East, Pune · Wagholi / Lohegaon / Kesnand

Is Wagholi / Lohegaon / Kesnand good for investment?

80 RERA-registered projects scored on one model, as of November 11, 2026. Prices, growth, yields, supply and the best-scored homes.

Straight answer · as of November 11, 2026

Wagholi / Lohegaon / Kesnand in one paragraph

On PropertyLens's model, Wagholi / Lohegaon / Kesnand is an average place to buy in Pune right now: the median analysed project scores 48/100 (below the Pune average), with projected price growth of 8.9% a year over five years and a median gross rental yield of 3.1%. Unsold homes would take about 22 months to absorb at the current sales pace, which is heavy supply and caps near-term price growth. 5 of 62 under-construction projects here are past their original RERA completion date, so weight the developer's record heavily.

Median of 80 projects; the spread inside the area is wide, so the ranked list below matters more than the average.

Projects analysed
80
18 ready · 62 under construction
Median score
48
below the Pune average
Projected growth / yr
8.9%
5-yr; 10-yr 8.6%
Median price / sq ft
₹6,650
modelled from comparables
Gross rental yield
3.1%
median, on all-in cost
Net-wealth CAGR
3.9%
8-yr hold, 75% loan, after all costs
Months of inventory
22
RERA filings
Past RERA date
5 / 62
under-construction projects overdue
Entry price
₹21.4 L
median ₹49.9 L

Best-scored projects in Wagholi / Lohegaon / Kesnand

All 80 analysed projects in Wagholi / Lohegaon / Kesnand

ProjectScoreGrowth / yrNet-wealth CAGRCash-flow IRRPrice / sq ftPriceStatus
Kharadi New Project -Tower 11
Lodha (Macrotech) · Wagholi / Lohegaon / Kesnand
559.9%5.6%10.2%₹8,800 est.₹66.0 LUnder construction
Nov 2030
Mahindra Codename Crown Tower A and Tower B
Mahindra Lifespaces · Wagholi / Lohegaon / Kesnand
559.7%4.8%8.2%₹6,650 est.₹49.9 LUnder construction
Dec 2029
Mahindra Codename Crown Tower E
Mahindra Lifespaces · Wagholi / Lohegaon / Kesnand
559.7%4.8%8.2%₹6,650 est.₹49.9 LUnder construction
Dec 2029
Mahindra IvyLush Tower C and Tower D
Mahindra Lifespaces · Wagholi / Lohegaon / Kesnand
549.6%4.4%7.6%₹6,650 est.₹49.9 LUnder construction
Aug 2030
Kharadi New Project -Tower 6
Lodha (Macrotech) · Wagholi / Lohegaon / Kesnand
549.8%5.3%9.8%₹8,800 est.₹66.0 LUnder construction
Mar 2031
Kharadi New Project - Tower 1
Lodha (Macrotech) · Wagholi / Lohegaon / Kesnand
539.7%4.9%8.4%₹8,800 est.₹66.0 LUnder construction
Mar 2030
Kharadi New Project -Tower 2
Lodha (Macrotech) · Wagholi / Lohegaon / Kesnand
539.7%4.9%8.4%₹8,800 est.₹66.0 LUnder construction
Mar 2030
Kharadi New Project - Tower 3
Lodha (Macrotech) · Wagholi / Lohegaon / Kesnand
539.7%4.9%8.4%₹8,800 est.₹66.0 LUnder construction
Mar 2030
Kharadi New Project -Tower 4
Lodha (Macrotech) · Wagholi / Lohegaon / Kesnand
539.7%4.9%8.4%₹8,800 est.₹66.0 LUnder construction
Mar 2030
Majestique Tower East Phase-9
Sharad Shree Enterprises · Wagholi / Lohegaon / Kesnand
539.9%4.8%9.0%₹5,150 est.₹38.6 LUnder construction
Dec 2030
Kharadi New Project -Tower 9
Lodha (Macrotech) · Wagholi / Lohegaon / Kesnand
539.6%5.0%9.2%₹8,800 est.₹66.0 LUnder construction
Sep 2031
Yashwin Enchante Phase 2
Vilas Javdekar · Wagholi / Lohegaon / Kesnand
529.7%4.8%8.2%₹6,650 est.₹49.9 LUnder construction
Dec 2029
Kohinoor Kaleido-Phase-II
Intofinity Promoters · Wagholi / Lohegaon / Kesnand
519.7%4.4%7.5%₹5,150 est.₹38.6 LUnder construction
Feb 2030
Shubh Nirvana Wing K L M
Viman Nagar Shubh Ventures · Wagholi / Lohegaon / Kesnand
519.3%3.9%6.2%₹5,150 est.₹38.6 LUnder construction
Dec 2028
Geras World of Joy M
Gera Developments · Wagholi / Lohegaon / Kesnand
518.9%3.6%5.4%₹6,650 est.₹49.9 LUnder construction
Dec 2027
Kharadi Pune P2
Lodha (Macrotech) · Wagholi / Lohegaon / Kesnand
518.9%3.7%5.6%₹8,800 est.₹66.0 LUnder construction
Oct 2027
VNSVL Shubh Nirvana Phase IV
Viman Nagar Shubh Ventures · Wagholi / Lohegaon / Kesnand
518.9%3.5%5.1%₹5,150 est.₹38.6 LUnder construction
Oct 2027
Kharadi Pune P1
Lodha (Macrotech) · Wagholi / Lohegaon / Kesnand
509.3%4.0%6.5%₹8,800 est.₹66.0 LUnder construction
Jun 2029
Kharadi Pune Phase II Tower 8
Lodha (Macrotech) · Wagholi / Lohegaon / Kesnand
509.3%4.0%6.5%₹8,800 est.₹66.0 LUnder construction
Jun 2029
Geras Island of Joy Project C
Gera Developments · Wagholi / Lohegaon / Kesnand
509.3%4.2%6.7%₹6,650 est.₹49.9 LUnder construction
Nov 2028
Ganga Pavitra
Majestique Landmarks · Wagholi / Lohegaon / Kesnand
509.3%4.2%6.7%₹6,650 est.₹49.9 LUnder construction
Dec 2028
VNSVL Shubh Nirvana Phase III
Viman Nagar Shubh Ventures · Wagholi / Lohegaon / Kesnand
508.5%2.6%3.4%₹5,150 est.₹38.6 LUnder construction
Dec 2026
Majestique Towers East Phase-7
Sharad Shree Enterprises · Wagholi / Lohegaon / Kesnand
499.3%3.9%6.2%₹5,150 est.₹38.6 LUnder construction
Dec 2028
Majestique Towers East Phase 6
Sharad Shree Enterprises · Wagholi / Lohegaon / Kesnand
499.3%3.9%6.2%₹5,150 est.₹38.6 LUnder construction
Dec 2028
Kharadi Pune P3
Lodha (Macrotech) · Wagholi / Lohegaon / Kesnand
498.9%3.4%5.2%₹8,800 est.₹66.0 LUnder construction
May 2028
343 Crest
Gera Developments · Wagholi / Lohegaon / Kesnand
498.9%3.6%5.4%₹6,650 est.₹49.9 LUnder construction
Dec 2027
Majestique Towers East Phase 05
Sharad Shree Enterprises · Wagholi / Lohegaon / Kesnand
498.9%3.5%5.1%₹5,150 est.₹38.6 LUnder construction
Dec 2027
Kharadi Signet
Lodha (Macrotech) · Wagholi / Lohegaon / Kesnand
498.9%3.3%5.1%₹8,800 est.₹66.0 LUnder construction
Aug 2028
Kohinoor Riverdale
Intofinity Promoters · Wagholi / Lohegaon / Kesnand
499.3%3.9%6.2%₹5,150 est.₹38.6 LUnder construction
Dec 2028
Kohinoor Riverdale - Phase II
Intofinity Promoters · Wagholi / Lohegaon / Kesnand
499.3%3.9%6.2%₹5,150 est.₹38.6 LUnder construction
Dec 2028
Kharadi Pune Phase I -Tower 5
Lodha (Macrotech) · Wagholi / Lohegaon / Kesnand
498.5%2.8%4.1%₹8,800 est.₹66.0 LUnder construction
May 2027
UK1321 Inclusive Housing
Vilas Javdekar · Wagholi / Lohegaon / Kesnand
498.5%2.7%3.6%₹6,650 est.₹49.9 LUnder construction
Dec 2026
Kharadi Pune Phase II Tower 7
Lodha (Macrotech) · Wagholi / Lohegaon / Kesnand
498.5%2.8%4.1%₹8,800 est.₹66.0 LUnder construction
May 2027
Kharadi Pune Phase II -Tower 6
Lodha (Macrotech) · Wagholi / Lohegaon / Kesnand
498.5%2.8%4.1%₹8,800 est.₹66.0 LUnder construction
May 2027
Kharadi Pune Phase I - Tower 1 to 4
Lodha (Macrotech) · Wagholi / Lohegaon / Kesnand
488.5%2.7%3.7%₹8,800 est.₹66.0 LUnder construction
Oct 2026
Geras Planet of Joy Project II
Gera Developments · Wagholi / Lohegaon / Kesnand
488.5%2.7%3.6%₹6,650 est.₹49.9 LUnder construction
Dec 2026
Geras Planet of Joy Project III
Gera Developments · Wagholi / Lohegaon / Kesnand
488.5%2.7%3.6%₹6,650 est.₹49.9 LUnder construction
Dec 2026
Geras Planet of Joy Project IV
Gera Developments · Wagholi / Lohegaon / Kesnand
488.5%2.7%3.6%₹6,650 est.₹49.9 LUnder construction
Dec 2026
Eminence Project 2
Naiknavare · Wagholi / Lohegaon / Kesnand
488.1%3.9%5.1%₹7,100 est.₹53.3 LReady
Geras Island of Joy Project A
Gera Developments · Wagholi / Lohegaon / Kesnand
488.9%3.4%5.0%₹6,650 est.₹49.9 LUnder construction
May 2028
Kohinoor Kaleido
Intofinity Promoters · Wagholi / Lohegaon / Kesnand
488.9%3.5%5.1%₹5,150 est.₹38.6 LUnder construction
Dec 2027
Panchshil Towers
Panchshil Realty · Wagholi / Lohegaon / Kesnand
488.5%2.6%3.6%₹8,800 est.₹66.0 LUnder construction
Dec 2026
Geras Island of Joy Project B
Gera Developments · Wagholi / Lohegaon / Kesnand
488.9%3.3%5.0%₹6,650 est.₹49.9 LUnder construction
Jun 2028
Pankaj Ekaant
Pankaj Developers · Wagholi / Lohegaon / Kesnand
489.5%5.1%10.2%₹5,150 est.₹38.6 LUnder construction
Dec 2031
Geras World of Joy L
Gera Developments · Wagholi / Lohegaon / Kesnand
478.1%3.9%5.1%₹7,100 est.₹53.3 LReady
Geras World of Joy D
Gera Developments · Wagholi / Lohegaon / Kesnand
478.1%3.9%5.1%₹7,100 est.₹53.3 LReady
Geras World of Joy C
Gera Developments · Wagholi / Lohegaon / Kesnand
478.1%3.9%5.1%₹7,100 est.₹53.3 LReady
Shrishti
Gera Developments · Wagholi / Lohegaon / Kesnand
478.1%3.9%5.1%₹7,100 est.₹53.3 LReady
Yashwin Enchante Phase 1
Vilas Javdekar · Wagholi / Lohegaon / Kesnand
478.5%2.8%4.0%₹6,650 est.₹49.9 LUnder construction
Jun 2027
Serene Spaces
Rathi Group · Wagholi / Lohegaon / Kesnand
479.7%4.5%7.6%₹5,150 est.₹38.6 LUnder construction
Dec 2029
Majestique Towers East Phase 1
Sharad Shree Enterprises · Wagholi / Lohegaon / Kesnand
478.1%4.0%5.1%₹5,500 est.₹41.3 LReady
Majestique Towers East Phase 2
Sharad Shree Enterprises · Wagholi / Lohegaon / Kesnand
478.1%4.0%5.1%₹5,500 est.₹41.3 LReady
Ivy Estate - Ivy Apartments and Villas and Umang Premiere and Umang Primo
Kolte-Patil · Wagholi / Lohegaon / Kesnand
478.1%3.9%5.1%₹7,100 est.₹53.3 LReady
The Joy Street Geras Island Of Joy
Gera Developments · Wagholi / Lohegaon / Kesnand
478.5%2.8%3.9%₹6,650 est.₹49.9 LUnder construction
Sep 2027
V2 Villa P-1
Panchshil Realty · Wagholi / Lohegaon / Kesnand
478.9%3.6%5.5%₹8,800 est.₹66.0 LUnder construction
Dec 2027
Shiv Park
Trimurti Developers · Wagholi / Lohegaon / Kesnand
468.1%4.0%5.1%₹5,500 est.₹41.3 LReady
Palmnest-Phase IV
Rathi Group · Wagholi / Lohegaon / Kesnand
468.1%4.0%5.1%₹5,500 est.₹41.3 LReady
Kharadi New Project -Tower 5
Lodha (Macrotech) · Wagholi / Lohegaon / Kesnand
469.6%4.6%7.9%₹8,800 est.₹66.0 LUnder construction
Sep 2030
Casagrand Caladium
Casagrand · Wagholi / Lohegaon / Kesnand
459.3%3.9%6.3%₹6,650 est.₹49.9 LUnder construction
May 2029
Urbano
Rathi Group · Wagholi / Lohegaon / Kesnand
448.1%4.0%5.1%₹5,500 est.₹41.3 LReady
Palmnest Phase III
Rathi Group · Wagholi / Lohegaon / Kesnand
448.1%4.0%5.1%₹5,500 est.₹41.3 LReady
Vishwaraj Residency
Anand Developers · Wagholi / Lohegaon / Kesnand
448.1%4.0%5.1%₹5,500 est.₹41.3 LReady
Neo City Part 3
Mahalaxmi Shelters · Wagholi / Lohegaon / Kesnand
448.5%2.6%3.4%₹5,150 est.₹38.6 LUnder construction
Dec 2026
VNSVL Shubh Nirvana - Phase II
Viman Nagar Shubh Ventures · Wagholi / Lohegaon / Kesnand
428.5%2.7%3.3%₹5,150 est.₹38.6 LUnder construction
Jun 2026
Purvanchal Phase2 C D E
VTP Realty · Wagholi / Lohegaon / Kesnand
418.1%3.9%5.1%₹7,100 est.₹53.3 LReady
Rohan Abhilasha Building B
Rohan Builders · Wagholi / Lohegaon / Kesnand
418.5%2.7%3.6%₹6,650 est.₹49.9 LUnder construction
Dec 2026
Rohan Abhilasha Building G
Rohan Builders · Wagholi / Lohegaon / Kesnand
418.5%2.7%3.6%₹6,650 est.₹49.9 LUnder construction
Dec 2026
Springshire
Kolte-Patil · Wagholi / Lohegaon / Kesnand
408.9%3.5%5.3%₹6,650 est.₹49.9 LUnder construction
Mar 2028
Majestique Towers East Phase 3
Sharad Shree Enterprises · Wagholi / Lohegaon / Kesnand
408.5%2.7%3.3%₹5,150 est.₹38.6 LUnder construction
Jun 2026
VNSVL Shubh Nirvana Phase 1
Viman Nagar Shubh Ventures · Wagholi / Lohegaon / Kesnand
408.5%2.7%3.3%₹5,150 est.₹38.6 LUnder construction
Dec 2025
Ivy Estate-Nia
Kolte-Patil · Wagholi / Lohegaon / Kesnand
408.1%3.9%5.1%₹7,100 est.₹53.3 LReady
Purvanchal F Building
VTP Realty · Wagholi / Lohegaon / Kesnand
398.1%3.9%5.1%₹7,100 est.₹53.3 LReady
The Hub
VTP Realty · Wagholi / Lohegaon / Kesnand
398.1%3.9%5.1%₹7,100 est.₹53.3 LReady
Geras Planet of Joy Project I
Gera Developments · Wagholi / Lohegaon / Kesnand
398.5%2.8%3.5%₹6,650 est.₹49.9 LUnder construction
Dec 2025
Nivaan Grandeur
Vishal Ashok Chugera · Wagholi / Lohegaon / Kesnand
3810.0%6.3%9.5%₹2,850 est.₹21.4 LUnder construction
Jun 2027
Shapoorji Pallonji Treetopia Phase 1
Manjri Horse Breeders' Farm · Wagholi / Lohegaon / Kesnand
388.9%3.0%4.5%₹5,150 est.₹38.6 LUnder construction
Sep 2028
Nivaan Sparsh Phase-1
Vishal Ashok Chugera · Wagholi / Lohegaon / Kesnand
378.5%2.7%3.7%₹5,150 est.₹38.6 LUnder construction
Jun 2027
Majestique Manhattan-D
Majestique Landmarks · Wagholi / Lohegaon / Kesnand
368.5%2.8%3.5%₹6,650 est.₹49.9 LUnder construction
Mar 2026
Nivaan Legacy
Vishal Ashok Chugera · Wagholi / Lohegaon / Kesnand
368.5%2.7%3.7%₹5,150 est.₹38.6 LUnder construction
May 2027
Fire Fly
Vishal Ashok Chugera · Wagholi / Lohegaon / Kesnand
338.1%4.0%5.1%₹5,500 est.₹41.3 LReady

Price per sq ft in Wagholi / Lohegaon / Kesnand: what the evidence says

Date₹ / sq ftBasisConfidence
2021-06₹5,200pun (derived)40%
2023-06₹5,800pun (derived)45%
2025-06₹6,800pun (derived)50%
2026-06₹7,300pun (derived)50%

That is 7.0% a year from 2021-06 to 2026-06. The model projects 8.9% a year from here; the growth story on each project page shows why.

Infrastructure pipeline

ProjectTypeStatusExpectedChance it lands on timePrice effect if it does
Metro extension Ramwadi–Wagholimetroplanned202945%+1.0% / yr
Pune Ring Road (PMRDA)roadconstruction202945%+0.8% / yr

The growth model counts each event at its probability, not its promise. Dates are the latest public schedule.

Developers active in Wagholi / Lohegaon / Kesnand

Ranked lists for Wagholi / Lohegaon / Kesnand

Wagholi / Lohegaon / Kesnand compared with other areas

Questions people ask

Is Wagholi / Lohegaon / Kesnand good for investment?

On PropertyLens's model the median analysed project in Wagholi / Lohegaon / Kesnand scores 48/100 (below the Pune average), with projected price growth of 8.9% a year over five years, median price ₹6,650 per sq ft and gross rental yield 3.1%. 80 RERA-registered projects analysed as of November 11, 2026. The best-scored project is Kharadi New Project -Tower 11 at 55.

What is the price per sq ft in Wagholi / Lohegaon / Kesnand?

Median ₹6,650 per sq ft of super built-up area across analysed projects, modelled from comparables where developers file no price. Entry price for an analysed home is about ₹21.4 L; the median home is ₹49.9 L.

What rental yield can I expect in Wagholi / Lohegaon / Kesnand?

Median gross yield 3.1% on the all-in cost of an analysed home, before maintenance, vacancy and tax. Net-wealth CAGR after every cost on an 8-year hold with a 75% loan is 3.9% at the median.

Are projects in Wagholi / Lohegaon / Kesnand delayed?

5 of 62 under-construction projects are past the completion date in their original RERA registration, and unsold stock equals about 22 months of sales. Each project page shows extensions, construction against bookings and complaints.

Scores and projections are model outputs built from dated public evidence (MahaRERA public filings, public ratings) and stated assumptions. Unit sizes and prices in this city are modelled estimates because the regulator does not publish unit inventories openly. They are research, not investment advice. How the numbers are built.

Share on WhatsApp