PropertyLensBengaluru · invest
Peninsula Land · Sarjapur Road (Carmelaram / Dommasandra)

Peninsula Park Elite

Survey nos. 78, 79/3, 80/1, 81/1A… · Sarjapur Road
Ready · rent from todayplot · luxuryRERA registered+ CompareFull report ↗
1 · Which home?
2 · Which exit plan?

Score, growth and returns below are for the highlighted home and plan. Prices, rent and possession never mix across phases.

50
Investment score
50/100
Evidence confidence55%
Plot · ~1,200 sq ft (assumed)
Price growth per year, next 5 yrs model
10.4%
likely range 6.9%–13.9% · over 10 yrs 10.2%/yr
Net-wealth CAGR, 8-yr hold
6.4%
your cash in → cash back incl. sale, per year
Cash-flow IRR, 8-yr hold
9.0%
with 75% loan · all-cash 8.8% · no interiors
Three numbers, three questions. Price growth: what will the home be worth? Net-wealth CAGR: what will my money have earned after every cost? Cash-flow IRR: the same, but counting when each rupee moves. Tap i on any of them.
Price · edit here or below assumed
₹Cr
₹ psf × 1,200 sq ft · as of Sep 2026
Price edits apply to ·
All-in cost
₹1.07 Cr
+ other charges 1.9 L, GST 0.0 L, stamp/reg 6.5 L
Gross rental yield assumed
0.0%
vacant plot: no rent assumed

All-in cost sheet this home, default assumptions

ItemBasisAmount
Base price₹8,100 per sq ft × 1,200 sq ft super built-up97.2 L
Other charges2.0% of base: floor-rise, preferred-location, car park, club, maintenance deposit, legal, corpus (edit in Assumptions)1.9 L
GST0.0% on an under-construction home — none is due on a ready home with an occupancy certificate, set GST to 0 if buying after OC0.0 L
Stamp duty and registration6.6% in Karnataka: 5% stamp duty + 1% registration + cess and surcharge on the agreement value6.5 L
All-in costwhat leaves your pocket and the bank's, before rent or resale₹1.07 Cr
Your own money75.0% loan at 8.5% for 20 years covers the rest; EMI 0.6 L a month₹89.3 L

Carpet area 889 sq ft against 1,200 sq ft super built-up: you pay for 26% that is common area and walls. Price per sq ft of carpet ≈ ₹10,934. Every percentage above is editable in Assumptions; the defaults are Karnataka rates as of 2026-09.

In plain words

Why 50 out of 100

Each home is marked on 11 things a careful buyer checks, then compared with every project we analyse in Bengaluru: 50 is the average project, 62 beats about five in six. Here is what lifts this one and what drags it:

  • +
    Legal, title & approvals · 3/5 pts
    Registered with Karnataka RERA; no court cases reported; land title not yet verified by us, so get a lawyer to check. The due-diligence report below flags 0 items in red.
  • +
    Resale liquidity · 1/4 pts
    Plenty of buyers can afford a ₹97.2 L home, and homes in Sarjapur Road resell at a normal pace.
  • +
    Builder delivery & handover risk · 5/16 pts
    Peninsula Land has finished 8+ projects and delivered on time about 35% of the time. This home is ready, so there is no waiting risk.
  • −
    Rental demand & yield · -4/8 pts
    A plot earns no rent, so this scores low by design.
  • −
    Employment access · -4/10 pts
    Drive times right now: ITPL Whitefield 41 min, ORR Bellandur (Ecospace) 43 min, Electronic City Ph-1 47 min; Hebbal (Kirloskar) 79 min. About 12 million sq ft of new offices are planned nearby in 3 years.
  • −
    Metro, bus, rail & airport · -4/9 pts
    No working metro nearby (nearest 9 km). Airport is about 101 minutes by road right now.
All 11 checks
  • +
    Price vs comparables · 1/3 pts
    Cheaper than similar luxury homes nearby: ₹8,100 vs about ₹14,000 per sq ft.
  • −
    Rental demand & yield · -4/8 pts
    A plot earns no rent, so this scores low by design.
  • +
    Resale liquidity · 1/4 pts
    Plenty of buyers can afford a ₹97.2 L home, and homes in Sarjapur Road resell at a normal pace.
  • −
    Employment access · -4/10 pts
    Drive times right now: ITPL Whitefield 41 min, ORR Bellandur (Ecospace) 43 min, Electronic City Ph-1 47 min; Hebbal (Kirloskar) 79 min. About 12 million sq ft of new offices are planned nearby in 3 years.
  • −
    Metro, bus, rail & airport · -4/9 pts
    No working metro nearby (nearest 9 km). Airport is about 101 minutes by road right now.
  • •
    Schools, hospitals, daily needs · -0/3 pts
    Schools, hospitals and daily shopping are good in this area.
  • •
    Builder delivery & handover risk · 5/16 pts
    Peninsula Land has finished 8+ projects and delivered on time about 35% of the time. This home is ready, so there is no waiting risk.
  • +
    Layout, size, age, amenities, maintenance · 0/3 pts
    Moderately dense layout (60 homes per acre); about 72% of the area you pay for is usable carpet area. Maintenance ~₹6 per sq ft a month.
  • •
    Water, flooding, noise, infrastructure · -2/9 pts
    Some flood risk in heavy rain; water supply is mostly borewell or tankers; noise is manageable.
  • +
    Legal, title & approvals · 3/5 pts
    Registered with Karnataka RERA; no court cases reported; land title not yet verified by us, so get a lawyer to check. The due-diligence report below flags 0 items in red.
  • •
    Expected price growth (5-yr CAGR model) · 4/26 pts
    We expect prices here to rise about 10.4% a year for the next 5 years (explained below).
Why prices should grow ~10.4% a year for the next 5 years

We build the forecast step by step, starting from what Bengaluru homes normally do and adjusting for this area and this project:

  1. + 6.0%Start with 6.0% a year: the normal long-run growth of Bengaluru home prices.
  2. + 1.3%Add 1.3%: prices here rose 14.5% a year recently (2023-06 to 2026-06). Some of that pace continues, but it fades each year.
  3. − 0.5%Subtract 0.5%: at ₹8,100 per sq ft, fewer families can afford to buy here, which slows further rises.
  4. + 2.6%Add 2.6%: 12 million sq ft of new offices nearby means more people wanting homes here.
  5. − 0.7%Subtract 0.7%: many new homes are being built here (20 months of unsold stock), which keeps prices in check.
  6. + 0.2%Add 0.2% for new roads, metro and water lines, weighted by how likely they are to actually finish: Peripheral Ring Road (planned, 2030); Cauvery Stage V water (construction, 2027); Bengaluru suburban rail (K-RIDE) (construction, 2029).
  7. + 1.5%No extra project-level adjustment.
  8. = 10.4%Result: about 10.4% a year, so a home worth ₹99.1 L today would be worth about ₹1.63 Cr in 5 years. We are 56% confident in the evidence behind this.

Highlights

  • Peninsula Land · Sarjapur Road (Carmelaram / Dommasandra) · unit count not filed on 8.0 acres
  • Marked completed on RERA (completion date 2023-09-30) after 1 extension
  • No litigation declared · 0 complaints on this registration

Assumptions editable

Purchase

₹/sq ft
₹ Cr
sq ft
% of base
%
%
%
₹/sq ft

FinancingLoan 75% · cash 25% · EMI ₹64,530/mo

% loan
% p.a.
years
%

Rent & running costs

₹/sq ft/mo
% of rent
% of value

Interiors & exit

%
%
years
% p.a. (blank = model)
%
%

Returns over 8 years · no interiors

Cash you put in₹89.3 L
Exit value (yr 8)₹2.17 Cr
Net sale after loan & costs₹1.55 Cr
Net rent after opex₹-2.9 L
Loan (75% of price)₹74.4 L
EMI / month₹64,530
Year 0: ₹-32.7 L0Year 1: ₹-8.0 L1Year 2: ₹-8.0 L2Year 3: ₹-8.1 L3Year 4: ₹-8.1 L4Year 5: ₹-8.1 L5Year 6: ₹-8.1 L6Year 7: ₹-8.2 L7Year 8: ₹1.46 Cr8
YearPurchaseLoan inRent (net of vacancy)OpexDebt serviceSale − loanNet cash
Today-1.07 Cr74.4 L0.0 L0.0 L0.0 L0.0 L-32.7 L
Yr 10.0 L0.0 L0.0 L-0.3 L-7.7 L0.0 L-8.0 L
Yr 20.0 L0.0 L0.0 L-0.3 L-7.7 L0.0 L-8.0 L
Yr 30.0 L0.0 L0.0 L-0.3 L-7.7 L0.0 L-8.1 L
Yr 40.0 L0.0 L0.0 L-0.3 L-7.7 L0.0 L-8.1 L
Yr 50.0 L0.0 L0.0 L-0.4 L-7.7 L0.0 L-8.1 L
Yr 60.0 L0.0 L0.0 L-0.4 L-7.7 L0.0 L-8.1 L
Yr 70.0 L0.0 L0.0 L-0.4 L-7.7 L0.0 L-8.2 L
Yr 80.0 L0.0 L0.0 L-0.5 L-7.7 L1.55 Cr1.46 Cr

Pre-tax unless capital-gains tax is set. Rent enters the cash flows once. Net-wealth CAGR = (cash returned incl. sale ÷ cash put in)^(1/years) − 1. IRR uses the dated cash flows.

Score factors

Bars show points added or taken away versus the average analysed Bengaluru project (score 50).

Price vs comparables
+0.9 pts vs avg
this home 7.3/10 · Bengaluru average 6.2 · confidence 30%
₹8,100 psf vs luxury comps ₹14,000 (-42%). Price is a model estimate, so this factor carries a third of its normal weight until a listed price is observed.
Rental demand & yield
−4.4 pts vs avg
this home 3.8/10 · Bengaluru average 6.0 · confidence 34%
Gross yield 0.0% (₹0 psf/month); locality rental demand 8/10.
Resale liquidity
+1.4 pts vs avg
this home 8.4/10 · Bengaluru average 7.6 · confidence 50%
Locality resale depth 8/10; ticket ₹0.97 Cr narrows the buyer pool.
Employment access
−4.1 pts vs avg
this home 3.2/10 · Bengaluru average 5.2 · confidence 85%
Drive times now (Google Maps, 2026-09-16): ITPL Whitefield 41 min, ORR Bellandur (Ecospace) 43 min, Electronic City Ph-1 47 min, Koramangala (Forum) 62 min; 0 of 7 major hubs within 30 min; 12 msf office pipeline (3 yr).
Metro, bus, rail & airport
−3.7 pts vs avg
this home 2.7/10 · Bengaluru average 4.8 · confidence 60%
none operational (nearest Purple/Yellow lines 8–10 km); Phase 3A Sarjapur line ~2033; airport ~101 min by road now (Google Maps); .
Schools, hospitals, daily needs
−0.5 pts vs avg
this home 6.5/10 · Bengaluru average 7.0 · confidence 50%
Locality social-infrastructure index (interim, expert-set; POI distances pending Maps integration).
Builder delivery & handover risk
+4.9 pts vs avg
this home 5.6/10 · Bengaluru average 3.7 · confidence 60%
Peninsula Land: 8+ projects, on-time 35% (derived); ready.
Layout, size, age, amenities, maintenance
+0.2 pts vs avg
this home 7.5/10 · Bengaluru average 7.3 · confidence 50%
60 units/acre; carpet/SBA ~72%; maintenance ~₹6 psf/month (assumed).
Water, flooding, noise, infrastructure
−1.8 pts vs avg
this home 4.9/10 · Bengaluru average 5.8 · confidence 50%
Heavy tanker dependence pending Cauvery Stage V; Varthur lake catchment
Legal, title & approvals
+2.9 pts vs avg
this home 8.8/10 · Bengaluru average 7.4 · confidence 55%
RERA registered; litigation: none reported; approvals: RERA registered; title: not verified. Due-diligence report lists 0 red flags (−0.0 pts).
Expected price growth (5-yr CAGR model)
+4.3 pts vs avg
this home 6.6/10 · Bengaluru average 6.0 · confidence 56%
Model 5-yr price CAGR 10.4% (range 6.9–13.9%).

Price growth model, year by year

Nominal growth per year. Parts add up; momentum fades, infrastructure is weighted by delivery probability and dated.

ComponentYr 1Yr 2Yr 3Yr 4Yr 5Yr 6Confidence
Bengaluru long-run nominal trend6.06.06.06.06.06.080%
Locality momentum (mean-reverting)3.01.60.90.50.30.145%
Affordability ceiling-0.9-0.6-0.4-0.3-0.2-0.160%
Employment access & office pipeline2.62.62.62.62.62.655%
Supply–demand balance-1.0-0.8-0.6-0.5-0.4-0.350%
Infrastructure delivery (probability-weighted)0.10.20.20.20.10.255%
Project-specific adjustments1.51.51.51.51.51.550%
Total growth11.4%10.6%10.2%10.0%9.9%10.0%56%

Bengaluru long-run nominal trend: City-wide 2013-25 nominal residential trend ≈ inflation + real income growth.

Locality momentum (mean-reverting): Trailing 3.0-yr locality CAGR 14.5% vs 6.0% trend; 35% carried forward, halving each year.

Affordability ceiling: Ticket at ₹8,100 psf vs city median ₹9,500; buyer pool thins above ₹15k/₹20k psf and after >6pp excess growth.

Employment access & office pipeline: 12 msf office pipeline (3 yr) on 18 msf stock; 30-min jobs index 0.60.

Supply–demand balance: 20 months of unsold inventory; new-launch/absorption ratio 1.34 (from 72 under-construction RERA filings in this locality: 13,146 unsold homes, 722.1 sold per month).

Infrastructure delivery (probability-weighted): Phase 3A Sarjapur–Hebbal (planned, 2033, p=0.45); Peripheral Ring Road (planned, 2030, p=0.4); Cauvery Stage V water (construction, 2027, p=0.7); Bengaluru suburban rail (K-RIDE) (construction, 2029, p=0.5)

Project-specific adjustments: Building age 3 yrs. Land in expansion corridors historically outpaces built stock; no depreciation.

Locality evidence: ₹8,000 (Jun 2023) → ₹12,000 (Jun 2026) = 14.5% p.a. Sources: Platform estimate (interim, not observed).

Financial & legal due diligence

What the public record says

Automated from the Karnataka RERA file PRM/KA/RERA/1251/308/PR/200103/003127. Prices and rents are locality estimates, not verified listings. Compiled Sep 2026 from the Karnataka RERA file, company registers, rating agencies, tribunal records and press. Facts only; anything that deserves a written answer before signing is flagged.

Delivery timeline8/10
delivered; the registration was extended 1× before completion
Legal & complaints9/10
no litigation and no complaints on the RERA file
Money to finish8/10
finance cost is 0% of the registered budget
Developer strength5/10
no public credit rating for the promoter

Meters are rule-based from the RERA file and public ratings (rules shown under each), not opinions.

Registration
PRM/KA/RERA/1251/308/PR/200103/003127 · M/S PENINSULA INFRA DEVELOPMENTS PVT LTD
Delivered
RegisteredDec 2019Original completionDec 2022Covid ext.Sep 2023TodaySep 2026
No litigation declaredNo complaintsEscrow: HDFC
Credit ratings of the people behind it

No public credit rating located for the promoter.

M/S PENINSULA INFRA DEVELOPMENTS PVT LTD: no public rating located

Complaints & disputes on record
On this project00 open
On the promoter entity12all projects
Court cases declared0no stay recorded
At a glance
Delivered

Delivered. RERA registration ran 2019-12-01 → 2023-09-30 after 1 extension (original 2022-12-31)

No complaints on this project

No RERA complaints on this project; 12 on the promoter overall

No litigation declared

No litigation declared in RERA filings

The record, in pictures

RERA file · Registration

Registered project cost ₹66.30 cr — where it goes
Land ₹18.8 cr · 28%Construction & on-site ₹47.5 cr · 72%
No litigation declaredBorrowing declared: not statedEscrow at HDFC

Red flags to resolve in writing

Questions to put to the developer before you sign

  1. Share the latest CA Form 4 and architect Form 5 with the escrow deposit ratio.
  2. Confirm the price list, floor-rise and other charges for the exact unit.
  3. Provide the occupancy certificate, khata and title chain for the unit.
  4. Confirm there is no litigation on the land or approvals beyond the RERA declaration.
  5. Is the land freehold with the developer, and is any part mortgaged?
Full record: every filed number, line by line1 sections · 8 items

RERA file · Registration

Registration
PRM/KA/RERA/1251/308/PR/200103/003127 · promoter M/S PENINSULA INFRA DEVELOPMENTS PVT LTD (Company) · Proposed Project End Date at the time of registration :
Dates
Start 2019-12-01 · original completion 2022-12-31 · 1 extension: Covid Extension → 2023-09-30
Status
Completed and occupied (per project status); RERA progress fields below are historical
Registered cost
Total ₹66.30 cr · land ₹18.75 cr · construction ₹47.55 cr
RERA bank account
HDFC, Fort Branch (70% construction account)
Land & towers
8.05 acres (32,576 sq m)
Litigation declared
None declared in filings
K-RERA complaints
0 on this registration (0 open) · 12 on the promoter entity across all its projects

Source: Karnataka RERA project record PRM/KA/RERA/1251/308/PR/200103/003127, fetched 2026-09-15. Figures are the promoter’s own filings.

Sources & caveats2 sources
  • Karnataka RERA project record PRM/KA/RERA/1251/308/PR/200103/003127 (registration file, quarterly updates, complaint register), fetched 2026-09-15
  • PropertyLens locality model (market-level estimates)
  • Karnataka RERA project records PRM/KA/RERA/1251/308/PR/200103/003127 (registration file, quarterly updates, complaint register), fetched Sep 2026.

Caveats. Automated analysis: prices, rents and travel times are estimates until listings and Maps data are verified. RERA figures are the promoter’s own filings. Nothing here is legal, tax or investment advice.

Evidence

Location, jobs & transit4 hubs · metro none nearby
Job hubs nearby
Wipro KodathiRGA Tech ParkORR Bellandur 10 kmITPL 9 km
Measured drive times below
Office space
Existing18 msf
Coming in 3 yrs12 msf
Jobs within 30 min6/10
Getting around
Metro today
none operational (nearest Purple/Yellow lines 8–10 km)
none within 5 km
Metro planned
Phase 3A Sarjapur line
~2033 45% likely ~2,500 m estimate
Rail
—
estimate
Airport
101 min by road now · 37.2 km
Google Maps
Buses
7/10 coverage
estimate
Drive times to job hubs
DestinationDrive nowRoad km
ITPL Whitefield41 min14.3
ORR Bellandur (Ecospace)43 min15.1
Electronic City Ph-147 min16.7
Koramangala (Forum)62 min22.4
MG Road (CBD)68 min24.5
Manyata Tech Park76 min27.5
Hebbal (Kirloskar)79 min28.9
Kempegowda Airport (KIA)101 min37.2

Google Maps driving time with live traffic, measured Sep 2026. Refreshed monthly.

Location used: Google Maps match “”. Bus coverage and planned-station distances are still interim estimates.

Price historylocality 14.5%/yr

No dated project-level price series yet; only the latest observation is on file.

Locality · average ₹/sq ft
Date₹ psfSourceConfidenceKind
Jun 20216,050Platform estimate (interim, not observed)40%derived
Jun 20238,000Platform estimate (interim, not observed)45%derived
Jun 202510,800Platform estimate (interim, not observed)50%derived
Jun 202612,000Platform estimate (interim, not observed)50%derived
Luxury comps₹14,000
Premium comps₹12,000
Mid comps₹9,000
Unsold stock20 months

Model backtest on this locality: 1-yr hold-out (Jun 2025→Jun 2026): predicted ₹11,852 vs actual ₹12,000 (-1.2%). Longer 3-yr hold-out (Jun 2023→Jun 2026): predicted 9% p.a. vs actual 14.5% p.a. — the model is deliberately mean-reverting and under-predicted the 2021–26 boom.

Environment, legal & productflood ok · water risk · RERA yes
Flood risksome risk
Water supplytankers/borewell
Quietok
Roads & drainspatchy

Heavy tanker dependence pending Cauvery Stage V; Varthur lake catchment

Legal & approvals
Registration 003127
RERA PRM/KA/RERA/1251/308/PR/200103/003127
ready
Litigation
none reported
observed
Approvals
RERA registered
observed
Title
not verified
assumed
Product
Land8.05 acres
Homesnull
Density60/acre
Launched2019
Sources & data gapswhat we know, from where, and what is missing

Automated analysis: unit mix and carpet areas come from the RERA inventory table; prices and rents are locality-model estimates until listings are verified.

FieldValueSource classDateConf.KindConflicting values
AddressSy No. 78, 79/3, 80/1, 81/1A, 81/4, 85, 90 & 91, Doddathimmasandra Village, , Sarjapura Hobli, Anekal Taluk, Bangalore DistKarnataka RERA (number as reported; registry lookup pending)Sep 202680%observed
Land area (acres)8.05Karnataka RERA (number as reported; registry lookup pending)Sep 202680%observed
Total unitsPlatform estimate (interim, not observed)Sep 202620%assumed
Launch year2019Karnataka RERA (number as reported; registry lookup pending)Sep 202670%observed
Possession · Registration 0031272023-09-30Karnataka RERA (number as reported; registry lookup pending)Sep 202670%observed
Price psf · Plot · ~1,200 sq ft (assumed)8100Platform estimate (interim, not observed)Sep 202630%assumed
Ticket · Plot · ~1,200 sq ft (assumed)9720000Platform estimate (interim, not observed)Sep 202630%derived
Rent · Plot · ~1,200 sq ft (assumed)0Platform estimate (interim, not observed)Sep 202630%assumed
Carpet area889Platform estimate (interim, not observed)Sep 202630%assumed
Builder on-time rate0.35Karnataka RERA (number as reported; registry lookup pending)Sep 202660%derived
Litigationnone reportedKarnataka RERA (number as reported; registry lookup pending)Sep 202670%observed
ApprovalsRERA registeredKarnataka RERA (number as reported; registry lookup pending)Sep 202660%observed

Commercial listing portals are shown as “Listing portal (aggregated)”; full provenance is retained internally. Official developer and Karnataka RERA sources are named.

Other projects worth comparing

Same model, same date. Scores are out of 100, where 50 is the average analysed Bengaluru project.

Questions people ask about Peninsula Park Elite

Is Peninsula Park Elite a good investment?

On PropertyLens's evidence-based model Peninsula Park Elite scores 50/100, below the average analysed Bengaluru project (50 = average, 12 points = one standard deviation). The model projects price growth of about 10.4% a year over five years and a net-wealth CAGR of 6.4% after every cost on an 8-year hold with a 75.0% loan. That is research on public filings, not advice; the factor breakdown on this page shows what drives the score.

What is the price per sq ft at Peninsula Park Elite?

About ₹8,100 per sq ft of super built-up area, a model estimate from Sarjapur Road comparables that you can edit. The Plot home costs about ₹97.2 L before other charges, GST and stamp duty, and ₹1.07 Cr all-in.

When is Peninsula Park Elite ready for possession?

The project is marked ready to move in; confirm the occupancy certificate before paying.

Is Peninsula Park Elite RERA registered?

Yes. Karnataka RERA registration: PRM/KA/RERA/1251/308/PR/200103/003127. No complaints on this registration and 12 on the promoter across projects at K-RERA as of 2026-09-15.

How reliable is Peninsula Land on delivery?

35% of Peninsula Land's crawled Bengaluru registrations needed no extension (2 of 8 crawled Bengaluru registrations needed no extension). 8 registrations analysed. The developer scorecard compares this with every other Bengaluru developer.

What rent can Peninsula Park Elite earn?

Plots earn no rent; the return is price growth alone.

Answers are generated from the filings and the model for this home and change when you edit the assumptions above. See the Peninsula Land scorecard and the Sarjapur Road area page.

Go deeper

Share on WhatsApp