---|---|---|---|
| 2021-06 | ₹12,000 | mum (derived) | 40% |
| 2023-06 | ₹13,500 | mum (derived) | 45% |
| 2025-06 | ₹16,000 | mum (derived) | 50% |
| 2026-06 | ₹17,500 | mum (derived) | 50% |
That is 7.8% a year from 2021-06 to 2026-06. The model projects 7.7% a year from here; the growth story on each project page shows why.
Infrastructure pipeline
| Project | Type | Status | Expected | Chance it lands on time | Price effect if it does |
|---|---|---|---|---|---|
| Metro Line 4 Wadala–Ghatkopar–Thane–Kasarvadavali | metro | construction | 2027 | 60% | +1.0% / yr |
| Metro Line 5 Thane–Bhiwandi–Kalyan | metro | construction | 2028 | 50% | +1.0% / yr |
| Thane–Borivali twin tunnel | road | construction | 2029 | 50% | +0.6% / yr |
The growth model counts each event at its probability, not its promise. Dates are the latest public schedule.
Developers active in Thane West
Ranked lists for Thane West
Thane West compared with other areas
Questions people ask
Is Thane West good for investment?
On PropertyLens's model the median analysed project in Thane West scores 56/100 (above the Mumbai average), with projected price growth of 7.7% a year over five years, median price ₹13,300 per sq ft and gross rental yield 3.0%. 218 RERA-registered projects analysed as of November 11, 2026. The best-scored project is IKIGAI Phase 2 at 65.
What is the price per sq ft in Thane West?
Median ₹13,300 per sq ft of super built-up area across analysed projects, modelled from comparables where developers file no price. Entry price for an analysed home is about ₹81.3 L; the median home is ₹86.5 L.
What rental yield can I expect in Thane West?
Median gross yield 3.0% on the all-in cost of an analysed home, before maintenance, vacancy and tax. Net-wealth CAGR after every cost on an 8-year hold with a 75% loan is 3.5% at the median.
Are projects in Thane West delayed?
23 of 169 under-construction projects are past the completion date in their original RERA registration, and unsold stock equals about 22 months of sales. Each project page shows extensions, construction against bookings and complaints.
Scores and projections are model outputs built from dated public evidence (MahaRERA public filings, public ratings) and stated assumptions. Unit sizes and prices in this city are modelled estimates because the regulator does not publish unit inventories openly. They are research, not investment advice. How the numbers are built.