PropertyLensBengaluru · invest
Reddy Structures · Electronic City / Hosur Road / Bommasandra

Mahaveer Palatium

MAHAVEER PALATIUM, GIDDENAHALLI VILLAGE, MAHANTALINGAPURA VILLAGE
Handover Aug 2020 · no rent beforeplot · midRERA registered+ CompareFull report ↗
1 · Which home?
2 · Which exit plan?

Score, growth and returns below are for the highlighted home and plan. Prices, rent and possession never mix across phases.

27
Investment score
27/100
Evidence confidence55%
Plot · 1692 sq ft
Price growth per year, next 5 yrs model
10.0%
likely range 6.6%–13.5% · over 10 yrs 9.3%/yr
Net-wealth CAGR, 8-yr hold
5.3%
your cash in → cash back incl. sale, per year
Cash-flow IRR, 8-yr hold
7.6%
with 75% loan · all-cash 8.1% · no interiors
Three numbers, three questions. Price growth: what will the home be worth? Net-wealth CAGR: what will my money have earned after every cost? Cash-flow IRR: the same, but counting when each rupee moves. Tap i on any of them.
Price · edit here or below assumed
₹Cr
₹ psf × 1,690 sq ft · as of Sep 2026
Price edits apply to ·
All-in cost
₹60.6 L
+ other charges 1.1 L, GST 0.0 L, stamp/reg 3.8 L
Gross rental yield assumed
0.0%
vacant plot: no rent assumed

All-in cost sheet this home, default assumptions

ItemBasisAmount
Base price₹3,300 per sq ft × 1,690 sq ft super built-up55.8 L
Other charges2.0% of base: floor-rise, preferred-location, car park, club, maintenance deposit, legal, corpus (edit in Assumptions)1.1 L
GST0.0% on an under-construction home0.0 L
Stamp duty and registration6.6% in Karnataka: 5% stamp duty + 1% registration + cess and surcharge on the agreement value3.8 L
All-in costwhat leaves your pocket and the bank's, before rent or resale₹60.6 L
Your own money75.0% loan at 8.5% for 20 years covers the rest; EMI 0.4 L a month₹50.9 L

Carpet area 1,692 sq ft against 1,690 sq ft super built-up: you pay for 0% that is common area and walls. Price per sq ft of carpet ≈ ₹3,296. Every percentage above is editable in Assumptions; the defaults are Karnataka rates as of 2026-09.

In plain words

Why 27 out of 100

Each home is marked on 11 things a careful buyer checks, then compared with every project we analyse in Bengaluru: 50 is the average project, 62 beats about five in six. Here is what lifts this one and what drags it:

  • +
    Price vs comparables · 1/3 pts
    Cheaper than similar mid homes nearby: ₹3,300 vs about ₹6,200 per sq ft.
  • +
    Metro, bus, rail & airport · 1/9 pts
    The nearest working metro is ~1.5 km away. Airport is about 134 minutes by road right now.
  • +
    Expected price growth (5-yr CAGR model) · 2/26 pts
    We expect prices here to rise about 10.0% a year for the next 5 years (explained below).
  • −
    Legal, title & approvals · -6/5 pts
    Registered with Karnataka RERA; no court cases reported; land title not yet verified by us, so get a lawyer to check. The due-diligence report below flags 3 items in red.
  • −
    Employment access · -8/10 pts
    Drive times right now: Electronic City Ph-1 32 min, ORR Bellandur (Ecospace) 56 min, Koramangala (Forum) 56 min; Manyata Tech Park 88 min. About 5 million sq ft of new offices are planned nearby in 3 years.
  • −
    Rental demand & yield · -5/8 pts
    A plot earns no rent, so this scores low by design.
All 11 checks
  • +
    Price vs comparables · 1/3 pts
    Cheaper than similar mid homes nearby: ₹3,300 vs about ₹6,200 per sq ft.
  • −
    Rental demand & yield · -5/8 pts
    A plot earns no rent, so this scores low by design.
  • +
    Resale liquidity · -1/4 pts
    Plenty of buyers can afford a ₹55.8 L home, and homes in Electronic City / Hosur Road / Bommasandra resell at a normal pace. Reselling before handover needs the builder’s permission.
  • −
    Employment access · -8/10 pts
    Drive times right now: Electronic City Ph-1 32 min, ORR Bellandur (Ecospace) 56 min, Koramangala (Forum) 56 min; Manyata Tech Park 88 min. About 5 million sq ft of new offices are planned nearby in 3 years.
  • •
    Metro, bus, rail & airport · 1/9 pts
    The nearest working metro is ~1.5 km away. Airport is about 134 minutes by road right now.
  • +
    Schools, hospitals, daily needs · 0/3 pts
    Schools, hospitals and daily shopping are good in this area.
  • −
    Builder delivery & handover risk · -7/16 pts
    Reddy Structures has finished 11+ projects and delivered on time about 70% of the time. This phase is 70% built, with handover promised for 2020-08-31: delays would push your rent start back.
  • •
    Layout, size, age, amenities, maintenance · -0/3 pts
    Moderately dense layout (60 homes per acre); about 72% of the area you pay for is usable carpet area. Maintenance ~₹3.5 per sq ft a month.
  • •
    Water, flooding, noise, infrastructure · 0/9 pts
    Low flood risk; water supply is mostly borewell or tankers; noticeable traffic or aircraft noise.
  • •
    Legal, title & approvals · -6/5 pts
    Registered with Karnataka RERA; no court cases reported; land title not yet verified by us, so get a lawyer to check. The due-diligence report below flags 3 items in red.
  • •
    Expected price growth (5-yr CAGR model) · 2/26 pts
    We expect prices here to rise about 10.0% a year for the next 5 years (explained below).
Why prices should grow ~10.0% a year for the next 5 years

We build the forecast step by step, starting from what Bengaluru homes normally do and adjusting for this area and this project:

  1. + 6.0%Start with 6.0% a year: the normal long-run growth of Bengaluru home prices.
  2. + 1.0%Add 1.0%: prices here rose 12.6% a year recently (2023-06 to 2026-06). Some of that pace continues, but it fades each year.
  3. − 0.1%Subtract 0.1%: at ₹3,300 per sq ft, fewer families can afford to buy here, which slows further rises.
  4. + 1.2%Add 1.2%: 5 million sq ft of new offices nearby means more people wanting homes here.
  5. − 0.7%Subtract 0.7%: many new homes are being built here (25 months of unsold stock), which keeps prices in check.
  6. + 0.2%Add 0.2% for new roads, metro and water lines, weighted by how likely they are to actually finish: Yellow Line RV Road–Bommasandra (opened Aug 2025) (operational, 2025); Satellite Town Ring Road (construction, 2028); Bengaluru suburban rail (K-RIDE) (construction, 2029).
  7. + 2.5%Add 2.5% for this project itself: unfinished homes are worth more once they are complete.
  8. = 10.0%Result: about 10.0% a year, so a home worth ₹56.9 L today would be worth about ₹91.8 L in 5 years. We are 56% confident in the evidence behind this.

Highlights

  • Reddy Structures · Electronic City / Hosur Road / Bommasandra · unit count not filed on 121.6 acres
  • Under construction: 70% complete, RERA completion 2020-08-31 (2 extensions)
  • No litigation declared · 76 complaints on this registration

Assumptions editable

Purchase

₹/sq ft
₹ Cr
sq ft
% of base
%
%
%
₹/sq ft

FinancingLoan 75% · cash 25% · EMI ₹37,025/mo

% loan
% p.a.
years
%

Rent & running costs

₹/sq ft/mo
% of rent
% of value

Interiors & exit

%
%
years
% p.a. (blank = model)
%
%

Returns over 8 years · no interiors

Cash you put in₹50.9 L
Exit value (yr 8)₹1.17 Cr
Net sale after loan & costs₹81.6 L
Net rent after opex₹-1.9 L
Loan (75% of price)₹42.7 L
EMI / month₹37,025
Year 0: ₹-18.2 L0Year 1: ₹-4.6 L1Year 2: ₹-4.6 L2Year 3: ₹-4.7 L3Year 4: ₹-4.7 L4Year 5: ₹-4.7 L5Year 6: ₹-4.7 L6Year 7: ₹-4.7 L7Year 8: ₹76.8 L8
YearPurchaseLoan inRent (net of vacancy)OpexDebt serviceSale − loanNet cash
Today-60.9 L42.7 L0.0 L0.0 L0.0 L0.0 L-18.2 L
Yr 10.0 L0.0 L0.0 L-0.2 L-4.4 L0.0 L-4.6 L
Yr 20.0 L0.0 L0.0 L-0.2 L-4.4 L0.0 L-4.6 L
Yr 30.0 L0.0 L0.0 L-0.2 L-4.4 L0.0 L-4.7 L
Yr 40.0 L0.0 L0.0 L-0.2 L-4.4 L0.0 L-4.7 L
Yr 50.0 L0.0 L0.0 L-0.2 L-4.4 L0.0 L-4.7 L
Yr 60.0 L0.0 L0.0 L-0.3 L-4.4 L0.0 L-4.7 L
Yr 70.0 L0.0 L0.0 L-0.3 L-4.4 L0.0 L-4.7 L
Yr 80.0 L0.0 L0.0 L-0.3 L-4.4 L81.6 L76.8 L

Pre-tax unless capital-gains tax is set. Rent enters the cash flows once. Net-wealth CAGR = (cash returned incl. sale ÷ cash put in)^(1/years) − 1. IRR uses the dated cash flows.

Score factors

Bars show points added or taken away versus the average analysed Bengaluru project (score 50).

Price vs comparables
+0.8 pts vs avg
this home 7.2/10 · Bengaluru average 6.2 · confidence 35%
₹3,300 psf vs mid comps ₹6,200 (-47%; under-construction should price ~8% below ready). Price is a model estimate, so this factor carries a third of its normal weight until a listed price is observed.
Rental demand & yield
−4.7 pts vs avg
this home 3.6/10 · Bengaluru average 6.0 · confidence 38%
Gross yield 0.0% (₹0 psf/month); locality rental demand 8/10.
Resale liquidity
−0.8 pts vs avg
this home 7.2/10 · Bengaluru average 7.6 · confidence 50%
Locality resale depth 7/10; ticket ₹0.56 Cr narrows the buyer pool; UC resale needs builder NOC.
Employment access
−7.6 pts vs avg
this home 1.5/10 · Bengaluru average 5.2 · confidence 85%
Drive times now (Google Maps, 2026-09-16): Electronic City Ph-1 32 min, ORR Bellandur (Ecospace) 56 min, Koramangala (Forum) 56 min, MG Road (CBD) 68 min; 0 of 7 major hubs within 30 min; 5 msf office pipeline (3 yr).
Metro, bus, rail & airport
+1.2 pts vs avg
this home 5.4/10 · Bengaluru average 4.8 · confidence 60%
Yellow Line Electronic City / Bommasandra (Aug 2025); no planned station within 2 km; airport ~134 min by road now (Google Maps); .
Schools, hospitals, daily needs
+0.0 pts vs avg
this home 7.0/10 · Bengaluru average 7.0 · confidence 50%
Locality social-infrastructure index (interim, expert-set; POI distances pending Maps integration).
Builder delivery & handover risk
−7.1 pts vs avg
this home 0.9/10 · Bengaluru average 3.7 · confidence 60%
Reddy Structures: 11+ projects, on-time 70% (derived); handover 2020-08-31 (RERA); 73 months past the RERA completion date, 2 extensions, work behind schedule (-30 pts).
Layout, size, age, amenities, maintenance
−0.4 pts vs avg
this home 7.0/10 · Bengaluru average 7.3 · confidence 50%
60 units/acre; carpet/SBA ~72%; maintenance ~₹3.5 psf/month (assumed).
Water, flooding, noise, infrastructure
+0.1 pts vs avg
this home 5.8/10 · Bengaluru average 5.8 · confidence 50%
Industrial belt; borewell dependence; Hosur Road noise
Legal, title & approvals
−5.7 pts vs avg
this home 4.6/10 · Bengaluru average 7.4 · confidence 55%
RERA registered; litigation: none reported; approvals: RERA registered; title: not verified. Due-diligence report lists 3 red flags (−3.9 pts).
Expected price growth (5-yr CAGR model)
+1.5 pts vs avg
this home 6.2/10 · Bengaluru average 6.0 · confidence 56%
Model 5-yr price CAGR 10.0% (range 6.6–13.5%).

Price growth model, year by year

Nominal growth per year. Parts add up; momentum fades, infrastructure is weighted by delivery probability and dated.

ComponentYr 1Yr 2Yr 3Yr 4Yr 5Yr 6Confidence
Bengaluru long-run nominal trend6.06.06.06.06.06.080%
Locality momentum (mean-reverting)2.31.30.70.40.20.145%
Affordability ceiling-0.2-0.2-0.1-0.1-0.1-0.060%
Employment access & office pipeline1.21.21.21.21.21.255%
Supply–demand balance-1.0-0.8-0.6-0.5-0.4-0.350%
Infrastructure delivery (probability-weighted)0.50.40.20.10.00.055%
Project-specific adjustments6.31.51.51.51.51.550%
Total growth15.1%9.4%8.9%8.6%8.4%8.4%56%

Bengaluru long-run nominal trend: City-wide 2013-25 nominal residential trend ≈ inflation + real income growth.

Locality momentum (mean-reverting): Trailing 3.0-yr locality CAGR 12.6% vs 6.0% trend; 35% carried forward, halving each year.

Affordability ceiling: Ticket at ₹3,300 psf vs city median ₹9,500; buyer pool thins above ₹15k/₹20k psf and after >6pp excess growth.

Employment access & office pipeline: 5 msf office pipeline (3 yr) on 30 msf stock; 30-min jobs index 0.75.

Supply–demand balance: 25 months of unsold inventory; new-launch/absorption ratio 1.28 (from 22 under-construction RERA filings in this locality: 5,161 unsold homes, 168.8 sold per month).

Infrastructure delivery (probability-weighted): Yellow Line RV Road–Bommasandra (opened Aug 2025) (operational, 2025, p=1); Satellite Town Ring Road (construction, 2028, p=0.6); Bengaluru suburban rail (K-RIDE) (construction, 2029, p=0.5)

Project-specific adjustments: Remaining construction risk (30% work left) re-rates toward ready comps by handover (~2.4% over 0.5 yr). Land in expansion corridors historically outpaces built stock; no depreciation.

Locality evidence: ₹5,600 (Jun 2023) → ₹8,000 (Jun 2026) = 12.6% p.a. Sources: Platform estimate (interim, not observed).

Financial & legal due diligence

What the public record says

Automated from the Karnataka RERA file PRM/KA/RERA/1251/308/PR/171015/000357. Prices and rents are locality estimates, not verified listings. Compiled Sep 2026 from the Karnataka RERA file, company registers, rating agencies, tribunal records and press. Facts only; anything that deserves a written answer before signing is flagged.

Delivery timeline3/10
2 extensions on the registration (−4); a registration completion date has already passed (−2)
Legal & complaints6/10
76 RERA complaints on the project (−3)
Money to finish8/10
finance cost is 0% of the registered budget
Developer strength5/10
no public credit rating for the promoter

Meters are rule-based from the RERA file and public ratings (rules shown under each), not opinions.

Registration
PRM/KA/RERA/1251/308/PR/171015/000357 · REDDY STRUCTURES PRIVATE LIMITED
Past RERA date
RegisteredApr 2014Original completionAug 2019Section 6 ext.Aug 2020Covid ext.Feb 2021TodaySep 2026
Construction70%
registration-time status
Collected (at registration)₹95.21 Cr
Spent₹184.44 Cr
Balance with promoter₹0
Delay declaredNo
No litigation declared76 complaints · 0 openEscrow: HDFC
Credit ratings of the people behind it

No public credit rating located for the promoter.

REDDY STRUCTURES PRIVATE LIMITED: no public rating located

Complaints & disputes on record
On this project760 open
On the promoter entity102all projects
Court cases declared0no stay recorded
What complainants raise
  • Regarding Discrepancy in Site Boundary Measurements – Mahaveer Palatium
  • Refund of deposit
  • Delay in Project Development/Completion and Compensation for the delay
  • Pending Amenities and Compensation and litigation on Survey no 12
At a glance
Registration extended 2×

Registration extended 2× — from 2019-08-31 to 2020-08-31 (already passed)

70% built

70% built per the latest filing

76 RERA complaints, 0 open

76 RERA complaints on this project (0 open); 102 on the promoter overall

No litigation declared

No litigation declared in RERA filings

The record, in pictures

RERA file · Registration

Registered project cost ₹265 cr — where it goes
Land ₹100.8 cr · 38%Construction & on-site ₹164.1 cr · 62%
No litigation declaredBorrowing declared: not statedEscrow at HDFC

Complaint log (K-RERA) · 76 on this project

  • Jun 2025Regarding Discrepancy in Site Boundary Measurements – Mahaveer Palatiumdisposed
  • Nov 2023Refund of depositdisposed
  • May 2022Delay in Project Development/Completion and Compensation for the delaydisposed
  • Apr 2022Pending Amenities and Compensation and litigation on Survey no 12disposed
  • Apr 2022Delay in Project Development/Completion and Compensation for the delaydisposed
  • Apr 2022Undeveloped layoutdisposed
  • Apr 2022Delay in project development/completion and compensation for the delaydisposed
  • Mar 2022Delayed Completiondisposed
  • Feb 2022Delay in Project Development/Completion and Compensation for the delaydisposed
  • Feb 2022Project delayed and negligible development done from the date of purchasedisposed
  • Feb 2022Delay in Project develwopment/completion and compensation for the delaydisposed
  • Feb 2022Delay in Project Development/completion and compensation for the delaydisposed
Complaints by status
Disposed (Authority)
75
Disposed (adjudicating officer)
1

Red flags to resolve in writing

1
Timeline

Registration extended 2 times: original completion 2019-08-31, now 2020-08-31.

2
Timeline

RERA completion date 2020-08-31 has passed without a completion application.

3
Timeline

76 K-RERA complaints on this registration.

Questions to put to the developer before you sign

  1. Share the latest CA Form 4 and architect Form 5 with the escrow deposit ratio.
  2. Confirm the price list, floor-rise and other charges for the exact unit.
  3. Which date is contractual — 2020-08-31 — and what is the per-month delay compensation?
  4. Confirm there is no litigation on the land or approvals beyond the RERA declaration.
  5. Is the land freehold with the developer, and is any part mortgaged?
Full record: every filed number, line by line2 sections · 35 items

RERA file · Registration

Registration
PRM/KA/RERA/1251/308/PR/171015/000357 · promoter REDDY STRUCTURES PRIVATE LIMITED (Company) · EX/PRM/KA/RERA/1251/308/PR/210401/000357
Dates
Start 2014-04-01 · original completion 2019-08-31 · 2 extensions: Covid Extension → 2021-02-28, Section 6 Extension → 2020-08-31 · current date has passed
Progress
70% complete per registration-time status
Registered cost
Total ₹265 cr · land ₹101 cr · construction ₹164 cr
RERA bank account
HDFC, RICHMOND ROAD (70% construction account)
Money at registration
collected ₹95.21 cr · used ₹184 cr · balance ₹0.00 cr · delay declared: No
Land & towers
121.58 acres (4,92,031 sq m)
Litigation declared
None declared in filings
K-RERA complaints
76 on this registration (0 open) · 102 on the promoter entity across all its projects
Completion applied
19/12/2020

Source: Karnataka RERA project record PRM/KA/RERA/1251/308/PR/171015/000357, fetched 2026-09-15. Figures are the promoter’s own filings.

Complaint log (K-RERA) · 76 on this project

2025-06-12 · 00838/2025
Regarding Discrepancy in Site Boundary Measurements – Mahaveer Palatium — DISPOSED AUTHORITY FULLBENCH (AUTHORITY)
2023-11-02 · 01651/2023
Refund of deposit — DISPOSED AUTHORITY BENCH4 (AUTHORITY)
2022-05-09 · CMP/220509/0009436
Delay in Project Development/Completion and Compensation for the delay — DISPOSED AUTHORITY BENCH4 (AUTHORITY)
2022-04-20 · CMP/220420/0009370
Pending Amenities and Compensation and litigation on Survey no 12 — DISPOSED AUTHORITY BENCH4 (AUTHORITY)
2022-04-20 · CMP/220420/0009375
Delay in Project Development/Completion and Compensation for the delay — DISPOSED AUTHORITY BENCH4 (AUTHORITY)
2022-04-16 · CMP/220416/0009356
Undeveloped layout — DISPOSED AUTHORITY BENCH4 (AUTHORITY)
2022-04-16 · CMP/220416/0009357
Delay in project development/completion and compensation for the delay — DISPOSED AUTHORITY BENCH4 (AUTHORITY)
2022-03-21 · CMP/220321/0009195
Delayed Completion — DISPOSED AUTHORITY BENCH4 (AUTHORITY)
2022-02-23 · CMP/220223/0009051
Delay in Project Development/Completion and Compensation for the delay — DISPOSED AUTHORITY BENCH4 (AUTHORITY)
2022-02-22 · CMP/220222/0009035
Project delayed and negligible development done from the date of purchase — DISPOSED AUTHORITY BENCH4 (AUTHORITY)
2022-02-17 · CMP/220217/0009018
Delay in Project develwopment/completion and compensation for the delay — DISPOSED AUTHORITY BENCH4 (AUTHORITY)
2022-02-14 · CMP/220214/0009002
Delay in Project Development/completion and compensation for the delay — DISPOSED AUTHORITY BENCH4 (AUTHORITY)
2022-02-09 · CMP/220209/0008990
Delay in Project Development/Completion and Compensation for the delay — DISPOSED AUTHORITY BENCH4 (AUTHORITY)
2022-02-08 · CMP/220208/0008987
Completion due date expired, Delay in completion of Basic Amenities and Compensation for the delay. — DISPOSED AUTHORITY BENCH4 (AUTHORITY)
2022-02-08 · CMP/220208/0008988
Pending Amenities and Compensation — DISPOSED AUTHORITY BENCH4 (AUTHORITY)
2022-02-07 · CMP/220207/0008978
Delay in Project Development/Completion and Compensation for the delay — DISPOSED AUTHORITY BENCH4 (AUTHORITY)
2022-02-07 · CMP/220207/0008980
Delay in Project Development/Completion and Compensation for the delay — DISPOSED AUTHORITY BENCH4 (AUTHORITY)
2022-02-07 · CMP/220207/0008981
Pending Amenities and Compensation — DISPOSED AUTHORITY BENCH4 (AUTHORITY)
2022-02-07 · CMP/220207/0008982
Delay in Project Development/Completion and Compensation for the delay — DISPOSED AUTHORITY BENCH4 (AUTHORITY)
2022-02-05 · CMP/220205/0008962
Promised amenities and Specifications nor Delivered — DISPOSED AUTHORITY BENCH4 (AUTHORITY)
2022-02-04 · CMP/220204/0008945
Delay in Project development /completion and compensation for the delay — DISPOSED AUTHORITY BENCH4 (AUTHORITY)
2022-02-04 · CMP/220204/0008946
Delay in Project Development/Completion and Compensation for the delay — DISPOSED AUTHORITY BENCH4 (AUTHORITY)
2022-02-04 · CMP/220204/0008947
Delay in project completion and its ameneties — DISPOSED AUTHORITY BENCH4 (AUTHORITY)
2022-02-04 · CMP/220204/0008948
Delay in Project Development/Completion and Compensation for the delay — DISPOSED AUTHORITY BENCH4 (AUTHORITY)
2022-02-04 · CMP/220204/0008949
Delay in Project Development/Competion and compensation for the delay — DISPOSED AUTHORITY BENCH4 (AUTHORITY)

Showing the latest 25 of 76.

Sources & caveats2 sources
  • Karnataka RERA project record PRM/KA/RERA/1251/308/PR/171015/000357 (registration file, quarterly updates, complaint register), fetched 2026-09-15
  • PropertyLens locality model (market-level estimates)
  • Karnataka RERA project records PRM/KA/RERA/1251/308/PR/171015/000357 (registration file, quarterly updates, complaint register), fetched Sep 2026.

Caveats. Automated analysis: prices, rents and travel times are estimates until listings and Maps data are verified. RERA figures are the promoter’s own filings. Nothing here is legal, tax or investment advice.

Evidence

Location, jobs & transit3 hubs · metro 1.5 km
Job hubs nearby
Electronic City Phase 1 & 2Bommasandra industrialHosur Road corridor
Measured drive times below
Office space
Existing30 msf
Coming in 3 yrs5 msf
Jobs within 30 min8/10
Getting around
Metro today
Yellow Line Electronic City / Bommasandra (Aug 2025)
~1,500 m estimate
Metro planned
No station planned within 2 km
Rail
—
estimate
Airport
134 min by road now · 50.2 km
Google Maps
Buses
7/10 coverage
estimate
Drive times to job hubs
DestinationDrive nowRoad km
Electronic City Ph-132 min10.9
ORR Bellandur (Ecospace)56 min19.9
Koramangala (Forum)56 min19.8
MG Road (CBD)68 min24.4
ITPL Whitefield78 min28.6
Hebbal (Kirloskar)85 min31.2
Manyata Tech Park88 min32.2
Kempegowda Airport (KIA)134 min50.2

Google Maps driving time with live traffic, measured Sep 2026. Refreshed monthly.

Location used: Google Maps match “”. Bus coverage and planned-station distances are still interim estimates.

Price historylocality 12.6%/yr

No dated project-level price series yet; only the latest observation is on file.

Locality · average ₹/sq ft
Date₹ psfSourceConfidenceKind
Jun 20214,500Platform estimate (interim, not observed)40%derived
Jun 20235,600Platform estimate (interim, not observed)45%derived
Jun 20257,000Platform estimate (interim, not observed)50%derived
Jun 20268,000Platform estimate (interim, not observed)50%derived
Luxury comps₹9,500
Premium comps₹7,800
Mid comps₹6,200
Unsold stock25 months

Model backtest on this locality: 1-yr hold-out (Jun 2025→Jun 2026): predicted ₹7,602 vs actual ₹8,000 (-5%). Longer 3-yr hold-out (Jun 2023→Jun 2026): predicted 7.8% p.a. vs actual 12.6% p.a. — the model is deliberately mean-reverting and under-predicted the 2021–26 boom.

Environment, legal & productflood ok · water risk · RERA yes
Flood risklow
Water supplytankers/borewell
Quietnoisy
Roads & drainspatchy

Industrial belt; borewell dependence; Hosur Road noise

Legal & approvals
Registration 000357
RERA PRM/KA/RERA/1251/308/PR/171015/000357
possession Aug 2020
Litigation
none reported
observed
Approvals
RERA registered
observed
Title
not verified
assumed
Product
Land121.58 acres
Homesnull
Density60/acre
Launched2014
Sources & data gapswhat we know, from where, and what is missing

Automated analysis: unit mix and carpet areas come from the RERA inventory table; prices and rents are locality-model estimates until listings are verified.

FieldValueSource classDateConf.KindConflicting values
AddressMAHAVEER PALATIUM, GIDDENAHALLI VILLAGE, MAHANTALINGAPURA VILLAGEKarnataka RERA (number as reported; registry lookup pending)Sep 202680%observed
Land area (acres)121.58Karnataka RERA (number as reported; registry lookup pending)Sep 202680%observed
Total unitsPlatform estimate (interim, not observed)Sep 202620%assumed
Launch year2014Karnataka RERA (number as reported; registry lookup pending)Sep 202670%observed
Possession · Registration 0003572020-08-31Karnataka RERA (number as reported; registry lookup pending)Sep 202670%observed
Price psf · Plot · 1692 sq ft3300Platform estimate (interim, not observed)Sep 202635%assumed
Ticket · Plot · 1692 sq ft5577000Platform estimate (interim, not observed)Sep 202635%derived
Rent · Plot · 1692 sq ft0Platform estimate (interim, not observed)Sep 202635%assumed
Carpet area1692Karnataka RERA (number as reported; registry lookup pending)Sep 202660%observed
Builder on-time rate0.7Karnataka RERA (number as reported; registry lookup pending)Sep 202660%derived
Litigationnone reportedKarnataka RERA (number as reported; registry lookup pending)Sep 202670%observed
ApprovalsRERA registeredKarnataka RERA (number as reported; registry lookup pending)Sep 202660%observed

Commercial listing portals are shown as “Listing portal (aggregated)”; full provenance is retained internally. Official developer and Karnataka RERA sources are named.

Other projects worth comparing

Same model, same date. Scores are out of 100, where 50 is the average analysed Bengaluru project.

Questions people ask about Mahaveer Palatium

Is Mahaveer Palatium a good investment?

On PropertyLens's evidence-based model Mahaveer Palatium scores 27/100, well below the average analysed Bengaluru project (50 = average, 12 points = one standard deviation). The model projects price growth of about 10.0% a year over five years and a net-wealth CAGR of 5.3% after every cost on an 8-year hold with a 75.0% loan. That is research on public filings, not advice; the factor breakdown on this page shows what drives the score.

What is the price per sq ft at Mahaveer Palatium?

About ₹3,300 per sq ft of super built-up area, a model estimate from Electronic City / Hosur Road / Bommasandra comparables that you can edit. The Plot home costs about ₹55.8 L before other charges, GST and stamp duty, and ₹60.6 L all-in.

When is Mahaveer Palatium ready for possession?

The RERA registration commits to Aug 2020. The project is 73 months past its original RERA completion date with 2 extensions filed.

Is Mahaveer Palatium RERA registered?

Yes. Karnataka RERA registration: PRM/KA/RERA/1251/308/PR/171015/000357. 76 complaints on this registration and 102 on the promoter across projects at K-RERA as of 2026-09-15.

How reliable is Reddy Structures on delivery?

70% of Reddy Structures's crawled Bengaluru registrations needed no extension (8 of 11 crawled Bengaluru registrations needed no extension). 11 registrations analysed. The developer scorecard compares this with every other Bengaluru developer.

What rent can Mahaveer Palatium earn?

Plots earn no rent; the return is price growth alone.

Answers are generated from the filings and the model for this home and change when you edit the assumptions above. See the Reddy Structures scorecard and the Electronic City / Hosur Road / Bommasandra area page.

Go deeper

Share on WhatsApp