The Woods Of East - Phase -V
Score, growth and returns below are for the highlighted home and plan. Prices, rent and possession never mix across phases.
Price edits apply to ·
All-in cost sheet this home, default assumptions
| Item | Basis | Amount |
|---|---|---|
| Base price | ₹4,650 per sq ft × 1,130 sq ft super built-up | 52.5 L |
| Other charges | 2.0% of base: floor-rise, preferred-location, car park, club, maintenance deposit, legal, corpus (edit in Assumptions) | 1.1 L |
| GST | 0.0% on an under-construction home | 0.0 L |
| Stamp duty and registration | 6.6% in Karnataka: 5% stamp duty + 1% registration + cess and surcharge on the agreement value | 3.5 L |
| All-in cost | what leaves your pocket and the bank's, before rent or resale | ₹57.1 L |
| Your own money | 75.0% loan at 8.5% for 20 years covers the rest; EMI 0.3 L a month | ₹47.9 L |
Carpet area 1,128 sq ft against 1,130 sq ft super built-up: you pay for 0% that is common area and walls. Price per sq ft of carpet ≈ ₹4,658. Every percentage above is editable in Assumptions; the defaults are Karnataka rates as of 2026-09.
In plain words
Each home is marked on 11 things a careful buyer checks, then compared with every project we analyse in Bengaluru: 50 is the average project, 62 beats about five in six. Here is what lifts this one and what drags it:
- +Employment access · 8/10 pts
Drive times right now: ORR Bellandur (Ecospace) 15 min, Electronic City Ph-1 20 min, Koramangala (Forum) 30 min; Hebbal (Kirloskar) 54 min. About 12 million sq ft of new offices are planned nearby in 3 years. - +Expected price growth (5-yr CAGR model) · 8/26 pts
We expect prices here to rise about 10.8% a year for the next 5 years (explained below). - +Price vs comparables · 1/3 pts
Cheaper than similar mid homes nearby: ₹4,650 vs about ₹9,000 per sq ft. - −Rental demand & yield · -4/8 pts
A plot earns no rent, so this scores low by design. - −Metro, bus, rail & airport · -3/9 pts
No working metro nearby (nearest 9 km). Airport is about 93 minutes by road right now. - −Builder delivery & handover risk · -4/16 pts
Odion Builders & Developers has finished 6+ projects and delivered on time about 76% of the time. This phase is still under construction, with handover promised for 2025-07-31: delays would push your rent start back.
All 11 checks
- +Price vs comparables · 1/3 pts
Cheaper than similar mid homes nearby: ₹4,650 vs about ₹9,000 per sq ft. - −Rental demand & yield · -4/8 pts
A plot earns no rent, so this scores low by design. - +Resale liquidity · -0/4 pts
Plenty of buyers can afford a ₹52.5 L home, and homes in Sarjapur Road resell at a normal pace. Reselling before handover needs the builder’s permission. - +Employment access · 8/10 pts
Drive times right now: ORR Bellandur (Ecospace) 15 min, Electronic City Ph-1 20 min, Koramangala (Forum) 30 min; Hebbal (Kirloskar) 54 min. About 12 million sq ft of new offices are planned nearby in 3 years. - −Metro, bus, rail & airport · -3/9 pts
No working metro nearby (nearest 9 km). Airport is about 93 minutes by road right now. - •Schools, hospitals, daily needs · -0/3 pts
Schools, hospitals and daily shopping are good in this area. - −Builder delivery & handover risk · -4/16 pts
Odion Builders & Developers has finished 6+ projects and delivered on time about 76% of the time. This phase is still under construction, with handover promised for 2025-07-31: delays would push your rent start back. - •Layout, size, age, amenities, maintenance · -0/3 pts
Moderately dense layout (60 homes per acre); about 72% of the area you pay for is usable carpet area. Maintenance ~₹3.5 per sq ft a month. - •Water, flooding, noise, infrastructure · -2/9 pts
Some flood risk in heavy rain; water supply is mostly borewell or tankers; noise is manageable. - +Legal, title & approvals · 1/5 pts
Registered with Karnataka RERA; no court cases reported; land title not yet verified by us, so get a lawyer to check. The due-diligence report below flags 1 item in red. - +Expected price growth (5-yr CAGR model) · 8/26 pts
We expect prices here to rise about 10.8% a year for the next 5 years (explained below).
We build the forecast step by step, starting from what Bengaluru homes normally do and adjusting for this area and this project:
- + 6.0%Start with 6.0% a year: the normal long-run growth of Bengaluru home prices.
- + 1.3%Add 1.3%: prices here rose 14.5% a year recently (2023-06 to 2026-06). Some of that pace continues, but it fades each year.
- − 0.5%Subtract 0.5%: at ₹4,650 per sq ft, fewer families can afford to buy here, which slows further rises.
- + 2.6%Add 2.6%: 12 million sq ft of new offices nearby means more people wanting homes here.
- − 0.7%Subtract 0.7%: many new homes are being built here (20 months of unsold stock), which keeps prices in check.
- + 0.2%Add 0.2% for new roads, metro and water lines, weighted by how likely they are to actually finish: Peripheral Ring Road (planned, 2030); Cauvery Stage V water (construction, 2027); Bengaluru suburban rail (K-RIDE) (construction, 2029).
- + 1.9%Add 1.9% for this project itself: unfinished homes are worth more once they are complete.
- = 10.8%Result: about 10.8% a year, so a home worth ₹53.6 L today would be worth about ₹89.4 L in 5 years. We are 56% confident in the evidence behind this.
Highlights
- Odion Builders & Developers · Sarjapur Road (Carmelaram / Dommasandra) · unit count not filed on 3.3 acres
- Under construction: progress not filed, RERA completion 2025-07-31
- No litigation declared · 0 complaints on this registration
Assumptions editable
Purchase
FinancingLoan 75% · cash 25% · EMI ₹34,884/mo
Rent & running costs
Interiors & exit
Returns over 8 years · no interiors
| Year | Purchase | Loan in | Rent (net of vacancy) | Opex | Debt service | Sale − loan | Net cash |
|---|---|---|---|---|---|---|---|
| Today | -57.3 L | 40.2 L | 0.0 L | 0.0 L | 0.0 L | 0.0 L | -17.1 L |
| Yr 1 | 0.0 L | 0.0 L | 0.0 L | -0.2 L | -4.2 L | 0.0 L | -4.3 L |
| Yr 2 | 0.0 L | 0.0 L | 0.0 L | -0.2 L | -4.2 L | 0.0 L | -4.4 L |
| Yr 3 | 0.0 L | 0.0 L | 0.0 L | -0.2 L | -4.2 L | 0.0 L | -4.4 L |
| Yr 4 | 0.0 L | 0.0 L | 0.0 L | -0.2 L | -4.2 L | 0.0 L | -4.4 L |
| Yr 5 | 0.0 L | 0.0 L | 0.0 L | -0.2 L | -4.2 L | 0.0 L | -4.4 L |
| Yr 6 | 0.0 L | 0.0 L | 0.0 L | -0.2 L | -4.2 L | 0.0 L | -4.4 L |
| Yr 7 | 0.0 L | 0.0 L | 0.0 L | -0.3 L | -4.2 L | 0.0 L | -4.4 L |
| Yr 8 | 0.0 L | 0.0 L | 0.0 L | -0.3 L | -4.2 L | 85.7 L | 81.2 L |
Pre-tax unless capital-gains tax is set. Rent enters the cash flows once. Net-wealth CAGR = (cash returned incl. sale ÷ cash put in)^(1/years) − 1. IRR uses the dated cash flows.
Score factors
Bars show points added or taken away versus the average analysed Bengaluru project (score 50).
Price growth model, year by year
Nominal growth per year. Parts add up; momentum fades, infrastructure is weighted by delivery probability and dated.
| Component | Yr 1 | Yr 2 | Yr 3 | Yr 4 | Yr 5 | Yr 6 | Confidence |
|---|---|---|---|---|---|---|---|
| Bengaluru long-run nominal trend | 6.0 | 6.0 | 6.0 | 6.0 | 6.0 | 6.0 | 80% |
| Locality momentum (mean-reverting) | 3.0 | 1.6 | 0.9 | 0.5 | 0.3 | 0.1 | 45% |
| Affordability ceiling | -0.9 | -0.6 | -0.4 | -0.3 | -0.2 | -0.1 | 60% |
| Employment access & office pipeline | 2.6 | 2.6 | 2.6 | 2.6 | 2.6 | 2.6 | 55% |
| Supply–demand balance | -1.0 | -0.8 | -0.6 | -0.5 | -0.4 | -0.3 | 50% |
| Infrastructure delivery (probability-weighted) | 0.1 | 0.2 | 0.2 | 0.2 | 0.1 | 0.2 | 55% |
| Project-specific adjustments | 3.5 | 1.5 | 1.5 | 1.5 | 1.5 | 1.5 | 50% |
| Total growth | 13.4% | 10.6% | 10.2% | 10.0% | 9.9% | 10.0% | 56% |
Bengaluru long-run nominal trend: City-wide 2013-25 nominal residential trend ≈ inflation + real income growth.
Locality momentum (mean-reverting): Trailing 3.0-yr locality CAGR 14.5% vs 6.0% trend; 35% carried forward, halving each year.
Affordability ceiling: Ticket at ₹4,650 psf vs city median ₹9,500; buyer pool thins above ₹15k/₹20k psf and after >6pp excess growth.
Employment access & office pipeline: 12 msf office pipeline (3 yr) on 18 msf stock; 30-min jobs index 0.60.
Supply–demand balance: 20 months of unsold inventory; new-launch/absorption ratio 1.34 (from 72 under-construction RERA filings in this locality: 13,146 unsold homes, 722.1 sold per month).
Infrastructure delivery (probability-weighted): Phase 3A Sarjapur–Hebbal (planned, 2033, p=0.45); Peripheral Ring Road (planned, 2030, p=0.4); Cauvery Stage V water (construction, 2027, p=0.7); Bengaluru suburban rail (K-RIDE) (construction, 2029, p=0.5)
Project-specific adjustments: Remaining construction risk (13% work left) re-rates toward ready comps by handover (~1.0% over 0.5 yr). Land in expansion corridors historically outpaces built stock; no depreciation.
Locality evidence: ₹8,000 (Jun 2023) → ₹12,000 (Jun 2026) = 14.5% p.a. Sources: Platform estimate (interim, not observed).
What the public record says
Automated from the Karnataka RERA file PRM/KA/RERA/1251/446/PR/220720/005090. Prices and rents are locality estimates, not verified listings. Compiled Sep 2026 from the Karnataka RERA file, company registers, rating agencies, tribunal records and press. Facts only; anything that deserves a written answer before signing is flagged.
Meters are rule-based from the RERA file and public ratings (rules shown under each), not opinions.
No public credit rating located for the promoter.
ODION BUILDERS AND DEVELOPERS: no public rating located
On its original RERA completion date: 2025-07-31
No RERA complaints on this project; 0 on the promoter overall
No litigation declared in RERA filings
RERA file · Registration
Red flags to resolve in writing
RERA completion date 2025-07-31 has passed without a completion application.
Questions to put to the developer before you sign
- Share the latest CA Form 4 and architect Form 5 with the escrow deposit ratio.
- Confirm the price list, floor-rise and other charges for the exact unit.
- Which date is contractual — 2025-07-31 — and what is the per-month delay compensation?
- Confirm there is no litigation on the land or approvals beyond the RERA declaration.
- Is the land freehold with the developer, and is any part mortgaged?
Full record: every filed number, line by line1 sections · 7 items
RERA file · Registration
Source: Karnataka RERA project record PRM/KA/RERA/1251/446/PR/220720/005090, fetched 2026-09-15. Figures are the promoter’s own filings.
Sources & caveats2 sources
- Karnataka RERA project record PRM/KA/RERA/1251/446/PR/220720/005090 (registration file, quarterly updates, complaint register), fetched 2026-09-15
- PropertyLens locality model (market-level estimates)
- Karnataka RERA project records PRM/KA/RERA/1251/446/PR/220720/005090 (registration file, quarterly updates, complaint register), fetched Sep 2026.
Caveats. Automated analysis: prices, rents and travel times are estimates until listings and Maps data are verified. RERA figures are the promoter’s own filings. Nothing here is legal, tax or investment advice.
Evidence
Location, jobs & transit4 hubs · metro none nearby
| Destination | Drive now | Road km |
|---|---|---|
| ORR Bellandur (Ecospace) | 15 min | 4.1 |
| Electronic City Ph-1 | 20 min | 6.2 |
| Koramangala (Forum) | 30 min | 10 |
| ITPL Whitefield | 34 min | 11.6 |
| MG Road (CBD) | 38 min | 13.2 |
| Manyata Tech Park | 53 min | 18.8 |
| Hebbal (Kirloskar) | 54 min | 19.1 |
| Kempegowda Airport (KIA) | 93 min | 34.2 |
Google Maps driving time with live traffic, measured Sep 2026. Refreshed monthly.
Location used: Google Maps match “”. Bus coverage and planned-station distances are still interim estimates.
Price historylocality 14.5%/yr
No dated project-level price series yet; only the latest observation is on file.
| Date | ₹ psf | Source | Confidence | Kind |
|---|---|---|---|---|
| Jun 2021 | 6,050 | Platform estimate (interim, not observed) | 40% | derived |
| Jun 2023 | 8,000 | Platform estimate (interim, not observed) | 45% | derived |
| Jun 2025 | 10,800 | Platform estimate (interim, not observed) | 50% | derived |
| Jun 2026 | 12,000 | Platform estimate (interim, not observed) | 50% | derived |
Model backtest on this locality: 1-yr hold-out (Jun 2025→Jun 2026): predicted ₹11,852 vs actual ₹12,000 (-1.2%). Longer 3-yr hold-out (Jun 2023→Jun 2026): predicted 9% p.a. vs actual 14.5% p.a. — the model is deliberately mean-reverting and under-predicted the 2021–26 boom.
Environment, legal & productflood ok · water risk · RERA yes
Heavy tanker dependence pending Cauvery Stage V; Varthur lake catchment
Sources & data gapswhat we know, from where, and what is missing
Automated analysis: unit mix and carpet areas come from the RERA inventory table; prices and rents are locality-model estimates until listings are verified.
| Field | Value | Source class | Date | Conf. | Kind | Conflicting values |
|---|---|---|---|---|---|---|
| Address | SY. NOS .32/1 & 37/1 OF CHIKKANAYAKANAHALLI VILLAGE, VARTHUR HOBLI, BANGALORE EAST TALUK | Karnataka RERA (number as reported; registry lookup pending) | Sep 2026 | 80% | observed | |
| Land area (acres) | 3.3 | Karnataka RERA (number as reported; registry lookup pending) | Sep 2026 | 80% | observed | |
| Total units | Platform estimate (interim, not observed) | Sep 2026 | 20% | assumed | ||
| Launch year | 2021 | Karnataka RERA (number as reported; registry lookup pending) | Sep 2026 | 70% | observed | |
| Possession · Registration 005090 | 2025-07-31 | Karnataka RERA (number as reported; registry lookup pending) | Sep 2026 | 70% | observed | |
| Price psf · Plot · 1128 sq ft | 4650 | Platform estimate (interim, not observed) | Sep 2026 | 35% | assumed | |
| Ticket · Plot · 1128 sq ft | 5254500 | Platform estimate (interim, not observed) | Sep 2026 | 35% | derived | |
| Rent · Plot · 1128 sq ft | 0 | Platform estimate (interim, not observed) | Sep 2026 | 35% | assumed | |
| Carpet area | 1128 | Karnataka RERA (number as reported; registry lookup pending) | Sep 2026 | 60% | observed | |
| Builder on-time rate | 0.76 | Karnataka RERA (number as reported; registry lookup pending) | Sep 2026 | 60% | derived | |
| Litigation | none reported | Karnataka RERA (number as reported; registry lookup pending) | Sep 2026 | 70% | observed | |
| Approvals | RERA registered | Karnataka RERA (number as reported; registry lookup pending) | Sep 2026 | 60% | observed |
Commercial listing portals are shown as “Listing portal (aggregated)”; full provenance is retained internally. Official developer and Karnataka RERA sources are named.
Other projects worth comparing
Same model, same date. Scores are out of 100, where 50 is the average analysed Bengaluru project.
More in Sarjapur Road All Sarjapur Road →
More from Odion Builders & Developers Delivery record →
Around ₹52.5 L elsewhere in Bengaluru All projects →
Questions people ask about The Woods Of East - Phase -V
Is The Woods Of East - Phase -V a good investment?
On PropertyLens's evidence-based model The Woods Of East - Phase -V scores 52/100, below the average analysed Bengaluru project (50 = average, 12 points = one standard deviation). The model projects price growth of about 10.8% a year over five years and a net-wealth CAGR of 6.8% after every cost on an 8-year hold with a 75.0% loan. That is research on public filings, not advice; the factor breakdown on this page shows what drives the score.
What is the price per sq ft at The Woods Of East - Phase -V?
About ₹4,650 per sq ft of super built-up area, a model estimate from Sarjapur Road comparables that you can edit. The Plot home costs about ₹52.5 L before other charges, GST and stamp duty, and ₹57.1 L all-in.
When is The Woods Of East - Phase -V ready for possession?
The RERA registration commits to Jul 2025. The project is 14 months past its original RERA completion date.
Is The Woods Of East - Phase -V RERA registered?
Yes. Karnataka RERA registration: PRM/KA/RERA/1251/446/PR/220720/005090. No complaints on this registration at K-RERA as of 2026-09-15.
How reliable is Odion Builders & Developers on delivery?
76% of Odion Builders & Developers's crawled Bengaluru registrations needed no extension (5 of 6 crawled Bengaluru registrations needed no extension). 6 registrations analysed. The developer scorecard compares this with every other Bengaluru developer.
What rent can The Woods Of East - Phase -V earn?
Plots earn no rent; the return is price growth alone.
Answers are generated from the filings and the model for this home and change when you edit the assumptions above. See the Odion Builders & Developers scorecard and the Sarjapur Road area page.