Sarjapur Road in one paragraph

On PropertyLens's model, Sarjapur Road is an average place to buy in Bengaluru right now: the median analysed project scores 49/100 (below the Bengaluru average), with projected price growth of 9.8% a year over five years and a median gross rental yield of 3.4%. Unsold homes would take about 20 months to absorb at the current sales pace, which is heavy supply and caps near-term price growth. 117 of 209 under-construction projects here are past their original RERA completion date, so weight the developer's record heavily.

Median of 284 projects; the spread inside the area is wide, so the ranked list below matters more than the average.

Projects analysed
284
75 ready · 209 under construction
Median score
49
below the Bengaluru average
Projected growth / yr
9.8%
5-yr; 10-yr 9.2%
Median price / sq ft
₹8,450
modelled from comparables
Gross rental yield
3.4%
median, on all-in cost
Net-wealth CAGR
6.3%
8-yr hold, 75% loan, after all costs
Months of inventory
20
13,146 unsold of 67,759 filed
Booked share
35%
typical under-construction project
Past RERA date
117 / 209
under-construction projects overdue
Entry price
₹33.0 L
median ₹88.7 L

Best-scored projects in Sarjapur Road

All 284 analysed projects in Sarjapur Road

ProjectScoreGrowth / yrNet-wealth CAGRCash-flow IRRPrice / sq ftPriceStatus
Godrej Lakeside Orchard
Godrej Properties · Sarjapur Road
7210.8%7.5%12.4%₹11,300 est.₹46.3 LUnder construction
Sep 2030
Birla Evara
Birla Estates · Sarjapur Road
7111.0%8.7%15.9%₹11,300 est.₹72.3 LUnder construction
Dec 2031
Mythri Street
Mythri Builders · Sarjapur Road
7110.9%7.4%12.3%₹8,450 est.₹88.7 LUnder construction
Dec 2029
Mythri Sity
Mythri Builders · Sarjapur Road
6910.6%6.8%10.6%₹8,450 est.₹57.9 LUnder construction
Aug 2029
The Earthscape Phase-1
Bricks & Milestones Projects · Sarjapur Road
6810.6%6.6%11.1%₹8,450 est.₹1.08 CrUnder construction
Aug 2030
Mythri Sikharam
Mythri Builders · Sarjapur Road
6710.6%7.0%10.8%₹8,450 est.₹83.7 LUnder construction
Mar 2029
Mana Dale
Mana Projects · Sarjapur Road
6610.2%7.6%15.2%₹8,450 est.₹1.18 CrUnder construction
Dec 2032
Mana Vista
Mana Projects · Sarjapur Road
6610.8%7.5%13.3%₹8,450 est.₹84.9 LUnder construction
Dec 2030
Elanza
Lodha (Macrotech) · Sarjapur Road
6511.2%7.8%13.9%₹13,800 est.₹1.81 CrUnder construction
Sep 2031
JRC Wild Woods building 2
JRC Projects · Sarjapur Road
6511.0%7.3%10.5%₹8,450 est.₹78.6 LUnder construction
Mar 2028
Rohan Ekanta Phase 3
Rohan Builders · Sarjapur Road
6510.1%6.7%10.5%₹11,650 est.₹1.23 CrUnder construction
Dec 2028
Abhee Aaria
Abhee Ventures · Sarjapur Road
6510.4%7.0%12.4%₹8,450 est.₹49.4 LUnder construction
May 2031
Haven Phase 2
Lodha (Macrotech) · Sarjapur Road
6510.2%6.7%11.2%₹13,800 est.₹1.98 CrUnder construction
Jun 2030
Mana Dale South -1
Mana Projects · Sarjapur Road
6410.3%6.9%11.5%₹8,450 est.₹95.1 LUnder construction
Nov 2029
Fernvale @ The Prestige City
Prestige · Sarjapur Road
6411.3%7.9%13.1%₹11,300 est.₹1.15 CrUnder construction
Mar 2030
The Right Life
Neobuild Ventures · Sarjapur Road
6410.2%15.2%24.5%₹8,450 est.₹92.1 LUnder construction
Dec 2035
Orchid Life
Goyal & Co · Sarjapur Road
6410.0%6.8%11.3%₹11,650 est.₹97.9 LUnder construction
Feb 2030
Mana Skanda The Right Life T45
Neobuild Ventures · Sarjapur Road
6410.5%6.6%11.0%₹8,450 est.₹1.08 CrUnder construction
Jun 2030
Assetz Inspira Melodies of Life
Assetz · Sarjapur Road
6410.4%6.4%9.0%₹6,600 est.₹39.6 LReady
Eaton Park @ The Prestige City
Prestige · Sarjapur Road
6311.3%7.5%12.6%₹11,300 est.₹1.83 CrUnder construction
Jun 2030
Prestige Serenity Shores
Prestige · Sarjapur Road
639.4%6.0%8.3%₹11,650 est.₹72.8 LUnder construction
Aug 2027
Confident Beverly Hills
Confident Group · Sarjapur Road
6310.4%6.3%9.0%₹4,950 est.₹59.4 LReady
Mana Skanda The Right Life T789
Neobuild Ventures · Sarjapur Road
6310.5%7.0%11.7%₹8,450 est.₹89.1 LUnder construction
Dec 2029
The Adwaith By Sanjeevini
Sanjeevini · Sarjapur Road
6310.4%7.2%11.1%₹8,450 est.₹54.1 LUnder construction
Dec 2028
Nambiar District 25 Phase 1
Nambiar Builders · Sarjapur Road
6211.1%7.5%12.4%₹8,450 est.₹91.3 LUnder construction
Jan 2030
Paradise at Brigade Cornerstone Utopia
Brigade Group · Sarjapur Road
628.9%7.2%9.0%₹12,000 est.₹58.8 LReady
Nambiar District 25 Phase 2
Nambiar Builders · Sarjapur Road
6211.1%7.1%11.9%₹8,450 est.₹95.9 LUnder construction
Aug 2030
Central Avenue Phase 3
Pionier Projects · Sarjapur Road
6211.2%8.2%13.0%₹4,650 est.₹56.0 LUnder construction
Nov 2027
Sunrise
Corporate Leisure & Property Developments · Sarjapur Road
6210.8%7.3%9.3%₹8,450 est.₹52.4 LUnder construction
Dec 2026
The Woods Of East Phase VIII
Odion Builders & Developers · Sarjapur Road
6111.9%7.8%11.0%₹4,650 est.₹35.1 LUnder construction
Dec 2025
Greenbay
Pionier Projects · Sarjapur Road
6111.2%8.2%13.0%₹4,650 est.₹55.8 LUnder construction
May 2028
Peninsula Pinewoods Phase - 2
Peninsula Land · Sarjapur Road
6010.4%6.4%9.0%₹8,100 est.₹97.2 LReady
Mana Verdant Terraces
Mana Projects · Sarjapur Road
6010.2%7.2%13.7%₹8,450 est.₹1.65 CrUnder construction
Dec 2031
Rohan Ekanta Phase 2
Rohan Builders · Sarjapur Road
609.2%6.6%8.4%₹12,000 est.₹1.28 CrReady
Assetz Inspira Melodies of Life Apartments
Assetz · Sarjapur Road
6010.3%7.2%12.7%₹11,300 est.₹1.92 CrUnder construction
Nov 2030
The Woods Of East
Odion Builders & Developers · Sarjapur Road
6012.1%7.9%11.2%₹4,650 est.₹55.8 LUnder construction
Mar 2018
Rohan Ekanta Phase 1
Rohan Builders · Sarjapur Road
609.0%7.0%8.8%₹12,000 est.₹77.4 LReady
Brigade Parkside East
Brigade Group · Sarjapur Road
598.9%6.0%7.8%₹12,000 est.₹1.80 CrReady
Godrej Park Retreat Phase 2
Godrej Properties · Sarjapur Road
599.4%5.7%8.4%₹11,650 est.₹1.12 CrUnder construction
Jun 2028
Grc Subhiksha Phase 2
GRC Infra · Sarjapur Road
588.9%7.1%8.8%₹9,000 est.₹55.4 LReady
Rrl Palm Altezze
RRL Builders & Developers · Sarjapur Road
5810.7%6.7%11.3%₹8,450 est.₹87.9 LUnder construction
Sep 2030
Godrej Park Retreat
Godrej Properties · Sarjapur Road
589.0%7.2%9.0%₹12,000 est.₹63.0 LReady
Abhee Nakshatra
Abhee Ventures · Sarjapur Road
588.9%6.1%7.8%₹9,000 est.₹1.35 CrReady
Gr Sunshine
Corporate Leisure & Property Developments · Sarjapur Road
578.9%6.4%8.1%₹9,000 est.₹97.7 LReady
Trifecta Retto
Trifecta · Sarjapur Road
5710.8%6.8%8.5%₹8,450 est.₹84.1 LUnder construction
Mar 2026
Pionier Lifestyle + Ext
Pionier Projects · Sarjapur Road
5712.1%7.9%11.2%₹4,650 est.₹55.8 LUnder construction
Dec 2022
Sj Classique
SJ Constructions · Sarjapur Road
5710.1%6.0%9.5%₹8,450 est.₹88.3 LUnder construction
Sep 2029
Trifecta Vanto Phase-2
Trifecta · Sarjapur Road
579.7%5.8%8.5%₹8,450 est.₹1.26 CrUnder construction
Mar 2028
The Woods Of East Phase VII
Odion Builders & Developers · Sarjapur Road
5711.0%7.0%10.0%₹4,800 est.₹69.4 LUnder construction
Mar 2024
Assetz Trees & Tandem -Tower B
Assetz · Sarjapur Road
5710.4%6.3%10.0%₹11,300 est.₹2.19 CrUnder construction
Aug 2029
Jrc Wild Woods
JRC Projects · Sarjapur Road
5710.8%6.7%8.4%₹8,450 est.₹98.9 LUnder construction
Mar 2026
Suncity Gloria
Corporate Leisure & Property Developments · Sarjapur Road
578.9%6.4%8.1%₹9,000 est.₹1.05 CrReady
GRC Subhiksha
GRC Infra · Sarjapur Road
578.9%6.5%8.2%₹9,000 est.₹88.2 LReady
Bhavisha Gardeniaa Phase-4
Bhavisha Properties · Sarjapur Road
5610.2%6.4%8.2%₹8,750 est.₹73.9 LUnder construction
Dec 2026
Millenia Muthanallur
Nambiar Builders · Sarjapur Road
568.8%7.1%8.8%₹9,000 est.₹53.5 LReady
Vaishno Lotus
Vaishno Builders · Sarjapur Road
568.9%6.1%7.8%₹9,000 est.₹1.35 CrReady
Sobha Altair
Sobha · Sarjapur Road
5610.6%7.2%12.8%₹11,300 est.₹1.96 CrUnder construction
May 2031
Manyata Ekamoi
Manyata Developers · Sarjapur Road
5611.0%8.6%14.1%₹4,800 est.₹57.6 LUnder construction
Dec 2028
Prestige Lakeside Habitat
Prestige · Sarjapur Road
568.9%5.9%7.7%₹12,000 est.₹2.09 CrReady
Spectra Mira
Spectra Constructions · Sarjapur Road
5610.4%6.3%9.0%₹4,950 est.₹72.0 LReady
Abhee Celestial City
Abhee Ventures · Sarjapur Road
569.6%5.7%8.9%₹8,450 est.₹92.1 LUnder construction
Jun 2029
Garden Breeze @ The Prestige City
Prestige · Sarjapur Road
5610.7%7.8%13.6%₹11,300 est.₹1.14 CrUnder construction
Nov 2030
Adithya Homes Paradise
Adithya Homes · Sarjapur Road
5610.4%6.3%9.0%₹4,950 est.₹59.4 LReady
Serene at Brigade Cornerstone Utopia
Brigade Group · Sarjapur Road
558.9%6.0%7.8%₹12,000 est.₹1.80 CrReady
Psr Platinum
PSR Builders & Developers · Sarjapur Road
5510.1%6.7%11.1%₹8,450 est.₹88.3 LUnder construction
Dec 2029
Abhee City Urban Glenn Phase I
Abhee Ventures · Sarjapur Road
559.9%9.8%16.9%₹8,450 est.₹90.4 LUnder construction
Dec 2033
Psr Vanasree Phase-II
PSR Builders & Developers · Sarjapur Road
5510.1%6.6%9.6%₹8,450 est.₹85.3 LUnder construction
Dec 2027
Manyata Ekamara
Manyata Developers · Sarjapur Road
5510.4%6.3%9.0%₹4,950 est.₹59.4 LReady
Satori Residence By Genurise
MAX Global Developers · Sarjapur Road
559.7%5.9%9.9%₹8,450 est.₹83.7 LUnder construction
Jun 2030
Trifecta Vanto Phase-1
Trifecta · Sarjapur Road
558.9%5.5%7.4%₹8,750 est.₹52.5 LUnder construction
Aug 2027
Casa Life By Bhavisha Homes
Bhavisha Properties · Sarjapur Road
5510.4%6.3%9.0%₹4,950 est.₹59.4 LReady
NCC Urban Green Province Phase 2
NCC Urban · Sarjapur Road
5510.9%8.0%12.6%₹6,400 est.₹1.44 CrUnder construction
Aug 2028
NCC Urban Green Province
NCC Urban · Sarjapur Road
5510.4%6.4%9.0%₹6,600 est.₹2.86 CrReady
Prestige Great Acres
Prestige · Sarjapur Road
5510.4%6.4%9.0%₹6,600 est.₹76.9 LReady
Morefields By Manyata
Manyata Developers · Sarjapur Road
5410.4%6.3%9.0%₹4,950 est.₹59.4 LReady
36 Park Avenue Phase III
R K Developers · Sarjapur Road
5410.4%6.3%9.0%₹4,950 est.₹74.3 LReady
Godrej Regent Park
Godrej Properties · Sarjapur Road
5410.5%7.1%12.6%₹11,300 est.₹1.25 CrUnder construction
Jul 2031
Adithya Homes Paradise Phase-4
Adithya Homes · Sarjapur Road
5410.4%6.3%9.0%₹4,950 est.₹59.4 LReady
Ozone Kns Oasis
KNS Infrastructure · Sarjapur Road
5410.4%6.3%9.0%₹4,950 est.₹1.45 CrReady
Arcadia
Corporate Leisure & Property Developments · Sarjapur Road
5410.1%6.1%7.6%₹8,750 est.₹1.01 CrUnder construction
Dec 2019
The Grand County Address
Indiabuild Realty · Sarjapur Road
5412.0%9.6%15.7%₹4,650 est.₹69.8 LUnder construction
Dec 2028
Ellegenza Phase I Extension-2
Nambiar Builders · Sarjapur Road
5410.4%6.3%9.0%₹4,950 est.₹96.8 LReady
Ranka PalmLakeside
Ranka · Sarjapur Road
5410.7%6.8%9.6%₹4,800 est.₹57.6 LUnder construction
Dec 2022
Ahad Opus
Ahad Builders · Sarjapur Road
538.9%6.1%7.8%₹9,000 est.₹1.35 CrReady
Confident Platinum Phase II
Confident Group · Sarjapur Road
5310.4%6.3%9.0%₹4,950 est.₹59.4 LReady
Mana Tropicale
Mana Projects · Sarjapur Road
538.9%6.2%7.9%₹9,000 est.₹1.20 CrReady
Mana Skanda The Right Life T6
Neobuild Ventures · Sarjapur Road
539.9%5.7%9.8%₹8,450 est.₹2.20 CrUnder construction
Jun 2030
Grc Savora
GRC Infra · Sarjapur Road
5310.1%6.4%9.9%₹8,450 est.₹1.04 CrUnder construction
Mar 2029
Ashish Green
Aashish Developers · Sarjapur Road
538.9%7.0%8.7%₹9,000 est.₹57.6 LReady
63 Degree East - Tower E
APG Intelli Homes · Sarjapur Road
539.3%5.1%6.7%₹8,750 est.₹1.17 CrUnder construction
Dec 2026
Bren Champions Square
Bren Corporation · Sarjapur Road
538.9%6.0%7.8%₹12,000 est.₹1.80 CrReady
Dsr The Address
DSR Infrastructure · Sarjapur Road
539.8%6.3%9.7%₹8,450 est.₹53.2 LUnder construction
Jun 2029
Geown Oasis Phase-2
Geown Properties · Sarjapur Road
5310.4%6.3%9.0%₹4,950 est.₹59.4 LReady
Confident Platinum
Confident Group · Sarjapur Road
5310.4%6.3%9.0%₹4,950 est.₹59.4 LReady
36 Park Avenue Phase-II
R K Developers · Sarjapur Road
5310.4%6.3%9.0%₹4,950 est.₹59.4 LReady
Nambiar District 25 Phase 3
Nambiar Builders · Sarjapur Road
5310.0%7.1%13.5%₹8,450 est.₹1.01 CrUnder construction
Feb 2032
Sterlling Aveenue
Pionier Projects · Sarjapur Road
5310.8%6.8%9.7%₹4,650 est.₹55.8 LUnder construction
Mar 2024
Psr Vanasree Phase-1
PSR Builders & Developers · Sarjapur Road
538.5%6.8%8.4%₹9,000 est.₹52.2 LReady
Trifecta Veranza
Trifecta · Sarjapur Road
5310.1%6.7%11.1%₹8,450 est.₹84.1 LUnder construction
Dec 2029
Candeur Landmark
Candeur Constructions · Sarjapur Road
528.9%6.1%7.8%₹9,000 est.₹1.35 CrReady
Bilva Phase-II By Bhavisha Homes
Bhavisha Properties · Sarjapur Road
5210.6%6.8%9.2%₹8,450 est.₹96.3 LUnder construction
Apr 2027
Ruchira Villa Feliz
Ruchira Developers · Sarjapur Road
5210.8%7.8%12.4%₹4,800 est.₹78.5 LUnder construction
Dec 2027
Geown Oasis Phase - 2a
Geown Properties · Sarjapur Road
5212.1%7.9%11.2%₹4,650 est.₹55.8 LUnder construction
Sep 2026
The Woods Of East - Phase -V
Odion Builders & Developers · Sarjapur Road
5210.8%6.8%9.7%₹4,650 est.₹52.5 LUnder construction
Jul 2025
Adithya Homes Elite
Sobha · Sarjapur Road
5210.4%6.4%9.0%₹6,600 est.₹79.2 LReady
NCC Urban Green Province One
NCC Urban · Sarjapur Road
5212.1%7.9%11.2%₹6,200 est.₹1.25 CrUnder construction
Dec 2025
Greendales Phase II
Pionier Projects · Sarjapur Road
5210.8%6.8%9.7%₹4,650 est.₹55.8 LUnder construction
Nov 2025
V R Royal Homes
VR Ventures · Sarjapur Road
5211.0%8.0%12.8%₹4,800 est.₹57.6 LUnder construction
Dec 2027
Mapple Avvenue
Pionier Projects · Sarjapur Road
5210.8%6.8%9.7%₹4,650 est.₹54.9 LUnder construction
Sep 2023
Tanmathra Meadows
Shriram Properties · Sarjapur Road
5210.8%6.3%8.1%₹11,300 est.₹2.35 CrUnder construction
Dec 2019
Silverlane
Pionier Projects · Sarjapur Road
5210.8%6.8%9.7%₹4,650 est.₹55.8 LUnder construction
Dec 2025
S S Prakruthi Meadows
Prakruthi · Sarjapur Road
5210.4%6.8%10.6%₹8,450 est.₹1.03 CrUnder construction
Dec 2028
Maitree Vajra
Maitree Developers · Sarjapur Road
529.8%5.8%8.5%₹8,450 est.₹1.42 CrUnder construction
Mar 2028
Macasa Emerald
Mana Projects · Sarjapur Road
518.6%6.3%8.0%₹9,000 est.₹85.5 LReady
The Woods Of East Phase -4
Odion Builders & Developers · Sarjapur Road
5110.8%6.8%9.7%₹4,650 est.₹55.8 LUnder construction
Nov 2023
Ellegenza Phase I Extension
Nambiar Builders · Sarjapur Road
5110.8%7.3%11.1%₹4,650 est.₹81.4 LUnder construction
Mar 2027
Mythri Signature
Mythri Builders · Sarjapur Road
519.3%5.5%6.8%₹8,450 est.₹87.5 LUnder construction
Jun 2026
Saritha Serene
Saritha Developers · Sarjapur Road
518.6%6.4%8.0%₹9,000 est.₹77.0 LReady
Ahad Meadows
Ahad Builders · Sarjapur Road
518.9%6.1%7.8%₹9,000 est.₹1.35 CrReady
Dsr Highland Greenz
DSR Infrastructure · Sarjapur Road
518.7%6.3%7.9%₹9,000 est.₹91.3 LReady
Brigade Gem
Brigade Group · Sarjapur Road
519.3%5.4%7.0%₹11,300 est.₹1.23 CrUnder construction
Aug 2024
SOBHA Crystal Meadows Phase 2 Wing 7 and 8
Sobha · Sarjapur Road
519.9%6.9%12.1%₹11,300 est.₹48.6 LUnder construction
Jun 2031
Bavisha Gardeniaa Phase 3
Bhavisha Properties · Sarjapur Road
518.9%7.1%8.8%₹9,000 est.₹52.6 LReady
Bavisha Gardeniaa Phase 2
Bhavisha Properties · Sarjapur Road
508.9%6.8%8.4%₹9,000 est.₹72.9 LReady
Engrace Vista
Modern Spaces · Sarjapur Road
509.8%5.9%9.3%₹8,450 est.₹1.48 CrUnder construction
Dec 2028
Abhee Siliconshine
Abhee Ventures · Sarjapur Road
508.7%5.5%6.7%₹8,750 est.₹55.6 LUnder construction
Aug 2026
Bhavisha Bentley Greens
Bhavisha Properties · Sarjapur Road
508.9%6.7%8.4%₹9,000 est.₹73.3 LReady
Sipani City Phase-1
Sipani · Sarjapur Road
5010.2%7.1%12.5%₹8,450 est.₹55.3 LUnder construction
Dec 2030
Ars Zurich Phase-2
ARS Infraa · Sarjapur Road
5010.2%6.3%8.1%₹8,450 est.₹81.5 LUnder construction
Dec 2026
Grc Shreekrish
GRC Infra · Sarjapur Road
508.8%4.7%6.1%₹8,750 est.₹1.23 CrUnder construction
Dec 2026
Peninsula Park Elite
Peninsula Land · Sarjapur Road
5010.4%6.4%9.0%₹8,100 est.₹97.2 LReady
East Avvenue
Pionier Projects · Sarjapur Road
5010.8%6.8%9.7%₹4,650 est.₹46.7 LUnder construction
Dec 2024
Central Avenuue
Pionier Projects · Sarjapur Road
5010.8%6.8%9.7%₹4,650 est.₹55.8 LUnder construction
Dec 2024
Orchard Avenue
Pionier Projects · Sarjapur Road
5010.8%6.8%9.7%₹4,650 est.₹45.1 LUnder construction
Sep 2024
Greendales
Pionier Projects · Sarjapur Road
5010.8%6.8%9.7%₹4,650 est.₹55.8 LUnder construction
Nov 2023
The Woods Of East Phase 3
Odion Builders & Developers · Sarjapur Road
5010.8%6.8%9.7%₹4,650 est.₹55.8 LUnder construction
Sep 2021
Sobha Royal Pavilion Phase 5 - Wing 8 and 9
Sobha · Sarjapur Road
508.9%5.9%7.7%₹12,000 est.₹2.02 CrReady
63 Degree East - Tower C & D
APG Intelli Homes · Sarjapur Road
4910.8%6.5%8.1%₹8,450 est.₹1.27 CrUnder construction
Mar 2021
Daintree 3
BSR Projects · Sarjapur Road
4912.1%7.9%11.3%₹4,650 est.₹81.4 LUnder construction
Feb 2027
Signature Premier
Signature Dwellings · Sarjapur Road
499.6%5.7%8.3%₹8,750 est.₹1.24 CrUnder construction
Mar 2028
Leafy Avenue
Leafy Realty · Sarjapur Road
4910.4%6.9%10.7%₹8,450 est.₹82.8 LUnder construction
Dec 2028
Meridian Park Phase I @ The Prestige City
Prestige · Sarjapur Road
498.9%6.1%7.9%₹12,000 est.₹1.61 CrReady
Engrace 4
Modern Spaces · Sarjapur Road
499.8%5.4%7.0%₹8,750 est.₹1.40 CrUnder construction
Dec 2026
Ahad Excellencia
Ahad Builders · Sarjapur Road
498.9%6.1%7.8%₹9,000 est.₹1.35 CrReady
Candeur Signature
Candeur Constructions · Sarjapur Road
499.3%5.0%6.9%₹8,450 est.₹1.27 CrUnder construction
Sep 2027
Aston Park @ The Prestige City
Prestige · Sarjapur Road
499.4%5.5%7.1%₹11,650 est.₹1.25 CrUnder construction
Sep 2026
Bavisha Greystone
Bhavisha Properties · Sarjapur Road
499.3%5.8%7.2%₹8,450 est.₹63.0 LUnder construction
Aug 2022
36 Park Avenue
R K Developers · Sarjapur Road
4912.1%7.9%11.2%₹4,650 est.₹54.9 LUnder construction
Jul 2024
Silver Dale
Pionier Projects · Sarjapur Road
4810.8%6.8%9.7%₹4,650 est.₹54.9 LUnder construction
May 2025
Eden Park @ The Prestige City
Prestige · Sarjapur Road
488.9%6.6%8.4%₹12,000 est.₹96.6 LReady
Sobha Royal Pavilion Phase 6 - Wing 10 and 11
Sobha · Sarjapur Road
488.9%5.9%7.7%₹12,000 est.₹1.99 CrReady
Dsr The Courtyard
DSR Infrastructure · Sarjapur Road
488.8%4.8%6.2%₹8,750 est.₹85.8 LUnder construction
Feb 2027
Pionier Lifestyle Phase 2
Pionier Projects · Sarjapur Road
4810.8%6.8%9.7%₹4,650 est.₹55.8 LUnder construction
Aug 2022
Sobha Royal Pavilion Phase 7 - Wing 12, 13 and 14
Sobha · Sarjapur Road
488.9%5.9%7.7%₹12,000 est.₹2.00 CrReady
Bavisha Gardeniaa
Bhavisha Properties · Sarjapur Road
488.9%6.6%8.3%₹9,000 est.₹86.8 LReady
Brigade Parkside West
Brigade Group · Sarjapur Road
489.3%5.2%6.7%₹11,300 est.₹1.70 CrUnder construction
Jun 2021
SOBHA Crystal Meadows Phase 1 Wing 1 to 6
Sobha · Sarjapur Road
4810.1%6.6%11.1%₹11,300 est.₹2.44 CrUnder construction
Dec 2029
Signature Classic - 2
Signature Dwellings · Sarjapur Road
488.9%6.8%8.4%₹9,000 est.₹71.5 LReady
Sobha Royal Pavilion Phase 8 - Wing 15
Sobha · Sarjapur Road
488.9%5.7%7.4%₹12,000 est.₹2.78 CrReady
Abhee Siliconshine
Abhee Ventures · Sarjapur Road
489.3%5.3%6.7%₹8,450 est.₹95.9 LUnder construction
Aug 2025
Park Avenuue
Pionier Projects · Sarjapur Road
4810.8%6.8%9.7%₹4,650 est.₹55.8 LUnder construction
Mar 2025
Lgcl New Life
LGCL Urban Homes · Sarjapur Road
4810.7%6.0%7.6%₹8,450 est.₹1.83 CrUnder construction
Dec 2020
Sai Metro City 9th Phase
Sai Reniit Projects · Sarjapur Road
4812.1%7.9%11.3%₹4,650 est.₹55.8 LUnder construction
Nov 2026
Wonderwall Phase III
Bricks & Milestones Projects · Sarjapur Road
479.3%5.8%7.8%₹8,450 est.₹87.0 LUnder construction
Mar 2027
Meridian Park Phase III @ The Prestige City
Prestige · Sarjapur Road
478.9%6.1%7.9%₹12,000 est.₹1.61 CrReady
Sapthagiri Sampada B Block
Sapthagiri Constructions · Sarjapur Road
4710.0%7.2%13.6%₹8,450 est.₹80.3 LUnder construction
Dec 2031
Modern Spaces Felicity Engrace 2
Modern Spaces · Sarjapur Road
478.9%6.3%7.9%₹9,000 est.₹1.13 CrReady
Green Acrres
Pionier Projects · Sarjapur Road
4710.8%6.8%9.7%₹4,650 est.₹55.8 LUnder construction
May 2025
Leafy Serene
Leafy Realty · Sarjapur Road
4710.4%6.7%10.4%₹8,450 est.₹1.05 CrUnder construction
Dec 2028
Mythri Sapphire
Mythri Builders · Sarjapur Road
479.3%5.5%6.8%₹8,450 est.₹82.8 LUnder construction
Dec 2024
Mana Verdant
Mana Projects · Sarjapur Road
479.9%6.7%11.8%₹8,450 est.₹81.1 LUnder construction
Dec 2030
Reliaable Residenza Crusher Series
RD Buildtech · Sarjapur Road
4710.8%6.8%9.7%₹4,650 est.₹55.8 LUnder construction
Apr 2024
Signature Crest
Signature Dwellings · Sarjapur Road
478.9%6.7%8.4%₹9,000 est.₹77.0 LReady
Confident Snow Flake
Confident Group · Sarjapur Road
478.9%7.0%8.7%₹9,000 est.₹59.0 LReady
JR Greenwich Phase 4
JR Housing · Sarjapur Road
4710.8%6.8%9.7%₹4,650 est.₹90.2 LUnder construction
Nov 2024
Tranquil at Brigade Cornerstone Utopia
Brigade Group · Sarjapur Road
479.3%5.2%6.7%₹11,300 est.₹1.70 CrUnder construction
Sep 2025
Halcyon at Brigade Cornerstone Utopia
Brigade Group · Sarjapur Road
469.3%5.2%6.7%₹11,300 est.₹1.70 CrUnder construction
Sep 2025
The Clan
Global Edifice Infra · Sarjapur Road
469.8%6.3%9.8%₹8,450 est.₹92.1 LUnder construction
Dec 2028
Godrej Woodland Phase 2
Godrej Properties · Sarjapur Road
4610.8%6.9%9.8%₹6,400 est.₹76.8 LUnder construction
Dec 2026
Signature Classic
Signature Dwellings · Sarjapur Road
4610.8%6.5%8.1%₹8,450 est.₹1.27 CrUnder construction
Apr 2019
Pionier Lifestyle
Pionier Projects · Sarjapur Road
4610.8%6.8%9.7%₹4,650 est.₹55.8 LUnder construction
Feb 2022
Confident Central Mall
Confident Group · Sarjapur Road
469.3%5.8%7.4%₹8,750 est.₹59.9 LUnder construction
Nov 2026
Dsr Green Waters
DSR Infrastructure · Sarjapur Road
469.3%5.5%6.9%₹8,450 est.₹83.2 LUnder construction
Mar 2025
Oaklands
MH Properties · Sarjapur Road
4610.8%6.8%9.7%₹4,650 est.₹69.8 LUnder construction
Sep 2025
Dsr Parkway (phase 2)
DSR Infrastructure · Sarjapur Road
469.3%6.1%7.5%₹8,450 est.₹47.7 LUnder construction
Oct 2025
Engrace 3
Modern Spaces · Sarjapur Road
468.9%6.2%7.9%₹9,000 est.₹1.16 CrReady
Trifecta Bueno
Trifecta · Sarjapur Road
459.3%5.5%6.8%₹8,450 est.₹82.8 LUnder construction
Dec 2023
Green Storeys
Modern Spaces · Sarjapur Road
459.8%5.7%7.3%₹8,450 est.₹1.01 CrUnder construction
Dec 2026
The County Address
Indiabuild Realty · Sarjapur Road
4512.1%7.9%11.2%₹4,650 est.₹55.6 LUnder construction
Jun 2020
Peninsula Park Elite Phase II
Peninsula Land · Sarjapur Road
4510.4%6.4%9.0%₹8,100 est.₹97.2 LReady
The Gran Carmen Address
Indiabuild Realty · Sarjapur Road
4510.0%5.2%6.6%₹8,750 est.₹3.85 CrUnder construction
Jan 2020
Nvt Arcot Vaksana
NVT Quality Lifestyle · Sarjapur Road
458.9%5.6%7.2%₹9,000 est.₹2.39 CrReady
Sowparnika Olivia Nest
Sowparnika · Sarjapur Road
459.1%6.9%8.6%₹9,000 est.₹76.5 LReady
Elleganza Phase I
Nambiar Builders · Sarjapur Road
4510.8%6.8%9.7%₹4,650 est.₹55.8 LUnder construction
Jul 2023
Bhavisha Avighna
Bhavisha Properties · Sarjapur Road
4410.8%6.2%7.8%₹8,450 est.₹1.64 CrUnder construction
Dec 2024
Evershine Greenwood
Evershine Dwellings · Sarjapur Road
448.9%6.1%7.8%₹9,000 est.₹1.35 CrReady
312 West
Modern Spaces · Sarjapur Road
4410.8%7.0%8.7%₹8,450 est.₹68.9 LUnder construction
Apr 2022
Eden at Brigade Cornerstone Utopia
Brigade Group · Sarjapur Road
449.3%5.2%6.7%₹11,300 est.₹1.70 CrUnder construction
Mar 2024
ARS Signaturehomes Phase-2
ARS Infraa · Sarjapur Road
4410.8%6.3%7.9%₹8,450 est.₹1.50 CrUnder construction
Jul 2025
Uber Verdant - II
Mana Projects · Sarjapur Road
449.3%5.2%6.6%₹8,450 est.₹1.09 CrUnder construction
Jun 2024
Peninsula Prakruthi Phase - 2
Peninsula Land · Sarjapur Road
448.9%5.8%7.6%₹14,700 est.₹2.21 CrReady
Sowparnika Tharangini Phase I
Sowparnika · Sarjapur Road
4410.8%6.9%8.6%₹8,450 est.₹77.7 LUnder construction
Dec 2019
Ars Zurich Phase-1
ARS Infraa · Sarjapur Road
439.0%5.1%7.0%₹8,750 est.₹1.30 CrUnder construction
Apr 2027
Dsr Parkway (phase-1)
DSR Infrastructure · Sarjapur Road
439.3%5.4%6.8%₹8,450 est.₹93.0 LUnder construction
Jul 2024
Adarsh Garden Estate
Akarshak Realty · Sarjapur Road
4310.8%6.8%9.7%₹4,650 est.₹55.8 LUnder construction
Dec 2024
Natura Daintree - II
BSR Projects · Sarjapur Road
439.6%4.8%6.3%₹8,750 est.₹2.60 CrUnder construction
Jan 2027
Peninsula Solitaire
Peninsula Land · Sarjapur Road
438.9%5.8%7.6%₹14,700 est.₹2.21 CrReady
Abhee Kings Court
Abhee Ventures · Sarjapur Road
428.6%6.2%7.8%₹9,000 est.₹1.02 CrReady
Felicity
Bricks & Milestones Projects · Sarjapur Road
4210.8%6.8%9.7%₹4,650 est.₹55.8 LUnder construction
May 2024
Meridian Park Phase II @ The Prestige City
Prestige · Sarjapur Road
428.9%6.2%8.0%₹12,000 est.₹1.43 CrReady
Ahad Serenity
Ahad Builders · Sarjapur Road
429.3%5.5%6.9%₹8,450 est.₹79.9 LUnder construction
Dec 2024
Leafy Delight
Leafy Realty · Sarjapur Road
429.4%5.7%8.3%₹8,450 est.₹1.06 CrUnder construction
Mar 2028
63 Degree East - Tower A
APG Intelli Homes · Sarjapur Road
429.3%5.2%6.6%₹8,450 est.₹1.05 CrUnder construction
Jul 2025
SOBHA Crystal Meadows Phase 3 Wing 9 to 15
Sobha · Sarjapur Road
429.4%7.5%14.6%₹11,300 est.₹3.89 CrUnder construction
Dec 2032
Adithya Homes Paradise Phase-3
Adithya Homes · Sarjapur Road
4210.8%6.8%9.7%₹4,650 est.₹55.8 LUnder construction
Mar 2023
63 Degree East - Tower F
APG Intelli Homes · Sarjapur Road
429.3%5.1%6.4%₹8,450 est.₹1.22 CrUnder construction
Jul 2025
Sobha Royal Pavilion Phase 2 - Wing 4 and 5
Sobha · Sarjapur Road
429.3%5.1%6.6%₹11,300 est.₹1.87 CrUnder construction
Jun 2024
Adithya Homes Grand Phase 3
Adithya Homes · Sarjapur Road
4210.8%6.8%9.7%₹4,650 est.₹65.1 LUnder construction
Mar 2024
Adithya Homes Grand Phase 2
Adithya Homes · Sarjapur Road
4210.8%6.8%9.7%₹4,650 est.₹70.4 LUnder construction
Mar 2024
Sobha Royal Pavilion Phase 4 - Wing 1, 2 and 3
Sobha · Sarjapur Road
429.3%5.1%6.5%₹11,300 est.₹1.88 CrUnder construction
Jun 2024
63 degree east - Tower B
APG Intelli Homes · Sarjapur Road
419.3%5.4%6.7%₹8,450 est.₹95.1 LUnder construction
Jun 2023
Saiven Siesta
Saiven Developers · Sarjapur Road
418.9%6.1%7.8%₹9,000 est.₹1.35 CrReady
Shriram Chirping Grove - 2
Shriram Properties · Sarjapur Road
418.9%5.7%7.4%₹12,000 est.₹2.92 CrReady
Icon Sanctuary
Icon Infra Shelters · Sarjapur Road
4111.9%7.8%11.0%₹4,650 est.₹55.8 LUnder construction
Dec 2018
Shriram Chirping Grove
Shriram Properties · Sarjapur Road
418.9%5.6%7.3%₹12,000 est.₹3.18 CrReady
Prestige Tech Habitat
Prestige · Sarjapur Road
417.7%4.5%6.0%₹12,000 est.₹3.19 CrReady
Sobha Royal Pavilion Phase 3 - Wing 16
Sobha · Sarjapur Road
419.3%4.8%6.3%₹11,300 est.₹2.62 CrUnder construction
Jun 2024
Geown OASIS
Geown Properties · Sarjapur Road
418.9%5.8%7.4%₹9,000 est.₹1.94 CrReady
Soul Tree - Serinity
Modern Spaces · Sarjapur Road
409.3%6.4%7.8%₹8,450 est.₹33.0 LUnder construction
Mar 2023
SOBHA Crystal Meadows Phase 4 Wing 23 to 28
Sobha · Sarjapur Road
409.3%9.3%16.0%₹11,300 est.₹3.89 CrUnder construction
Dec 2033
Shravanthi Pragathi
Shravanthi · Sarjapur Road
4010.0%5.5%7.0%₹8,750 est.₹1.44 CrUnder construction
Mar 2019
Sobha Royal Pavilion Phase 1 - Wing 6 and 7
Sobha · Sarjapur Road
409.3%5.1%6.5%₹11,300 est.₹1.90 CrUnder construction
Jun 2024
Raaga By Bhavisha Homes
Bhavisha Properties · Sarjapur Road
409.3%5.5%6.8%₹8,450 est.₹85.8 LUnder construction
Dec 2025
SOBHA Crystal Meadows Phase 5 Wing 16 to 22
Sobha · Sarjapur Road
409.0%14.1%22.9%₹11,300 est.₹3.40 CrUnder construction
Dec 2035
Soulace by Modern Spaaces
Modern Spaces · Sarjapur Road
4010.8%6.8%9.7%₹4,650 est.₹84.2 LUnder construction
Dec 2024
Ashish Green B-Block
Aashish Developers · Sarjapur Road
409.3%5.7%7.1%₹8,450 est.₹68.4 LUnder construction
Sep 2023
Sai Metro City 7th Phase
Sai Reniit Projects · Sarjapur Road
4010.5%6.6%9.4%₹4,800 est.₹77.3 LUnder construction
Dec 2021
Assetz Trees & Tandem -Tower A
Assetz · Sarjapur Road
409.1%5.9%9.8%₹11,300 est.₹78.0 LUnder construction
May 2030
Platinum Phase 3
Confident Group · Sarjapur Road
3910.8%6.8%9.7%₹4,650 est.₹55.8 LUnder construction
Sep 2022
Geown Oasis Phase-3
Geown Properties · Sarjapur Road
3910.8%6.8%9.7%₹4,650 est.₹55.8 LUnder construction
Jun 2025
Leaves & Lives Phase 2
APG Intelli Homes · Sarjapur Road
399.3%4.6%5.9%₹8,450 est.₹2.66 CrUnder construction
Sep 2024
Bavisha Greenwoods
Bhavisha Properties · Sarjapur Road
399.3%5.7%7.1%₹8,450 est.₹70.1 LUnder construction
Mar 2022
Signature Pristine
Signature Dwellings · Sarjapur Road
399.3%5.7%7.0%₹8,450 est.₹71.0 LUnder construction
Dec 2025
Adarsh Sanctuary
Adarsh Developers · Sarjapur Road
399.3%4.8%6.3%₹11,300 est.₹2.54 CrUnder construction
Feb 2025
Arvind Forest Trails
Arvind SmartSpaces · Sarjapur Road
399.8%5.7%9.0%₹11,300 est.₹2.86 CrUnder construction
Jun 2029
WONDERWALL -Phase II, Block-1
Bricks & Milestones Projects · Sarjapur Road
389.3%5.4%6.7%₹8,450 est.₹88.7 LUnder construction
Mar 2025
Nvt Symphony Of Orchards
NVT Quality Lifestyle · Sarjapur Road
389.3%4.6%5.9%₹8,450 est.₹2.36 CrUnder construction
Feb 2026
Soul Tree - Nirvana
Modern Spaces · Sarjapur Road
389.3%6.2%7.6%₹8,450 est.₹45.2 LUnder construction
Dec 2023
Aryan Fountain Square
Aryan Hometec · Sarjapur Road
389.4%5.1%6.5%₹8,750 est.₹1.31 CrUnder construction
Apr 2018
Bhavisha Bentley Greens Phase 2
Bhavisha Properties · Sarjapur Road
389.3%5.3%6.7%₹8,450 est.₹96.8 LUnder construction
Jul 2022
Wonderwall
Bricks & Milestones Projects · Sarjapur Road
389.3%5.6%7.0%₹8,450 est.₹74.4 LUnder construction
Oct 2024
Divine Meadows
MAX Global Developers · Sarjapur Road
388.8%4.1%5.2%₹8,750 est.₹2.74 CrUnder construction
Aug 2026
Bhavisha Bentley goldberg phase 2
Bhavisha Properties · Sarjapur Road
379.3%5.5%6.8%₹8,450 est.₹85.8 LUnder construction
Oct 2024
Dain Tree
BSR Projects · Sarjapur Road
3710.8%6.8%9.7%₹4,650 est.₹81.6 LUnder construction
Sep 2025
Signature Meadows
Signature Dwellings · Sarjapur Road
379.3%5.8%7.2%₹8,450 est.₹61.7 LUnder construction
Dec 2024
Bhavisha Bentley Goldberg Phase-1
Bhavisha Properties · Sarjapur Road
379.3%5.7%7.1%₹8,450 est.₹69.7 LUnder construction
Dec 2023
Godrej Woodland
Godrej Properties · Sarjapur Road
3710.8%6.9%9.8%₹6,400 est.₹44.2 LUnder construction
Dec 2026
Rrl Nature Woods
RRL Builders & Developers · Sarjapur Road
379.3%6.0%7.4%₹8,450 est.₹55.3 LUnder construction
Dec 2024
Leaves & Lives Phase 1
APG Intelli Homes · Sarjapur Road
369.3%4.6%5.9%₹8,450 est.₹2.51 CrUnder construction
Apr 2023
Soul Tree - Bliss
Modern Spaces · Sarjapur Road
369.3%5.9%7.3%₹8,450 est.₹57.9 LUnder construction
Feb 2024
302 West
Modern Spaces · Sarjapur Road
369.3%5.5%6.9%₹8,450 est.₹83.7 LUnder construction
Jul 2023
Axis Niran
Axis Concept Construction · Sarjapur Road
369.4%5.4%7.9%₹8,450 est.₹87.5 LUnder construction
Sep 2028
Peninsula Park Elite Phase III
Peninsula Land · Sarjapur Road
3610.8%6.9%9.8%₹7,600 est.₹91.2 LUnder construction
Sep 2024
The County Address Phase 2
Indiabuild Realty · Sarjapur Road
3510.8%6.8%9.7%₹4,650 est.₹90.7 LUnder construction
Mar 2025
77 East Phase 2 By Modern Spaaces Ventures
Modern Spaces · Sarjapur Road
359.3%5.1%6.5%₹8,450 est.₹1.15 CrUnder construction
Dec 2022
Sai Metro City Ph 6
Sai Reniit Projects · Sarjapur Road
3510.8%6.8%9.7%₹4,650 est.₹55.8 LUnder construction
Feb 2020
Confident Square
Confident Group · Sarjapur Road
349.3%5.2%6.5%₹8,450 est.₹1.13 CrUnder construction
Oct 2024
The Prestige City - Avalon Park
Prestige · Sarjapur Road
349.3%5.1%6.6%₹11,300 est.₹1.82 CrUnder construction
Feb 2025
Modern Spaces Felicity Engrace 1
Modern Spaces · Sarjapur Road
349.3%5.3%6.6%₹8,450 est.₹1.04 CrUnder construction
Jun 2025
SNR Verity
SNR Square · Sarjapur Road
348.9%6.1%7.8%₹9,000 est.₹1.35 CrReady
Bhavisha Bilva
Bhavisha Properties · Sarjapur Road
349.3%4.9%6.2%₹8,450 est.₹1.63 CrUnder construction
Dec 2024
Ars Singature Homes
ARS Infraa · Sarjapur Road
339.3%5.0%6.4%₹8,450 est.₹1.35 CrUnder construction
Oct 2023
Sowparnika Flamenco
Sowparnika · Sarjapur Road
339.3%6.0%7.3%₹8,450 est.₹52.8 LUnder construction
Sep 2022
Aspen Greens @ The Prestige City
Prestige · Sarjapur Road
339.3%4.7%6.2%₹11,300 est.₹3.57 CrUnder construction
Apr 2025
Godrej 24
Godrej Properties · Sarjapur Road
329.3%5.2%6.7%₹11,300 est.₹1.70 CrUnder construction
Jun 2025
Sai Metrocity 8th Phase
Sai Reniit Projects · Sarjapur Road
3210.8%6.8%9.7%₹4,650 est.₹1.31 CrUnder construction
Jun 2025
Sai Metro city 5th phase
Sai Reniit Projects · Sarjapur Road
3210.8%6.8%9.7%₹4,650 est.₹55.8 LUnder construction
Jun 2023
77 East
Modern Spaces · Sarjapur Road
309.3%5.1%6.4%₹8,450 est.₹1.27 CrUnder construction
Jan 2023
Snr Magnolia Park
SNR Square · Sarjapur Road
309.3%5.3%6.7%₹8,450 est.₹96.8 LUnder construction
Jul 2022
Saiven Silver Oaks
Saiven Developers · Sarjapur Road
299.3%5.1%6.4%₹8,450 est.₹1.27 CrUnder construction
Apr 2022
Sowparnika Pragati
Sowparnika · Sarjapur Road
289.3%5.3%6.7%₹8,450 est.₹98.0 LUnder construction
Mar 2025
Snr Safa
SNR Square · Sarjapur Road
279.3%5.4%6.7%₹8,450 est.₹88.7 LUnder construction
Feb 2025
Iconest4
Icon Infra Shelters · Sarjapur Road
269.3%5.7%7.0%₹8,450 est.₹68.9 LUnder construction
Apr 2023
Peninsula Paramount
Peninsula Land · Sarjapur Road
239.3%5.0%6.6%₹13,800 est.₹2.07 CrUnder construction
Jan 2023

Price per sq ft in Sarjapur Road: what the evidence says

Date₹ / sq ftBasisConfidence
2021-06₹6,050blr (derived)40%
2023-06₹8,000blr (derived)45%
2025-06₹10,800blr (derived)50%
2026-06₹12,000blr (derived)50%

That is 14.7% a year from 2021-06 to 2026-06. The model projects 9.8% a year from here; the growth story on each project page shows why.

Supply and demand from RERA filings

Registered projects
204
72 under construction
Homes filed
67,759
13,146 unsold
Sales pace
722 / month
homes booked per month
New supply ratio
1.34
new launches ÷ sales; above 1 = supply building

Karnataka RERA, 2026-09. Months of inventory = unsold homes ÷ monthly sales.

Infrastructure pipeline

ProjectTypeStatusExpectedChance it lands on timePrice effect if it does
Phase 3A Sarjapur–Hebbalmetroplanned203345%+1.5% / yr
Peripheral Ring Roadroadplanned203040%+0.6% / yr
Cauvery Stage V waterutilityconstruction202770%+0.5% / yr
Bengaluru suburban rail (K-RIDE)railconstruction202950%+0.6% / yr

The growth model counts each event at its probability, not its promise. Dates are the latest public schedule.

Developers active in Sarjapur Road

Ranked lists for Sarjapur Road

Sarjapur Road compared with other areas

Questions people ask

Is Sarjapur Road good for investment?

On PropertyLens's model the median analysed project in Sarjapur Road scores 49/100 (below the Bengaluru average), with projected price growth of 9.8% a year over five years, median price ₹8,450 per sq ft and gross rental yield 3.4%. 284 RERA-registered projects analysed as of September 11, 2026. The best-scored project is Godrej Lakeside Orchard at 72.

What is the price per sq ft in Sarjapur Road?

Median ₹8,450 per sq ft of super built-up area across analysed projects, modelled from comparables where developers file no price. Entry price for an analysed home is about ₹33.0 L; the median home is ₹88.7 L.

What rental yield can I expect in Sarjapur Road?

Median gross yield 3.4% on the all-in cost of an analysed home, before maintenance, vacancy and tax. Net-wealth CAGR after every cost on an 8-year hold with a 75% loan is 6.3% at the median.

Are projects in Sarjapur Road delayed?

117 of 209 under-construction projects are past the completion date in their original RERA registration, and unsold stock equals about 20 months of sales. Each project page shows extensions, construction against bookings and complaints.

Scores and projections are model outputs built from dated public evidence (Karnataka RERA filings, promoter quarterly updates, complaint registers, public ratings) and stated assumptions. They are research, not investment advice. How the numbers are built.