Is Sarjapur Road good for investment?
284 RERA-registered projects scored on one model, as of September 11, 2026. Prices, growth, yields, supply and the best-scored homes.
Sarjapur Road in one paragraph
On PropertyLens's model, Sarjapur Road is an average place to buy in Bengaluru right now: the median analysed project scores 49/100 (below the Bengaluru average), with projected price growth of 9.8% a year over five years and a median gross rental yield of 3.4%. Unsold homes would take about 20 months to absorb at the current sales pace, which is heavy supply and caps near-term price growth. 117 of 209 under-construction projects here are past their original RERA completion date, so weight the developer's record heavily.
Median of 284 projects; the spread inside the area is wide, so the ranked list below matters more than the average.
Best-scored projects in Sarjapur Road
All 284 analysed projects in Sarjapur Road
| Project | Score | Growth / yr | Net-wealth CAGR | Cash-flow IRR | Price / sq ft | Price | Status |
|---|---|---|---|---|---|---|---|
| Godrej Lakeside Orchard Godrej Properties · Sarjapur Road | 72 | 10.8% | 7.5% | 12.4% | ₹11,300 est. | ₹46.3 L | Under construction Sep 2030 |
| Birla Evara Birla Estates · Sarjapur Road | 71 | 11.0% | 8.7% | 15.9% | ₹11,300 est. | ₹72.3 L | Under construction Dec 2031 |
| Mythri Street Mythri Builders · Sarjapur Road | 71 | 10.9% | 7.4% | 12.3% | ₹8,450 est. | ₹88.7 L | Under construction Dec 2029 |
| Mythri Sity Mythri Builders · Sarjapur Road | 69 | 10.6% | 6.8% | 10.6% | ₹8,450 est. | ₹57.9 L | Under construction Aug 2029 |
| The Earthscape Phase-1 Bricks & Milestones Projects · Sarjapur Road | 68 | 10.6% | 6.6% | 11.1% | ₹8,450 est. | ₹1.08 Cr | Under construction Aug 2030 |
| Mythri Sikharam Mythri Builders · Sarjapur Road | 67 | 10.6% | 7.0% | 10.8% | ₹8,450 est. | ₹83.7 L | Under construction Mar 2029 |
| Mana Dale Mana Projects · Sarjapur Road | 66 | 10.2% | 7.6% | 15.2% | ₹8,450 est. | ₹1.18 Cr | Under construction Dec 2032 |
| Mana Vista Mana Projects · Sarjapur Road | 66 | 10.8% | 7.5% | 13.3% | ₹8,450 est. | ₹84.9 L | Under construction Dec 2030 |
| Elanza Lodha (Macrotech) · Sarjapur Road | 65 | 11.2% | 7.8% | 13.9% | ₹13,800 est. | ₹1.81 Cr | Under construction Sep 2031 |
| JRC Wild Woods building 2 JRC Projects · Sarjapur Road | 65 | 11.0% | 7.3% | 10.5% | ₹8,450 est. | ₹78.6 L | Under construction Mar 2028 |
| Rohan Ekanta Phase 3 Rohan Builders · Sarjapur Road | 65 | 10.1% | 6.7% | 10.5% | ₹11,650 est. | ₹1.23 Cr | Under construction Dec 2028 |
| Abhee Aaria Abhee Ventures · Sarjapur Road | 65 | 10.4% | 7.0% | 12.4% | ₹8,450 est. | ₹49.4 L | Under construction May 2031 |
| Haven Phase 2 Lodha (Macrotech) · Sarjapur Road | 65 | 10.2% | 6.7% | 11.2% | ₹13,800 est. | ₹1.98 Cr | Under construction Jun 2030 |
| Mana Dale South -1 Mana Projects · Sarjapur Road | 64 | 10.3% | 6.9% | 11.5% | ₹8,450 est. | ₹95.1 L | Under construction Nov 2029 |
| Fernvale @ The Prestige City Prestige · Sarjapur Road | 64 | 11.3% | 7.9% | 13.1% | ₹11,300 est. | ₹1.15 Cr | Under construction Mar 2030 |
| The Right Life Neobuild Ventures · Sarjapur Road | 64 | 10.2% | 15.2% | 24.5% | ₹8,450 est. | ₹92.1 L | Under construction Dec 2035 |
| Orchid Life Goyal & Co · Sarjapur Road | 64 | 10.0% | 6.8% | 11.3% | ₹11,650 est. | ₹97.9 L | Under construction Feb 2030 |
| Mana Skanda The Right Life T45 Neobuild Ventures · Sarjapur Road | 64 | 10.5% | 6.6% | 11.0% | ₹8,450 est. | ₹1.08 Cr | Under construction Jun 2030 |
| Assetz Inspira Melodies of Life Assetz · Sarjapur Road | 64 | 10.4% | 6.4% | 9.0% | ₹6,600 est. | ₹39.6 L | Ready |
| Eaton Park @ The Prestige City Prestige · Sarjapur Road | 63 | 11.3% | 7.5% | 12.6% | ₹11,300 est. | ₹1.83 Cr | Under construction Jun 2030 |
| Prestige Serenity Shores Prestige · Sarjapur Road | 63 | 9.4% | 6.0% | 8.3% | ₹11,650 est. | ₹72.8 L | Under construction Aug 2027 |
| Confident Beverly Hills Confident Group · Sarjapur Road | 63 | 10.4% | 6.3% | 9.0% | ₹4,950 est. | ₹59.4 L | Ready |
| Mana Skanda The Right Life T789 Neobuild Ventures · Sarjapur Road | 63 | 10.5% | 7.0% | 11.7% | ₹8,450 est. | ₹89.1 L | Under construction Dec 2029 |
| The Adwaith By Sanjeevini Sanjeevini · Sarjapur Road | 63 | 10.4% | 7.2% | 11.1% | ₹8,450 est. | ₹54.1 L | Under construction Dec 2028 |
| Nambiar District 25 Phase 1 Nambiar Builders · Sarjapur Road | 62 | 11.1% | 7.5% | 12.4% | ₹8,450 est. | ₹91.3 L | Under construction Jan 2030 |
| Paradise at Brigade Cornerstone Utopia Brigade Group · Sarjapur Road | 62 | 8.9% | 7.2% | 9.0% | ₹12,000 est. | ₹58.8 L | Ready |
| Nambiar District 25 Phase 2 Nambiar Builders · Sarjapur Road | 62 | 11.1% | 7.1% | 11.9% | ₹8,450 est. | ₹95.9 L | Under construction Aug 2030 |
| Central Avenue Phase 3 Pionier Projects · Sarjapur Road | 62 | 11.2% | 8.2% | 13.0% | ₹4,650 est. | ₹56.0 L | Under construction Nov 2027 |
| Sunrise Corporate Leisure & Property Developments · Sarjapur Road | 62 | 10.8% | 7.3% | 9.3% | ₹8,450 est. | ₹52.4 L | Under construction Dec 2026 |
| The Woods Of East Phase VIII Odion Builders & Developers · Sarjapur Road | 61 | 11.9% | 7.8% | 11.0% | ₹4,650 est. | ₹35.1 L | Under construction Dec 2025 |
| Greenbay Pionier Projects · Sarjapur Road | 61 | 11.2% | 8.2% | 13.0% | ₹4,650 est. | ₹55.8 L | Under construction May 2028 |
| Peninsula Pinewoods Phase - 2 Peninsula Land · Sarjapur Road | 60 | 10.4% | 6.4% | 9.0% | ₹8,100 est. | ₹97.2 L | Ready |
| Mana Verdant Terraces Mana Projects · Sarjapur Road | 60 | 10.2% | 7.2% | 13.7% | ₹8,450 est. | ₹1.65 Cr | Under construction Dec 2031 |
| Rohan Ekanta Phase 2 Rohan Builders · Sarjapur Road | 60 | 9.2% | 6.6% | 8.4% | ₹12,000 est. | ₹1.28 Cr | Ready |
| Assetz Inspira Melodies of Life Apartments Assetz · Sarjapur Road | 60 | 10.3% | 7.2% | 12.7% | ₹11,300 est. | ₹1.92 Cr | Under construction Nov 2030 |
| The Woods Of East Odion Builders & Developers · Sarjapur Road | 60 | 12.1% | 7.9% | 11.2% | ₹4,650 est. | ₹55.8 L | Under construction Mar 2018 |
| Rohan Ekanta Phase 1 Rohan Builders · Sarjapur Road | 60 | 9.0% | 7.0% | 8.8% | ₹12,000 est. | ₹77.4 L | Ready |
| Brigade Parkside East Brigade Group · Sarjapur Road | 59 | 8.9% | 6.0% | 7.8% | ₹12,000 est. | ₹1.80 Cr | Ready |
| Godrej Park Retreat Phase 2 Godrej Properties · Sarjapur Road | 59 | 9.4% | 5.7% | 8.4% | ₹11,650 est. | ₹1.12 Cr | Under construction Jun 2028 |
| Grc Subhiksha Phase 2 GRC Infra · Sarjapur Road | 58 | 8.9% | 7.1% | 8.8% | ₹9,000 est. | ₹55.4 L | Ready |
| Rrl Palm Altezze RRL Builders & Developers · Sarjapur Road | 58 | 10.7% | 6.7% | 11.3% | ₹8,450 est. | ₹87.9 L | Under construction Sep 2030 |
| Godrej Park Retreat Godrej Properties · Sarjapur Road | 58 | 9.0% | 7.2% | 9.0% | ₹12,000 est. | ₹63.0 L | Ready |
| Abhee Nakshatra Abhee Ventures · Sarjapur Road | 58 | 8.9% | 6.1% | 7.8% | ₹9,000 est. | ₹1.35 Cr | Ready |
| Gr Sunshine Corporate Leisure & Property Developments · Sarjapur Road | 57 | 8.9% | 6.4% | 8.1% | ₹9,000 est. | ₹97.7 L | Ready |
| Trifecta Retto Trifecta · Sarjapur Road | 57 | 10.8% | 6.8% | 8.5% | ₹8,450 est. | ₹84.1 L | Under construction Mar 2026 |
| Pionier Lifestyle + Ext Pionier Projects · Sarjapur Road | 57 | 12.1% | 7.9% | 11.2% | ₹4,650 est. | ₹55.8 L | Under construction Dec 2022 |
| Sj Classique SJ Constructions · Sarjapur Road | 57 | 10.1% | 6.0% | 9.5% | ₹8,450 est. | ₹88.3 L | Under construction Sep 2029 |
| Trifecta Vanto Phase-2 Trifecta · Sarjapur Road | 57 | 9.7% | 5.8% | 8.5% | ₹8,450 est. | ₹1.26 Cr | Under construction Mar 2028 |
| The Woods Of East Phase VII Odion Builders & Developers · Sarjapur Road | 57 | 11.0% | 7.0% | 10.0% | ₹4,800 est. | ₹69.4 L | Under construction Mar 2024 |
| Assetz Trees & Tandem -Tower B Assetz · Sarjapur Road | 57 | 10.4% | 6.3% | 10.0% | ₹11,300 est. | ₹2.19 Cr | Under construction Aug 2029 |
| Jrc Wild Woods JRC Projects · Sarjapur Road | 57 | 10.8% | 6.7% | 8.4% | ₹8,450 est. | ₹98.9 L | Under construction Mar 2026 |
| Suncity Gloria Corporate Leisure & Property Developments · Sarjapur Road | 57 | 8.9% | 6.4% | 8.1% | ₹9,000 est. | ₹1.05 Cr | Ready |
| GRC Subhiksha GRC Infra · Sarjapur Road | 57 | 8.9% | 6.5% | 8.2% | ₹9,000 est. | ₹88.2 L | Ready |
| Bhavisha Gardeniaa Phase-4 Bhavisha Properties · Sarjapur Road | 56 | 10.2% | 6.4% | 8.2% | ₹8,750 est. | ₹73.9 L | Under construction Dec 2026 |
| Millenia Muthanallur Nambiar Builders · Sarjapur Road | 56 | 8.8% | 7.1% | 8.8% | ₹9,000 est. | ₹53.5 L | Ready |
| Vaishno Lotus Vaishno Builders · Sarjapur Road | 56 | 8.9% | 6.1% | 7.8% | ₹9,000 est. | ₹1.35 Cr | Ready |
| Sobha Altair Sobha · Sarjapur Road | 56 | 10.6% | 7.2% | 12.8% | ₹11,300 est. | ₹1.96 Cr | Under construction May 2031 |
| Manyata Ekamoi Manyata Developers · Sarjapur Road | 56 | 11.0% | 8.6% | 14.1% | ₹4,800 est. | ₹57.6 L | Under construction Dec 2028 |
| Prestige Lakeside Habitat Prestige · Sarjapur Road | 56 | 8.9% | 5.9% | 7.7% | ₹12,000 est. | ₹2.09 Cr | Ready |
| Spectra Mira Spectra Constructions · Sarjapur Road | 56 | 10.4% | 6.3% | 9.0% | ₹4,950 est. | ₹72.0 L | Ready |
| Abhee Celestial City Abhee Ventures · Sarjapur Road | 56 | 9.6% | 5.7% | 8.9% | ₹8,450 est. | ₹92.1 L | Under construction Jun 2029 |
| Garden Breeze @ The Prestige City Prestige · Sarjapur Road | 56 | 10.7% | 7.8% | 13.6% | ₹11,300 est. | ₹1.14 Cr | Under construction Nov 2030 |
| Adithya Homes Paradise Adithya Homes · Sarjapur Road | 56 | 10.4% | 6.3% | 9.0% | ₹4,950 est. | ₹59.4 L | Ready |
| Serene at Brigade Cornerstone Utopia Brigade Group · Sarjapur Road | 55 | 8.9% | 6.0% | 7.8% | ₹12,000 est. | ₹1.80 Cr | Ready |
| Psr Platinum PSR Builders & Developers · Sarjapur Road | 55 | 10.1% | 6.7% | 11.1% | ₹8,450 est. | ₹88.3 L | Under construction Dec 2029 |
| Abhee City Urban Glenn Phase I Abhee Ventures · Sarjapur Road | 55 | 9.9% | 9.8% | 16.9% | ₹8,450 est. | ₹90.4 L | Under construction Dec 2033 |
| Psr Vanasree Phase-II PSR Builders & Developers · Sarjapur Road | 55 | 10.1% | 6.6% | 9.6% | ₹8,450 est. | ₹85.3 L | Under construction Dec 2027 |
| Manyata Ekamara Manyata Developers · Sarjapur Road | 55 | 10.4% | 6.3% | 9.0% | ₹4,950 est. | ₹59.4 L | Ready |
| Satori Residence By Genurise MAX Global Developers · Sarjapur Road | 55 | 9.7% | 5.9% | 9.9% | ₹8,450 est. | ₹83.7 L | Under construction Jun 2030 |
| Trifecta Vanto Phase-1 Trifecta · Sarjapur Road | 55 | 8.9% | 5.5% | 7.4% | ₹8,750 est. | ₹52.5 L | Under construction Aug 2027 |
| Casa Life By Bhavisha Homes Bhavisha Properties · Sarjapur Road | 55 | 10.4% | 6.3% | 9.0% | ₹4,950 est. | ₹59.4 L | Ready |
| NCC Urban Green Province Phase 2 NCC Urban · Sarjapur Road | 55 | 10.9% | 8.0% | 12.6% | ₹6,400 est. | ₹1.44 Cr | Under construction Aug 2028 |
| NCC Urban Green Province NCC Urban · Sarjapur Road | 55 | 10.4% | 6.4% | 9.0% | ₹6,600 est. | ₹2.86 Cr | Ready |
| Prestige Great Acres Prestige · Sarjapur Road | 55 | 10.4% | 6.4% | 9.0% | ₹6,600 est. | ₹76.9 L | Ready |
| Morefields By Manyata Manyata Developers · Sarjapur Road | 54 | 10.4% | 6.3% | 9.0% | ₹4,950 est. | ₹59.4 L | Ready |
| 36 Park Avenue Phase III R K Developers · Sarjapur Road | 54 | 10.4% | 6.3% | 9.0% | ₹4,950 est. | ₹74.3 L | Ready |
| Godrej Regent Park Godrej Properties · Sarjapur Road | 54 | 10.5% | 7.1% | 12.6% | ₹11,300 est. | ₹1.25 Cr | Under construction Jul 2031 |
| Adithya Homes Paradise Phase-4 Adithya Homes · Sarjapur Road | 54 | 10.4% | 6.3% | 9.0% | ₹4,950 est. | ₹59.4 L | Ready |
| Ozone Kns Oasis KNS Infrastructure · Sarjapur Road | 54 | 10.4% | 6.3% | 9.0% | ₹4,950 est. | ₹1.45 Cr | Ready |
| Arcadia Corporate Leisure & Property Developments · Sarjapur Road | 54 | 10.1% | 6.1% | 7.6% | ₹8,750 est. | ₹1.01 Cr | Under construction Dec 2019 |
| The Grand County Address Indiabuild Realty · Sarjapur Road | 54 | 12.0% | 9.6% | 15.7% | ₹4,650 est. | ₹69.8 L | Under construction Dec 2028 |
| Ellegenza Phase I Extension-2 Nambiar Builders · Sarjapur Road | 54 | 10.4% | 6.3% | 9.0% | ₹4,950 est. | ₹96.8 L | Ready |
| Ranka PalmLakeside Ranka · Sarjapur Road | 54 | 10.7% | 6.8% | 9.6% | ₹4,800 est. | ₹57.6 L | Under construction Dec 2022 |
| Ahad Opus Ahad Builders · Sarjapur Road | 53 | 8.9% | 6.1% | 7.8% | ₹9,000 est. | ₹1.35 Cr | Ready |
| Confident Platinum Phase II Confident Group · Sarjapur Road | 53 | 10.4% | 6.3% | 9.0% | ₹4,950 est. | ₹59.4 L | Ready |
| Mana Tropicale Mana Projects · Sarjapur Road | 53 | 8.9% | 6.2% | 7.9% | ₹9,000 est. | ₹1.20 Cr | Ready |
| Mana Skanda The Right Life T6 Neobuild Ventures · Sarjapur Road | 53 | 9.9% | 5.7% | 9.8% | ₹8,450 est. | ₹2.20 Cr | Under construction Jun 2030 |
| Grc Savora GRC Infra · Sarjapur Road | 53 | 10.1% | 6.4% | 9.9% | ₹8,450 est. | ₹1.04 Cr | Under construction Mar 2029 |
| Ashish Green Aashish Developers · Sarjapur Road | 53 | 8.9% | 7.0% | 8.7% | ₹9,000 est. | ₹57.6 L | Ready |
| 63 Degree East - Tower E APG Intelli Homes · Sarjapur Road | 53 | 9.3% | 5.1% | 6.7% | ₹8,750 est. | ₹1.17 Cr | Under construction Dec 2026 |
| Bren Champions Square Bren Corporation · Sarjapur Road | 53 | 8.9% | 6.0% | 7.8% | ₹12,000 est. | ₹1.80 Cr | Ready |
| Dsr The Address DSR Infrastructure · Sarjapur Road | 53 | 9.8% | 6.3% | 9.7% | ₹8,450 est. | ₹53.2 L | Under construction Jun 2029 |
| Geown Oasis Phase-2 Geown Properties · Sarjapur Road | 53 | 10.4% | 6.3% | 9.0% | ₹4,950 est. | ₹59.4 L | Ready |
| Confident Platinum Confident Group · Sarjapur Road | 53 | 10.4% | 6.3% | 9.0% | ₹4,950 est. | ₹59.4 L | Ready |
| 36 Park Avenue Phase-II R K Developers · Sarjapur Road | 53 | 10.4% | 6.3% | 9.0% | ₹4,950 est. | ₹59.4 L | Ready |
| Nambiar District 25 Phase 3 Nambiar Builders · Sarjapur Road | 53 | 10.0% | 7.1% | 13.5% | ₹8,450 est. | ₹1.01 Cr | Under construction Feb 2032 |
| Sterlling Aveenue Pionier Projects · Sarjapur Road | 53 | 10.8% | 6.8% | 9.7% | ₹4,650 est. | ₹55.8 L | Under construction Mar 2024 |
| Psr Vanasree Phase-1 PSR Builders & Developers · Sarjapur Road | 53 | 8.5% | 6.8% | 8.4% | ₹9,000 est. | ₹52.2 L | Ready |
| Trifecta Veranza Trifecta · Sarjapur Road | 53 | 10.1% | 6.7% | 11.1% | ₹8,450 est. | ₹84.1 L | Under construction Dec 2029 |
| Candeur Landmark Candeur Constructions · Sarjapur Road | 52 | 8.9% | 6.1% | 7.8% | ₹9,000 est. | ₹1.35 Cr | Ready |
| Bilva Phase-II By Bhavisha Homes Bhavisha Properties · Sarjapur Road | 52 | 10.6% | 6.8% | 9.2% | ₹8,450 est. | ₹96.3 L | Under construction Apr 2027 |
| Ruchira Villa Feliz Ruchira Developers · Sarjapur Road | 52 | 10.8% | 7.8% | 12.4% | ₹4,800 est. | ₹78.5 L | Under construction Dec 2027 |
| Geown Oasis Phase - 2a Geown Properties · Sarjapur Road | 52 | 12.1% | 7.9% | 11.2% | ₹4,650 est. | ₹55.8 L | Under construction Sep 2026 |
| The Woods Of East - Phase -V Odion Builders & Developers · Sarjapur Road | 52 | 10.8% | 6.8% | 9.7% | ₹4,650 est. | ₹52.5 L | Under construction Jul 2025 |
| Adithya Homes Elite Sobha · Sarjapur Road | 52 | 10.4% | 6.4% | 9.0% | ₹6,600 est. | ₹79.2 L | Ready |
| NCC Urban Green Province One NCC Urban · Sarjapur Road | 52 | 12.1% | 7.9% | 11.2% | ₹6,200 est. | ₹1.25 Cr | Under construction Dec 2025 |
| Greendales Phase II Pionier Projects · Sarjapur Road | 52 | 10.8% | 6.8% | 9.7% | ₹4,650 est. | ₹55.8 L | Under construction Nov 2025 |
| V R Royal Homes VR Ventures · Sarjapur Road | 52 | 11.0% | 8.0% | 12.8% | ₹4,800 est. | ₹57.6 L | Under construction Dec 2027 |
| Mapple Avvenue Pionier Projects · Sarjapur Road | 52 | 10.8% | 6.8% | 9.7% | ₹4,650 est. | ₹54.9 L | Under construction Sep 2023 |
| Tanmathra Meadows Shriram Properties · Sarjapur Road | 52 | 10.8% | 6.3% | 8.1% | ₹11,300 est. | ₹2.35 Cr | Under construction Dec 2019 |
| Silverlane Pionier Projects · Sarjapur Road | 52 | 10.8% | 6.8% | 9.7% | ₹4,650 est. | ₹55.8 L | Under construction Dec 2025 |
| S S Prakruthi Meadows Prakruthi · Sarjapur Road | 52 | 10.4% | 6.8% | 10.6% | ₹8,450 est. | ₹1.03 Cr | Under construction Dec 2028 |
| Maitree Vajra Maitree Developers · Sarjapur Road | 52 | 9.8% | 5.8% | 8.5% | ₹8,450 est. | ₹1.42 Cr | Under construction Mar 2028 |
| Macasa Emerald Mana Projects · Sarjapur Road | 51 | 8.6% | 6.3% | 8.0% | ₹9,000 est. | ₹85.5 L | Ready |
| The Woods Of East Phase -4 Odion Builders & Developers · Sarjapur Road | 51 | 10.8% | 6.8% | 9.7% | ₹4,650 est. | ₹55.8 L | Under construction Nov 2023 |
| Ellegenza Phase I Extension Nambiar Builders · Sarjapur Road | 51 | 10.8% | 7.3% | 11.1% | ₹4,650 est. | ₹81.4 L | Under construction Mar 2027 |
| Mythri Signature Mythri Builders · Sarjapur Road | 51 | 9.3% | 5.5% | 6.8% | ₹8,450 est. | ₹87.5 L | Under construction Jun 2026 |
| Saritha Serene Saritha Developers · Sarjapur Road | 51 | 8.6% | 6.4% | 8.0% | ₹9,000 est. | ₹77.0 L | Ready |
| Ahad Meadows Ahad Builders · Sarjapur Road | 51 | 8.9% | 6.1% | 7.8% | ₹9,000 est. | ₹1.35 Cr | Ready |
| Dsr Highland Greenz DSR Infrastructure · Sarjapur Road | 51 | 8.7% | 6.3% | 7.9% | ₹9,000 est. | ₹91.3 L | Ready |
| Brigade Gem Brigade Group · Sarjapur Road | 51 | 9.3% | 5.4% | 7.0% | ₹11,300 est. | ₹1.23 Cr | Under construction Aug 2024 |
| SOBHA Crystal Meadows Phase 2 Wing 7 and 8 Sobha · Sarjapur Road | 51 | 9.9% | 6.9% | 12.1% | ₹11,300 est. | ₹48.6 L | Under construction Jun 2031 |
| Bavisha Gardeniaa Phase 3 Bhavisha Properties · Sarjapur Road | 51 | 8.9% | 7.1% | 8.8% | ₹9,000 est. | ₹52.6 L | Ready |
| Bavisha Gardeniaa Phase 2 Bhavisha Properties · Sarjapur Road | 50 | 8.9% | 6.8% | 8.4% | ₹9,000 est. | ₹72.9 L | Ready |
| Engrace Vista Modern Spaces · Sarjapur Road | 50 | 9.8% | 5.9% | 9.3% | ₹8,450 est. | ₹1.48 Cr | Under construction Dec 2028 |
| Abhee Siliconshine Abhee Ventures · Sarjapur Road | 50 | 8.7% | 5.5% | 6.7% | ₹8,750 est. | ₹55.6 L | Under construction Aug 2026 |
| Bhavisha Bentley Greens Bhavisha Properties · Sarjapur Road | 50 | 8.9% | 6.7% | 8.4% | ₹9,000 est. | ₹73.3 L | Ready |
| Sipani City Phase-1 Sipani · Sarjapur Road | 50 | 10.2% | 7.1% | 12.5% | ₹8,450 est. | ₹55.3 L | Under construction Dec 2030 |
| Ars Zurich Phase-2 ARS Infraa · Sarjapur Road | 50 | 10.2% | 6.3% | 8.1% | ₹8,450 est. | ₹81.5 L | Under construction Dec 2026 |
| Grc Shreekrish GRC Infra · Sarjapur Road | 50 | 8.8% | 4.7% | 6.1% | ₹8,750 est. | ₹1.23 Cr | Under construction Dec 2026 |
| Peninsula Park Elite Peninsula Land · Sarjapur Road | 50 | 10.4% | 6.4% | 9.0% | ₹8,100 est. | ₹97.2 L | Ready |
| East Avvenue Pionier Projects · Sarjapur Road | 50 | 10.8% | 6.8% | 9.7% | ₹4,650 est. | ₹46.7 L | Under construction Dec 2024 |
| Central Avenuue Pionier Projects · Sarjapur Road | 50 | 10.8% | 6.8% | 9.7% | ₹4,650 est. | ₹55.8 L | Under construction Dec 2024 |
| Orchard Avenue Pionier Projects · Sarjapur Road | 50 | 10.8% | 6.8% | 9.7% | ₹4,650 est. | ₹45.1 L | Under construction Sep 2024 |
| Greendales Pionier Projects · Sarjapur Road | 50 | 10.8% | 6.8% | 9.7% | ₹4,650 est. | ₹55.8 L | Under construction Nov 2023 |
| The Woods Of East Phase 3 Odion Builders & Developers · Sarjapur Road | 50 | 10.8% | 6.8% | 9.7% | ₹4,650 est. | ₹55.8 L | Under construction Sep 2021 |
| Sobha Royal Pavilion Phase 5 - Wing 8 and 9 Sobha · Sarjapur Road | 50 | 8.9% | 5.9% | 7.7% | ₹12,000 est. | ₹2.02 Cr | Ready |
| 63 Degree East - Tower C & D APG Intelli Homes · Sarjapur Road | 49 | 10.8% | 6.5% | 8.1% | ₹8,450 est. | ₹1.27 Cr | Under construction Mar 2021 |
| Daintree 3 BSR Projects · Sarjapur Road | 49 | 12.1% | 7.9% | 11.3% | ₹4,650 est. | ₹81.4 L | Under construction Feb 2027 |
| Signature Premier Signature Dwellings · Sarjapur Road | 49 | 9.6% | 5.7% | 8.3% | ₹8,750 est. | ₹1.24 Cr | Under construction Mar 2028 |
| Leafy Avenue Leafy Realty · Sarjapur Road | 49 | 10.4% | 6.9% | 10.7% | ₹8,450 est. | ₹82.8 L | Under construction Dec 2028 |
| Meridian Park Phase I @ The Prestige City Prestige · Sarjapur Road | 49 | 8.9% | 6.1% | 7.9% | ₹12,000 est. | ₹1.61 Cr | Ready |
| Engrace 4 Modern Spaces · Sarjapur Road | 49 | 9.8% | 5.4% | 7.0% | ₹8,750 est. | ₹1.40 Cr | Under construction Dec 2026 |
| Ahad Excellencia Ahad Builders · Sarjapur Road | 49 | 8.9% | 6.1% | 7.8% | ₹9,000 est. | ₹1.35 Cr | Ready |
| Candeur Signature Candeur Constructions · Sarjapur Road | 49 | 9.3% | 5.0% | 6.9% | ₹8,450 est. | ₹1.27 Cr | Under construction Sep 2027 |
| Aston Park @ The Prestige City Prestige · Sarjapur Road | 49 | 9.4% | 5.5% | 7.1% | ₹11,650 est. | ₹1.25 Cr | Under construction Sep 2026 |
| Bavisha Greystone Bhavisha Properties · Sarjapur Road | 49 | 9.3% | 5.8% | 7.2% | ₹8,450 est. | ₹63.0 L | Under construction Aug 2022 |
| 36 Park Avenue R K Developers · Sarjapur Road | 49 | 12.1% | 7.9% | 11.2% | ₹4,650 est. | ₹54.9 L | Under construction Jul 2024 |
| Silver Dale Pionier Projects · Sarjapur Road | 48 | 10.8% | 6.8% | 9.7% | ₹4,650 est. | ₹54.9 L | Under construction May 2025 |
| Eden Park @ The Prestige City Prestige · Sarjapur Road | 48 | 8.9% | 6.6% | 8.4% | ₹12,000 est. | ₹96.6 L | Ready |
| Sobha Royal Pavilion Phase 6 - Wing 10 and 11 Sobha · Sarjapur Road | 48 | 8.9% | 5.9% | 7.7% | ₹12,000 est. | ₹1.99 Cr | Ready |
| Dsr The Courtyard DSR Infrastructure · Sarjapur Road | 48 | 8.8% | 4.8% | 6.2% | ₹8,750 est. | ₹85.8 L | Under construction Feb 2027 |
| Pionier Lifestyle Phase 2 Pionier Projects · Sarjapur Road | 48 | 10.8% | 6.8% | 9.7% | ₹4,650 est. | ₹55.8 L | Under construction Aug 2022 |
| Sobha Royal Pavilion Phase 7 - Wing 12, 13 and 14 Sobha · Sarjapur Road | 48 | 8.9% | 5.9% | 7.7% | ₹12,000 est. | ₹2.00 Cr | Ready |
| Bavisha Gardeniaa Bhavisha Properties · Sarjapur Road | 48 | 8.9% | 6.6% | 8.3% | ₹9,000 est. | ₹86.8 L | Ready |
| Brigade Parkside West Brigade Group · Sarjapur Road | 48 | 9.3% | 5.2% | 6.7% | ₹11,300 est. | ₹1.70 Cr | Under construction Jun 2021 |
| SOBHA Crystal Meadows Phase 1 Wing 1 to 6 Sobha · Sarjapur Road | 48 | 10.1% | 6.6% | 11.1% | ₹11,300 est. | ₹2.44 Cr | Under construction Dec 2029 |
| Signature Classic - 2 Signature Dwellings · Sarjapur Road | 48 | 8.9% | 6.8% | 8.4% | ₹9,000 est. | ₹71.5 L | Ready |
| Sobha Royal Pavilion Phase 8 - Wing 15 Sobha · Sarjapur Road | 48 | 8.9% | 5.7% | 7.4% | ₹12,000 est. | ₹2.78 Cr | Ready |
| Abhee Siliconshine Abhee Ventures · Sarjapur Road | 48 | 9.3% | 5.3% | 6.7% | ₹8,450 est. | ₹95.9 L | Under construction Aug 2025 |
| Park Avenuue Pionier Projects · Sarjapur Road | 48 | 10.8% | 6.8% | 9.7% | ₹4,650 est. | ₹55.8 L | Under construction Mar 2025 |
| Lgcl New Life LGCL Urban Homes · Sarjapur Road | 48 | 10.7% | 6.0% | 7.6% | ₹8,450 est. | ₹1.83 Cr | Under construction Dec 2020 |
| Sai Metro City 9th Phase Sai Reniit Projects · Sarjapur Road | 48 | 12.1% | 7.9% | 11.3% | ₹4,650 est. | ₹55.8 L | Under construction Nov 2026 |
| Wonderwall Phase III Bricks & Milestones Projects · Sarjapur Road | 47 | 9.3% | 5.8% | 7.8% | ₹8,450 est. | ₹87.0 L | Under construction Mar 2027 |
| Meridian Park Phase III @ The Prestige City Prestige · Sarjapur Road | 47 | 8.9% | 6.1% | 7.9% | ₹12,000 est. | ₹1.61 Cr | Ready |
| Sapthagiri Sampada B Block Sapthagiri Constructions · Sarjapur Road | 47 | 10.0% | 7.2% | 13.6% | ₹8,450 est. | ₹80.3 L | Under construction Dec 2031 |
| Modern Spaces Felicity Engrace 2 Modern Spaces · Sarjapur Road | 47 | 8.9% | 6.3% | 7.9% | ₹9,000 est. | ₹1.13 Cr | Ready |
| Green Acrres Pionier Projects · Sarjapur Road | 47 | 10.8% | 6.8% | 9.7% | ₹4,650 est. | ₹55.8 L | Under construction May 2025 |
| Leafy Serene Leafy Realty · Sarjapur Road | 47 | 10.4% | 6.7% | 10.4% | ₹8,450 est. | ₹1.05 Cr | Under construction Dec 2028 |
| Mythri Sapphire Mythri Builders · Sarjapur Road | 47 | 9.3% | 5.5% | 6.8% | ₹8,450 est. | ₹82.8 L | Under construction Dec 2024 |
| Mana Verdant Mana Projects · Sarjapur Road | 47 | 9.9% | 6.7% | 11.8% | ₹8,450 est. | ₹81.1 L | Under construction Dec 2030 |
| Reliaable Residenza Crusher Series RD Buildtech · Sarjapur Road | 47 | 10.8% | 6.8% | 9.7% | ₹4,650 est. | ₹55.8 L | Under construction Apr 2024 |
| Signature Crest Signature Dwellings · Sarjapur Road | 47 | 8.9% | 6.7% | 8.4% | ₹9,000 est. | ₹77.0 L | Ready |
| Confident Snow Flake Confident Group · Sarjapur Road | 47 | 8.9% | 7.0% | 8.7% | ₹9,000 est. | ₹59.0 L | Ready |
| JR Greenwich Phase 4 JR Housing · Sarjapur Road | 47 | 10.8% | 6.8% | 9.7% | ₹4,650 est. | ₹90.2 L | Under construction Nov 2024 |
| Tranquil at Brigade Cornerstone Utopia Brigade Group · Sarjapur Road | 47 | 9.3% | 5.2% | 6.7% | ₹11,300 est. | ₹1.70 Cr | Under construction Sep 2025 |
| Halcyon at Brigade Cornerstone Utopia Brigade Group · Sarjapur Road | 46 | 9.3% | 5.2% | 6.7% | ₹11,300 est. | ₹1.70 Cr | Under construction Sep 2025 |
| The Clan Global Edifice Infra · Sarjapur Road | 46 | 9.8% | 6.3% | 9.8% | ₹8,450 est. | ₹92.1 L | Under construction Dec 2028 |
| Godrej Woodland Phase 2 Godrej Properties · Sarjapur Road | 46 | 10.8% | 6.9% | 9.8% | ₹6,400 est. | ₹76.8 L | Under construction Dec 2026 |
| Signature Classic Signature Dwellings · Sarjapur Road | 46 | 10.8% | 6.5% | 8.1% | ₹8,450 est. | ₹1.27 Cr | Under construction Apr 2019 |
| Pionier Lifestyle Pionier Projects · Sarjapur Road | 46 | 10.8% | 6.8% | 9.7% | ₹4,650 est. | ₹55.8 L | Under construction Feb 2022 |
| Confident Central Mall Confident Group · Sarjapur Road | 46 | 9.3% | 5.8% | 7.4% | ₹8,750 est. | ₹59.9 L | Under construction Nov 2026 |
| Dsr Green Waters DSR Infrastructure · Sarjapur Road | 46 | 9.3% | 5.5% | 6.9% | ₹8,450 est. | ₹83.2 L | Under construction Mar 2025 |
| Oaklands MH Properties · Sarjapur Road | 46 | 10.8% | 6.8% | 9.7% | ₹4,650 est. | ₹69.8 L | Under construction Sep 2025 |
| Dsr Parkway (phase 2) DSR Infrastructure · Sarjapur Road | 46 | 9.3% | 6.1% | 7.5% | ₹8,450 est. | ₹47.7 L | Under construction Oct 2025 |
| Engrace 3 Modern Spaces · Sarjapur Road | 46 | 8.9% | 6.2% | 7.9% | ₹9,000 est. | ₹1.16 Cr | Ready |
| Trifecta Bueno Trifecta · Sarjapur Road | 45 | 9.3% | 5.5% | 6.8% | ₹8,450 est. | ₹82.8 L | Under construction Dec 2023 |
| Green Storeys Modern Spaces · Sarjapur Road | 45 | 9.8% | 5.7% | 7.3% | ₹8,450 est. | ₹1.01 Cr | Under construction Dec 2026 |
| The County Address Indiabuild Realty · Sarjapur Road | 45 | 12.1% | 7.9% | 11.2% | ₹4,650 est. | ₹55.6 L | Under construction Jun 2020 |
| Peninsula Park Elite Phase II Peninsula Land · Sarjapur Road | 45 | 10.4% | 6.4% | 9.0% | ₹8,100 est. | ₹97.2 L | Ready |
| The Gran Carmen Address Indiabuild Realty · Sarjapur Road | 45 | 10.0% | 5.2% | 6.6% | ₹8,750 est. | ₹3.85 Cr | Under construction Jan 2020 |
| Nvt Arcot Vaksana NVT Quality Lifestyle · Sarjapur Road | 45 | 8.9% | 5.6% | 7.2% | ₹9,000 est. | ₹2.39 Cr | Ready |
| Sowparnika Olivia Nest Sowparnika · Sarjapur Road | 45 | 9.1% | 6.9% | 8.6% | ₹9,000 est. | ₹76.5 L | Ready |
| Elleganza Phase I Nambiar Builders · Sarjapur Road | 45 | 10.8% | 6.8% | 9.7% | ₹4,650 est. | ₹55.8 L | Under construction Jul 2023 |
| Bhavisha Avighna Bhavisha Properties · Sarjapur Road | 44 | 10.8% | 6.2% | 7.8% | ₹8,450 est. | ₹1.64 Cr | Under construction Dec 2024 |
| Evershine Greenwood Evershine Dwellings · Sarjapur Road | 44 | 8.9% | 6.1% | 7.8% | ₹9,000 est. | ₹1.35 Cr | Ready |
| 312 West Modern Spaces · Sarjapur Road | 44 | 10.8% | 7.0% | 8.7% | ₹8,450 est. | ₹68.9 L | Under construction Apr 2022 |
| Eden at Brigade Cornerstone Utopia Brigade Group · Sarjapur Road | 44 | 9.3% | 5.2% | 6.7% | ₹11,300 est. | ₹1.70 Cr | Under construction Mar 2024 |
| ARS Signaturehomes Phase-2 ARS Infraa · Sarjapur Road | 44 | 10.8% | 6.3% | 7.9% | ₹8,450 est. | ₹1.50 Cr | Under construction Jul 2025 |
| Uber Verdant - II Mana Projects · Sarjapur Road | 44 | 9.3% | 5.2% | 6.6% | ₹8,450 est. | ₹1.09 Cr | Under construction Jun 2024 |
| Peninsula Prakruthi Phase - 2 Peninsula Land · Sarjapur Road | 44 | 8.9% | 5.8% | 7.6% | ₹14,700 est. | ₹2.21 Cr | Ready |
| Sowparnika Tharangini Phase I Sowparnika · Sarjapur Road | 44 | 10.8% | 6.9% | 8.6% | ₹8,450 est. | ₹77.7 L | Under construction Dec 2019 |
| Ars Zurich Phase-1 ARS Infraa · Sarjapur Road | 43 | 9.0% | 5.1% | 7.0% | ₹8,750 est. | ₹1.30 Cr | Under construction Apr 2027 |
| Dsr Parkway (phase-1) DSR Infrastructure · Sarjapur Road | 43 | 9.3% | 5.4% | 6.8% | ₹8,450 est. | ₹93.0 L | Under construction Jul 2024 |
| Adarsh Garden Estate Akarshak Realty · Sarjapur Road | 43 | 10.8% | 6.8% | 9.7% | ₹4,650 est. | ₹55.8 L | Under construction Dec 2024 |
| Natura Daintree - II BSR Projects · Sarjapur Road | 43 | 9.6% | 4.8% | 6.3% | ₹8,750 est. | ₹2.60 Cr | Under construction Jan 2027 |
| Peninsula Solitaire Peninsula Land · Sarjapur Road | 43 | 8.9% | 5.8% | 7.6% | ₹14,700 est. | ₹2.21 Cr | Ready |
| Abhee Kings Court Abhee Ventures · Sarjapur Road | 42 | 8.6% | 6.2% | 7.8% | ₹9,000 est. | ₹1.02 Cr | Ready |
| Felicity Bricks & Milestones Projects · Sarjapur Road | 42 | 10.8% | 6.8% | 9.7% | ₹4,650 est. | ₹55.8 L | Under construction May 2024 |
| Meridian Park Phase II @ The Prestige City Prestige · Sarjapur Road | 42 | 8.9% | 6.2% | 8.0% | ₹12,000 est. | ₹1.43 Cr | Ready |
| Ahad Serenity Ahad Builders · Sarjapur Road | 42 | 9.3% | 5.5% | 6.9% | ₹8,450 est. | ₹79.9 L | Under construction Dec 2024 |
| Leafy Delight Leafy Realty · Sarjapur Road | 42 | 9.4% | 5.7% | 8.3% | ₹8,450 est. | ₹1.06 Cr | Under construction Mar 2028 |
| 63 Degree East - Tower A APG Intelli Homes · Sarjapur Road | 42 | 9.3% | 5.2% | 6.6% | ₹8,450 est. | ₹1.05 Cr | Under construction Jul 2025 |
| SOBHA Crystal Meadows Phase 3 Wing 9 to 15 Sobha · Sarjapur Road | 42 | 9.4% | 7.5% | 14.6% | ₹11,300 est. | ₹3.89 Cr | Under construction Dec 2032 |
| Adithya Homes Paradise Phase-3 Adithya Homes · Sarjapur Road | 42 | 10.8% | 6.8% | 9.7% | ₹4,650 est. | ₹55.8 L | Under construction Mar 2023 |
| 63 Degree East - Tower F APG Intelli Homes · Sarjapur Road | 42 | 9.3% | 5.1% | 6.4% | ₹8,450 est. | ₹1.22 Cr | Under construction Jul 2025 |
| Sobha Royal Pavilion Phase 2 - Wing 4 and 5 Sobha · Sarjapur Road | 42 | 9.3% | 5.1% | 6.6% | ₹11,300 est. | ₹1.87 Cr | Under construction Jun 2024 |
| Adithya Homes Grand Phase 3 Adithya Homes · Sarjapur Road | 42 | 10.8% | 6.8% | 9.7% | ₹4,650 est. | ₹65.1 L | Under construction Mar 2024 |
| Adithya Homes Grand Phase 2 Adithya Homes · Sarjapur Road | 42 | 10.8% | 6.8% | 9.7% | ₹4,650 est. | ₹70.4 L | Under construction Mar 2024 |
| Sobha Royal Pavilion Phase 4 - Wing 1, 2 and 3 Sobha · Sarjapur Road | 42 | 9.3% | 5.1% | 6.5% | ₹11,300 est. | ₹1.88 Cr | Under construction Jun 2024 |
| 63 degree east - Tower B APG Intelli Homes · Sarjapur Road | 41 | 9.3% | 5.4% | 6.7% | ₹8,450 est. | ₹95.1 L | Under construction Jun 2023 |
| Saiven Siesta Saiven Developers · Sarjapur Road | 41 | 8.9% | 6.1% | 7.8% | ₹9,000 est. | ₹1.35 Cr | Ready |
| Shriram Chirping Grove - 2 Shriram Properties · Sarjapur Road | 41 | 8.9% | 5.7% | 7.4% | ₹12,000 est. | ₹2.92 Cr | Ready |
| Icon Sanctuary Icon Infra Shelters · Sarjapur Road | 41 | 11.9% | 7.8% | 11.0% | ₹4,650 est. | ₹55.8 L | Under construction Dec 2018 |
| Shriram Chirping Grove Shriram Properties · Sarjapur Road | 41 | 8.9% | 5.6% | 7.3% | ₹12,000 est. | ₹3.18 Cr | Ready |
| Prestige Tech Habitat Prestige · Sarjapur Road | 41 | 7.7% | 4.5% | 6.0% | ₹12,000 est. | ₹3.19 Cr | Ready |
| Sobha Royal Pavilion Phase 3 - Wing 16 Sobha · Sarjapur Road | 41 | 9.3% | 4.8% | 6.3% | ₹11,300 est. | ₹2.62 Cr | Under construction Jun 2024 |
| Geown OASIS Geown Properties · Sarjapur Road | 41 | 8.9% | 5.8% | 7.4% | ₹9,000 est. | ₹1.94 Cr | Ready |
| Soul Tree - Serinity Modern Spaces · Sarjapur Road | 40 | 9.3% | 6.4% | 7.8% | ₹8,450 est. | ₹33.0 L | Under construction Mar 2023 |
| SOBHA Crystal Meadows Phase 4 Wing 23 to 28 Sobha · Sarjapur Road | 40 | 9.3% | 9.3% | 16.0% | ₹11,300 est. | ₹3.89 Cr | Under construction Dec 2033 |
| Shravanthi Pragathi Shravanthi · Sarjapur Road | 40 | 10.0% | 5.5% | 7.0% | ₹8,750 est. | ₹1.44 Cr | Under construction Mar 2019 |
| Sobha Royal Pavilion Phase 1 - Wing 6 and 7 Sobha · Sarjapur Road | 40 | 9.3% | 5.1% | 6.5% | ₹11,300 est. | ₹1.90 Cr | Under construction Jun 2024 |
| Raaga By Bhavisha Homes Bhavisha Properties · Sarjapur Road | 40 | 9.3% | 5.5% | 6.8% | ₹8,450 est. | ₹85.8 L | Under construction Dec 2025 |
| SOBHA Crystal Meadows Phase 5 Wing 16 to 22 Sobha · Sarjapur Road | 40 | 9.0% | 14.1% | 22.9% | ₹11,300 est. | ₹3.40 Cr | Under construction Dec 2035 |
| Soulace by Modern Spaaces Modern Spaces · Sarjapur Road | 40 | 10.8% | 6.8% | 9.7% | ₹4,650 est. | ₹84.2 L | Under construction Dec 2024 |
| Ashish Green B-Block Aashish Developers · Sarjapur Road | 40 | 9.3% | 5.7% | 7.1% | ₹8,450 est. | ₹68.4 L | Under construction Sep 2023 |
| Sai Metro City 7th Phase Sai Reniit Projects · Sarjapur Road | 40 | 10.5% | 6.6% | 9.4% | ₹4,800 est. | ₹77.3 L | Under construction Dec 2021 |
| Assetz Trees & Tandem -Tower A Assetz · Sarjapur Road | 40 | 9.1% | 5.9% | 9.8% | ₹11,300 est. | ₹78.0 L | Under construction May 2030 |
| Platinum Phase 3 Confident Group · Sarjapur Road | 39 | 10.8% | 6.8% | 9.7% | ₹4,650 est. | ₹55.8 L | Under construction Sep 2022 |
| Geown Oasis Phase-3 Geown Properties · Sarjapur Road | 39 | 10.8% | 6.8% | 9.7% | ₹4,650 est. | ₹55.8 L | Under construction Jun 2025 |
| Leaves & Lives Phase 2 APG Intelli Homes · Sarjapur Road | 39 | 9.3% | 4.6% | 5.9% | ₹8,450 est. | ₹2.66 Cr | Under construction Sep 2024 |
| Bavisha Greenwoods Bhavisha Properties · Sarjapur Road | 39 | 9.3% | 5.7% | 7.1% | ₹8,450 est. | ₹70.1 L | Under construction Mar 2022 |
| Signature Pristine Signature Dwellings · Sarjapur Road | 39 | 9.3% | 5.7% | 7.0% | ₹8,450 est. | ₹71.0 L | Under construction Dec 2025 |
| Adarsh Sanctuary Adarsh Developers · Sarjapur Road | 39 | 9.3% | 4.8% | 6.3% | ₹11,300 est. | ₹2.54 Cr | Under construction Feb 2025 |
| Arvind Forest Trails Arvind SmartSpaces · Sarjapur Road | 39 | 9.8% | 5.7% | 9.0% | ₹11,300 est. | ₹2.86 Cr | Under construction Jun 2029 |
| WONDERWALL -Phase II, Block-1 Bricks & Milestones Projects · Sarjapur Road | 38 | 9.3% | 5.4% | 6.7% | ₹8,450 est. | ₹88.7 L | Under construction Mar 2025 |
| Nvt Symphony Of Orchards NVT Quality Lifestyle · Sarjapur Road | 38 | 9.3% | 4.6% | 5.9% | ₹8,450 est. | ₹2.36 Cr | Under construction Feb 2026 |
| Soul Tree - Nirvana Modern Spaces · Sarjapur Road | 38 | 9.3% | 6.2% | 7.6% | ₹8,450 est. | ₹45.2 L | Under construction Dec 2023 |
| Aryan Fountain Square Aryan Hometec · Sarjapur Road | 38 | 9.4% | 5.1% | 6.5% | ₹8,750 est. | ₹1.31 Cr | Under construction Apr 2018 |
| Bhavisha Bentley Greens Phase 2 Bhavisha Properties · Sarjapur Road | 38 | 9.3% | 5.3% | 6.7% | ₹8,450 est. | ₹96.8 L | Under construction Jul 2022 |
| Wonderwall Bricks & Milestones Projects · Sarjapur Road | 38 | 9.3% | 5.6% | 7.0% | ₹8,450 est. | ₹74.4 L | Under construction Oct 2024 |
| Divine Meadows MAX Global Developers · Sarjapur Road | 38 | 8.8% | 4.1% | 5.2% | ₹8,750 est. | ₹2.74 Cr | Under construction Aug 2026 |
| Bhavisha Bentley goldberg phase 2 Bhavisha Properties · Sarjapur Road | 37 | 9.3% | 5.5% | 6.8% | ₹8,450 est. | ₹85.8 L | Under construction Oct 2024 |
| Dain Tree BSR Projects · Sarjapur Road | 37 | 10.8% | 6.8% | 9.7% | ₹4,650 est. | ₹81.6 L | Under construction Sep 2025 |
| Signature Meadows Signature Dwellings · Sarjapur Road | 37 | 9.3% | 5.8% | 7.2% | ₹8,450 est. | ₹61.7 L | Under construction Dec 2024 |
| Bhavisha Bentley Goldberg Phase-1 Bhavisha Properties · Sarjapur Road | 37 | 9.3% | 5.7% | 7.1% | ₹8,450 est. | ₹69.7 L | Under construction Dec 2023 |
| Godrej Woodland Godrej Properties · Sarjapur Road | 37 | 10.8% | 6.9% | 9.8% | ₹6,400 est. | ₹44.2 L | Under construction Dec 2026 |
| Rrl Nature Woods RRL Builders & Developers · Sarjapur Road | 37 | 9.3% | 6.0% | 7.4% | ₹8,450 est. | ₹55.3 L | Under construction Dec 2024 |
| Leaves & Lives Phase 1 APG Intelli Homes · Sarjapur Road | 36 | 9.3% | 4.6% | 5.9% | ₹8,450 est. | ₹2.51 Cr | Under construction Apr 2023 |
| Soul Tree - Bliss Modern Spaces · Sarjapur Road | 36 | 9.3% | 5.9% | 7.3% | ₹8,450 est. | ₹57.9 L | Under construction Feb 2024 |
| 302 West Modern Spaces · Sarjapur Road | 36 | 9.3% | 5.5% | 6.9% | ₹8,450 est. | ₹83.7 L | Under construction Jul 2023 |
| Axis Niran Axis Concept Construction · Sarjapur Road | 36 | 9.4% | 5.4% | 7.9% | ₹8,450 est. | ₹87.5 L | Under construction Sep 2028 |
| Peninsula Park Elite Phase III Peninsula Land · Sarjapur Road | 36 | 10.8% | 6.9% | 9.8% | ₹7,600 est. | ₹91.2 L | Under construction Sep 2024 |
| The County Address Phase 2 Indiabuild Realty · Sarjapur Road | 35 | 10.8% | 6.8% | 9.7% | ₹4,650 est. | ₹90.7 L | Under construction Mar 2025 |
| 77 East Phase 2 By Modern Spaaces Ventures Modern Spaces · Sarjapur Road | 35 | 9.3% | 5.1% | 6.5% | ₹8,450 est. | ₹1.15 Cr | Under construction Dec 2022 |
| Sai Metro City Ph 6 Sai Reniit Projects · Sarjapur Road | 35 | 10.8% | 6.8% | 9.7% | ₹4,650 est. | ₹55.8 L | Under construction Feb 2020 |
| Confident Square Confident Group · Sarjapur Road | 34 | 9.3% | 5.2% | 6.5% | ₹8,450 est. | ₹1.13 Cr | Under construction Oct 2024 |
| The Prestige City - Avalon Park Prestige · Sarjapur Road | 34 | 9.3% | 5.1% | 6.6% | ₹11,300 est. | ₹1.82 Cr | Under construction Feb 2025 |
| Modern Spaces Felicity Engrace 1 Modern Spaces · Sarjapur Road | 34 | 9.3% | 5.3% | 6.6% | ₹8,450 est. | ₹1.04 Cr | Under construction Jun 2025 |
| SNR Verity SNR Square · Sarjapur Road | 34 | 8.9% | 6.1% | 7.8% | ₹9,000 est. | ₹1.35 Cr | Ready |
| Bhavisha Bilva Bhavisha Properties · Sarjapur Road | 34 | 9.3% | 4.9% | 6.2% | ₹8,450 est. | ₹1.63 Cr | Under construction Dec 2024 |
| Ars Singature Homes ARS Infraa · Sarjapur Road | 33 | 9.3% | 5.0% | 6.4% | ₹8,450 est. | ₹1.35 Cr | Under construction Oct 2023 |
| Sowparnika Flamenco Sowparnika · Sarjapur Road | 33 | 9.3% | 6.0% | 7.3% | ₹8,450 est. | ₹52.8 L | Under construction Sep 2022 |
| Aspen Greens @ The Prestige City Prestige · Sarjapur Road | 33 | 9.3% | 4.7% | 6.2% | ₹11,300 est. | ₹3.57 Cr | Under construction Apr 2025 |
| Godrej 24 Godrej Properties · Sarjapur Road | 32 | 9.3% | 5.2% | 6.7% | ₹11,300 est. | ₹1.70 Cr | Under construction Jun 2025 |
| Sai Metrocity 8th Phase Sai Reniit Projects · Sarjapur Road | 32 | 10.8% | 6.8% | 9.7% | ₹4,650 est. | ₹1.31 Cr | Under construction Jun 2025 |
| Sai Metro city 5th phase Sai Reniit Projects · Sarjapur Road | 32 | 10.8% | 6.8% | 9.7% | ₹4,650 est. | ₹55.8 L | Under construction Jun 2023 |
| 77 East Modern Spaces · Sarjapur Road | 30 | 9.3% | 5.1% | 6.4% | ₹8,450 est. | ₹1.27 Cr | Under construction Jan 2023 |
| Snr Magnolia Park SNR Square · Sarjapur Road | 30 | 9.3% | 5.3% | 6.7% | ₹8,450 est. | ₹96.8 L | Under construction Jul 2022 |
| Saiven Silver Oaks Saiven Developers · Sarjapur Road | 29 | 9.3% | 5.1% | 6.4% | ₹8,450 est. | ₹1.27 Cr | Under construction Apr 2022 |
| Sowparnika Pragati Sowparnika · Sarjapur Road | 28 | 9.3% | 5.3% | 6.7% | ₹8,450 est. | ₹98.0 L | Under construction Mar 2025 |
| Snr Safa SNR Square · Sarjapur Road | 27 | 9.3% | 5.4% | 6.7% | ₹8,450 est. | ₹88.7 L | Under construction Feb 2025 |
| Iconest4 Icon Infra Shelters · Sarjapur Road | 26 | 9.3% | 5.7% | 7.0% | ₹8,450 est. | ₹68.9 L | Under construction Apr 2023 |
| Peninsula Paramount Peninsula Land · Sarjapur Road | 23 | 9.3% | 5.0% | 6.6% | ₹13,800 est. | ₹2.07 Cr | Under construction Jan 2023 |
Price per sq ft in Sarjapur Road: what the evidence says
| Date | ₹ / sq ft | Basis | Confidence |
|---|---|---|---|
| 2021-06 | ₹6,050 | blr (derived) | 40% |
| 2023-06 | ₹8,000 | blr (derived) | 45% |
| 2025-06 | ₹10,800 | blr (derived) | 50% |
| 2026-06 | ₹12,000 | blr (derived) | 50% |
That is 14.7% a year from 2021-06 to 2026-06. The model projects 9.8% a year from here; the growth story on each project page shows why.
Supply and demand from RERA filings
Karnataka RERA, 2026-09. Months of inventory = unsold homes ÷ monthly sales.
Infrastructure pipeline
| Project | Type | Status | Expected | Chance it lands on time | Price effect if it does |
|---|---|---|---|---|---|
| Phase 3A Sarjapur–Hebbal | metro | planned | 2033 | 45% | +1.5% / yr |
| Peripheral Ring Road | road | planned | 2030 | 40% | +0.6% / yr |
| Cauvery Stage V water | utility | construction | 2027 | 70% | +0.5% / yr |
| Bengaluru suburban rail (K-RIDE) | rail | construction | 2029 | 50% | +0.6% / yr |
The growth model counts each event at its probability, not its promise. Dates are the latest public schedule.
Developers active in Sarjapur Road
Ranked lists for Sarjapur Road
Sarjapur Road compared with other areas
Questions people ask
Is Sarjapur Road good for investment?
On PropertyLens's model the median analysed project in Sarjapur Road scores 49/100 (below the Bengaluru average), with projected price growth of 9.8% a year over five years, median price ₹8,450 per sq ft and gross rental yield 3.4%. 284 RERA-registered projects analysed as of September 11, 2026. The best-scored project is Godrej Lakeside Orchard at 72.
What is the price per sq ft in Sarjapur Road?
Median ₹8,450 per sq ft of super built-up area across analysed projects, modelled from comparables where developers file no price. Entry price for an analysed home is about ₹33.0 L; the median home is ₹88.7 L.
What rental yield can I expect in Sarjapur Road?
Median gross yield 3.4% on the all-in cost of an analysed home, before maintenance, vacancy and tax. Net-wealth CAGR after every cost on an 8-year hold with a 75% loan is 6.3% at the median.
Are projects in Sarjapur Road delayed?
117 of 209 under-construction projects are past the completion date in their original RERA registration, and unsold stock equals about 20 months of sales. Each project page shows extensions, construction against bookings and complaints.
Scores and projections are model outputs built from dated public evidence (Karnataka RERA filings, promoter quarterly updates, complaint registers, public ratings) and stated assumptions. They are research, not investment advice. How the numbers are built.