57
Investment score
57/100
Evidence confidence56%
Home · ~1,010 sq ft (712 carpet)
Price growth per year, next 5 yrs model
8.8%
likely range 5.4%–12.3% · over 10 yrs 8.1%/yr
Net-wealth CAGR, 8-yr hold
5.5%
your cash in → cash back incl. sale, per year
Cash-flow IRR, 8-yr hold
7.1%
with 75% loan · all-cash 7.8% · with interiors
Three numbers, three questions. Price growth: what will the home be worth? Net-wealth CAGR: what will my money have earned after every cost? Cash-flow IRR: the same, but counting when each rupee moves. Tap i on any of them.
Price · edit here or below assumed
₹Cr
₹ psf × 1,010 sq ft · as of Sep 2026
Price edits apply to ·
All-in cost
₹1.43 Cr
+ other charges 4.2 L, GST 0.0 L, stamp/reg 8.3 L, interiors 8.1 L
Gross rental yield assumed
3.1%
rent starts in ~0.3 yr

All-in cost sheet this home, default assumptions

ItemBasisAmount
Base price₹12,000 per sq ft × 1,010 sq ft super built-up1.21 Cr
Other charges3.5% of base: floor-rise, preferred-location, car park, club, maintenance deposit, legal, corpus (edit in Assumptions)4.2 L
GST0.0% on an under-construction home — none is due on a ready home with an occupancy certificate, set GST to 0 if buying after OC0.0 L
Stamp duty and registration6.6% in Karnataka: 5% stamp duty + 1% registration + cess and surcharge on the agreement value8.3 L
Interiors₹800 per sq ft, needed before the home can be let8.1 L
All-in costwhat leaves your pocket and the bank's, before rent or resale₹1.43 Cr
Your own money75.0% loan at 8.5% for 20 years covers the rest; EMI 0.8 L a month₹1.00 Cr

Carpet area 712 sq ft against 1,010 sq ft super built-up: you pay for 30% that is common area and walls. Price per sq ft of carpet ≈ ₹17,022. Every percentage above is editable in Assumptions; the defaults are Karnataka rates as of 2026-09.

In plain words

Why 57 out of 100

Each home is marked on 11 things a careful buyer checks, then compared with every project we analyse in Bengaluru: 50 is the average project, 62 beats about five in six. Here is what lifts this one and what drags it:

  • +
    Resale liquidity · 3/4 pts
    Plenty of buyers can afford a ₹1.21 Cr home, and homes in Marathahalli / Kundalahalli / Varthur resell quickly.
  • +
    Employment access · 5/10 pts
    Drive times right now: ITPL Whitefield 18 min, ORR Bellandur (Ecospace) 18 min, Electronic City Ph-1 37 min; Hebbal (Kirloskar) 50 min. About 7 million sq ft of new offices are planned nearby in 3 years.
  • +
    Schools, hospitals, daily needs · 2/3 pts
    Schools, hospitals and daily shopping are excellent in this area.
  • −
    Legal, title & approvals · -5/5 pts
    Registered with Karnataka RERA; litigation reported; land title not yet verified by us, so get a lawyer to check. The due-diligence report below flags 1 item in red.
  • −
    Expected price growth (5-yr CAGR model) · -9/26 pts
    We expect prices here to rise about 8.8% a year for the next 5 years (explained below).
  • −
    Water, flooding, noise, infrastructure · -1/9 pts
    Some flood risk in heavy rain; water supply is partly piped, partly tankers; noticeable traffic or aircraft noise.
All 11 checks
  • •
    Price vs comparables · -0/3 pts
    Priced about the same as similar premium homes nearby (₹12,000 vs ~₹12,000 per sq ft).
  • •
    Rental demand & yield · 1/8 pts
    Rent pays back 3.1% of the price every year, close to the usual 3% in Bengaluru. Tenant demand here is very strong.
  • +
    Resale liquidity · 3/4 pts
    Plenty of buyers can afford a ₹1.21 Cr home, and homes in Marathahalli / Kundalahalli / Varthur resell quickly.
  • +
    Employment access · 5/10 pts
    Drive times right now: ITPL Whitefield 18 min, ORR Bellandur (Ecospace) 18 min, Electronic City Ph-1 37 min; Hebbal (Kirloskar) 50 min. About 7 million sq ft of new offices are planned nearby in 3 years.
  • •
    Metro, bus, rail & airport · 2/9 pts
    The nearest working metro is ~1.5 km away. Airport is about 79 minutes by road right now.
  • +
    Schools, hospitals, daily needs · 2/3 pts
    Schools, hospitals and daily shopping are excellent in this area.
  • •
    Builder delivery & handover risk · 7/16 pts
    Sobha has finished 119+ projects and delivered on time about 57% of the time. This home is ready, so there is no waiting risk.
  • +
    Layout, size, age, amenities, maintenance · 1/3 pts
    Moderately dense layout (65 homes per acre); about 72% of the area you pay for is usable carpet area. Maintenance ~₹4.5 per sq ft a month.
  • •
    Water, flooding, noise, infrastructure · -1/9 pts
    Some flood risk in heavy rain; water supply is partly piped, partly tankers; noticeable traffic or aircraft noise.
  • •
    Legal, title & approvals · -5/5 pts
    Registered with Karnataka RERA; litigation reported; land title not yet verified by us, so get a lawyer to check. The due-diligence report below flags 1 item in red.
  • •
    Expected price growth (5-yr CAGR model) · -9/26 pts
    We expect prices here to rise about 8.8% a year for the next 5 years (explained below).
Why prices should grow ~8.8% a year for the next 5 years

We build the forecast step by step, starting from what Bengaluru homes normally do and adjusting for this area and this project:

  1. + 6.0%Start with 6.0% a year: the normal long-run growth of Bengaluru home prices.
  2. + 0.8%Add 0.8%: prices here rose 11.6% a year recently (2023-06 to 2026-06). Some of that pace continues, but it fades each year.
  3. + 0.0%Prices are still affordable enough that this does not slow growth.
  4. + 1.3%Add 1.3%: 7 million sq ft of new offices nearby means more people wanting homes here.
  5. + 0.5%Add 0.5%: few unsold homes in the area (12 months of stock), so sellers have the upper hand.
  6. + 0.2%Add 0.2% for new roads, metro and water lines, weighted by how likely they are to actually finish: Blue Line KR Puram–Hebbal–Airport (construction, 2027); Purple Line Whitefield extension (2023) (operational, 2023); Peripheral Ring Road (planned, 2030).
  7. + 0.0%No extra project-level adjustment.
  8. = 8.8%Result: about 8.8% a year, so a home worth ₹1.25 Cr today would be worth about ₹1.91 Cr in 5 years. We are 56% confident in the evidence behind this.

Which exit suits you?

Interiors change both the rent you get and what you recover at sale. Same price, same loan; only the strategy changes:

StrategyHoldIRR / yrWealth CAGR / yrCash you put inNet rentNet saleApply
No interiors, rent unfurnished best IRR
Skip interiors; rent 12% lower than a fitted home; sell after 8 yrs with no interiors value.
8 yrs8.2%6.1%₹95.2 L₹17.6 L₹1.60 Cr
Do interiors, rent & sell fitted selected
Spend ₹800/sq ft on interiors, earn full rent, recover ~40% of interiors cost at sale (fading over 10 yrs).
8 yrs7.1%5.5%₹1.00 Cr₹21.0 L₹1.60 Cr

IRR and CAGR are per year over the hold shown. A short hold can show a high IRR on a small absolute gain; compare the net-sale column too. Selling before registration usually needs the builder’s transfer NOC and a fee.

Highlights

  • Sobha · Marathahalli / Kundalahalli / Varthur · 356 homes on 5.5 acres
  • Marked completed on RERA (completion date 2026-09-30) after 1 extension
  • 12 court case(s) declared · 2 complaints on this registration

Assumptions editable

Purchase

₹/sq ft
₹ Cr
sq ft
% of base
%
%
%
₹/sq ft

FinancingLoan 75% · cash 25% · EMI ₹81,646/mo

% loan
% p.a.
years
%

Rent & running costs

₹
% p.a.
%
months
months
₹/sq ft/mo
% of rent
% of rent
% of value

Interiors & exit

%
%
years
% p.a. (blank = model)
%
%

Returns over 8 years · with interiors

Cash you put in₹1.00 Cr
Exit value (yr 8)₹2.38 Cr
Net sale after loan & costs₹1.60 Cr
Net rent after opex₹21.0 L
Loan (75% of price)₹94.1 L
EMI / month₹81,646
Year 0: ₹-49.4 L0Year 1: ₹-8.6 L1Year 2: ₹-7.4 L2Year 3: ₹-7.3 L3Year 4: ₹-7.1 L4Year 5: ₹-7.0 L5Year 6: ₹-6.8 L6Year 7: ₹-6.7 L7Year 8: ₹1.54 Cr8
YearPurchaseLoan inRent (net of vacancy)OpexDebt serviceSale − loanNet cash
Today-1.44 Cr94.1 L0.0 L0.0 L0.0 L0.0 L-49.4 L
Yr 10.0 L0.0 L2.4 L-1.2 L-9.8 L0.0 L-8.6 L
Yr 20.0 L0.0 L3.8 L-1.5 L-9.8 L0.0 L-7.4 L
Yr 30.0 L0.0 L4.0 L-1.5 L-9.8 L0.0 L-7.3 L
Yr 40.0 L0.0 L4.2 L-1.6 L-9.8 L0.0 L-7.1 L
Yr 50.0 L0.0 L4.4 L-1.6 L-9.8 L0.0 L-7.0 L
Yr 60.0 L0.0 L4.7 L-1.7 L-9.8 L0.0 L-6.8 L
Yr 70.0 L0.0 L4.9 L-1.8 L-9.8 L0.0 L-6.7 L
Yr 80.0 L0.0 L5.1 L-1.8 L-9.8 L1.60 Cr1.54 Cr

Pre-tax unless capital-gains tax is set. Rent enters the cash flows once. Net-wealth CAGR = (cash returned incl. sale ÷ cash put in)^(1/years) − 1. IRR uses the dated cash flows.

Score factors

Bars show points added or taken away versus the average analysed Bengaluru project (score 50).

Price vs comparables
−0.2 pts vs avg
this home 6.0/10 · Bengaluru average 6.2 · confidence 35%
₹12,000 psf vs premium comps ₹12,000 (0%). Price is a model estimate, so this factor carries a third of its normal weight until a listed price is observed.
Rental demand & yield
+1.3 pts vs avg
this home 6.6/10 · Bengaluru average 6.0 · confidence 38%
Gross yield 3.2% (₹32 psf/month); locality rental demand 9/10.
Resale liquidity
+3.3 pts vs avg
this home 9.5/10 · Bengaluru average 7.6 · confidence 60%
Locality resale depth 8/10; ticket ₹1.21 Cr narrows the buyer pool; 356-home project gives deep resale comps; RERA sales pace ratio 1.
Employment access
+5.0 pts vs avg
this home 7.7/10 · Bengaluru average 5.2 · confidence 85%
Drive times now (Google Maps, 2026-09-16): ITPL Whitefield 18 min, ORR Bellandur (Ecospace) 18 min, Electronic City Ph-1 37 min, Koramangala (Forum) 37 min; 2 of 7 major hubs within 30 min; 7 msf office pipeline (3 yr).
Metro, bus, rail & airport
+2.0 pts vs avg
this home 5.9/10 · Bengaluru average 4.8 · confidence 60%
Purple Line Kundalahalli / Nallurhalli; ORR Blue Line stations ~2027; airport ~79 min by road now (Google Maps); .
Schools, hospitals, daily needs
+1.6 pts vs avg
this home 8.5/10 · Bengaluru average 7.0 · confidence 50%
Locality social-infrastructure index (interim, expert-set; POI distances pending Maps integration).
Builder delivery & handover risk
+7.5 pts vs avg
this home 6.7/10 · Bengaluru average 3.7 · confidence 60%
Sobha: 119+ projects, on-time 57% (derived); ready.
Layout, size, age, amenities, maintenance
+1.0 pts vs avg
this home 8.1/10 · Bengaluru average 7.3 · confidence 55%
65 units/acre; carpet/SBA ~72%; maintenance ~₹4.5 psf/month (assumed); filed construction cost ₹3,968 per sq ft (premium spec).
Water, flooding, noise, infrastructure
−0.9 pts vs avg
this home 5.3/10 · Bengaluru average 5.8 · confidence 50%
Varthur lake catchment; ORR congestion
Legal, title & approvals
−5.0 pts vs avg
this home 4.9/10 · Bengaluru average 7.4 · confidence 55%
RERA registered; litigation: 12 case(s) declared; approvals: RERA registered; title: not verified. Due-diligence report lists 1 red flag (−1.4 pts).
Expected price growth (5-yr CAGR model)
−8.6 pts vs avg
this home 4.6/10 · Bengaluru average 6.0 · confidence 56%
Model 5-yr price CAGR 8.8% (range 5.4–12.3%).

Price growth model, year by year

Nominal growth per year. Parts add up; momentum fades, infrastructure is weighted by delivery probability and dated.

ComponentYr 1Yr 2Yr 3Yr 4Yr 5Yr 6Confidence
Bengaluru long-run nominal trend6.06.06.06.06.06.080%
Locality momentum (mean-reverting)2.01.10.60.30.20.145%
Affordability ceiling0.00.00.00.00.00.060%
Employment access & office pipeline1.31.31.31.31.31.355%
Supply–demand balance0.80.60.50.40.30.350%
Infrastructure delivery (probability-weighted)0.40.40.10.10.10.055%
Project-specific adjustments0.00.00.00.00.00.050%
Total growth10.4%9.4%8.4%8.1%7.8%7.6%56%

Bengaluru long-run nominal trend: City-wide 2013-25 nominal residential trend ≈ inflation + real income growth.

Locality momentum (mean-reverting): Trailing 3.0-yr locality CAGR 11.6% vs 6.0% trend; 35% carried forward, halving each year.

Affordability ceiling: Ticket at ₹12,000 psf vs city median ₹9,500; buyer pool thins above ₹15k/₹20k psf and after >6pp excess growth.

Employment access & office pipeline: 7 msf office pipeline (3 yr) on 50 msf stock; 30-min jobs index 0.90.

Supply–demand balance: 12 months of unsold inventory; new-launch/absorption ratio 0.9 (from 24 under-construction RERA filings in this locality: 3,352 unsold homes, 376.9 sold per month).

Infrastructure delivery (probability-weighted): Blue Line KR Puram–Hebbal–Airport (construction, 2027, p=0.65); Purple Line Whitefield extension (2023) (operational, 2023, p=1); Peripheral Ring Road (planned, 2030, p=0.4)

Project-specific adjustments: Building age 0 yrs. Sales pace from RERA filings: 100% of 356 homes booked with 100% of the build timeline elapsed (pace ratio 1); fast sellers re-rate, slow sellers discount.

Locality evidence: ₹9,000 (Jun 2023) → ₹12,500 (Jun 2026) = 11.6% p.a. Sources: Platform estimate (interim, not observed).

Financial & legal due diligence

What the public record says

Automated from the Karnataka RERA file PRM/KA/RERA/1251/446/PR/200121/003218 and 3 quarterly filings. Prices and rents are locality estimates, not verified listings. Compiled Sep 2026 from the Karnataka RERA file, company registers, rating agencies, tribunal records and press. Facts only; anything that deserves a written answer before signing is flagged.

Delivery timeline8/10
delivered; the registration was extended 1× before completion
Legal & complaints1.5/10
12 court cases declared in filings (−4.5); an injunction/stay is recorded (−2); 2 RERA complaints on the project (−1); 1 still open
Money to finish8/10
finance cost is 0% of the registered budget; last quarter withdrew ₹0.00 cr against ₹0.00 cr collected (−1); 100% of homes booked (+1)
Developer strength8.3/10
ICRA A+/Stable (Sobha Ltd)

Meters are rule-based from the RERA file and public ratings (rules shown under each), not opinions.

Registration
PRM/KA/RERA/1251/446/PR/200121/003218 · SOBHA LIMITED
Delivered
RegisteredDec 2019Original completionDec 2025TodaySep 2026Covid ext.Sep 2026
Money through the RERA account
Collected ₹6.9 LWithdrawn ₹6.8 LQ3 2025-266.9 L6.8 LCollected ₹4.1 LWithdrawn ₹4.1 LQ4 2025-264.1 L4.1 LCollected ₹0Withdrawn ₹7Q1 2026-270.0 L0.0 L
Collected from buyersWithdrawn for construction
Latest milestones
  • Earth work and other leveling preparation
    100%
  • Foundation footing work
    100%
  • Retaining wall
    100%
  • Sub-structure flooring
    100%
  • RCC or MS Framed structure
    100%
  • Joinery: Doors, Windows, Ventilators etc
    100%
12 court cases declared2 complaints · 1 openEscrow: ANDHRA BANK
Credit ratings of the people behind it
AAAAAABBBBBBCDinvestment grade ◀▶ speculative gradeICRA A+ / Stable · Sobha Ltd · Aug 2025
Complaints & disputes on record
On this project21 open
On the promoter entity224all projects
Court cases declared12no stay recorded
What complainants raise
  • Not Providing Additional Benefit as promised .
  • Refund of Full Token Advance of Rs.99,000/-
At a glance
Delivered

Delivered. RERA registration ran 2019-12-18 → 2026-09-30 after 1 extension (original 2025-12-31)

2 RERA complaints, 1 open

2 RERA complaints on this project (1 open); 224 on the promoter overall

12 court cases declared

12 court cases declared in RERA filings (no stay recorded)

The record, in pictures

RERA file · Registration

Registered project cost ₹170 cr — where it goes
Land ₹34.3 cr · 20%Construction & on-site ₹135.7 cr · 80%
Partition Suit in O.S. filed by Smt.Ramakka against Sri. Akrishnappa and others 594/2016 · II Addl. (Sr.Dn.), Bangalore Rural · no stayPartition Suit in O.S. filed by Smt. Rajamma against B.C. Narayana Reddy and others (M/s.Sobha Limited is not a party and no adverse Order/s on land / project is passed by the Court;) 356/2010 · Principal Civil Judge (Sr. Dn.), Banglaore Rural · no stayPartition Suit in O.S. filed by Smt.Y.Achhamma against Y.Venkata Reddy and others (M/s.Sobha Limited is not a party and no adverse Order/s on land / project is passed by the Court;) 227/2011 · Principal (Sr.Dn.) Civil Judge, Bangalore Rural · no stayPartition Suit in O.S. filed by Smt. Rathnamma & Others Vs. Sri. Muniraju and Others (M/s.Sobha Limited is not a party and no adverse Order/s on land / project is passed by the Court;) 448/2014 · III Additional Senior Civil Judge Bengaluru Rural Dist · no stayPartition Suit in O.S. filed by Muniyappa Vs Smt. Shaifunissa and Others (M/s.Sobha Limited is not a party and no adverse Order/s on land / project is passed by the Court;) 1351/2009 · 1st Additional Senior Civil Judge Bengaluru Rural Dist · no stayPartition Suit in O.S. filed by Anand Kumar and Anr Vs. Gauramma and Ors (M/s.Sobha Limited is not a party and no adverse Order/s on land / project is passed by the Court;) 815/2017 · I Additional Senior Civil Judge, Bengaluru Rural, Bengaluru · STAYW P filed by Sobha Limited against State of Karnataka and others challenging the levy of Benificiary Capital Contribution by BWSSB 17398/2015 · High court of Karnataka · STAYW P filed by Sobha Limited against BBMP and Others, before the High Court of Karnataka, challenging the Ground Rent charges claimed by BBMP 25145/2019 · High court of Karnataka · STAYWrit petition filed by Sobha Limited against BBMP and Others, challenging the Ground Rent charges claimed by BBMP 388/2020 · High court of Karnataka · STAYWrit petition filed by Sobha Limited against BBMP and Others, before the High Court of Karnataka, challenging the Ground Rent,GSt and others charges claimed by BBMP 13573/2020 · High court of Karnataka · STAYOS 368/2020 filed by Manohar Babu and another against Rukkamma and others before IV Addl Senior Civil Judge at Bangalore Rural for partition, separate possession and other reliefs 368/2020 · IV Additional Senior Civil Judge Bengaluru Rural Dist · no stayOS 483/2022 filed by Kaveramma against Muniyappa and others before III Addl Senior Civil Judge at Bangalore Rural for partition, separate possession and other reliefs 483/2022 · III Additional Senior Civil Judge Bengaluru Rural Dist · no stayBorrowing declared: not statedEscrow at ANDHRA BANKOwners’ association: not formed

Complaint log (K-RERA) · 2 on this project

  • May 2025Not Providing Additional Benefit as promised .open
  • Dec 2022Refund of Full Token Advance of Rs.99,000/-disposed
Complaints by status
Open / under enquiry
1
Disposed (Authority)
1

Red flags to resolve in writing

1
Legal

12 court cases declared in RERA filings (594/2016, 356/2010); check for stays and title impact.

Questions to put to the developer before you sign

  1. Share the latest CA Form 4 and architect Form 5 with the escrow deposit ratio.
  2. Confirm the price list, floor-rise and other charges for the exact unit.
  3. Provide the occupancy certificate, khata and title chain for the unit.
  4. What do the declared cases (594/2016, 356/2010, 227/2011, 448/2014, 1351/2009, 815/2017, 17398/2015, 25145/2019, 388/2020, 13573/2020, 368/2020, 483/2022) concern and is any stay in force?
  5. Is the land freehold with the developer, and is any part mortgaged?
Full record: every filed number, line by line2 sections · 12 items

RERA file · Registration

Registration
PRM/KA/RERA/1251/446/PR/200121/003218 · promoter SOBHA LIMITED (Company) · Proposed Project End Date at the time of registration :
Dates
Start 2019-12-18 · original completion 2025-12-31 · 1 extension: Covid Extension → 2026-09-30
Status
Completed and occupied (per project status); RERA progress fields below are historical
Registered cost
Total ₹170 cr · land ₹34.33 cr · construction ₹136 cr
RERA bank account
ANDHRA BANK, Ulsoor Road (70% construction account)
Land & towers
5.47 acres (22,121 sq m) · Wing 55 60 homes, 14 floors; Wing 56 118 homes, 14 floors; Wing 57 60 homes, 14 floors; Wing 58 118 homes, 14 floors
Litigation declared
Partition Suit in O.S. filed by Smt.Ramakka against Sri. Akrishnappa and others 594/2016, II Addl. (Sr.Dn.), Bangalore Rural — no stay; Partition Suit in O.S. filed by Smt. Rajamma against B.C. Narayana Reddy and others (M/s.Sobha Limited is not a party and no adverse Order/s on land / project is passed by the Court;) 356/2010, Principal Civil Judge (Sr. Dn.), Banglaore Rural — no stay; Partition Suit in O.S. filed by Smt.Y.Achhamma against Y.Venkata Reddy and others (M/s.Sobha Limited is not a party and no adverse Order/s on land / project is passed by the Court;) 227/2011, Principal (Sr.Dn.) Civil Judge, Bangalore Rural — no stay; Partition Suit in O.S. filed by Smt. Rathnamma & Others Vs. Sri. Muniraju and Others (M/s.Sobha Limited is not a party and no adverse Order/s on land / project is passed by the Court;) 448/2014, III Additional Senior Civil Judge Bengaluru Rural Dist — no stay; Partition Suit in O.S. filed by Muniyappa Vs Smt. Shaifunissa and Others (M/s.Sobha Limited is not a party and no adverse Order/s on land / project is passed by the Court;) 1351/2009, 1st Additional Senior Civil Judge Bengaluru Rural Dist — no stay; Partition Suit in O.S. filed by Anand Kumar and Anr Vs. Gauramma and Ors (M/s.Sobha Limited is not a party and no adverse Order/s on land / project is passed by the Court;) 815/2017, I Additional Senior Civil Judge, Bengaluru Rural, Bengaluru — injunction/stay recorded; W P filed by Sobha Limited against State of Karnataka and others challenging the levy of Benificiary Capital Contribution by BWSSB 17398/2015, High court of Karnataka — injunction/stay recorded; W P filed by Sobha Limited against BBMP and Others, before the High Court of Karnataka, challenging the Ground Rent charges claimed by BBMP 25145/2019, High court of Karnataka — injunction/stay recorded; Writ petition filed by Sobha Limited against BBMP and Others, challenging the Ground Rent charges claimed by BBMP 388/2020, High court of Karnataka — injunction/stay recorded; Writ petition filed by Sobha Limited against BBMP and Others, before the High Court of Karnataka, challenging the Ground Rent,GSt and others charges claimed by BBMP 13573/2020, High court of Karnataka — injunction/stay recorded; OS 368/2020 filed by Manohar Babu and another against Rukkamma and others before IV Addl Senior Civil Judge at Bangalore Rural for partition, separate possession and other reliefs 368/2020, IV Additional Senior Civil Judge Bengaluru Rural Dist — no stay; OS 483/2022 filed by Kaveramma against Muniyappa and others before III Addl Senior Civil Judge at Bangalore Rural for partition, separate possession and other reliefs 483/2022, III Additional Senior Civil Judge Bengaluru Rural Dist — no stay
K-RERA complaints
2 on this registration (1 open) · 224 on the promoter entity across all its projects
Owners’ association
Not yet formed
Completion applied
19/12/2020

Source: Karnataka RERA project record PRM/KA/RERA/1251/446/PR/200121/003218, fetched 2026-09-15. Figures are the promoter’s own filings.

Complaint log (K-RERA) · 2 on this project

2025-05-27 · 00781/2025
Not Providing Additional Benefit as promised . — POSTED FOR ORDERS AUTHORITY BENCH4
2022-12-26 · CMP/221226/0010531
Refund of Full Token Advance of Rs.99,000/- — DISPOSED AUTHORITY BENCH4 (AUTHORITY)

Complaint subjects are as filed by complainants; a disposed complaint may have been decided either way.

Sources & caveats2 sources
  • Karnataka RERA project record PRM/KA/RERA/1251/446/PR/200121/003218 (registration file, quarterly updates, complaint register), fetched 2026-09-15
  • PropertyLens locality model (market-level estimates)
  • Karnataka RERA project records PRM/KA/RERA/1251/446/PR/200121/003218 (registration file, quarterly updates, complaint register), fetched Sep 2026.

Caveats. Automated analysis: prices, rents and travel times are estimates until listings and Maps data are verified. RERA figures are the promoter’s own filings. Nothing here is legal, tax or investment advice.

Evidence

Location, jobs & transit3 hubs · metro 1.5 km
Job hubs nearby
ORR Marathahalli–BellandurITPL 5 kmBrookefield / AECS
Measured drive times below
Office space
Existing50 msf
Coming in 3 yrs7 msf
Jobs within 30 min9/10
Getting around
Metro today
Purple Line Kundalahalli / Nallurhalli
~1,500 m estimate
Metro planned
ORR Blue Line stations
~2027 65% likely ~2,000 m estimate
Rail
—
estimate
Airport
79 min by road now · 29 km
Google Maps
Buses
7/10 coverage
estimate
Drive times to job hubs
DestinationDrive nowRoad km
ITPL Whitefield18 min5.4
ORR Bellandur (Ecospace)18 min5.4
Electronic City Ph-137 min12.7
Koramangala (Forum)37 min12.5
MG Road (CBD)39 min13.6
Manyata Tech Park47 min16.5
Hebbal (Kirloskar)50 min17.7
Kempegowda Airport (KIA)79 min29

Google Maps driving time with live traffic, measured Sep 2026. Refreshed monthly.

Location used: Google Maps match “”. Bus coverage and planned-station distances are still interim estimates.

Price historylocality 11.6%/yr

No dated project-level price series yet; only the latest observation is on file.

Locality · average ₹/sq ft
Date₹ psfSourceConfidenceKind
Jun 20216,800Platform estimate (interim, not observed)40%derived
Jun 20239,000Platform estimate (interim, not observed)45%derived
Jun 202511,200Platform estimate (interim, not observed)50%derived
Jun 202612,500Platform estimate (interim, not observed)50%derived
Luxury comps₹15,000
Premium comps₹12,000
Mid comps₹9,200
Unsold stock12 months

Model backtest on this locality: 1-yr hold-out (Jun 2025→Jun 2026): predicted ₹12,374 vs actual ₹12,500 (-1%). Longer 3-yr hold-out (Jun 2023→Jun 2026): predicted 9.4% p.a. vs actual 11.6% p.a. — the model is deliberately mean-reverting and under-predicted the 2021–26 boom.

Environment, legal & productflood ok · water risk · RERA yes
Flood risksome risk
Water supplymixed
Quietnoisy
Roads & drainspatchy

Varthur lake catchment; ORR congestion

Legal & approvals
Registration 003218
RERA PRM/KA/RERA/1251/446/PR/200121/003218
ready
Litigation
12 case(s) declared
observed
Approvals
RERA registered
observed
Title
not verified
assumed
Product
Land5.47 acres
Homes356
Density65/acre
Launched2019
Sources & data gapswhat we know, from where, and what is missing

Automated analysis: unit mix and carpet areas come from the RERA inventory table; prices and rents are locality-model estimates until listings are verified.

FieldValueSource classDateConf.KindConflicting values
AddressBalegere, Varthur HobliKarnataka RERA (number as reported; registry lookup pending)Sep 202680%observed
Land area (acres)5.47Karnataka RERA (number as reported; registry lookup pending)Sep 202680%observed
Total units356Karnataka RERA (number as reported; registry lookup pending)Sep 202680%observed
Launch year2019Karnataka RERA (number as reported; registry lookup pending)Sep 202670%observed
Possession · Registration 0032182026-09-30Karnataka RERA (number as reported; registry lookup pending)Sep 202670%observed
Price psf · Home · ~1,010 sq ft (712 carpet)12000Platform estimate (interim, not observed)Sep 202635%assumed
Ticket · Home · ~1,010 sq ft (712 carpet)12120000Platform estimate (interim, not observed)Sep 202635%derived
Rent · Home · ~1,010 sq ft (712 carpet)32000Platform estimate (interim, not observed)Sep 202635%assumed
Carpet area712Karnataka RERA (number as reported; registry lookup pending)Sep 202660%observed
Builder on-time rate0.57Karnataka RERA (number as reported; registry lookup pending)Sep 202660%derived
Litigation12 case(s) declaredKarnataka RERA (number as reported; registry lookup pending)Sep 202670%observed
ApprovalsRERA registeredKarnataka RERA (number as reported; registry lookup pending)Sep 202660%observed

Commercial listing portals are shown as “Listing portal (aggregated)”; full provenance is retained internally. Official developer and Karnataka RERA sources are named.

Other projects worth comparing

Same model, same date. Scores are out of 100, where 50 is the average analysed Bengaluru project.

Questions people ask about Sobha Dream Acres - Oasis Phase 27 Wing 55, 56, 57 and 58

Is Sobha Dream Acres - Oasis Phase 27 Wing 55, 56, 57 and 58 a good investment?

On PropertyLens's evidence-based model Sobha Dream Acres - Oasis Phase 27 Wing 55, 56, 57 and 58 scores 57/100, above the average analysed Bengaluru project (50 = average, 12 points = one standard deviation). The model projects price growth of about 8.8% a year over five years and a net-wealth CAGR of 5.5% after every cost on an 8-year hold with a 75.0% loan. That is research on public filings, not advice; the factor breakdown on this page shows what drives the score.

What is the price per sq ft at Sobha Dream Acres - Oasis Phase 27 Wing 55, 56, 57 and 58?

About ₹12,000 per sq ft of super built-up area, a model estimate from Marathahalli / Kundalahalli / Varthur comparables that you can edit. The Home home costs about ₹1.21 Cr before other charges, GST and stamp duty, and ₹1.43 Cr all-in.

When is Sobha Dream Acres - Oasis Phase 27 Wing 55, 56, 57 and 58 ready for possession?

The project is marked ready to move in; confirm the occupancy certificate before paying.

Is Sobha Dream Acres - Oasis Phase 27 Wing 55, 56, 57 and 58 RERA registered?

Yes. Karnataka RERA registration: PRM/KA/RERA/1251/446/PR/200121/003218. 2 complaints on this registration and 224 on the promoter across projects at K-RERA as of 2026-09-15.

How reliable is Sobha on delivery?

57% of Sobha's crawled Bengaluru registrations needed no extension (68 of 119 crawled Bengaluru registrations needed no extension). 119 registrations analysed. The developer scorecard compares this with every other Bengaluru developer.

What rent can Sobha Dream Acres - Oasis Phase 27 Wing 55, 56, 57 and 58 earn?

About ₹32,000 a month for this home (a model estimate from Marathahalli / Kundalahalli / Varthur rents), a gross yield of 3.1% on the all-in cost. Rent covers 39% of the EMI at the default loan.

Answers are generated from the filings and the model for this home and change when you edit the assumptions above. See the Sobha scorecard and the Marathahalli / Kundalahalli / Varthur area page.

Go deeper

Share on WhatsApp