PropertyLensBengaluru · invest
Birla Estates · Kanakapura Road / Talaghattapura / Banashankari 6th

Birla Apple Aroma

SY NO.92/2 ALAHALLI VILLAGE, UTTRAHALLI HOBLI
Ready · rent from todayapartment · premiumRERA registered+ CompareFull report ↗
1 · Which home?
2 · Which exit plan?

Score, growth and returns below are for the highlighted home and plan. Prices, rent and possession never mix across phases.

29
Investment score
29/100
Evidence confidence56%
Residential Apartments · ~1,600 sq ft (1126 carpet)
Price growth per year, next 5 yrs model
6.3%
likely range 2.8%–9.7% · over 10 yrs 6.7%/yr
Net-wealth CAGR, 8-yr hold
2.1%
your cash in → cash back incl. sale, per year
Cash-flow IRR, 8-yr hold
2.8%
with 75% loan · all-cash 5.8% · with interiors
Three numbers, three questions. Price growth: what will the home be worth? Net-wealth CAGR: what will my money have earned after every cost? Cash-flow IRR: the same, but counting when each rupee moves. Tap i on any of them.
Price · edit here or below assumed
₹Cr
₹ psf × 1,600 sq ft · as of Sep 2026
Price edits apply to ·
All-in cost
₹1.87 Cr
+ other charges 5.5 L, GST 0.0 L, stamp/reg 10.7 L, interiors 12.8 L
Gross rental yield assumed
2.7%
rent starts in ~0.3 yr

All-in cost sheet this home, default assumptions

ItemBasisAmount
Base price₹9,800 per sq ft × 1,600 sq ft super built-up1.57 Cr
Other charges3.5% of base: floor-rise, preferred-location, car park, club, maintenance deposit, legal, corpus (edit in Assumptions)5.5 L
GST0.0% on an under-construction home — none is due on a ready home with an occupancy certificate, set GST to 0 if buying after OC0.0 L
Stamp duty and registration6.6% in Karnataka: 5% stamp duty + 1% registration + cess and surcharge on the agreement value10.7 L
Interiors₹800 per sq ft, needed before the home can be let12.8 L
All-in costwhat leaves your pocket and the bank's, before rent or resale₹1.87 Cr
Your own money75.0% loan at 8.5% for 20 years covers the rest; EMI 1.1 L a month₹1.37 Cr

Carpet area 1,126 sq ft against 1,600 sq ft super built-up: you pay for 30% that is common area and walls. Price per sq ft of carpet ≈ ₹13,925. Every percentage above is editable in Assumptions; the defaults are Karnataka rates as of 2026-09.

In plain words

Why 29 out of 100

Each home is marked on 11 things a careful buyer checks, then compared with every project we analyse in Bengaluru: 50 is the average project, 62 beats about five in six. Here is what lifts this one and what drags it:

  • +
    Builder delivery & handover risk · 8/16 pts
    Birla Estates has finished 10+ projects and delivered on time about 75% of the time. This home is ready, so there is no waiting risk.
  • +
    Metro, bus, rail & airport · 4/9 pts
    A metro station is a short walk away (~1200 m). Airport is about 106 minutes by road right now.
  • +
    Water, flooding, noise, infrastructure · 2/9 pts
    Low flood risk; water supply is partly piped, partly tankers; noise is manageable.
  • −
    Expected price growth (5-yr CAGR model) · -30/26 pts
    We expect prices here to rise about 6.3% a year for the next 5 years (explained below).
  • −
    Legal, title & approvals · -3/5 pts
    Registered with Karnataka RERA; no court cases reported; land title not yet verified by us, so get a lawyer to check. The due-diligence report below flags 2 items in red.
  • −
    Rental demand & yield · -2/8 pts
    Rent pays back 2.7% of the price every year, close to the usual 3% in Bengaluru. Tenant demand here is decent.
All 11 checks
  • •
    Price vs comparables · -0/3 pts
    Priced about the same as similar premium homes nearby (₹9,800 vs ~₹9,800 per sq ft).
  • •
    Rental demand & yield · -2/8 pts
    Rent pays back 2.7% of the price every year, close to the usual 3% in Bengaluru. Tenant demand here is decent.
  • +
    Resale liquidity · 0/4 pts
    Plenty of buyers can afford a ₹1.57 Cr home, and homes in Kanakapura Road / Talaghattapura / Banashankari 6th resell at a normal pace.
  • •
    Employment access · -0/10 pts
    Drive times right now: Koramangala (Forum) 26 min, Electronic City Ph-1 33 min, MG Road (CBD) 36 min; ITPL Whitefield 63 min. About 2 million sq ft of new offices are planned nearby in 3 years.
  • •
    Metro, bus, rail & airport · 4/9 pts
    A metro station is a short walk away (~1200 m). Airport is about 106 minutes by road right now.
  • +
    Schools, hospitals, daily needs · 1/3 pts
    Schools, hospitals and daily shopping are good in this area.
  • •
    Builder delivery & handover risk · 8/16 pts
    Birla Estates has finished 10+ projects and delivered on time about 75% of the time. This home is ready, so there is no waiting risk.
  • +
    Layout, size, age, amenities, maintenance · -0/3 pts
    Dense layout (79 homes per acre); about 72% of the area you pay for is usable carpet area. Maintenance ~₹4.5 per sq ft a month.
  • +
    Water, flooding, noise, infrastructure · 2/9 pts
    Low flood risk; water supply is partly piped, partly tankers; noise is manageable.
  • •
    Legal, title & approvals · -3/5 pts
    Registered with Karnataka RERA; no court cases reported; land title not yet verified by us, so get a lawyer to check. The due-diligence report below flags 2 items in red.
  • −
    Expected price growth (5-yr CAGR model) · -30/26 pts
    We expect prices here to rise about 6.3% a year for the next 5 years (explained below).
Why prices should grow ~6.3% a year for the next 5 years

We build the forecast step by step, starting from what Bengaluru homes normally do and adjusting for this area and this project:

  1. + 6.0%Start with 6.0% a year: the normal long-run growth of Bengaluru home prices.
  2. + 0.7%Add 0.7%: prices here rose 10.8% a year recently (2023-06 to 2026-06). Some of that pace continues, but it fades each year.
  3. + 0.0%Prices are still affordable enough that this does not slow growth.
  4. + 1.4%Add 1.4%: 2 million sq ft of new offices nearby means more people wanting homes here.
  5. − 0.7%Subtract 0.7%: many new homes are being built here (20 months of unsold stock), which keeps prices in check.
  6. + 0.2%Add 0.2% for new roads, metro and water lines, weighted by how likely they are to actually finish: Phase 3 (Orange/Red lines: JP Nagar–Kempapura, Hosahalli–Kadabagere) (construction, 2029); Satellite Town Ring Road (construction, 2028).
  7. − 1.4%Subtract 1.4% for this project itself: it is priced above its neighbours or is ageing.
  8. = 6.3%Result: about 6.3% a year, so a home worth ₹1.62 Cr today would be worth about ₹2.20 Cr in 5 years. We are 56% confident in the evidence behind this.

Which exit suits you?

Interiors change both the rent you get and what you recover at sale. Same price, same loan; only the strategy changes:

StrategyHoldIRR / yrWealth CAGR / yrCash you put inNet rentNet saleApply
No interiors, rent unfurnished best IRR
Skip interiors; rent 12% lower than a fitted home; sell after 8 yrs with no interiors value.
8 yrs4.0%2.9%₹1.27 Cr₹18.0 L₹1.70 Cr
Do interiors, rent & sell fitted selected
Spend ₹800/sq ft on interiors, earn full rent, recover ~40% of interiors cost at sale (fading over 10 yrs).
8 yrs2.8%2.1%₹1.37 Cr₹21.9 L₹1.71 Cr

IRR and CAGR are per year over the hold shown. A short hold can show a high IRR on a small absolute gain; compare the net-sale column too. Selling before registration usually needs the builder’s transfer NOC and a fee.

Highlights

  • Birla Estates · Kanakapura Road / Talaghattapura / Banashankari 6th · 180 homes on 2.3 acres
  • Marked completed on RERA (completion date 2026-03-31) after 2 extensions
  • No litigation declared · 15 complaints on this registration

Assumptions editable

Purchase

₹/sq ft
₹ Cr
sq ft
% of base
%
%
%
₹/sq ft

FinancingLoan 75% · cash 25% · EMI ₹1.1 L/mo

% loan
% p.a.
years
%

Rent & running costs

₹
% p.a.
%
months
months
₹/sq ft/mo
% of rent
% of rent
% of value

Interiors & exit

%
%
years
% p.a. (blank = model)
%
%

Returns over 8 years · with interiors

Cash you put in₹1.37 Cr
Exit value (yr 8)₹2.71 Cr
Net sale after loan & costs₹1.71 Cr
Net rent after opex₹21.9 L
Loan (75% of price)₹1.22 Cr
EMI / month₹1.1 L
Year 0: ₹-66.3 L0Year 1: ₹-11.5 L1Year 2: ₹-10.2 L2Year 3: ₹-10.1 L3Year 4: ₹-9.9 L4Year 5: ₹-9.7 L5Year 6: ₹-9.5 L6Year 7: ₹-9.3 L7Year 8: ₹1.62 Cr8
YearPurchaseLoan inRent (net of vacancy)OpexDebt serviceSale − loanNet cash
Today-1.88 Cr1.22 Cr0.0 L0.0 L0.0 L0.0 L-66.3 L
Yr 10.0 L0.0 L2.8 L-1.6 L-12.7 L0.0 L-11.5 L
Yr 20.0 L0.0 L4.4 L-1.9 L-12.7 L0.0 L-10.2 L
Yr 30.0 L0.0 L4.6 L-2.0 L-12.7 L0.0 L-10.1 L
Yr 40.0 L0.0 L4.8 L-2.0 L-12.7 L0.0 L-9.9 L
Yr 50.0 L0.0 L5.1 L-2.1 L-12.7 L0.0 L-9.7 L
Yr 60.0 L0.0 L5.3 L-2.2 L-12.7 L0.0 L-9.5 L
Yr 70.0 L0.0 L5.6 L-2.2 L-12.7 L0.0 L-9.3 L
Yr 80.0 L0.0 L5.9 L-2.3 L-12.7 L1.71 Cr1.62 Cr

Pre-tax unless capital-gains tax is set. Rent enters the cash flows once. Net-wealth CAGR = (cash returned incl. sale ÷ cash put in)^(1/years) − 1. IRR uses the dated cash flows.

Score factors

Bars show points added or taken away versus the average analysed Bengaluru project (score 50).

Price vs comparables
−0.2 pts vs avg
this home 6.0/10 · Bengaluru average 6.2 · confidence 35%
₹9,800 psf vs premium comps ₹9,800 (0%). Price is a model estimate, so this factor carries a third of its normal weight until a listed price is observed.
Rental demand & yield
−2.1 pts vs avg
this home 4.9/10 · Bengaluru average 6.0 · confidence 38%
Gross yield 2.8% (₹23 psf/month); locality rental demand 8/10.
Resale liquidity
+0.2 pts vs avg
this home 7.7/10 · Bengaluru average 7.6 · confidence 60%
Locality resale depth 8/10; ticket ₹1.57 Cr narrows the buyer pool; 180-home project; RERA sales pace ratio 0.
Employment access
−0.1 pts vs avg
this home 5.2/10 · Bengaluru average 5.2 · confidence 85%
Drive times now (Google Maps, 2026-09-16): Koramangala (Forum) 26 min, Electronic City Ph-1 33 min, MG Road (CBD) 36 min, ORR Bellandur (Ecospace) 40 min; 1 of 7 major hubs within 30 min; 2 msf office pipeline (3 yr).
Metro, bus, rail & airport
+3.8 pts vs avg
this home 6.9/10 · Bengaluru average 4.8 · confidence 60%
Green Line Silk Institute / Vajarahalli / Talaghattapura; no planned station within 2 km; airport ~106 min by road now (Google Maps); .
Schools, hospitals, daily needs
+0.5 pts vs avg
this home 7.5/10 · Bengaluru average 7.0 · confidence 50%
Locality social-infrastructure index (interim, expert-set; POI distances pending Maps integration).
Builder delivery & handover risk
+7.7 pts vs avg
this home 6.8/10 · Bengaluru average 3.7 · confidence 60%
Birla Estates: 10+ projects, on-time 75% (derived); ready.
Layout, size, age, amenities, maintenance
−0.2 pts vs avg
this home 7.2/10 · Bengaluru average 7.3 · confidence 55%
79 units/acre; carpet/SBA ~72%; maintenance ~₹4.5 psf/month (assumed); filed construction cost ₹2,640 per sq ft (standard spec).
Water, flooding, noise, infrastructure
+2.5 pts vs avg
this home 7.0/10 · Bengaluru average 5.8 · confidence 50%
NICE road access; metro at doorstep on the corridor
Legal, title & approvals
−3.4 pts vs avg
this home 5.7/10 · Bengaluru average 7.4 · confidence 55%
RERA registered; litigation: none reported; approvals: RERA registered; title: not verified. Due-diligence report lists 2 red flags (−3.1 pts).
Expected price growth (5-yr CAGR model)
−29.6 pts vs avg
this home 1.3/10 · Bengaluru average 6.0 · confidence 56%
Model 5-yr price CAGR 6.3% (range 2.8–9.7%).

Price growth model, year by year

Nominal growth per year. Parts add up; momentum fades, infrastructure is weighted by delivery probability and dated.

ComponentYr 1Yr 2Yr 3Yr 4Yr 5Yr 6Confidence
Bengaluru long-run nominal trend6.06.06.06.06.06.080%
Locality momentum (mean-reverting)1.70.90.50.30.20.145%
Affordability ceiling0.00.00.00.00.00.060%
Employment access & office pipeline1.41.41.41.41.41.455%
Supply–demand balance-1.0-0.8-0.6-0.5-0.4-0.350%
Infrastructure delivery (probability-weighted)0.10.30.30.20.00.055%
Project-specific adjustments-2.0-2.0-2.0-0.80.00.050%
Total growth6.2%5.8%5.6%6.5%7.1%7.1%56%

Bengaluru long-run nominal trend: City-wide 2013-25 nominal residential trend ≈ inflation + real income growth.

Locality momentum (mean-reverting): Trailing 3.0-yr locality CAGR 10.8% vs 6.0% trend; 35% carried forward, halving each year.

Affordability ceiling: Ticket at ₹9,800 psf vs city median ₹9,500; buyer pool thins above ₹15k/₹20k psf and after >6pp excess growth.

Employment access & office pipeline: 2 msf office pipeline (3 yr) on 8 msf stock; 30-min jobs index 0.60.

Supply–demand balance: 20 months of unsold inventory; new-launch/absorption ratio 1.01 (from 22 under-construction RERA filings in this locality: 2,756 unsold homes, 118.9 sold per month).

Infrastructure delivery (probability-weighted): Phase 3 (Orange/Red lines: JP Nagar–Kempapura, Hosahalli–Kadabagere) (construction, 2029, p=0.55); Satellite Town Ring Road (construction, 2028, p=0.6)

Project-specific adjustments: Building age 0 yrs. Sales pace from RERA filings: 0% of 180 homes booked with 100% of the build timeline elapsed (pace ratio 0); fast sellers re-rate, slow sellers discount. Large unsold stock after completion weighs on resale pricing.

Locality evidence: ₹7,200 (Jun 2023) → ₹9,800 (Jun 2026) = 10.8% p.a. Sources: Platform estimate (interim, not observed).

Financial & legal due diligence

What the public record says

Automated from the Karnataka RERA file PRM/KA/RERA/1251/310/PR/171125/000383 and 2 quarterly filings. Prices and rents are locality estimates, not verified listings. Compiled Sep 2026 from the Karnataka RERA file, company registers, rating agencies, tribunal records and press. Facts only; anything that deserves a written answer before signing is flagged.

Delivery timeline8/10
delivered; the registration was extended 2× before completion
Legal & complaints6/10
15 RERA complaints on the project (−3); 3 still open
Money to finish6/10
finance cost is 0% of the registered budget; last quarter withdrew ₹8.52 cr against ₹2.79 cr collected (−1); only 0% of homes booked (−1)
Developer strength9/10
CRISIL AA/Stable (Birla Estates)

Meters are rule-based from the RERA file and public ratings (rules shown under each), not opinions.

Registration
PRM/KA/RERA/1251/310/PR/171125/000383 · APPLE SPIRE INDIA LLP
Delivered
RegisteredApr 2016Original completionMar 2019Section 6 ext.Mar 2020Further ext.Mar 2026TodaySep 2026
Money through the RERA account
Collected ₹2.71 CrWithdrawn ₹3.66 CrQ3 2025-262.71 Cr3.66 CrCollected ₹2.79 CrWithdrawn ₹8.52 CrQ4 2025-262.79 Cr8.52 Cr
Collected from buyersWithdrawn for construction
Latest milestones
  • Earth work and other leveling preparation
    100%
  • Foundation footing work
    100%
  • Retaining wall
    100%
  • Plinth level Beam
    100%
  • Sub-structure flooring
    100%
  • RCC or MS Framed structure
    100%
No litigation declared15 complaints · 3 openEscrow: HDFC
Credit ratings of the people behind it
AAAAAABBBBBBCDinvestment grade ◀▶ speculative gradeCRISIL AA / Stable · Birla Estates (Aditya Birla Real Estate) · Jun 2025
Complaints & disputes on record
On this project153 open
On the promoter entity18all projects
Court cases declared0no stay recorded
What complainants raise
  • Delay in renewal of RERA Registration, Delay in Completion of Construction and Delay in ha
  • Delay in Completion of the Project by the Builder
  • Complaint against the Delayed Completion of Project
  • Delay in completing the construction and handing over the property
At a glance
Delivered

Delivered. RERA registration ran 2016-04-15 → 2026-03-31 after 2 extensions (original 2019-03-30)

15 RERA complaints, 3 open

15 RERA complaints on this project (3 open); 18 on the promoter overall

No litigation declared

No litigation declared in RERA filings

The record, in pictures

RERA file · Registration

Registered project cost ₹74.23 cr — where it goes
Land ₹5.2 cr · 7%Construction & on-site ₹69 cr · 93%
No litigation declaredBorrowing declared: not statedEscrow at HDFCOwners’ association: not formed

Complaint log (K-RERA) · 15 on this project

  • Feb 2026Delay in renewal of RERA Registration, Delay in Completion of Construction and Delay in handing over the propeopen
  • Feb 2026Delay in Completion of the Project by the Builderopen
  • Dec 2025Complaint against the Delayed Completion of Projectopen
  • Mar 2025Delay in completing the construction and handing over the propertydisposed
  • Dec 2024Delay in handing over possession and execution. of Sale Deeddisposed
  • May 2024Delay in renewal of RERA Registration, Delay in Completion of Construction andDelay in handing over the properdisposed
  • May 2024Delay in renewal of RERA Registration, Delay in Completion of Construction andDelay in handing over the properdisposed
  • May 2024Delay in renewal of RERA Registration, Delay in Completion of Construction andDelay in handing over the properdisposed
  • May 2024Delay in renewal of RERA Registration, Delay in Completion of Construction and Delay in handing over the propedisposed
  • May 2024Delay in renewal of RERA Registration, Delay in Completion of Construction and Delay in handing over the propedisposed
  • May 2024Delay in renewal of RERA Registration, Delay in Completion of Construction andDelay in handing over the properdisposed
  • May 2024Delay in renewal of RERA Registration, Delay in Completion of Construction andDelay in handing over the properdisposed
Complaints by status
Open / under enquiry
3
Disposed (Authority)
12

Red flags to resolve in writing

1
Timeline

Registration extended 2 times: original completion 2019-03-30, now 2026-03-31.

2
Timeline

15 K-RERA complaints on this registration.

Questions to put to the developer before you sign

  1. Share the latest CA Form 4 and architect Form 5 with the escrow deposit ratio.
  2. Confirm the price list, floor-rise and other charges for the exact unit.
  3. Provide the occupancy certificate, khata and title chain for the unit.
  4. Confirm there is no litigation on the land or approvals beyond the RERA declaration.
  5. Is the land freehold with the developer, and is any part mortgaged?
Full record: every filed number, line by line2 sections · 26 items

RERA file · Registration

Registration
PRM/KA/RERA/1251/310/PR/171125/000383 · promoter APPLE SPIRE INDIA LLP (Other) · EX/PRM/KA/RERA/1251/310/PR/220711/000383
Dates
Start 2016-04-15 · original completion 2019-03-30 · 2 extensions: Section 6 Extension → 2020-03-30, Further Extension → 2026-03-31
Status
Completed and occupied (per project status); RERA progress fields below are historical
Registered cost
Total ₹74.23 cr · land ₹5.23 cr · construction ₹69.00 cr
RERA bank account
HDFC, Fort (70% construction account)
Money at registration
collected ₹1.34 cr · used ₹1.34 cr · balance ₹0.00 cr · delay declared: No
Land & towers
2.27 acres (9,191 sq m) · Tower A 90 homes, 14 floors; Tower B 90 homes, 14 floors
Litigation declared
None declared in filings
K-RERA complaints
15 on this registration (3 open) · 18 on the promoter entity across all its projects (a project-specific LLP; group-level complaints sit under other entities)
Owners’ association
Not yet formed
Completion applied
19/12/2020

Source: Karnataka RERA project record PRM/KA/RERA/1251/310/PR/171125/000383, fetched 2026-09-15. Figures are the promoter’s own filings.

Complaint log (K-RERA) · 15 on this project

2026-02-18 · 00128/2026
Delay in renewal of RERA Registration, Delay in Completion of Construction and Delay in handing over the property — UNDER ENQUIRY AUTHORITY BENCH6
2026-02-06 · 00090/2026
Delay in Completion of the Project by the Builder — UNDER ENQUIRY AUTHORITY BENCH6
2025-12-26 · 01524/2025
Complaint against the Delayed Completion of Project — UNDER ENQUIRY AUTHORITY BENCH6
2025-03-21 · 00537/2025
Delay in completing the construction and handing over the property — DISPOSED AUTHORITY BENCH5 (AUTHORITY)
2024-12-21 · 01340/2024
Delay in handing over possession and execution. of Sale Deed — DISPOSED AUTHORITY BENCH5 (AUTHORITY)
2024-05-23 · 00465/2024
Delay in renewal of RERA Registration, Delay in Completion of Construction andDelay in handing over the property — DISPOSED AUTHORITY BENCH5 (AUTHORITY)
2024-05-23 · 00466/2024
Delay in renewal of RERA Registration, Delay in Completion of Construction andDelay in handing over the property — DISPOSED AUTHORITY BENCH5 (AUTHORITY)
2024-05-23 · 00467/2024
Delay in renewal of RERA Registration, Delay in Completion of Construction andDelay in handing over the property — DISPOSED AUTHORITY BENCH5 (AUTHORITY)
2024-05-13 · 00438/2024
Delay in renewal of RERA Registration, Delay in Completion of Construction and Delay in handing over the property — DISPOSED AUTHORITY BENCH5 (AUTHORITY)
2024-05-13 · 00439/2024
Delay in renewal of RERA Registration, Delay in Completion of Construction and Delay in handing over the property — DISPOSED AUTHORITY BENCH5 (AUTHORITY)
2024-05-13 · 00440/2024
Delay in renewal of RERA Registration, Delay in Completion of Construction andDelay in handing over the property — DISPOSED AUTHORITY BENCH5 (AUTHORITY)
2024-05-13 · 00441/2024
Delay in renewal of RERA Registration, Delay in Completion of Construction andDelay in handing over the property — DISPOSED AUTHORITY BENCH5 (AUTHORITY)
2024-05-13 · 00442/2024
Delay in renewal of RERA Registration, Delay in Completion ofConstruction andDelay in handing over the property — DISPOSED AUTHORITY BENCH5 (AUTHORITY)
2023-07-27 · 01198/2023
Complete the Development work and Execute sale deed in favor of complainant. — DISPOSED AUTHORITY BENCH5 (AUTHORITY)
2023-07-15 · 01097/2023
Complete the Development work and Execute sale deed in favor of complainant. — DISPOSED AUTHORITY BENCH5 (AUTHORITY)

Complaint subjects are as filed by complainants; a disposed complaint may have been decided either way.

Sources & caveats2 sources
  • Karnataka RERA project record PRM/KA/RERA/1251/310/PR/171125/000383 (registration file, quarterly updates, complaint register), fetched 2026-09-15
  • PropertyLens locality model (market-level estimates)
  • Karnataka RERA project records PRM/KA/RERA/1251/310/PR/171125/000383 (registration file, quarterly updates, complaint register), fetched Sep 2026.

Caveats. Automated analysis: prices, rents and travel times are estimates until listings and Maps data are verified. RERA figures are the promoter’s own filings. Nothing here is legal, tax or investment advice.

Evidence

Location, jobs & transit3 hubs · metro walkable
Job hubs nearby
Global Village Tech Park 8 kmElectronic City 18 kmJayanagar / JP Nagar
Measured drive times below
Office space
Existing8 msf
Coming in 3 yrs2 msf
Jobs within 30 min6/10
Getting around
Metro today
Green Line Silk Institute / Vajarahalli / Talaghattapura
~1,200 m estimate
Metro planned
No station planned within 2 km
Rail
—
estimate
Airport
106 min by road now · 39.3 km
Google Maps
Buses
7/10 coverage
estimate
Drive times to job hubs
DestinationDrive nowRoad km
Koramangala (Forum)26 min8.5
Electronic City Ph-133 min11
MG Road (CBD)36 min12.3
ORR Bellandur (Ecospace)40 min13.8
Hebbal (Kirloskar)52 min18.4
Manyata Tech Park56 min20.1
ITPL Whitefield63 min22.5
Kempegowda Airport (KIA)106 min39.3

Google Maps driving time with live traffic, measured Sep 2026. Refreshed monthly.

Location used: Google Maps match “”. Bus coverage and planned-station distances are still interim estimates.

Price historylocality 10.8%/yr

No dated project-level price series yet; only the latest observation is on file.

Locality · average ₹/sq ft
Date₹ psfSourceConfidenceKind
Jun 20215,600Platform estimate (interim, not observed)40%derived
Jun 20237,200Platform estimate (interim, not observed)45%derived
Jun 20258,800Platform estimate (interim, not observed)50%derived
Jun 20269,800Platform estimate (interim, not observed)50%derived
Luxury comps₹12,000
Premium comps₹9,800
Mid comps₹7,500
Unsold stock20 months

Model backtest on this locality: 1-yr hold-out (Jun 2025→Jun 2026): predicted ₹9,546 vs actual ₹9,800 (-2.6%). Longer 3-yr hold-out (Jun 2023→Jun 2026): predicted 7.8% p.a. vs actual 10.8% p.a. — the model is deliberately mean-reverting and under-predicted the 2021–26 boom.

Environment, legal & productflood ok · water risk · RERA yes
Flood risklow
Water supplymixed
Quietok
Roads & drainsgood

NICE road access; metro at doorstep on the corridor

Legal & approvals
Registration 000383
RERA PRM/KA/RERA/1251/310/PR/171125/000383
ready
Litigation
none reported
observed
Approvals
RERA registered
observed
Title
not verified
assumed
Product
Land2.27 acres
Homes180
Density79/acre
Launched2016
Sources & data gapswhat we know, from where, and what is missing

Automated analysis: unit mix and carpet areas come from the RERA inventory table; prices and rents are locality-model estimates until listings are verified.

FieldValueSource classDateConf.KindConflicting values
AddressSY NO.92/2 ALAHALLI VILLAGE, UTTRAHALLI HOBLIKarnataka RERA (number as reported; registry lookup pending)Sep 202680%observed
Land area (acres)2.27Karnataka RERA (number as reported; registry lookup pending)Sep 202680%observed
Total units180Karnataka RERA (number as reported; registry lookup pending)Sep 202680%observed
Launch year2016Karnataka RERA (number as reported; registry lookup pending)Sep 202670%observed
Possession · Registration 0003832026-03-31Karnataka RERA (number as reported; registry lookup pending)Sep 202670%observed
Price psf · Residential Apartments · ~1,600 sq ft (1126 carpet)9800Platform estimate (interim, not observed)Sep 202635%assumed
Ticket · Residential Apartments · ~1,600 sq ft (1126 carpet)15680000Platform estimate (interim, not observed)Sep 202635%derived
Rent · Residential Apartments · ~1,600 sq ft (1126 carpet)36500Platform estimate (interim, not observed)Sep 202635%assumed
Carpet area1126Karnataka RERA (number as reported; registry lookup pending)Sep 202660%observed
Builder on-time rate0.75Karnataka RERA (number as reported; registry lookup pending)Sep 202660%derived
Litigationnone reportedKarnataka RERA (number as reported; registry lookup pending)Sep 202670%observed
ApprovalsRERA registeredKarnataka RERA (number as reported; registry lookup pending)Sep 202660%observed

Commercial listing portals are shown as “Listing portal (aggregated)”; full provenance is retained internally. Official developer and Karnataka RERA sources are named.

Other projects worth comparing

Same model, same date. Scores are out of 100, where 50 is the average analysed Bengaluru project.

Questions people ask about Birla Apple Aroma

Is Birla Apple Aroma a good investment?

On PropertyLens's evidence-based model Birla Apple Aroma scores 29/100, well below the average analysed Bengaluru project (50 = average, 12 points = one standard deviation). The model projects price growth of about 6.3% a year over five years and a net-wealth CAGR of 2.1% after every cost on an 8-year hold with a 75.0% loan. That is research on public filings, not advice; the factor breakdown on this page shows what drives the score.

What is the price per sq ft at Birla Apple Aroma?

About ₹9,800 per sq ft of super built-up area, a model estimate from Kanakapura Road / Talaghattapura / Banashankari 6th comparables that you can edit. The Residential Apartments home costs about ₹1.57 Cr before other charges, GST and stamp duty, and ₹1.87 Cr all-in.

When is Birla Apple Aroma ready for possession?

The project is marked ready to move in; confirm the occupancy certificate before paying.

Is Birla Apple Aroma RERA registered?

Yes. Karnataka RERA registration: PRM/KA/RERA/1251/310/PR/171125/000383. 15 complaints on this registration and 18 on the promoter across projects at K-RERA as of 2026-09-15.

How reliable is Birla Estates on delivery?

75% of Birla Estates's crawled Bengaluru registrations needed no extension (8 of 10 crawled Bengaluru registrations needed no extension). 10 registrations analysed. The developer scorecard compares this with every other Bengaluru developer.

What rent can Birla Apple Aroma earn?

About ₹36,500 a month for this home (a model estimate from Kanakapura Road / Talaghattapura / Banashankari 6th rents), a gross yield of 2.7% on the all-in cost. Rent covers 35% of the EMI at the default loan.

Answers are generated from the filings and the model for this home and change when you edit the assumptions above. See the Birla Estates scorecard and the Kanakapura Road / Talaghattapura / Banashankari 6th area page.

Go deeper

Share on WhatsApp