PropertyLensBengaluru · invest
Sobha · Sarjapur Road (Carmelaram / Dommasandra)

SOBHA Crystal Meadows Phase 4 Wing 23 to 28

"Sobha Neopolis, Survey no 46/4, 46/7 (old
Handover Dec 2033 · no rent beforevilla · premiumRERA registered+ CompareFull report ↗
1 · Which home?
2 · Which exit plan?

Score, growth and returns below are for the highlighted home and plan. Prices, rent and possession never mix across phases.

40
Investment score
40/100
Evidence confidence56%
1 Room · ~3,440 sq ft (2422 carpet)
Price growth per year, next 5 yrs model
9.3%
likely range 5.8%–12.7% · over 10 yrs 9.2%/yr
Net-wealth CAGR, 8-yr hold
9.3%
your cash in → cash back incl. sale, per year
Cash-flow IRR, 8-yr hold
16.0%
with 75% loan · all-cash 13.1% · with interiors
Three numbers, three questions. Price growth: what will the home be worth? Net-wealth CAGR: what will my money have earned after every cost? Cash-flow IRR: the same, but counting when each rupee moves. Tap i on any of them.
Price · edit here or below assumed
₹Cr
₹ psf × 3,440 sq ft · as of Sep 2026
Price edits apply to ·
All-in cost
₹4.90 Cr
+ other charges 13.6 L, GST 20.1 L, stamp/reg 26.6 L, interiors 41.3 L
Gross rental yield assumed
2.7%
rent starts in ~7.6 yr

All-in cost sheet this home, default assumptions

ItemBasisAmount
Base price₹11,300 per sq ft × 3,440 sq ft super built-up3.89 Cr
Other charges3.5% of base: floor-rise, preferred-location, car park, club, maintenance deposit, legal, corpus (edit in Assumptions)13.6 L
GST5.0% on an under-construction home20.1 L
Stamp duty and registration6.6% in Karnataka: 5% stamp duty + 1% registration + cess and surcharge on the agreement value26.6 L
Interiors₹1,200 per sq ft, needed before the home can be let41.3 L
All-in costwhat leaves your pocket and the bank's, before rent or resale₹4.90 Cr
Your own money75.0% loan at 8.5% for 20 years covers the rest; EMI 2.7 L a month₹2.15 Cr

Carpet area 2,422 sq ft against 3,440 sq ft super built-up: you pay for 30% that is common area and walls. Price per sq ft of carpet ≈ ₹16,050. Every percentage above is editable in Assumptions; the defaults are Karnataka rates as of 2026-09.

In plain words

Why 40 out of 100

Each home is marked on 11 things a careful buyer checks, then compared with every project we analyse in Bengaluru: 50 is the average project, 62 beats about five in six. Here is what lifts this one and what drags it:

  • +
    Layout, size, age, amenities, maintenance · 3/3 pts
    Spacious layout (10 homes per acre); about 72% of the area you pay for is usable carpet area. Maintenance ~₹4.5 per sq ft a month.
  • +
    Employment access · 8/10 pts
    Drive times right now: ORR Bellandur (Ecospace) 16 min, ITPL Whitefield 28 min, Electronic City Ph-1 28 min; Hebbal (Kirloskar) 55 min. About 12 million sq ft of new offices are planned nearby in 3 years.
  • +
    Builder delivery & handover risk · -1/16 pts
    Sobha has finished 119+ projects and delivered on time about 57% of the time. This phase is 0% built, with handover promised for 2033-12-31: delays would push your rent start back.
  • −
    Legal, title & approvals · -4/5 pts
    Registered with Karnataka RERA; litigation reported; land title not yet verified by us, so get a lawyer to check. The due-diligence report below flags 1 item in red.
  • −
    Resale liquidity · -3/4 pts
    Plenty of buyers can afford a ₹3.89 Cr home, and homes in Sarjapur Road resell at a normal pace. Reselling before handover needs the builder’s permission.
  • −
    Metro, bus, rail & airport · -3/9 pts
    No working metro nearby (nearest 9 km). Airport is about 88 minutes by road right now.
All 11 checks
  • •
    Price vs comparables · -0/3 pts
    Priced about the same as similar premium homes nearby (₹11,300 vs ~₹12,000 per sq ft).
  • •
    Rental demand & yield · -2/8 pts
    Rent pays back 2.7% of the price every year, close to the usual 3% in Bengaluru. Tenant demand here is very strong.
  • •
    Resale liquidity · -3/4 pts
    Plenty of buyers can afford a ₹3.89 Cr home, and homes in Sarjapur Road resell at a normal pace. Reselling before handover needs the builder’s permission.
  • +
    Employment access · 8/10 pts
    Drive times right now: ORR Bellandur (Ecospace) 16 min, ITPL Whitefield 28 min, Electronic City Ph-1 28 min; Hebbal (Kirloskar) 55 min. About 12 million sq ft of new offices are planned nearby in 3 years.
  • −
    Metro, bus, rail & airport · -3/9 pts
    No working metro nearby (nearest 9 km). Airport is about 88 minutes by road right now.
  • •
    Schools, hospitals, daily needs · -0/3 pts
    Schools, hospitals and daily shopping are good in this area.
  • −
    Builder delivery & handover risk · -1/16 pts
    Sobha has finished 119+ projects and delivered on time about 57% of the time. This phase is 0% built, with handover promised for 2033-12-31: delays would push your rent start back.
  • +
    Layout, size, age, amenities, maintenance · 3/3 pts
    Spacious layout (10 homes per acre); about 72% of the area you pay for is usable carpet area. Maintenance ~₹4.5 per sq ft a month.
  • •
    Water, flooding, noise, infrastructure · -2/9 pts
    Some flood risk in heavy rain; water supply is mostly borewell or tankers; noise is manageable.
  • •
    Legal, title & approvals · -4/5 pts
    Registered with Karnataka RERA; litigation reported; land title not yet verified by us, so get a lawyer to check. The due-diligence report below flags 1 item in red.
  • •
    Expected price growth (5-yr CAGR model) · -5/26 pts
    We expect prices here to rise about 9.3% a year for the next 5 years (explained below).
Why prices should grow ~9.3% a year for the next 5 years

We build the forecast step by step, starting from what Bengaluru homes normally do and adjusting for this area and this project:

  1. + 6.0%Start with 6.0% a year: the normal long-run growth of Bengaluru home prices.
  2. + 1.3%Add 1.3%: prices here rose 14.5% a year recently (2023-06 to 2026-06). Some of that pace continues, but it fades each year.
  3. − 0.5%Subtract 0.5%: at ₹11,300 per sq ft, fewer families can afford to buy here, which slows further rises.
  4. + 2.6%Add 2.6%: 12 million sq ft of new offices nearby means more people wanting homes here.
  5. − 0.7%Subtract 0.7%: many new homes are being built here (20 months of unsold stock), which keeps prices in check.
  6. + 0.2%Add 0.2% for new roads, metro and water lines, weighted by how likely they are to actually finish: Peripheral Ring Road (planned, 2030); Cauvery Stage V water (construction, 2027); Bengaluru suburban rail (K-RIDE) (construction, 2029).
  7. + 0.4%Add 0.4% for this project itself: unfinished homes are worth more once they are complete.
  8. = 9.3%Result: about 9.3% a year, so a home worth ₹4.02 Cr today would be worth about ₹6.27 Cr in 5 years. We are 56% confident in the evidence behind this.

Which exit suits you?

For an unfinished flat the answer depends on whether you sell at handover or hold, and whether you spend on interiors. Same price, same loan; only the strategy changes:

StrategyHoldIRR / yrWealth CAGR / yrCash you put inNet rentNet saleApply
Sell at handover, no interiors best IRR
Take delivery in 2033-12-31 and sell the bare flat (8 yr hold). Needs builder NOC or registration first; no rent.
8 yrs17.3%10.0%₹2.15 Cr₹1.4 L₹4.98 Cr
Hold bare, rent unfurnished
Skip interiors; rent 12% lower than a fitted home; sell after 8 yrs with no interiors value.
8 yrs17.3%10.0%₹2.15 Cr₹1.4 L₹4.98 Cr
Hold, do interiors, rent & sell fitted selected
Spend ₹1,200/sq ft on interiors, earn full rent, recover ~40% of interiors cost at sale (fading over 10 yrs).
8 yrs16.0%9.3%₹2.15 Cr₹1.9 L₹5.14 Cr

IRR and CAGR are per year over the hold shown. A short hold can show a high IRR on a small absolute gain; compare the net-sale column too. Selling before registration usually needs the builder’s transfer NOC and a fee.

Highlights

  • Sobha · Sarjapur Road (Carmelaram / Dommasandra) · 42 homes on 4.4 acres
  • Under construction: 0% complete, RERA completion 2033-12-31
  • 3 court case(s) declared · 0 complaints on this registration

Assumptions editable

Purchase

₹/sq ft
₹ Cr
sq ft
% of base
%
%
%
₹/sq ft

FinancingLoan 75% · cash 25% · EMI ₹2.7 L/mo

% loan
% p.a.
years
%

Rent & running costs

₹
% p.a.
%
months
months
₹/sq ft/mo
% of rent
% of rent
% of value

Interiors & exit

%
%
years
% p.a. (blank = model)
%
%

Returns over 8 years · with interiors

Cash you put in₹2.15 Cr
Exit value (yr 8)₹8.27 Cr
Net sale after loan & costs₹5.14 Cr
Net rent after opex₹1.9 L
Loan (75% of price)₹3.17 Cr
EMI / month₹2.7 L
Year 0: ₹-38.7 L0Year 1: ₹-16.1 L1Year 2: ₹-19.1 L2Year 3: ₹-22.1 L3Year 4: ₹-25.2 L4Year 5: ₹-28.2 L5Year 6: ₹-31.2 L6Year 7: ₹-34.3 L7Year 8: ₹4.38 Cr8
YearPurchaseLoan inRent (net of vacancy)OpexDebt serviceSale − loanNet cash
Today-70.4 L31.7 L0.0 L0.0 L0.0 L0.0 L-38.7 L
Yr 1-47.5 L35.6 L0.0 L0.0 L-4.2 L0.0 L-16.1 L
Yr 2-47.5 L35.6 L0.0 L0.0 L-7.2 L0.0 L-19.1 L
Yr 3-47.5 L35.6 L0.0 L0.0 L-10.3 L0.0 L-22.1 L
Yr 4-47.5 L35.6 L0.0 L0.0 L-13.3 L0.0 L-25.2 L
Yr 5-47.5 L35.6 L0.0 L0.0 L-16.3 L0.0 L-28.2 L
Yr 6-47.5 L35.6 L0.0 L0.0 L-19.4 L0.0 L-31.2 L
Yr 7-47.5 L35.6 L0.0 L0.0 L-22.4 L0.0 L-34.3 L
Yr 8-88.8 L35.6 L4.3 L-2.4 L-25.4 L5.14 Cr4.38 Cr

Pre-tax unless capital-gains tax is set. Rent enters the cash flows once. Net-wealth CAGR = (cash returned incl. sale ÷ cash put in)^(1/years) − 1. IRR uses the dated cash flows.

Score factors

Bars show points added or taken away versus the average analysed Bengaluru project (score 50).

Price vs comparables
−0.3 pts vs avg
this home 5.9/10 · Bengaluru average 6.2 · confidence 35%
₹11,300 psf vs premium comps ₹12,000 (-6%; under-construction should price ~8% below ready). Price is a model estimate, so this factor carries a third of its normal weight until a listed price is observed.
Rental demand & yield
−1.8 pts vs avg
this home 5.1/10 · Bengaluru average 6.0 · confidence 38%
Gross yield 2.8% (₹26 psf/month); locality rental demand 8/10.
Resale liquidity
−3.4 pts vs avg
this home 5.7/10 · Bengaluru average 7.6 · confidence 60%
Locality resale depth 8/10; ticket ₹3.89 Cr narrows the buyer pool; UC resale needs builder NOC; 42-home project; RERA sales pace ratio 0.
Employment access
+8.1 pts vs avg
this home 9.2/10 · Bengaluru average 5.2 · confidence 85%
Drive times now (Google Maps, 2026-09-16): ORR Bellandur (Ecospace) 16 min, ITPL Whitefield 28 min, Electronic City Ph-1 28 min, Koramangala (Forum) 35 min; 3 of 7 major hubs within 30 min; 12 msf office pipeline (3 yr).
Metro, bus, rail & airport
−3.2 pts vs avg
this home 3.0/10 · Bengaluru average 4.8 · confidence 60%
none operational (nearest Purple/Yellow lines 8–10 km); Phase 3A Sarjapur line ~2033; airport ~88 min by road now (Google Maps); .
Schools, hospitals, daily needs
−0.5 pts vs avg
this home 6.5/10 · Bengaluru average 7.0 · confidence 50%
Locality social-infrastructure index (interim, expert-set; POI distances pending Maps integration).
Builder delivery & handover risk
−0.7 pts vs avg
this home 3.5/10 · Bengaluru average 3.7 · confidence 60%
Sobha: 119+ projects, on-time 57% (derived); handover 2033-12-31 (RERA); within the RERA timeline, work behind schedule (-23 pts).
Layout, size, age, amenities, maintenance
+3.1 pts vs avg
this home 9.8/10 · Bengaluru average 7.3 · confidence 55%
10 units/acre; carpet/SBA ~72%; maintenance ~₹4.5 psf/month (assumed); filed construction cost ₹10,377 per sq ft (premium spec).
Water, flooding, noise, infrastructure
−1.8 pts vs avg
this home 4.9/10 · Bengaluru average 5.8 · confidence 50%
Heavy tanker dependence pending Cauvery Stage V; Varthur lake catchment
Legal, title & approvals
−4.5 pts vs avg
this home 5.2/10 · Bengaluru average 7.4 · confidence 55%
RERA registered; litigation: 3 case(s) declared; approvals: Plan BDA/NM/AS/AA-1/TS-4/E/62/2023-24 dated 2024-03-11; title: not verified. Due-diligence report lists 1 red flag (−0.8 pts).
Expected price growth (5-yr CAGR model)
−4.8 pts vs avg
this home 5.2/10 · Bengaluru average 6.0 · confidence 56%
Model 5-yr price CAGR 9.3% (range 5.8–12.7%).

Price growth model, year by year

Nominal growth per year. Parts add up; momentum fades, infrastructure is weighted by delivery probability and dated.

ComponentYr 1Yr 2Yr 3Yr 4Yr 5Yr 6Confidence
Bengaluru long-run nominal trend6.06.06.06.06.06.080%
Locality momentum (mean-reverting)3.01.60.90.50.30.145%
Affordability ceiling-0.9-0.6-0.4-0.3-0.2-0.160%
Employment access & office pipeline2.62.62.62.62.62.655%
Supply–demand balance-1.0-0.8-0.6-0.5-0.4-0.350%
Infrastructure delivery (probability-weighted)0.10.20.20.20.10.255%
Project-specific adjustments-0.1-0.1-0.11.11.11.150%
Total growth9.8%9.0%8.6%9.6%9.5%9.6%56%

Bengaluru long-run nominal trend: City-wide 2013-25 nominal residential trend ≈ inflation + real income growth.

Locality momentum (mean-reverting): Trailing 3.0-yr locality CAGR 14.5% vs 6.0% trend; 35% carried forward, halving each year.

Affordability ceiling: Ticket at ₹11,300 psf vs city median ₹9,500; buyer pool thins above ₹15k/₹20k psf and after >6pp excess growth.

Employment access & office pipeline: 12 msf office pipeline (3 yr) on 18 msf stock; 30-min jobs index 0.60.

Supply–demand balance: 20 months of unsold inventory; new-launch/absorption ratio 1.34 (from 72 under-construction RERA filings in this locality: 13,146 unsold homes, 722.1 sold per month).

Infrastructure delivery (probability-weighted): Phase 3A Sarjapur–Hebbal (planned, 2033, p=0.45); Peripheral Ring Road (planned, 2030, p=0.4); Cauvery Stage V water (construction, 2027, p=0.7); Bengaluru suburban rail (K-RIDE) (construction, 2029, p=0.5)

Project-specific adjustments: Remaining construction risk (100% work left) re-rates toward ready comps by handover (~8.0% over 7.3 yr). Sales pace from RERA filings: 0% of 42 homes booked with 23% of the build timeline elapsed (pace ratio 0); fast sellers re-rate, slow sellers discount.

Locality evidence: ₹8,000 (Jun 2023) → ₹12,000 (Jun 2026) = 14.5% p.a. Sources: Platform estimate (interim, not observed).

Financial & legal due diligence

What the public record says

Automated from the Karnataka RERA file PRM/KA/RERA/1251/446/PR/280324/006736 and 2 quarterly filings. Prices and rents are locality estimates, not verified listings. Compiled Sep 2026 from the Karnataka RERA file, company registers, rating agencies, tribunal records and press. Facts only; anything that deserves a written answer before signing is flagged.

Delivery timeline9/10
no extensions, no overdue dates on the RERA file
Legal & complaints3.5/10
3 court cases declared in filings (−4.5); land litigation declared “Yes” on a registration (−1)
Money to finish7/10
finance cost is 13% of the registered budget; last quarter: collected ₹0.00 cr, withdrew ₹0.00 cr; only 0% of homes booked (−1)
Developer strength8.3/10
ICRA A+/Stable (Sobha Ltd)

Meters are rule-based from the RERA file and public ratings (rules shown under each), not opinions.

Registration
PRM/KA/RERA/1251/446/PR/280324/006736 · SOBHA LIMITED
On original date
RegisteredAug 2024TodaySep 2026Original completionDec 2033
Construction0%
quarterly filing Q4 2025-26 (submitted 2026-04-13)
Homes booked0 / 42
42 still available
Sold vs built0% vs 0%
Sales and construction are broadly in step.
Money through the RERA account
Collected ₹0Withdrawn ₹0Q3 2025-260.0 L0.0 LCollected ₹0Withdrawn ₹0Q4 2025-260.0 L0.0 L
Collected from buyersWithdrawn for construction
Latest milestones
  • Earth work and other leveling preparation
    0%
  • Foundation footing work
    0%
  • Upto Plinth Level
    0%
  • Sub-structure flooring
    0%
  • RCC or MS Framed structure
    0%
  • Masonry Construction
    0%
3 court cases declaredNo complaintsEscrow: Axis BankJoint-development land
Credit ratings of the people behind it
AAAAAABBBBBBCDinvestment grade ◀▶ speculative gradeICRA A+ / Stable · Sobha Ltd · Aug 2025
Complaints & disputes on record
On this project20 open
On the promoter entity224all projects
Court cases declared3no stay recorded
What complainants raise
  • Interest on refundable amount
  • Builder not refunding booking amount post Cancellation and agreed
At a glance
On its original RERA date

On its original RERA completion date: 2033-12-31

0% built, 0% booked

0% built per the latest filing; 0/42 homes booked

2 RERA complaints, 0 open

2 RERA complaints on this project (0 open); 224 on the promoter overall

3 court cases declared

3 court cases declared in RERA filings (no stay recorded)

The record, in pictures

RERA file · Registration

Registered project cost ₹221 cr — where it goes
Land ₹0 cr · 0%Approvals ₹1.2 cr · 1%Construction & on-site ₹174.8 cr · 79%Finance (bank) ₹29.7 cr · 13%Other / taxes ₹15.5 cr · 7%
Construction programme as filed (quarterly filing Q4 2025-26 (submitted 2026-04-13))
202520262027202820292030203120322033Earth work and other leveling preparat0%Foundation footing work0%Upto Plinth Level0%Sub-structure flooring0%RCC or MS Framed structure0%Masonry Construction0%Plastering inside , outside & Ceiling0%Joinery: Doors, Windows, Ventilators e0%Basic work of Water supply, Sanitary a0%Dadoing, Skirting, Flooring, Tiles wor0%Railing and Grill fixing0%Electrification, Water supply and Sani0%Painting0%Fire prevention and fire fighting fitt0%Weather Proof work0%Wardrobe, Showcase, Kitchen cabinet, P0%Elevation work0%Internal and External work including l0%today
Bars are the filed schedule; filled part is reported progress. Red = past its scheduled end and not complete.
Partition suit in O S 1028/2010/2010 · O S No1028/2010 filed by one Smt Kempamma against Smt Jayamma and others before the IV Addl Senior Civil Judge Bangalore Rural District Bangalore · no stayPartition suit in O S 1520/2012/2012 · O S No 1520/2012 filed by one Sri Gajendra against Sri Gullappa and others before I Addl Civil Judge Bangalore Rural District Bangalore · no stayPartition suit in O S 642/2014/2014 · O S No 642/2014 filed by Smt Chandramma and others against Sri Muniyallappa and others before the III Addl Senior Civil Judge Bangalore Rural District Bangalore · no stayBorrowing declared: YesEscrow at Axis Bank19 recorded land-owner sharesOwners’ association: not formed

Complaint log (K-RERA) · 2 on this project

  • Nov 2024Interest on refundable amountdisposed
  • Sep 2024Builder not refunding booking amount post Cancellation and agreeddisposed
Complaints by status
Disposed (adjudicating officer)
1
Disposed (Authority)
1

Red flags to resolve in writing

1
Legal

3 court cases declared in RERA filings (1028/2010/2010, 1520/2012/2012); check for stays and title impact.

Questions to put to the developer before you sign

  1. Share the latest CA Form 4 and architect Form 5 with the escrow deposit ratio.
  2. Confirm the price list, floor-rise and other charges for the exact unit.
  3. Which date is contractual — 2033-12-31 — and what is the per-month delay compensation?
  4. What do the declared cases (1028/2010/2010, 1520/2012/2012, 642/2014/2014) concern and is any stay in force?
  5. Is the land freehold with the developer, and is any part mortgaged?
Full record: every filed number, line by line2 sections · 14 items

RERA file · Registration

Registration
PRM/KA/RERA/1251/446/PR/280324/006736 · promoter SOBHA LIMITED (Company) · L45201KA1995PLC018475
Dates
Start 2024-08-01 · original completion 2033-12-31 · no extensions
Progress
0% complete per quarterly filing Q4 2025-26 (submitted 2026-04-13) · 0 of 42 homes booked (42 available)
Registered cost
Total ₹221 cr · land ₹0.00 cr · construction ₹175 cr · bank principal+interest ₹29.72 cr
Borrowing / mortgage declared
Borrowing: Yes
RERA bank account
Axis Bank, MG Road, Bangalore (70% construction account)
Plan sanction
BDA/NM/AS/AA-1/TS-4/E/62/2023-24 dated 2024-03-11 · BDA - Bangalore Development Authority
Land & towers
4.36 acres (17,640 sq m) · Wing 23 to 28 42 homes, 3 floors
Land owners / co-promoters
M/s. Sobha Limited (100.0%, Sy 64/2); M/s. Sobha Limited (100.0%, Sy 64/3); M/s. Sobha Limited (100.0%, Sy 65/2); M/s. Sobha Limited (100.0%, Sy 64/4); M/s. Sobha Limited (100.0%, Sy 75/1); M/s. Sobha Limited (100.0%, Sy 75/3); M/s. Sobha Limited (100.0%, Sy 74); M/s. Sobha Limited (100.0%, Sy 74) +11 more
Litigation declared
Partition suit in O S 1028/2010/2010, O S No1028/2010 filed by one Smt Kempamma against Smt Jayamma and others before the IV Addl Senior Civil Judge Bangalore Rural District Bangalore — no stay; Partition suit in O S 1520/2012/2012, O S No 1520/2012 filed by one Sri Gajendra against Sri Gullappa and others before I Addl Civil Judge Bangalore Rural District Bangalore — no stay; Partition suit in O S 642/2014/2014, O S No 642/2014 filed by Smt Chandramma and others against Sri Muniyallappa and others before the III Addl Senior Civil Judge Bangalore Rural District Bangalore — no stay
Owners’ association
Not yet formed
Completion applied
19/12/2020

Source: Karnataka RERA project record PRM/KA/RERA/1251/446/PR/280324/006736, fetched 2026-09-15. Figures are the promoter’s own filings.

Complaint log (K-RERA) · 2 on this project

2024-11-20 · 01231/2024
Interest on refundable amount — DISPOSED AO (ADJUDICATING OFFICER)
2024-09-30 · 00950/2024
Builder not refunding booking amount post Cancellation and agreed — DISPOSED AUTHORITY BENCH4 (AUTHORITY)

Complaint subjects are as filed by complainants; a disposed complaint may have been decided either way.

Sources & caveats2 sources
  • Karnataka RERA project record PRM/KA/RERA/1251/446/PR/280324/006736 (registration file, quarterly updates, complaint register), fetched 2026-09-15
  • PropertyLens locality model (market-level estimates)
  • Karnataka RERA project records PRM/KA/RERA/1251/446/PR/280324/006736 (registration file, quarterly updates, complaint register), fetched Sep 2026.

Caveats. Automated analysis: prices, rents and travel times are estimates until listings and Maps data are verified. RERA figures are the promoter’s own filings. Nothing here is legal, tax or investment advice.

Evidence

Location, jobs & transit4 hubs · metro none nearby
Job hubs nearby
Wipro KodathiRGA Tech ParkORR Bellandur 10 kmITPL 9 km
Measured drive times below
Office space
Existing18 msf
Coming in 3 yrs12 msf
Jobs within 30 min6/10
Getting around
Metro today
none operational (nearest Purple/Yellow lines 8–10 km)
none within 5 km
Metro planned
Phase 3A Sarjapur line
~2033 45% likely ~2,500 m estimate
Rail
—
estimate
Airport
88 min by road now · 32.5 km
Google Maps
Buses
7/10 coverage
estimate
Drive times to job hubs
DestinationDrive nowRoad km
ORR Bellandur (Ecospace)16 min4.8
ITPL Whitefield28 min9.1
Electronic City Ph-128 min9.3
Koramangala (Forum)35 min12
MG Road (CBD)41 min14.3
Manyata Tech Park53 min18.7
Hebbal (Kirloskar)55 min19.5
Kempegowda Airport (KIA)88 min32.5

Google Maps driving time with live traffic, measured Sep 2026. Refreshed monthly.

Location used: Google Maps match “”. Bus coverage and planned-station distances are still interim estimates.

Price historylocality 14.5%/yr

No dated project-level price series yet; only the latest observation is on file.

Locality · average ₹/sq ft
Date₹ psfSourceConfidenceKind
Jun 20216,050Platform estimate (interim, not observed)40%derived
Jun 20238,000Platform estimate (interim, not observed)45%derived
Jun 202510,800Platform estimate (interim, not observed)50%derived
Jun 202612,000Platform estimate (interim, not observed)50%derived
Luxury comps₹14,000
Premium comps₹12,000
Mid comps₹9,000
Unsold stock20 months

Model backtest on this locality: 1-yr hold-out (Jun 2025→Jun 2026): predicted ₹11,852 vs actual ₹12,000 (-1.2%). Longer 3-yr hold-out (Jun 2023→Jun 2026): predicted 9% p.a. vs actual 14.5% p.a. — the model is deliberately mean-reverting and under-predicted the 2021–26 boom.

Environment, legal & productflood ok · water risk · RERA yes
Flood risksome risk
Water supplytankers/borewell
Quietok
Roads & drainspatchy

Heavy tanker dependence pending Cauvery Stage V; Varthur lake catchment

Legal & approvals
Registration 006736
RERA PRM/KA/RERA/1251/446/PR/280324/006736
possession Dec 2033
Litigation
3 case(s) declared
observed
Approvals
Plan BDA/NM/AS/AA-1/TS-4/E/62/2023-24 dated 2024-03-11
observed
Title
not verified
assumed
Product
Land4.36 acres
Homes42
Density10/acre
Launched2024
Sources & data gapswhat we know, from where, and what is missing

Automated analysis: unit mix and carpet areas come from the RERA inventory table; prices and rents are locality-model estimates until listings are verified.

FieldValueSource classDateConf.KindConflicting values
Address"Sobha Neopolis, Survey no 46/4, 46/7 (oldKarnataka RERA (number as reported; registry lookup pending)Sep 202680%observed
Land area (acres)4.36Karnataka RERA (number as reported; registry lookup pending)Sep 202680%observed
Total units42Karnataka RERA (number as reported; registry lookup pending)Sep 202680%observed
Launch year2024Karnataka RERA (number as reported; registry lookup pending)Sep 202670%observed
Possession · Registration 0067362033-12-31Karnataka RERA (number as reported; registry lookup pending)Sep 202670%observed
Price psf · 1 Room · ~3,440 sq ft (2422 carpet)11300Platform estimate (interim, not observed)Sep 202635%assumed
Ticket · 1 Room · ~3,440 sq ft (2422 carpet)38872000Platform estimate (interim, not observed)Sep 202635%derived
Rent · 1 Room · ~3,440 sq ft (2422 carpet)91000Platform estimate (interim, not observed)Sep 202635%assumed
Carpet area2422Karnataka RERA (number as reported; registry lookup pending)Sep 202660%observed
Builder on-time rate0.57Karnataka RERA (number as reported; registry lookup pending)Sep 202660%derived
Litigation3 case(s) declaredKarnataka RERA (number as reported; registry lookup pending)Sep 202670%observed
ApprovalsPlan BDA/NM/AS/AA-1/TS-4/E/62/2023-24 dated 2024-03-11Karnataka RERA (number as reported; registry lookup pending)Sep 202660%observed

Commercial listing portals are shown as “Listing portal (aggregated)”; full provenance is retained internally. Official developer and Karnataka RERA sources are named.

Other projects worth comparing

Same model, same date. Scores are out of 100, where 50 is the average analysed Bengaluru project.

Questions people ask about SOBHA Crystal Meadows Phase 4 Wing 23 to 28

Is SOBHA Crystal Meadows Phase 4 Wing 23 to 28 a good investment?

On PropertyLens's evidence-based model SOBHA Crystal Meadows Phase 4 Wing 23 to 28 scores 40/100, below the average analysed Bengaluru project (50 = average, 12 points = one standard deviation). The model projects price growth of about 9.3% a year over five years and a net-wealth CAGR of 9.3% after every cost on an 8-year hold with a 75.0% loan. That is research on public filings, not advice; the factor breakdown on this page shows what drives the score.

What is the price per sq ft at SOBHA Crystal Meadows Phase 4 Wing 23 to 28?

About ₹11,300 per sq ft of super built-up area, a model estimate from Sarjapur Road comparables that you can edit. The 1 Room home costs about ₹3.89 Cr before other charges, GST and stamp duty, and ₹4.90 Cr all-in.

When is SOBHA Crystal Meadows Phase 4 Wing 23 to 28 ready for possession?

The RERA registration commits to Dec 2033. Latest filing: 23% of the schedule elapsed, 0% of homes booked.

Is SOBHA Crystal Meadows Phase 4 Wing 23 to 28 RERA registered?

Yes. Karnataka RERA registration: PRM/KA/RERA/1251/446/PR/280324/006736. No complaints on this registration and 224 on the promoter across projects at K-RERA as of 2026-09-15.

How reliable is Sobha on delivery?

57% of Sobha's crawled Bengaluru registrations needed no extension (68 of 119 crawled Bengaluru registrations needed no extension). 119 registrations analysed. The developer scorecard compares this with every other Bengaluru developer.

What rent can SOBHA Crystal Meadows Phase 4 Wing 23 to 28 earn?

About ₹91,000 a month for this home (a model estimate from Sarjapur Road rents), a gross yield of 2.7% on the all-in cost. Nothing is earned before handover. Rent covers 33% of the EMI at the default loan.

Answers are generated from the filings and the model for this home and change when you edit the assumptions above. See the Sobha scorecard and the Sarjapur Road area page.

Go deeper

Share on WhatsApp