PropertyLensBengaluru · invest
Assetz · Electronic City / Hosur Road / Bommasandra

Assetz Ren & Rei

Survey nos. 109/1, 109/2, 109/10 & 110 DODDABANAHALLI VILLAGE, BIDARAHALLI HOBLI… · Electronic City / Hosur Road / Bommasandra
Handover Jan 2029 · no rent beforeapartment · premiumRERA registered+ CompareFull report ↗
1 · Which home?
2 · Which exit plan?

Score, growth and returns below are for the highlighted home and plan. Prices, rent and possession never mix across phases.

59
Investment score
59/100
Evidence confidence56%
3 BHK · ~1,730 sq ft (1217 carpet)
Price growth per year, next 5 yrs model
9.1%
likely range 5.6%–12.5% · over 10 yrs 8.0%/yr
Net-wealth CAGR, 8-yr hold
3.7%
your cash in → cash back incl. sale, per year
Cash-flow IRR, 8-yr hold
5.9%
with 75% loan · all-cash 7.7% · with interiors
Three numbers, three questions. Price growth: what will the home be worth? Net-wealth CAGR: what will my money have earned after every cost? Cash-flow IRR: the same, but counting when each rupee moves. Tap i on any of them.
Price · edit here or below assumed
₹Cr
₹ psf × 1,730 sq ft · as of Sep 2026
Price edits apply to ·
All-in cost
₹1.68 Cr
+ other charges 4.5 L, GST 6.6 L, stamp/reg 8.7 L, interiors 20.8 L
Gross rental yield assumed
3.2%
rent starts in ~2.7 yr

All-in cost sheet this home, default assumptions

ItemBasisAmount
Base price₹7,350 per sq ft × 1,730 sq ft super built-up1.27 Cr
Other charges3.5% of base: floor-rise, preferred-location, car park, club, maintenance deposit, legal, corpus (edit in Assumptions)4.5 L
GST5.0% on an under-construction home6.6 L
Stamp duty and registration6.6% in Karnataka: 5% stamp duty + 1% registration + cess and surcharge on the agreement value8.7 L
Interiors₹1,200 per sq ft, needed before the home can be let20.8 L
All-in costwhat leaves your pocket and the bank's, before rent or resale₹1.68 Cr
Your own money75.0% loan at 8.5% for 20 years covers the rest; EMI 0.9 L a month₹1.12 Cr

Carpet area 1,217 sq ft against 1,730 sq ft super built-up: you pay for 30% that is common area and walls. Price per sq ft of carpet ≈ ₹10,448. Every percentage above is editable in Assumptions; the defaults are Karnataka rates as of 2026-09.

In plain words

Why 59 out of 100

Each home is marked on 11 things a careful buyer checks, then compared with every project we analyse in Bengaluru: 50 is the average project, 62 beats about five in six. Here is what lifts this one and what drags it:

  • +
    Employment access · 5/10 pts
    Drive times right now: Electronic City Ph-1 15 min, ORR Bellandur (Ecospace) 22 min, Koramangala (Forum) 35 min; Hebbal (Kirloskar) 60 min. About 5 million sq ft of new offices are planned nearby in 3 years.
  • +
    Layout, size, age, amenities, maintenance · 1/3 pts
    Moderately dense layout (57 homes per acre); about 72% of the area you pay for is usable carpet area. Maintenance ~₹4.5 per sq ft a month.
  • +
    Resale liquidity · 1/4 pts
    Plenty of buyers can afford a ₹1.27 Cr home, and homes in Electronic City / Hosur Road / Bommasandra resell at a normal pace. Reselling before handover needs the builder’s permission.
  • −
    Expected price growth (5-yr CAGR model) · -6/26 pts
    We expect prices here to rise about 9.1% a year for the next 5 years (explained below).
  • −
    Price vs comparables · -0/3 pts
    Priced about the same as similar premium homes nearby (₹7,350 vs ~₹7,800 per sq ft).
  • •
    Legal, title & approvals · 0/5 pts
    Registered with Karnataka RERA; no court cases reported; land title not yet verified by us, so get a lawyer to check. The due-diligence report below flags 1 item in red.
All 11 checks
  • •
    Price vs comparables · -0/3 pts
    Priced about the same as similar premium homes nearby (₹7,350 vs ~₹7,800 per sq ft).
  • +
    Rental demand & yield · 3/8 pts
    Rent pays back 3.2% of the price every year, close to the usual 3% in Bengaluru. Tenant demand here is decent.
  • +
    Resale liquidity · 1/4 pts
    Plenty of buyers can afford a ₹1.27 Cr home, and homes in Electronic City / Hosur Road / Bommasandra resell at a normal pace. Reselling before handover needs the builder’s permission.
  • +
    Employment access · 5/10 pts
    Drive times right now: Electronic City Ph-1 15 min, ORR Bellandur (Ecospace) 22 min, Koramangala (Forum) 35 min; Hebbal (Kirloskar) 60 min. About 5 million sq ft of new offices are planned nearby in 3 years.
  • •
    Metro, bus, rail & airport · 1/9 pts
    The nearest working metro is ~1.5 km away. Airport is about 100 minutes by road right now.
  • +
    Schools, hospitals, daily needs · 0/3 pts
    Schools, hospitals and daily shopping are good in this area.
  • •
    Builder delivery & handover risk · 5/16 pts
    Assetz has finished 45+ projects and delivered on time about 75% of the time. This phase is 55% built, with handover promised for 2029-01-31: delays would push your rent start back.
  • +
    Layout, size, age, amenities, maintenance · 1/3 pts
    Moderately dense layout (57 homes per acre); about 72% of the area you pay for is usable carpet area. Maintenance ~₹4.5 per sq ft a month.
  • •
    Water, flooding, noise, infrastructure · 0/9 pts
    Low flood risk; water supply is mostly borewell or tankers; noticeable traffic or aircraft noise.
  • +
    Legal, title & approvals · 0/5 pts
    Registered with Karnataka RERA; no court cases reported; land title not yet verified by us, so get a lawyer to check. The due-diligence report below flags 1 item in red.
  • •
    Expected price growth (5-yr CAGR model) · -6/26 pts
    We expect prices here to rise about 9.1% a year for the next 5 years (explained below).
Why prices should grow ~9.1% a year for the next 5 years

We build the forecast step by step, starting from what Bengaluru homes normally do and adjusting for this area and this project:

  1. + 6.0%Start with 6.0% a year: the normal long-run growth of Bengaluru home prices.
  2. + 1.0%Add 1.0%: prices here rose 12.6% a year recently (2023-06 to 2026-06). Some of that pace continues, but it fades each year.
  3. − 0.1%Subtract 0.1%: at ₹7,350 per sq ft, fewer families can afford to buy here, which slows further rises.
  4. + 1.2%Add 1.2%: 5 million sq ft of new offices nearby means more people wanting homes here.
  5. − 0.7%Subtract 0.7%: many new homes are being built here (25 months of unsold stock), which keeps prices in check.
  6. + 0.2%Add 0.2% for new roads, metro and water lines, weighted by how likely they are to actually finish: Yellow Line RV Road–Bommasandra (opened Aug 2025) (operational, 2025); Satellite Town Ring Road (construction, 2028); Bengaluru suburban rail (K-RIDE) (construction, 2029).
  7. + 1.5%Add 1.5% for this project itself: unfinished homes are worth more once they are complete.
  8. = 9.1%Result: about 9.1% a year, so a home worth ₹1.32 Cr today would be worth about ₹2.03 Cr in 5 years. We are 56% confident in the evidence behind this.

Which exit suits you?

For an unfinished flat the answer depends on whether you sell at handover or hold, and whether you spend on interiors. Same price, same loan; only the strategy changes:

StrategyHoldIRR / yrWealth CAGR / yrCash you put inNet rentNet saleApply
Sell at handover, no interiors best IRR
Take delivery in 2029-01-31 and sell the bare flat (3 yr hold). Needs builder NOC or registration first; no rent.
3 yrs15.3%9.9%₹40.4 L₹35,512₹71.2 L
Hold bare, rent unfurnished
Skip interiors; rent 12% lower than a fitted home; sell after 8 yrs with no interiors value.
8 yrs9.0%5.7%₹93.0 L₹10.9 L₹1.53 Cr
Hold, do interiors, rent & sell fitted selected
Spend ₹1,200/sq ft on interiors, earn full rent, recover ~40% of interiors cost at sale (fading over 10 yrs).
8 yrs5.9%3.7%₹1.12 Cr₹13.4 L₹1.57 Cr

IRR and CAGR are per year over the hold shown. A short hold can show a high IRR on a small absolute gain; compare the net-sale column too. Selling before registration usually needs the builder’s transfer NOC and a fee.

Highlights

  • Assetz · Electronic City / Hosur Road / Bommasandra · 218 homes on 3.8 acres
  • Under construction: 55% complete, RERA completion 2029-01-31
  • No litigation declared · 1 complaints on this registration

Assumptions editable

Purchase

₹/sq ft
₹ Cr
sq ft
% of base
%
%
%
₹/sq ft

FinancingLoan 75% · cash 25% · EMI ₹89,941/mo

% loan
% p.a.
years
%

Rent & running costs

₹
% p.a.
%
months
months
₹/sq ft/mo
% of rent
% of rent
% of value

Interiors & exit

%
%
years
% p.a. (blank = model)
%
%

Returns over 8 years · with interiors

Cash you put in₹1.12 Cr
Exit value (yr 8)₹2.49 Cr
Net sale after loan & costs₹1.57 Cr
Net rent after opex₹13.4 L
Loan (75% of price)₹1.04 Cr
EMI / month₹89,941
Year 0: ₹-12.7 L0Year 1: ₹-12.6 L1Year 2: ₹-15.2 L2Year 3: ₹-38.1 L3Year 4: ₹-8.5 L4Year 5: ₹-8.4 L5Year 6: ₹-8.2 L6Year 7: ₹-8.0 L7Year 8: ₹1.49 Cr8
YearPurchaseLoan inRent (net of vacancy)OpexDebt serviceSale − loanNet cash
Today-23.0 L10.4 L0.0 L0.0 L0.0 L0.0 L-12.7 L
Yr 1-41.5 L31.1 L0.0 L0.0 L-2.2 L0.0 L-12.6 L
Yr 2-41.5 L31.1 L0.0 L0.0 L-4.8 L0.0 L-15.2 L
Yr 3-62.2 L31.1 L1.3 L-0.9 L-7.5 L0.0 L-38.1 L
Yr 40.0 L0.0 L4.2 L-2.0 L-10.8 L0.0 L-8.5 L
Yr 50.0 L0.0 L4.5 L-2.0 L-10.8 L0.0 L-8.4 L
Yr 60.0 L0.0 L4.7 L-2.1 L-10.8 L0.0 L-8.2 L
Yr 70.0 L0.0 L4.9 L-2.2 L-10.8 L0.0 L-8.0 L
Yr 80.0 L0.0 L5.2 L-2.2 L-10.8 L1.57 Cr1.49 Cr

Pre-tax unless capital-gains tax is set. Rent enters the cash flows once. Net-wealth CAGR = (cash returned incl. sale ÷ cash put in)^(1/years) − 1. IRR uses the dated cash flows.

Score factors

Bars show points added or taken away versus the average analysed Bengaluru project (score 50).

Price vs comparables
−0.3 pts vs avg
this home 5.9/10 · Bengaluru average 6.2 · confidence 35%
₹7,350 psf vs premium comps ₹7,800 (-6%; under-construction should price ~8% below ready). Price is a model estimate, so this factor carries a third of its normal weight until a listed price is observed.
Rental demand & yield
+2.5 pts vs avg
this home 7.2/10 · Bengaluru average 6.0 · confidence 38%
Gross yield 3.4% (₹21 psf/month); locality rental demand 8/10.
Resale liquidity
+1.4 pts vs avg
this home 8.4/10 · Bengaluru average 7.6 · confidence 60%
Locality resale depth 7/10; ticket ₹1.27 Cr narrows the buyer pool; UC resale needs builder NOC; 218-home project; RERA sales pace ratio 1.76.
Employment access
+4.6 pts vs avg
this home 7.5/10 · Bengaluru average 5.2 · confidence 85%
Drive times now (Google Maps, 2026-09-16): Electronic City Ph-1 15 min, ORR Bellandur (Ecospace) 22 min, Koramangala (Forum) 35 min, ITPL Whitefield 41 min; 2 of 7 major hubs within 30 min; 5 msf office pipeline (3 yr).
Metro, bus, rail & airport
+1.2 pts vs avg
this home 5.4/10 · Bengaluru average 4.8 · confidence 60%
Yellow Line Electronic City / Bommasandra (Aug 2025); no planned station within 2 km; airport ~100 min by road now (Google Maps); .
Schools, hospitals, daily needs
+0.0 pts vs avg
this home 7.0/10 · Bengaluru average 7.0 · confidence 50%
Locality social-infrastructure index (interim, expert-set; POI distances pending Maps integration).
Builder delivery & handover risk
+4.8 pts vs avg
this home 5.6/10 · Bengaluru average 3.7 · confidence 60%
Assetz: 45+ projects, on-time 75% (derived); handover 2029-01-31 (RERA); within the RERA timeline, work on schedule (14 pts).
Layout, size, age, amenities, maintenance
+1.2 pts vs avg
this home 8.3/10 · Bengaluru average 7.3 · confidence 55%
57 units/acre; carpet/SBA ~72%; maintenance ~₹4.5 psf/month (assumed); filed construction cost ₹4,686 per sq ft (premium spec).
Water, flooding, noise, infrastructure
+0.1 pts vs avg
this home 5.8/10 · Bengaluru average 5.8 · confidence 50%
Industrial belt; borewell dependence; Hosur Road noise
Legal, title & approvals
+0.0 pts vs avg
this home 7.4/10 · Bengaluru average 7.4 · confidence 55%
RERA registered; litigation: none reported; approvals: Plan 0000 dated 2025-01-07; title: not verified. Due-diligence report lists 1 red flag (−1.1 pts).
Expected price growth (5-yr CAGR model)
−6.5 pts vs avg
this home 5.0/10 · Bengaluru average 6.0 · confidence 56%
Model 5-yr price CAGR 9.1% (range 5.6–12.5%).

Price growth model, year by year

Nominal growth per year. Parts add up; momentum fades, infrastructure is weighted by delivery probability and dated.

ComponentYr 1Yr 2Yr 3Yr 4Yr 5Yr 6Confidence
Bengaluru long-run nominal trend6.06.06.06.06.06.080%
Locality momentum (mean-reverting)2.31.30.70.40.20.145%
Affordability ceiling-0.2-0.2-0.1-0.1-0.1-0.060%
Employment access & office pipeline1.21.21.21.21.21.255%
Supply–demand balance-1.0-0.8-0.6-0.5-0.4-0.350%
Infrastructure delivery (probability-weighted)0.50.40.20.10.00.055%
Project-specific adjustments2.52.52.50.00.00.050%
Total growth11.3%10.3%9.8%7.1%6.9%6.9%56%

Bengaluru long-run nominal trend: City-wide 2013-25 nominal residential trend ≈ inflation + real income growth.

Locality momentum (mean-reverting): Trailing 3.0-yr locality CAGR 12.6% vs 6.0% trend; 35% carried forward, halving each year.

Affordability ceiling: Ticket at ₹7,350 psf vs city median ₹9,500; buyer pool thins above ₹15k/₹20k psf and after >6pp excess growth.

Employment access & office pipeline: 5 msf office pipeline (3 yr) on 30 msf stock; 30-min jobs index 0.75.

Supply–demand balance: 25 months of unsold inventory; new-launch/absorption ratio 1.28 (from 22 under-construction RERA filings in this locality: 5,161 unsold homes, 168.8 sold per month).

Infrastructure delivery (probability-weighted): Yellow Line RV Road–Bommasandra (opened Aug 2025) (operational, 2025, p=1); Satellite Town Ring Road (construction, 2028, p=0.6); Bengaluru suburban rail (K-RIDE) (construction, 2029, p=0.5)

Project-specific adjustments: Remaining construction risk (45% work left) re-rates toward ready comps by handover (~3.6% over 2.3 yr). Sales pace from RERA filings: 72% of 218 homes booked with 41% of the build timeline elapsed (pace ratio 1.76); fast sellers re-rate, slow sellers discount.

Locality evidence: ₹5,600 (Jun 2023) → ₹8,000 (Jun 2026) = 12.6% p.a. Sources: Platform estimate (interim, not observed).

Financial & legal due diligence

What the public record says

Automated from the Karnataka RERA file PRM/KA/RERA/1251/446/PR/130225/007501 and 3 quarterly filings. Prices and rents are locality estimates, not verified listings. Compiled Sep 2026 from the Karnataka RERA file, company registers, rating agencies, tribunal records and press. Facts only; anything that deserves a written answer before signing is flagged.

Delivery timeline9/10
no extensions, no overdue dates on the RERA file
Legal & complaints8.5/10
1 RERA complaint on the project (−0.5)
Money to finish8/10
finance cost is 4% of the registered budget; last quarter: collected ₹10.40 cr, withdrew ₹6.33 cr
Developer strength5/10
no public credit rating for the promoter

Meters are rule-based from the RERA file and public ratings (rules shown under each), not opinions.

Registration
PRM/KA/RERA/1251/446/PR/130225/007501 · APG PREMIUM RESIDENTIAL PRIVATE LIMITED
On original date
RegisteredFeb 2025TodaySep 2026Original completionJan 2029
Construction55%
quarterly filing Q1 2026-27 (submitted 2026-07-15)
Homes booked156 / 218
62 still available
Sold vs built72% vs 55%
Sales and construction are broadly in step.
Money through the RERA account
Collected ₹23.12 CrWithdrawn ₹19.07 CrQ3 2025-2623.12 Cr19.07 CrCollected ₹22.48 CrWithdrawn ₹16.36 CrQ4 2025-2622.48 Cr16.36 CrCollected ₹10.40 CrWithdrawn ₹6.33 CrQ1 2026-2710.40 Cr6.33 Cr
Collected from buyersWithdrawn for construction
Latest milestones
  • Masonry Construction
    0%
  • Plastering inside , outside & Ceiling
    0%
  • Joinery: Doors, Windows, Ventilators etc
    0%
  • Basic work of Water supply, Sanitary and E
    0%
  • Dadoing, Skirting, Flooring, Tiles work
    0%
  • Railing and Grill fixing
    0%
No litigation declared1 complaintsEscrow: ICICI BankJoint-development land
Credit ratings of the people behind it

No public credit rating located for the promoter.

APG PREMIUM RESIDENTIAL PRIVATE LIMITED: no public rating located

Complaints & disputes on record
On this project1– open
On the promoter entity1all projects
Court cases declared0no stay recorded
At a glance
On its original RERA date

On its original RERA completion date: 2029-01-31

55% built, 72% booked

55% built per the latest filing; 156/218 homes booked

1 RERA complaints

1 RERA complaints on this project; 1 on the promoter overall

No litigation declared

No litigation declared in RERA filings

The record, in pictures

RERA file · Registration

Registered project cost ₹274 cr — where it goes
Land ₹0 cr · 0%Approvals ₹10.5 cr · 4%Construction & on-site ₹167.8 cr · 61%Finance (bank) ₹10 cr · 4%Other / taxes ₹85.5 cr · 31%
Construction programme as filed (quarterly filing Q1 2026-27 (submitted 2026-07-15))
2026202720282029Earth work and other leveling preparat100%Foundation footing work100%Upto Plinth Level85%Sub-structure flooring70%Retaining wall80%RCC or MS Framed structure30%Masonry Construction0%Plastering inside , outside & Ceiling0%Joinery: Doors, Windows, Ventilators e0%Basic work of Water supply, Sanitary a0%Dadoing, Skirting, Flooring, Tiles wor0%Railing and Grill fixing0%Electrification, Water supply and Sani0%Painting0%Fire prevention and fire fighting fitt0%Weather Proof work0%Elevation work0%Internal and External work including l0%today
Bars are the filed schedule; filled part is reported progress. Red = past its scheduled end and not complete.
No litigation declaredBorrowing declared: NoEscrow at ICICI Bank10 recorded land-owner sharesOwners’ association: not formed

Red flags to resolve in writing

1
Legal

Joint-development land: confirm which units fall in the owners’ share.

Questions to put to the developer before you sign

  1. Share the latest CA Form 4 and architect Form 5 with the escrow deposit ratio.
  2. Confirm the price list, floor-rise and other charges for the exact unit.
  3. Which date is contractual — 2029-01-31 — and what is the per-month delay compensation?
  4. Confirm there is no litigation on the land or approvals beyond the RERA declaration.
  5. What is the land owners’ share of built area and is the unit in the developer’s share?
Full record: every filed number, line by line1 sections · 13 items

RERA file · Registration

Registration
PRM/KA/RERA/1251/446/PR/130225/007501 · promoter APG PREMIUM RESIDENTIAL PRIVATE LIMITED (Company) · U45201KA2018PTC114159
Dates
Start 2025-02-01 · original completion 2029-01-31 · no extensions
Progress
55% complete per quarterly filing Q1 2026-27 (submitted 2026-07-15) · 156 of 218 homes booked (62 available)
Registered cost
Total ₹274 cr · land ₹0.00 cr · construction ₹168 cr · bank principal+interest ₹10.00 cr
Borrowing / mortgage declared
Borrowing: No
RERA bank account
ICICI Bank, M.G.ROAD (70% construction account)
Plan sanction
0000 dated 2025-01-07 · BDA - Bangalore Development Authority
Land & towers
3.80 acres (15,378 sq m) · Tower-A1 109 homes, 13 floors; Tower A2 109 homes, 13 floors
Land owners / co-promoters
No. of Basement (1%, Sy Total No. of Parking); 41.86 (81.26%, Sy 1); 40.79 (79.29%, Sy 1); 40.1 (77.87%, Sy 1); 41.86 (81.26%, Sy 1); 38.23 (74.22%, Sy 1); 33.04 (68.76%, Sy 1); 33.51 (70.65%, Sy 1) +2 more
Litigation declared
None declared in filings
K-RERA complaints
1 on this registration · 1 on the promoter entity across all its projects
Owners’ association
Not yet formed
Completion applied
19/12/2020

Source: Karnataka RERA project record PRM/KA/RERA/1251/446/PR/130225/007501, fetched 2026-09-15. Figures are the promoter’s own filings.

Sources & caveats2 sources
  • Karnataka RERA project record PRM/KA/RERA/1251/446/PR/130225/007501 (registration file, quarterly updates, complaint register), fetched 2026-09-15
  • PropertyLens locality model (market-level estimates)
  • Karnataka RERA project records PRM/KA/RERA/1251/446/PR/130225/007501 (registration file, quarterly updates, complaint register), fetched Sep 2026.

Caveats. Automated analysis: prices, rents and travel times are estimates until listings and Maps data are verified. RERA figures are the promoter’s own filings. Nothing here is legal, tax or investment advice.

Evidence

Location, jobs & transit3 hubs · metro 1.5 km
Job hubs nearby
Electronic City Phase 1 & 2Bommasandra industrialHosur Road corridor
Measured drive times below
Office space
Existing30 msf
Coming in 3 yrs5 msf
Jobs within 30 min8/10
Getting around
Metro today
Yellow Line Electronic City / Bommasandra (Aug 2025)
~1,500 m estimate
Metro planned
No station planned within 2 km
Rail
—
estimate
Airport
100 min by road now · 37.1 km
Google Maps
Buses
7/10 coverage
estimate
Drive times to job hubs
DestinationDrive nowRoad km
Electronic City Ph-115 min4.4
ORR Bellandur (Ecospace)22 min6.9
Koramangala (Forum)35 min11.8
ITPL Whitefield41 min14.2
MG Road (CBD)44 min15.5
Manyata Tech Park60 min21.5
Hebbal (Kirloskar)60 min21.7
Kempegowda Airport (KIA)100 min37.1

Google Maps driving time with live traffic, measured Sep 2026. Refreshed monthly.

Location used: Google Maps match “”. Bus coverage and planned-station distances are still interim estimates.

Price historylocality 12.6%/yr

No dated project-level price series yet; only the latest observation is on file.

Locality · average ₹/sq ft
Date₹ psfSourceConfidenceKind
Jun 20214,500Platform estimate (interim, not observed)40%derived
Jun 20235,600Platform estimate (interim, not observed)45%derived
Jun 20257,000Platform estimate (interim, not observed)50%derived
Jun 20268,000Platform estimate (interim, not observed)50%derived
Luxury comps₹9,500
Premium comps₹7,800
Mid comps₹6,200
Unsold stock25 months

Model backtest on this locality: 1-yr hold-out (Jun 2025→Jun 2026): predicted ₹7,602 vs actual ₹8,000 (-5%). Longer 3-yr hold-out (Jun 2023→Jun 2026): predicted 7.8% p.a. vs actual 12.6% p.a. — the model is deliberately mean-reverting and under-predicted the 2021–26 boom.

Environment, legal & productflood ok · water risk · RERA yes
Flood risklow
Water supplytankers/borewell
Quietnoisy
Roads & drainspatchy

Industrial belt; borewell dependence; Hosur Road noise

Legal & approvals
Registration 007501
RERA PRM/KA/RERA/1251/446/PR/130225/007501
possession Jan 2029
Litigation
none reported
observed
Approvals
Plan 0000 dated 2025-01-07
observed
Title
not verified
assumed
Product
Land3.8 acres
Homes218
Density57/acre
Launched2025
Sources & data gapswhat we know, from where, and what is missing

Automated analysis: unit mix and carpet areas come from the RERA inventory table; prices and rents are locality-model estimates until listings are verified.

FieldValueSource classDateConf.KindConflicting values
AddressSurvey no 109/1, 109/2,109/10 & 110 DODDABANAHALLI VILLAGE, BIDARAHALLI HOBLI, BENGALURU EAST TALUK, , BENGALURU EASTKarnataka RERA (number as reported; registry lookup pending)Sep 202680%observed
Land area (acres)3.8Karnataka RERA (number as reported; registry lookup pending)Sep 202680%observed
Total units218Karnataka RERA (number as reported; registry lookup pending)Sep 202680%observed
Launch year2025Karnataka RERA (number as reported; registry lookup pending)Sep 202670%observed
Possession · Registration 0075012029-01-31Karnataka RERA (number as reported; registry lookup pending)Sep 202670%observed
Price psf · 3 BHK · ~1,730 sq ft (1217 carpet)7350Platform estimate (interim, not observed)Sep 202635%assumed
Ticket · 3 BHK · ~1,730 sq ft (1217 carpet)12715500Platform estimate (interim, not observed)Sep 202635%derived
Rent · 3 BHK · ~1,730 sq ft (1217 carpet)35500Platform estimate (interim, not observed)Sep 202635%assumed
Carpet area1217Karnataka RERA (number as reported; registry lookup pending)Sep 202660%observed
Builder on-time rate0.75Karnataka RERA (number as reported; registry lookup pending)Sep 202660%derived
Litigationnone reportedKarnataka RERA (number as reported; registry lookup pending)Sep 202670%observed
ApprovalsPlan 0000 dated 2025-01-07Karnataka RERA (number as reported; registry lookup pending)Sep 202660%observed

Commercial listing portals are shown as “Listing portal (aggregated)”; full provenance is retained internally. Official developer and Karnataka RERA sources are named.

Other projects worth comparing

Same model, same date. Scores are out of 100, where 50 is the average analysed Bengaluru project.

Questions people ask about Assetz Ren & Rei

Is Assetz Ren & Rei a good investment?

On PropertyLens's evidence-based model Assetz Ren & Rei scores 59/100, above the average analysed Bengaluru project (50 = average, 12 points = one standard deviation). The model projects price growth of about 9.1% a year over five years and a net-wealth CAGR of 3.7% after every cost on an 8-year hold with a 75.0% loan. That is research on public filings, not advice; the factor breakdown on this page shows what drives the score.

What is the price per sq ft at Assetz Ren & Rei?

About ₹7,350 per sq ft of super built-up area, a model estimate from Electronic City / Hosur Road / Bommasandra comparables that you can edit. The 3 BHK home costs about ₹1.27 Cr before other charges, GST and stamp duty, and ₹1.68 Cr all-in.

When is Assetz Ren & Rei ready for possession?

The RERA registration commits to Jan 2029. Latest filing: 41% of the schedule elapsed, 72% of homes booked.

Is Assetz Ren & Rei RERA registered?

Yes. Karnataka RERA registration: PRM/KA/RERA/1251/446/PR/130225/007501. 1 complaint on this registration and 1 on the promoter across projects at K-RERA as of 2026-09-15.

How reliable is Assetz on delivery?

75% of Assetz's crawled Bengaluru registrations needed no extension (34 of 45 crawled Bengaluru registrations needed no extension). 45 registrations analysed. The developer scorecard compares this with every other Bengaluru developer.

What rent can Assetz Ren & Rei earn?

About ₹35,500 a month for this home (a model estimate from Electronic City / Hosur Road / Bommasandra rents), a gross yield of 3.2% on the all-in cost. Nothing is earned before handover. Rent covers 39% of the EMI at the default loan.

Answers are generated from the filings and the model for this home and change when you edit the assumptions above. See the Assetz scorecard and the Electronic City / Hosur Road / Bommasandra area page.

Go deeper

Share on WhatsApp