PropertyLensBengaluru · invest
South Bengaluru · Electronic City / Hosur Road / Bommasandra

Is Electronic City / Hosur Road / Bommasandra good for investment?

115 RERA-registered projects scored on one model, as of September 11, 2026. Prices, growth, yields, supply and the best-scored homes.

Straight answer · as of September 11, 2026

Electronic City / Hosur Road / Bommasandra in one paragraph

On PropertyLens's model, Electronic City / Hosur Road / Bommasandra is a weaker-than-average place to buy in Bengaluru right now: the median analysed project scores 41/100 (below the Bengaluru average), with projected price growth of 9.1% a year over five years and a median gross rental yield of 3.5%. Unsold homes would take about 25 months to absorb at the current sales pace, which is heavy supply and caps near-term price growth. 54 of 88 under-construction projects here are past their original RERA completion date, so weight the developer's record heavily.

Median of 115 projects; the spread inside the area is wide, so the ranked list below matters more than the average.

Projects analysed
115
27 ready · 88 under construction
Median score
41
below the Bengaluru average
Projected growth / yr
9.1%
5-yr; 10-yr 8.0%
Median price / sq ft
₹5,850
modelled from comparables
Gross rental yield
3.5%
median, on all-in cost
Net-wealth CAGR
3.6%
8-yr hold, 75% loan, after all costs
Months of inventory
25
5,161 unsold of 24,760 filed
Booked share
24%
typical under-construction project
Past RERA date
54 / 88
under-construction projects overdue
Entry price
₹29.8 L
median ₹59.9 L

Best-scored projects in Electronic City / Hosur Road / Bommasandra

All 115 analysed projects in Electronic City / Hosur Road / Bommasandra

ProjectScoreGrowth / yrNet-wealth CAGRCash-flow IRRPrice / sq ftPriceStatus
Casagrand Vivacity
Casagrand · Electronic City / Hosur Road / Bommasandra
659.6%4.8%7.5%₹7,350 est.₹41.9 LUnder construction
Apr 2029
Purva Silversky
Puravankara · Electronic City / Hosur Road / Bommasandra
6510.0%4.5%7.7%₹7,350 est.₹1.17 CrUnder construction
Jul 2030
Primetownn Phase 1
Elite Estates · Electronic City / Hosur Road / Bommasandra
6411.0%9.1%15.8%₹3,200 est.₹37.1 LUnder construction
Dec 2030
Prestige Suncrest
Prestige · Electronic City / Hosur Road / Bommasandra
629.4%4.2%6.1%₹7,350 est.₹45.2 LUnder construction
Sep 2028
Adarsh Forest Glen
Akarshak Realty · Electronic City / Hosur Road / Bommasandra
6011.2%7.3%11.6%₹3,200 est.₹38.4 LUnder construction
Nov 2027
Central Avenue Phase II
Pionier Projects · Electronic City / Hosur Road / Bommasandra
6011.3%7.3%11.7%₹3,200 est.₹38.4 LUnder construction
Nov 2027
Lakecity Phase 1
Elite Estates · Electronic City / Hosur Road / Bommasandra
6011.0%9.1%15.8%₹3,200 est.₹37.8 LUnder construction
Dec 2030
Assetz Ren & Rei
Assetz · Electronic City / Hosur Road / Bommasandra
599.1%3.7%5.9%₹7,350 est.₹1.27 CrUnder construction
Jan 2029
The Citadel
Pionier Projects · Electronic City / Hosur Road / Bommasandra
5811.0%9.1%15.8%₹3,200 est.₹37.8 LUnder construction
Dec 2030
The Roots By Elegance Infra
Pionier Projects · Electronic City / Hosur Road / Bommasandra
5810.9%6.5%10.0%₹3,200 est.₹34.4 LUnder construction
Jul 2027
Pionier Daffodil
Pionier Projects · Electronic City / Hosur Road / Bommasandra
569.9%6.1%9.7%₹3,200 est.₹38.4 LUnder construction
Dec 2027
Adarsh Welkin Park Phase 2
Akarshak Realty · Electronic City / Hosur Road / Bommasandra
569.1%4.0%6.7%₹5,850 est.₹37.4 LUnder construction
Mar 2030
Greensquare
Pionier Projects · Electronic City / Hosur Road / Bommasandra
549.9%6.1%9.7%₹3,200 est.₹38.4 LUnder construction
Dec 2027
Elements
Pionier Projects · Electronic City / Hosur Road / Bommasandra
539.9%6.1%9.7%₹3,200 est.₹38.4 LUnder construction
Oct 2027
Shriram Sapphire
Shriram Properties · Electronic City / Hosur Road / Bommasandra
539.1%4.2%6.6%₹7,350 est.₹68.7 LUnder construction
Nov 2028
Sobha Silicon Oasis Phase 4 Wing 9
Sobha · Electronic City / Hosur Road / Bommasandra
527.6%3.4%4.3%₹7,800 est.₹1.22 CrReady
Sobha Silicon Oasis Phase 1 Wing 1, 2, 3, 4, 5 & 6
Sobha · Electronic City / Hosur Road / Bommasandra
527.6%3.4%4.4%₹7,800 est.₹1.15 CrReady
Sobha Silicon Oasis Phase 5 Wing 10 & 11
Sobha · Electronic City / Hosur Road / Bommasandra
527.6%3.2%4.1%₹7,800 est.₹1.48 CrReady
Sobha Silicon Oasis Phase 3 Wing 8
Sobha · Electronic City / Hosur Road / Bommasandra
527.6%3.4%4.3%₹7,800 est.₹1.22 CrReady
Mayfairre
Pionier Projects · Electronic City / Hosur Road / Bommasandra
519.5%4.8%6.9%₹3,200 est.₹37.9 LUnder construction
Dec 2026
Sobha Silicon Oasis Phase 7 Block 2 and 3 (Row House No. 9, 10)
Sobha · Electronic City / Hosur Road / Bommasandra
507.6%3.1%4.0%₹7,800 est.₹1.59 CrReady
SNN Raj Greenbay
SNN · Electronic City / Hosur Road / Bommasandra
507.6%4.7%5.8%₹7,800 est.₹32.4 LReady
Ds Max Sahara Grand
DS-MAX · Electronic City / Hosur Road / Bommasandra
508.5%3.2%5.0%₹5,850 est.₹53.5 LUnder construction
Jan 2029
Prestige King's County
Prestige · Electronic City / Hosur Road / Bommasandra
499.7%5.0%7.2%₹4,150 est.₹49.8 LUnder construction
Oct 2026
Sobha Silicon Oasis Phase 2 Wing 7
Sobha · Electronic City / Hosur Road / Bommasandra
499.1%3.3%4.1%₹7,350 est.₹1.15 CrUnder construction
Jan 2020
Assetz Muse & Maison
Assetz · Electronic City / Hosur Road / Bommasandra
498.4%3.2%5.4%₹7,350 est.₹1.25 CrUnder construction
Mar 2030
Adarsh Welkin Park Phase 1
Akarshak Realty · Electronic City / Hosur Road / Bommasandra
488.4%3.3%4.7%₹6,000 est.₹53.1 LUnder construction
Dec 2027
Sobha Silicon Oasis Phase 6 Block 2 and 3 (Row house No. 1 to 8 & 11 to 17)
Sobha · Electronic City / Hosur Road / Bommasandra
489.4%3.1%4.0%₹7,350 est.₹2.48 CrUnder construction
Apr 2019
Aswani Aaeesha B Wing
Aswani Properties · Electronic City / Hosur Road / Bommasandra
487.6%4.6%5.6%₹6,200 est.₹31.6 LReady
Mahaveer Edenfield
Mahaveer · Electronic City / Hosur Road / Bommasandra
489.1%4.3%6.2%₹3,400 est.₹55.6 LReady
Samruddhi Sunshine
Samruddhi Realty · Electronic City / Hosur Road / Bommasandra
478.2%2.3%2.9%₹6,000 est.₹90.0 LUnder construction
Jun 2018
M5 Echelon
Mahendra Homes · Electronic City / Hosur Road / Bommasandra
479.1%4.3%8.7%₹5,850 est.₹84.5 LUnder construction
Dec 2031
Ajmera Iris
Ajmera · Electronic City / Hosur Road / Bommasandra
478.0%3.2%4.1%₹7,550 est.₹40.0 LUnder construction
Dec 2026
Mahaveer Ranches Phase II
Mahaveer · Electronic City / Hosur Road / Bommasandra
469.7%3.6%4.5%₹5,850 est.₹93.6 LUnder construction
Mar 2025
The green terraces
Keya Homes · Electronic City / Hosur Road / Bommasandra
467.6%3.9%4.9%₹6,200 est.₹55.5 LReady
The Lake View Address – Phase 3
Indiabuild Realty · Electronic City / Hosur Road / Bommasandra
469.1%4.3%6.2%₹3,400 est.₹40.8 LReady
Adarsh Welkin Park Villas
Adarsh Developers · Electronic City / Hosur Road / Bommasandra
469.1%3.4%5.0%₹7,350 est.₹2.10 CrUnder construction
Oct 2027
Aswani Aaeesha A Wing
Aswani Properties · Electronic City / Hosur Road / Bommasandra
469.2%4.3%5.2%₹5,850 est.₹29.8 LUnder construction
Nov 2019
Ajmera Annex Residential
Ajmera · Electronic City / Hosur Road / Bommasandra
457.6%3.6%4.6%₹7,800 est.₹89.3 LReady
Ajmera Annex Commercial
Ajmera · Electronic City / Hosur Road / Bommasandra
457.6%3.2%4.1%₹7,800 est.₹1.46 CrReady
The Hamptons
Saiven Developers · Electronic City / Hosur Road / Bommasandra
457.6%3.4%4.3%₹6,200 est.₹93.0 LReady
Orchid South Park
Goyal & Co · Electronic City / Hosur Road / Bommasandra
458.6%3.7%6.8%₹7,350 est.₹83.1 LUnder construction
Apr 2031
JRC Wild Woods Phase III
JRC Projects · Electronic City / Hosur Road / Bommasandra
457.8%2.7%4.2%₹6,000 est.₹52.2 LUnder construction
Nov 2028
Evershine NORTHEAST Apartments
Evershine Dwellings · Electronic City / Hosur Road / Bommasandra
457.4%3.8%4.7%₹6,200 est.₹51.5 LReady
Gopalan Lakefront
Gopalan Enterprises · Electronic City / Hosur Road / Bommasandra
459.7%3.8%4.7%₹5,850 est.₹72.2 LUnder construction
Jun 2020
Beverly Aveenue
Pionier Projects · Electronic City / Hosur Road / Bommasandra
459.5%4.8%6.9%₹3,200 est.₹38.4 LUnder construction
Sep 2024
G R Gardenia
G R Promoters · Electronic City / Hosur Road / Bommasandra
447.6%3.7%4.7%₹6,200 est.₹65.7 LReady
Grand Icon 3
Icon Infra Shelters · Electronic City / Hosur Road / Bommasandra
449.1%4.3%6.2%₹3,400 est.₹40.8 LReady
Ranka Countryside
Ranka · Electronic City / Hosur Road / Bommasandra
439.1%4.3%6.2%₹3,400 est.₹58.8 LReady
Ds-Max Star Line
DS-MAX · Electronic City / Hosur Road / Bommasandra
437.6%3.4%4.3%₹6,200 est.₹93.0 LReady
Eterrnia
Pionier Projects · Electronic City / Hosur Road / Bommasandra
439.5%4.8%6.9%₹3,200 est.₹32.3 LUnder construction
Dec 2025
Mahaveer Ranches Phase I
Mahaveer · Electronic City / Hosur Road / Bommasandra
428.8%2.8%3.5%₹6,000 est.₹89.1 LUnder construction
Dec 2018
Concorde Epitome
Concorde · Electronic City / Hosur Road / Bommasandra
427.6%2.9%3.8%₹7,800 est.₹3.01 CrReady
Shriram Summitt
Shriram Properties · Electronic City / Hosur Road / Bommasandra
429.3%3.6%4.5%₹7,350 est.₹95.5 LUnder construction
Dec 2019
The lake Terraces
Keya Homes · Electronic City / Hosur Road / Bommasandra
427.2%4.0%4.9%₹6,200 est.₹40.3 LReady
Ds Max Sky Sanman
DS-MAX · Electronic City / Hosur Road / Bommasandra
428.4%3.2%5.5%₹5,850 est.₹52.9 LUnder construction
Jan 2030
Mahendra Aarya
Mahendra Homes · Electronic City / Hosur Road / Bommasandra
427.5%3.6%4.5%₹6,200 est.₹62.9 LReady
Mahendra AARNA
Mahendra Homes · Electronic City / Hosur Road / Bommasandra
417.6%3.6%4.5%₹6,200 est.₹74.1 LReady
Keerthi Royal Palms-Phase-I
Keerthi Estates · Electronic City / Hosur Road / Bommasandra
418.1%2.2%2.8%₹6,000 est.₹90.0 LUnder construction
Mar 2019
Bren Park City
Bren Corporation · Electronic City / Hosur Road / Bommasandra
418.5%3.5%5.5%₹7,350 est.₹43.7 LUnder construction
Jun 2029
Mahendra Solterra Aarya Phase-2
Mahendra Homes · Electronic City / Hosur Road / Bommasandra
418.6%3.4%6.3%₹5,850 est.₹84.2 LUnder construction
Dec 2030
DS Max Silverwood
DS-MAX · Electronic City / Hosur Road / Bommasandra
417.6%3.4%4.3%₹6,200 est.₹93.0 LReady
Shravanthi Prakruti
Shravanthi · Electronic City / Hosur Road / Bommasandra
418.0%2.5%3.7%₹5,850 est.₹68.4 LUnder construction
Mar 2028
Ds Max Starry
DS-MAX · Electronic City / Hosur Road / Bommasandra
417.6%3.4%4.3%₹6,200 est.₹93.0 LReady
DS MAX Silver Oak
DS-MAX · Electronic City / Hosur Road / Bommasandra
407.6%3.4%4.3%₹6,200 est.₹93.0 LReady
Shriram Summitt
Shriram Properties · Electronic City / Hosur Road / Bommasandra
409.3%3.6%4.6%₹7,350 est.₹94.4 LUnder construction
Dec 2019
Shriram Summitt
Shriram Properties · Electronic City / Hosur Road / Bommasandra
409.3%3.6%4.6%₹7,350 est.₹91.1 LUnder construction
Dec 2019
Ramky Lumina
Ramky Estates · Electronic City / Hosur Road / Bommasandra
408.3%3.0%4.7%₹5,850 est.₹64.6 LUnder construction
Dec 2028
Shriram Summitt
Shriram Properties · Electronic City / Hosur Road / Bommasandra
409.3%3.6%4.6%₹7,350 est.₹96.7 LUnder construction
Dec 2019
Reliaable Dollar Collony Phase 1C
RD Buildtech · Electronic City / Hosur Road / Bommasandra
399.5%4.8%6.9%₹3,200 est.₹38.4 LUnder construction
Jan 2024
Reliaable Dollar Collony Phase1B
RD Buildtech · Electronic City / Hosur Road / Bommasandra
399.5%4.8%6.9%₹3,200 est.₹38.4 LUnder construction
Jan 2024
RELIAABLE DOLLAR COLLONY Phase 2F
RD Buildtech · Electronic City / Hosur Road / Bommasandra
399.5%4.8%6.9%₹3,200 est.₹38.4 LUnder construction
May 2021
RELIAABLE DOLLAR COLLONY Phase 2E
RD Buildtech · Electronic City / Hosur Road / Bommasandra
399.5%4.8%6.9%₹3,200 est.₹38.4 LUnder construction
May 2021
Reliaable DOLLAR COLLONY Phase 2D
RD Buildtech · Electronic City / Hosur Road / Bommasandra
399.5%4.8%6.9%₹3,200 est.₹38.4 LUnder construction
Dec 2021
Reliaable DOLLAR COLLONY Phase 2C
RD Buildtech · Electronic City / Hosur Road / Bommasandra
399.5%4.8%6.9%₹3,200 est.₹38.4 LUnder construction
Dec 2021
Reliaable Residenza Phase 1B
Reliaable · Electronic City / Hosur Road / Bommasandra
399.5%4.8%6.9%₹3,200 est.₹38.4 LUnder construction
Dec 2023
Reliaable Dollar Collony Phase 2g
Reliaable · Electronic City / Hosur Road / Bommasandra
399.5%4.8%6.9%₹3,200 est.₹38.4 LUnder construction
Jan 2024
Reliaable Dollar Collony Phase 1A
Reliaable · Electronic City / Hosur Road / Bommasandra
399.5%4.8%6.9%₹3,200 est.₹38.4 LUnder construction
Dec 2021
Reliaable Residenza Phase 1A
Reliaable · Electronic City / Hosur Road / Bommasandra
399.5%4.8%6.9%₹3,200 est.₹38.4 LUnder construction
Dec 2022
RELIAABLE DOLLAR COLLONY Phase 2B
RD Buildtech · Electronic City / Hosur Road / Bommasandra
399.5%4.8%6.9%₹3,300 est.₹39.6 LUnder construction
May 2021
Skylark Royaume
Skylark · Electronic City / Hosur Road / Bommasandra
398.4%3.1%4.9%₹5,850 est.₹64.6 LUnder construction
Dec 2028
Reliaable Prime City Phase 1A
RD Buildtech · Electronic City / Hosur Road / Bommasandra
389.5%4.8%6.9%₹3,200 est.₹38.4 LUnder construction
Aug 2023
Aratt Milano
Arattukulam Developers · Electronic City / Hosur Road / Bommasandra
388.7%2.7%3.4%₹6,000 est.₹90.0 LUnder construction
Mar 2019
Reliaable Residenza Phase 1
RD Buildtech · Electronic City / Hosur Road / Bommasandra
389.5%4.8%6.9%₹3,200 est.₹38.4 LUnder construction
Sep 2022
Evershine StonePark
Evershine Dwellings · Electronic City / Hosur Road / Bommasandra
378.5%2.5%4.4%₹5,850 est.₹1.41 CrUnder construction
Sep 2030
Sai Crystal
Adarsh Developers · Electronic City / Hosur Road / Bommasandra
379.6%4.0%5.1%₹7,350 est.₹77.9 LUnder construction
Jun 2025
Reliaable E-City Plan-3
RD Buildtech · Electronic City / Hosur Road / Bommasandra
379.5%4.8%6.9%₹3,200 est.₹38.4 LUnder construction
Sep 2025
Reliaable E City Plan 2
RD Buildtech · Electronic City / Hosur Road / Bommasandra
379.5%4.8%6.9%₹3,200 est.₹38.4 LUnder construction
Sep 2025
Reliaable E City Plan 1
Reliaable · Electronic City / Hosur Road / Bommasandra
379.5%4.8%6.9%₹3,200 est.₹32.5 LUnder construction
Oct 2025
Reliaable Prime City PHASE 1
RD Buildtech · Electronic City / Hosur Road / Bommasandra
379.5%4.8%6.9%₹3,200 est.₹38.4 LUnder construction
Sep 2024
Mahaveer Palatium Annex Sy No 28-1
Mahaveer · Electronic City / Hosur Road / Bommasandra
369.1%4.3%6.2%₹3,400 est.₹40.8 LReady
Bellezea Phase V
Nambiar Builders · Electronic City / Hosur Road / Bommasandra
369.5%4.8%6.9%₹3,200 est.₹1.28 CrUnder construction
Jun 2025
Icon Micasa
Icon Infra Shelters · Electronic City / Hosur Road / Bommasandra
368.2%2.7%3.5%₹6,000 est.₹49.2 LUnder construction
Dec 2026
Bellezea-Phase IV
Nambiar Builders · Electronic City / Hosur Road / Bommasandra
367.6%1.6%2.1%₹6,000 est.₹90.0 LUnder construction
Jan 2027
“Townsville”
GM Infinite · Electronic City / Hosur Road / Bommasandra
359.4%2.9%3.7%₹5,850 est.₹1.91 CrUnder construction
Oct 2020
Ds Max Sahara
DS-MAX · Electronic City / Hosur Road / Bommasandra
348.0%2.1%2.6%₹5,850 est.₹87.8 LUnder construction
Dec 2024
Godrej Nurture
Godrej Properties · Electronic City / Hosur Road / Bommasandra
348.0%3.1%3.9%₹7,350 est.₹45.6 LUnder construction
Dec 2025
Skylark Dasos
Skylark · Electronic City / Hosur Road / Bommasandra
348.0%2.3%2.9%₹5,850 est.₹66.4 LUnder construction
Sep 2023
Shriram Summitt
Shriram Properties · Electronic City / Hosur Road / Bommasandra
349.3%3.6%4.6%₹7,350 est.₹96.7 LUnder construction
Dec 2020
Ramky One Karnival
Ramky Estates · Electronic City / Hosur Road / Bommasandra
347.4%3.2%4.1%₹6,200 est.₹93.0 LReady
The Lake View Address- Phase 1
Indiabuild Realty · Electronic City / Hosur Road / Bommasandra
338.8%2.5%3.2%₹6,000 est.₹1.26 CrUnder construction
Apr 2021
Mahaveer Turquoise
Reddy Structures · Electronic City / Hosur Road / Bommasandra
338.0%2.9%3.5%₹5,850 est.₹38.9 LUnder construction
Sep 2022
Sipani Viveza
Sipani · Electronic City / Hosur Road / Bommasandra
338.0%2.3%2.8%₹5,850 est.₹73.7 LUnder construction
Nov 2024
The Lake View Address Phase 4
Indiabuild Realty · Electronic City / Hosur Road / Bommasandra
329.5%4.8%6.9%₹3,200 est.₹51.4 LUnder construction
Mar 2025
Ajmera Nucleus Phase 1 (residential - A & B Wing)
Ajmera · Electronic City / Hosur Road / Bommasandra
318.0%2.5%3.1%₹7,350 est.₹87.8 LUnder construction
Sep 2023
Ajmera Nucleus Phase 2 (residential -C Wing)
Ajmera · Electronic City / Hosur Road / Bommasandra
318.0%2.8%3.6%₹7,350 est.₹59.2 LUnder construction
Mar 2024
Pride Gateway
Pride & Expert Properties · Electronic City / Hosur Road / Bommasandra
318.0%1.8%2.3%₹5,850 est.₹1.23 CrUnder construction
Mar 2024
Mahendra AARNA 5
Mahendra Homes · Electronic City / Hosur Road / Bommasandra
318.0%2.1%2.6%₹5,850 est.₹87.8 LUnder construction
Dec 2021
I Towers Exente
Kolte-Patil · Electronic City / Hosur Road / Bommasandra
308.0%2.4%3.0%₹7,350 est.₹95.5 LUnder construction
Apr 2024
Mahaveer Palatium Sy No 41
Reddy Structures · Electronic City / Hosur Road / Bommasandra
309.5%4.8%6.9%₹3,200 est.₹38.4 LUnder construction
Aug 2022
Ds Max Sky Classic
DS-MAX · Electronic City / Hosur Road / Bommasandra
298.0%2.1%2.6%₹5,850 est.₹87.8 LUnder construction
Sep 2023
Mahaveer Trident
Reddy Structures · Electronic City / Hosur Road / Bommasandra
288.0%2.4%3.0%₹5,850 est.₹64.1 LUnder construction
Mar 2025
The Lake View Address - Apartments
Indiabuild Realty · Electronic City / Hosur Road / Bommasandra
288.0%2.1%2.6%₹5,850 est.₹87.8 LUnder construction
Jan 2023
Mahaveer Palatium
Reddy Structures · Electronic City / Hosur Road / Bommasandra
2710.1%5.3%7.6%₹3,300 est.₹55.8 LUnder construction
Aug 2020
Shriram Liberty Square
Shriram Properties · Electronic City / Hosur Road / Bommasandra
268.0%2.8%3.5%₹7,350 est.₹59.9 LUnder construction
Nov 2024

Price per sq ft in Electronic City / Hosur Road / Bommasandra: what the evidence says

Date₹ / sq ftBasisConfidence
2021-06₹4,500blr (derived)40%
2023-06₹5,600blr (derived)45%
2025-06₹7,000blr (derived)50%
2026-06₹8,000blr (derived)50%

That is 12.2% a year from 2021-06 to 2026-06. The model projects 9.1% a year from here; the growth story on each project page shows why.

Supply and demand from RERA filings

Registered projects
75
22 under construction
Homes filed
24,760
5,161 unsold
Sales pace
169 / month
homes booked per month
New supply ratio
1.28
new launches ÷ sales; above 1 = supply building

Karnataka RERA, 2026-09. Months of inventory = unsold homes ÷ monthly sales.

Infrastructure pipeline

ProjectTypeStatusExpectedChance it lands on timePrice effect if it does
Yellow Line RV Road–Bommasandra (opened Aug 2025)metrooperational2025100%+0.8% / yr
Satellite Town Ring Roadroadconstruction202860%+0.6% / yr
Bengaluru suburban rail (K-RIDE)railconstruction202950%+0.6% / yr

The growth model counts each event at its probability, not its promise. Dates are the latest public schedule.

Developers active in Electronic City / Hosur Road / Bommasandra

Ranked lists for Electronic City / Hosur Road / Bommasandra

Electronic City / Hosur Road / Bommasandra compared with other areas

Questions people ask

Is Electronic City / Hosur Road / Bommasandra good for investment?

On PropertyLens's model the median analysed project in Electronic City / Hosur Road / Bommasandra scores 41/100 (below the Bengaluru average), with projected price growth of 9.1% a year over five years, median price ₹5,850 per sq ft and gross rental yield 3.5%. 115 RERA-registered projects analysed as of September 11, 2026. The best-scored project is Casagrand Vivacity at 65.

What is the price per sq ft in Electronic City / Hosur Road / Bommasandra?

Median ₹5,850 per sq ft of super built-up area across analysed projects, modelled from comparables where developers file no price. Entry price for an analysed home is about ₹29.8 L; the median home is ₹59.9 L.

What rental yield can I expect in Electronic City / Hosur Road / Bommasandra?

Median gross yield 3.5% on the all-in cost of an analysed home, before maintenance, vacancy and tax. Net-wealth CAGR after every cost on an 8-year hold with a 75% loan is 3.6% at the median.

Are projects in Electronic City / Hosur Road / Bommasandra delayed?

54 of 88 under-construction projects are past the completion date in their original RERA registration, and unsold stock equals about 25 months of sales. Each project page shows extensions, construction against bookings and complaints.

Scores and projections are model outputs built from dated public evidence (Karnataka RERA filings, promoter quarterly updates, complaint registers, public ratings) and stated assumptions. They are research, not investment advice. How the numbers are built.