Is Kondhwa / NIBM / Undri / Pisoli good for investment?
75 RERA-registered projects scored on one model, as of November 11, 2026. Prices, growth, yields, supply and the best-scored homes.
Kondhwa / NIBM / Undri / Pisoli in one paragraph
On PropertyLens's model, Kondhwa / NIBM / Undri / Pisoli is a weaker-than-average place to buy in Pune right now: the median analysed project scores 41/100 (below the Pune average), with projected price growth of 7.5% a year over five years and a median gross rental yield of 3.3%. Unsold homes would take about 20 months to absorb at the current sales pace, which is heavy supply and caps near-term price growth. 8 of 58 under-construction projects here are past their original RERA completion date, so weight the developer's record heavily.
Median of 75 projects; the spread inside the area is wide, so the ranked list below matters more than the average.
Best-scored projects in Kondhwa / NIBM / Undri / Pisoli
All 75 analysed projects in Kondhwa / NIBM / Undri / Pisoli
| Project | Score | Growth / yr | Net-wealth CAGR | Cash-flow IRR | Price / sq ft | Price | Status |
|---|---|---|---|---|---|---|---|
| Majestique Ephelia Phase 3 Majestique Landmarks · Kondhwa / NIBM / Undri / Pisoli | 50 | 8.9% | 4.2% | 7.5% | ₹8,350 est. | ₹62.6 L | Under construction Dec 2030 |
| Elixir - Phase I Kolte-Patil · Kondhwa / NIBM / Undri / Pisoli | 50 | 8.7% | 3.4% | 5.9% | ₹8,350 est. | ₹62.6 L | Under construction Jun 2030 |
| Dynamic Solitaire – Phase II Dynamic Realty Enterprises · Kondhwa / NIBM / Undri / Pisoli | 50 | 8.9% | 3.9% | 7.1% | ₹6,600 est. | ₹49.5 L | Under construction Dec 2030 |
| Raheja Aurum Cavalcade Properties · Kondhwa / NIBM / Undri / Pisoli | 49 | 8.9% | 4.0% | 7.2% | ₹6,600 est. | ₹49.5 L | Under construction Nov 2030 |
| Nyati Elenor Nyati Group · Kondhwa / NIBM / Undri / Pisoli | 48 | 8.7% | 3.8% | 6.4% | ₹8,350 est. | ₹62.6 L | Under construction Oct 2029 |
| Dynamic Solitaire Dynamic Realty Enterprises · Kondhwa / NIBM / Undri / Pisoli | 47 | 8.5% | 4.1% | 8.0% | ₹6,600 est. | ₹49.5 L | Under construction Dec 2031 |
| T4 named Astra of Raheja Galaxy in RV Premiere Cavalcade Properties · Kondhwa / NIBM / Undri / Pisoli | 47 | 8.9% | 3.9% | 7.1% | ₹6,600 est. | ₹49.5 L | Under construction Dec 2030 |
| Ephelia Phase 2 Majestique Landmarks · Kondhwa / NIBM / Undri / Pisoli | 47 | 8.3% | 3.1% | 5.0% | ₹8,350 est. | ₹62.6 L | Under construction Dec 2028 |
| T4A named Celina of Raheja Galaxy in RV Premiere Cavalcade Properties · Kondhwa / NIBM / Undri / Pisoli | 46 | 8.7% | 3.4% | 5.8% | ₹6,600 est. | ₹49.5 L | Under construction Mar 2030 |
| Majestique Rhythm County Phase III Majestique Landmarks · Kondhwa / NIBM / Undri / Pisoli | 45 | 7.5% | 1.8% | 2.4% | ₹8,350 est. | ₹62.6 L | Under construction Dec 2026 |
| Rbd- Elina Legend Chaphalkar Karandikar Developers · Kondhwa / NIBM / Undri / Pisoli | 45 | 8.5% | 4.1% | 8.0% | ₹6,600 est. | ₹49.5 L | Under construction Dec 2031 |
| T7 named Belvedere phase 3 of Raheja Reserve being buildings T7 T8 T9 T10 in RV Premiere Cavalcade Properties · Kondhwa / NIBM / Undri / Pisoli | 45 | 7.1% | 3.0% | 3.8% | ₹7,000 est. | ₹52.5 L | Ready |
| Dynamic Grandeur Premium H Dynamic Realty Enterprises · Kondhwa / NIBM / Undri / Pisoli | 45 | 8.7% | 3.5% | 6.0% | ₹6,600 est. | ₹49.5 L | Under construction Dec 2029 |
| Siddhi Aurum Siddhivinayak Developers · Kondhwa / NIBM / Undri / Pisoli | 44 | 8.3% | 3.0% | 4.7% | ₹6,600 est. | ₹49.5 L | Under construction Dec 2028 |
| Ephelia- Phase 1 Majestique Landmarks · Kondhwa / NIBM / Undri / Pisoli | 44 | 7.1% | 2.9% | 3.7% | ₹8,900 est. | ₹66.8 L | Ready |
| Provident Kenvista T12 Provident · Kondhwa / NIBM / Undri / Pisoli | 44 | 7.9% | 2.2% | 3.3% | ₹6,600 est. | ₹49.5 L | Under construction Jun 2028 |
| Nyati Esteban III Nyati Group · Kondhwa / NIBM / Undri / Pisoli | 44 | 8.9% | 4.2% | 7.6% | ₹8,350 est. | ₹62.6 L | Under construction Nov 2030 |
| Dynamic Grandeur Premium J Wing Dynamic Realty Enterprises · Kondhwa / NIBM / Undri / Pisoli | 43 | 8.5% | 4.1% | 8.0% | ₹6,600 est. | ₹49.5 L | Under construction Dec 2031 |
| Lodha Pune NIBM Project- Tower 7,8 and 9 Lodha (Macrotech) · Kondhwa / NIBM / Undri / Pisoli | 43 | 7.9% | 2.5% | 3.9% | ₹11,050 est. | ₹82.9 L | Under construction Dec 2027 |
| T1 named Helios of Raheja Galaxy in RV Premiere Cavalcade Properties · Kondhwa / NIBM / Undri / Pisoli | 43 | 8.3% | 3.0% | 4.8% | ₹6,600 est. | ₹49.5 L | Under construction Nov 2028 |
| Lodha Pune NIBM Project-Tower 5 Lodha (Macrotech) · Kondhwa / NIBM / Undri / Pisoli | 43 | 7.5% | 1.6% | 2.2% | ₹11,050 est. | ₹82.9 L | Under construction Dec 2026 |
| Lodha Pune NIBM Project-Tower 6 Lodha (Macrotech) · Kondhwa / NIBM / Undri / Pisoli | 43 | 7.5% | 1.6% | 2.2% | ₹11,050 est. | ₹82.9 L | Under construction Dec 2026 |
| Lodha Pune NIBM Project-Tower 10 Lodha (Macrotech) · Kondhwa / NIBM / Undri / Pisoli | 43 | 7.5% | 1.6% | 2.2% | ₹11,050 est. | ₹82.9 L | Under construction Dec 2026 |
| Lodha Bella Vita Signet Lodha (Macrotech) · Kondhwa / NIBM / Undri / Pisoli | 43 | 7.5% | 1.6% | 2.2% | ₹11,050 est. | ₹82.9 L | Under construction Dec 2026 |
| High-Street of Raheja Galaxy in RVP Cavalcade Properties · Kondhwa / NIBM / Undri / Pisoli | 43 | 8.3% | 2.9% | 4.6% | ₹6,600 est. | ₹49.5 L | Under construction Mar 2029 |
| Provident Kenvista T10 Provident · Kondhwa / NIBM / Undri / Pisoli | 42 | 7.9% | 2.2% | 3.3% | ₹6,600 est. | ₹49.5 L | Under construction Jun 2028 |
| Provident Kenvista T11 Provident · Kondhwa / NIBM / Undri / Pisoli | 42 | 7.9% | 2.2% | 3.3% | ₹6,600 est. | ₹49.5 L | Under construction Jun 2028 |
| Raheja Sterling - Tower 3 Cavalcade Properties · Kondhwa / NIBM / Undri / Pisoli | 42 | 7.5% | 1.8% | 2.3% | ₹6,600 est. | ₹49.5 L | Under construction Nov 2026 |
| T11 named as Raheja Stellar in RV Premiere Cavalcade Properties · Kondhwa / NIBM / Undri / Pisoli | 42 | 7.5% | 1.8% | 2.3% | ₹6,600 est. | ₹49.5 L | Under construction Dec 2026 |
| Raheja Sterling - Tower 4 Cavalcade Properties · Kondhwa / NIBM / Undri / Pisoli | 42 | 7.5% | 1.8% | 2.3% | ₹6,600 est. | ₹49.5 L | Under construction Dec 2026 |
| Raheja Sterling - Tower 5 Cavalcade Properties · Kondhwa / NIBM / Undri / Pisoli | 42 | 7.5% | 1.8% | 2.3% | ₹6,600 est. | ₹49.5 L | Under construction Dec 2026 |
| Kumar Palmcrest A6 Kumar Properties · Kondhwa / NIBM / Undri / Pisoli | 42 | 8.3% | 3.0% | 4.9% | ₹8,350 est. | ₹62.6 L | Under construction Mar 2029 |
| Kumar Plexus Kumar Properties · Kondhwa / NIBM / Undri / Pisoli | 42 | 8.3% | 2.9% | 4.6% | ₹8,350 est. | ₹62.6 L | Under construction May 2029 |
| Princetown Tower - C1 Kumar Properties · Kondhwa / NIBM / Undri / Pisoli | 42 | 7.9% | 2.6% | 3.9% | ₹8,350 est. | ₹62.6 L | Under construction Dec 2027 |
| Dynamic Grandeur Premium I Dynamic Realty Enterprises · Kondhwa / NIBM / Undri / Pisoli | 42 | 8.5% | 4.1% | 8.0% | ₹6,600 est. | ₹49.5 L | Under construction Dec 2031 |
| Mantra Essence Phase 4 Mantra Properties · Kondhwa / NIBM / Undri / Pisoli | 41 | 7.1% | 3.0% | 3.8% | ₹7,000 est. | ₹52.5 L | Ready |
| Mantra Essence Phase 6 Mantra Properties · Kondhwa / NIBM / Undri / Pisoli | 41 | 7.1% | 3.0% | 3.8% | ₹7,000 est. | ₹52.5 L | Ready |
| Verve Villas at Raheja Sterling Cavalcade Properties · Kondhwa / NIBM / Undri / Pisoli | 41 | 7.9% | 2.2% | 3.3% | ₹6,600 est. | ₹49.5 L | Under construction Jun 2028 |
| Kumar Palmnest Kumar Properties · Kondhwa / NIBM / Undri / Pisoli | 41 | 8.9% | 4.2% | 7.5% | ₹8,350 est. | ₹62.6 L | Under construction Dec 2030 |
| T2 named Constella of Raheja Galaxy in RV Premiere Cavalcade Properties · Kondhwa / NIBM / Undri / Pisoli | 41 | 7.9% | 2.2% | 3.2% | ₹6,600 est. | ₹49.5 L | Under construction Jul 2028 |
| T3 named Altair of Raheja Galaxy in RV Premiere Cavalcade Properties · Kondhwa / NIBM / Undri / Pisoli | 41 | 7.9% | 2.2% | 3.2% | ₹6,600 est. | ₹49.5 L | Under construction Jul 2028 |
| The Landmark Siddhivinayak Developers · Kondhwa / NIBM / Undri / Pisoli | 41 | 8.3% | 3.0% | 4.7% | ₹6,600 est. | ₹49.5 L | Under construction Dec 2028 |
| Princetown Royal - B3 and B6 Kumar Properties · Kondhwa / NIBM / Undri / Pisoli | 40 | 7.5% | 1.9% | 2.7% | ₹8,350 est. | ₹62.6 L | Under construction May 2027 |
| 38 Park Majestique Phase V Majestique Landmarks · Kondhwa / NIBM / Undri / Pisoli | 40 | 7.5% | 1.8% | 2.4% | ₹8,350 est. | ₹62.6 L | Under construction Dec 2026 |
| KUL Utsav Phase I -Building G Kumar Properties · Kondhwa / NIBM / Undri / Pisoli | 39 | 7.1% | 2.9% | 3.7% | ₹8,900 est. | ₹66.8 L | Ready |
| Venkatesh Galaxy Wing D2 and F Venkatesh Associates · Kondhwa / NIBM / Undri / Pisoli | 39 | 7.1% | 3.0% | 3.8% | ₹7,000 est. | ₹52.5 L | Ready |
| Crystal Paradise Building A, B Venkatesh Associates · Kondhwa / NIBM / Undri / Pisoli | 39 | 7.1% | 3.0% | 3.8% | ₹7,000 est. | ₹52.5 L | Ready |
| Hillcrest Manor Rathi Group · Kondhwa / NIBM / Undri / Pisoli | 39 | 8.3% | 2.6% | 4.1% | ₹6,600 est. | ₹49.5 L | Under construction Sep 2029 |
| Dynamic Grandeur Premium L Phase II Dynamic Realty Enterprises · Kondhwa / NIBM / Undri / Pisoli | 39 | 7.5% | 1.8% | 2.3% | ₹6,600 est. | ₹49.5 L | Under construction Dec 2026 |
| Nyati Exuberance I Nyati Group · Kondhwa / NIBM / Undri / Pisoli | 38 | 7.1% | 2.9% | 3.7% | ₹8,900 est. | ₹66.8 L | Ready |
| Nyati Exuberance III Nyati Group · Kondhwa / NIBM / Undri / Pisoli | 38 | 7.1% | 2.9% | 3.7% | ₹8,900 est. | ₹66.8 L | Ready |
| Nyati Elite Nyati Group · Kondhwa / NIBM / Undri / Pisoli | 38 | 7.1% | 2.9% | 3.7% | ₹8,900 est. | ₹66.8 L | Ready |
| Nyati Defence Enclave I Nyati Group · Kondhwa / NIBM / Undri / Pisoli | 38 | 7.1% | 2.9% | 3.7% | ₹8,900 est. | ₹66.8 L | Ready |
| Nyati Defence Enclave II Nyati Group · Kondhwa / NIBM / Undri / Pisoli | 38 | 7.1% | 2.9% | 3.7% | ₹8,900 est. | ₹66.8 L | Ready |
| Nyati Defence Enclave III Nyati Group · Kondhwa / NIBM / Undri / Pisoli | 38 | 7.1% | 2.9% | 3.7% | ₹8,900 est. | ₹66.8 L | Ready |
| Nyati Exuberance II Nyati Group · Kondhwa / NIBM / Undri / Pisoli | 38 | 7.1% | 2.9% | 3.7% | ₹8,900 est. | ₹66.8 L | Ready |
| Hubtown Countrywoods Building 4 Hubtown · Kondhwa / NIBM / Undri / Pisoli | 37 | 7.1% | 2.9% | 3.7% | ₹8,900 est. | ₹66.8 L | Ready |
| Nyati Esteban II Nyati Group · Kondhwa / NIBM / Undri / Pisoli | 37 | 7.5% | 1.8% | 2.5% | ₹8,350 est. | ₹62.6 L | Under construction Sep 2027 |
| The Spectrum Shriram Properties · Kondhwa / NIBM / Undri / Pisoli | 36 | 8.0% | 10.3% | 17.1% | ₹8,350 est. | ₹62.6 L | Under construction Apr 2035 |
| Ganga Glitz G Undri Pune Goel Ganga · Kondhwa / NIBM / Undri / Pisoli | 36 | 7.1% | 3.0% | 3.8% | ₹7,000 est. | ₹52.5 L | Ready |
| Majestique Mrugavarsha Phase III Majestique Landmarks · Kondhwa / NIBM / Undri / Pisoli | 36 | 7.5% | 1.8% | 2.4% | ₹8,350 est. | ₹62.6 L | Under construction Dec 2026 |
| Sukhwani Verde Sukhwani Constructions · Kondhwa / NIBM / Undri / Pisoli | 36 | 7.9% | 2.5% | 3.8% | ₹6,600 est. | ₹49.5 L | Under construction Dec 2027 |
| Sai Sparsh Sai Developers · Kondhwa / NIBM / Undri / Pisoli | 36 | 7.9% | 2.5% | 3.8% | ₹6,600 est. | ₹49.5 L | Under construction Dec 2027 |
| Nyati Exuberance IV Nyati Group · Kondhwa / NIBM / Undri / Pisoli | 35 | 7.5% | 2.1% | 2.9% | ₹8,350 est. | ₹62.6 L | Under construction Mar 2027 |
| AMITs COLORI Phase-III G Building Amit Enterprises Housing · Kondhwa / NIBM / Undri / Pisoli | 34 | 7.1% | 3.0% | 3.8% | ₹7,000 est. | ₹52.5 L | Ready |
| Kesar Raichandani Constructions · Kondhwa / NIBM / Undri / Pisoli | 34 | 7.5% | 1.8% | 2.3% | ₹6,600 est. | ₹49.5 L | Under construction Dec 2025 |
| Lodha Pune NIBM Project Lodha (Macrotech) · Kondhwa / NIBM / Undri / Pisoli | 34 | 7.5% | 1.7% | 2.2% | ₹11,050 est. | ₹82.9 L | Under construction Jul 2026 |
| T8 named LUXURIANT Phase 2 of Raheja Reserve being Buildings T7 T8 T9 T10 in RV Premiere Cavalcade Properties · Kondhwa / NIBM / Undri / Pisoli | 33 | 7.5% | 1.8% | 2.3% | ₹6,600 est. | ₹49.5 L | Under construction Mar 2026 |
| Raheja Sterling - Tower 1 Cavalcade Properties · Kondhwa / NIBM / Undri / Pisoli | 33 | 7.5% | 1.8% | 2.3% | ₹6,600 est. | ₹49.5 L | Under construction Mar 2026 |
| Raheja Sterling - Tower 2 Cavalcade Properties · Kondhwa / NIBM / Undri / Pisoli | 33 | 7.5% | 1.8% | 2.3% | ₹6,600 est. | ₹49.5 L | Under construction Mar 2026 |
| Ganga Fernhill phase 02 Goel Ganga · Kondhwa / NIBM / Undri / Pisoli | 32 | 7.5% | 1.8% | 2.3% | ₹6,600 est. | ₹49.5 L | Under construction Dec 2026 |
| Princetown Tower - C2 Kumar Properties · Kondhwa / NIBM / Undri / Pisoli | 31 | 7.5% | 1.8% | 2.4% | ₹8,350 est. | ₹62.6 L | Under construction Dec 2025 |
| Astonia Classic Phase II - A5 Building Amit Enterprises Housing · Kondhwa / NIBM / Undri / Pisoli | 30 | 7.5% | 1.8% | 2.3% | ₹6,600 est. | ₹49.5 L | Under construction Dec 2026 |
| Elina Lite Chaphalkar Karandikar Developers · Kondhwa / NIBM / Undri / Pisoli | 30 | 7.5% | 1.8% | 2.3% | ₹6,600 est. | ₹49.5 L | Under construction Jan 2026 |
| Kumar Palmcrest A5 Kumar Properties · Kondhwa / NIBM / Undri / Pisoli | 30 | 7.5% | 1.8% | 2.4% | ₹8,350 est. | ₹62.6 L | Under construction Dec 2025 |
Price per sq ft in Kondhwa / NIBM / Undri / Pisoli: what the evidence says
| Date | ₹ / sq ft | Basis | Confidence |
|---|---|---|---|
| 2021-06 | ₹6,800 | pun (derived) | 40% |
| 2023-06 | ₹7,400 | pun (derived) | 45% |
| 2025-06 | ₹8,600 | pun (derived) | 50% |
| 2026-06 | ₹9,200 | pun (derived) | 50% |
That is 6.2% a year from 2021-06 to 2026-06. The model projects 7.5% a year from here; the growth story on each project page shows why.
Infrastructure pipeline
| Project | Type | Status | Expected | Chance it lands on time | Price effect if it does |
|---|---|---|---|---|---|
| Metro extensions PCMC–Nigdi and Swargate–Katraj | metro | construction | 2027 | 60% | +0.8% / yr |
| Pune Ring Road (PMRDA) | road | construction | 2029 | 45% | +0.8% / yr |
The growth model counts each event at its probability, not its promise. Dates are the latest public schedule.
Developers active in Kondhwa / NIBM / Undri / Pisoli
Ranked lists for Kondhwa / NIBM / Undri / Pisoli
Kondhwa / NIBM / Undri / Pisoli compared with other areas
Questions people ask
Is Kondhwa / NIBM / Undri / Pisoli good for investment?
On PropertyLens's model the median analysed project in Kondhwa / NIBM / Undri / Pisoli scores 41/100 (below the Pune average), with projected price growth of 7.5% a year over five years, median price ₹7,000 per sq ft and gross rental yield 3.3%. 75 RERA-registered projects analysed as of November 11, 2026. The best-scored project is Majestique Ephelia Phase 3 at 50.
What is the price per sq ft in Kondhwa / NIBM / Undri / Pisoli?
Median ₹7,000 per sq ft of super built-up area across analysed projects, modelled from comparables where developers file no price. Entry price for an analysed home is about ₹49.5 L; the median home is ₹52.5 L.
What rental yield can I expect in Kondhwa / NIBM / Undri / Pisoli?
Median gross yield 3.3% on the all-in cost of an analysed home, before maintenance, vacancy and tax. Net-wealth CAGR after every cost on an 8-year hold with a 75% loan is 2.9% at the median.
Are projects in Kondhwa / NIBM / Undri / Pisoli delayed?
8 of 58 under-construction projects are past the completion date in their original RERA registration, and unsold stock equals about 20 months of sales. Each project page shows extensions, construction against bookings and complaints.
Scores and projections are model outputs built from dated public evidence (MahaRERA public filings, public ratings) and stated assumptions. Unit sizes and prices in this city are modelled estimates because the regulator does not publish unit inventories openly. They are research, not investment advice. How the numbers are built.