PropertyLensBengaluru · invest
Brigade Group · Attibele / Anekal / Chandapura

Cielo at Brigade Valencia

Survey nos. ’s: 52, 53, 54/1A, 54/2… · Attibele / Anekal / Chandapura
Handover Dec 2027 · no rent beforeapartment · premiumRERA registered+ CompareFull report ↗
1 · Which home?
2 · Which exit plan?

Score, growth and returns below are for the highlighted home and plan. Prices, rent and possession never mix across phases.

51
Investment score
51/100
Evidence confidence57%
1 BHK · ~490 sq ft (344 carpet)
Price growth per year, next 5 yrs model
9.4%
likely range 5.9%–12.8% · over 10 yrs 8.8%/yr
Net-wealth CAGR, 8-yr hold
4.9%
your cash in → cash back incl. sale, per year
Cash-flow IRR, 8-yr hold
7.1%
with 75% loan · all-cash 8.2% · with interiors
Three numbers, three questions. Price growth: what will the home be worth? Net-wealth CAGR: what will my money have earned after every cost? Cash-flow IRR: the same, but counting when each rupee moves. Tap i on any of them.
Price · edit here or below assumed
₹Cr
₹ psf × 490 sq ft · as of Sep 2026
Price edits apply to ·
All-in cost
₹41.5 L
+ other charges 1.1 L, GST 1.6 L, stamp/reg 2.1 L, interiors 5.9 L
Gross rental yield assumed
4.1%
rent starts in ~1.6 yr

All-in cost sheet this home, default assumptions

ItemBasisAmount
Base price₹6,300 per sq ft × 490 sq ft super built-up30.9 L
Other charges3.5% of base: floor-rise, preferred-location, car park, club, maintenance deposit, legal, corpus (edit in Assumptions)1.1 L
GST5.0% on an under-construction home (this unit may qualify for the 1% affordable rate: ≤ ₹45 lakh and ≤ 60 sq m carpet)1.6 L
Stamp duty and registration6.6% in Karnataka: 5% stamp duty + 1% registration + cess and surcharge on the agreement value2.1 L
Interiors₹1,200 per sq ft, needed before the home can be let5.9 L
All-in costwhat leaves your pocket and the bank's, before rent or resale₹41.5 L
Your own money75.0% loan at 8.5% for 20 years covers the rest; EMI 0.2 L a month₹27.4 L

Carpet area 344 sq ft against 490 sq ft super built-up: you pay for 30% that is common area and walls. Price per sq ft of carpet ≈ ₹8,974. Every percentage above is editable in Assumptions; the defaults are Karnataka rates as of 2026-09.

In plain words

Why 51 out of 100

Each home is marked on 11 things a careful buyer checks, then compared with every project we analyse in Bengaluru: 50 is the average project, 62 beats about five in six. Here is what lifts this one and what drags it:

  • +
    Builder delivery & handover risk · 11/16 pts
    Brigade Group has finished 250+ projects and delivered on time about 80% of the time. This phase is 88% built, with handover promised for 2027-12-31: delays would push your rent start back.
  • +
    Rental demand & yield · 4/8 pts
    Rent pays back 4.1% of the price every year, better than the usual 3% in Bengaluru. Tenant demand here is thin.
  • +
    Legal, title & approvals · 1/5 pts
    Registered with Karnataka RERA; no court cases reported; land title not yet verified by us, so get a lawyer to check. The due-diligence report below flags 1 item in red.
  • −
    Schools, hospitals, daily needs · -2/3 pts
    Schools, hospitals and daily shopping are limited in this area.
  • −
    Metro, bus, rail & airport · -4/9 pts
    No working metro nearby (nearest 7 km). Airport is about 118 minutes by road right now.
  • −
    Employment access · -4/10 pts
    Drive times right now: Electronic City Ph-1 20 min, ORR Bellandur (Ecospace) 39 min, Koramangala (Forum) 49 min; Hebbal (Kirloskar) 77 min. About 4 million sq ft of new offices are planned nearby in 3 years.
All 11 checks
  • •
    Price vs comparables · -0/3 pts
    Priced about the same as similar premium homes nearby (₹6,300 vs ~₹6,500 per sq ft).
  • +
    Rental demand & yield · 4/8 pts
    Rent pays back 4.1% of the price every year, better than the usual 3% in Bengaluru. Tenant demand here is thin.
  • +
    Resale liquidity · 0/4 pts
    Plenty of buyers can afford a ₹30.9 L home, and homes in Attibele / Anekal / Chandapura take time to resell. Reselling before handover needs the builder’s permission.
  • −
    Employment access · -4/10 pts
    Drive times right now: Electronic City Ph-1 20 min, ORR Bellandur (Ecospace) 39 min, Koramangala (Forum) 49 min; Hebbal (Kirloskar) 77 min. About 4 million sq ft of new offices are planned nearby in 3 years.
  • −
    Metro, bus, rail & airport · -4/9 pts
    No working metro nearby (nearest 7 km). Airport is about 118 minutes by road right now.
  • •
    Schools, hospitals, daily needs · -2/3 pts
    Schools, hospitals and daily shopping are limited in this area.
  • +
    Builder delivery & handover risk · 11/16 pts
    Brigade Group has finished 250+ projects and delivered on time about 80% of the time. This phase is 88% built, with handover promised for 2027-12-31: delays would push your rent start back.
  • +
    Layout, size, age, amenities, maintenance · 0/3 pts
    Dense layout (83 homes per acre); about 72% of the area you pay for is usable carpet area. Maintenance ~₹4.5 per sq ft a month.
  • •
    Water, flooding, noise, infrastructure · -1/9 pts
    Low flood risk; water supply is mostly borewell or tankers; noise is manageable.
  • +
    Legal, title & approvals · 1/5 pts
    Registered with Karnataka RERA; no court cases reported; land title not yet verified by us, so get a lawyer to check. The due-diligence report below flags 1 item in red.
  • •
    Expected price growth (5-yr CAGR model) · -4/26 pts
    We expect prices here to rise about 9.4% a year for the next 5 years (explained below).
Why prices should grow ~9.4% a year for the next 5 years

We build the forecast step by step, starting from what Bengaluru homes normally do and adjusting for this area and this project:

  1. + 6.0%Start with 6.0% a year: the normal long-run growth of Bengaluru home prices.
  2. + 0.9%Add 0.9%: prices here rose 11.9% a year recently (2023-06 to 2026-06). Some of that pace continues, but it fades each year.
  3. + 0.0%Prices are still affordable enough that this does not slow growth.
  4. + 2.4%Add 2.4%: 4 million sq ft of new offices nearby means more people wanting homes here.
  5. − 0.7%Subtract 0.7%: many new homes are being built here (20 months of unsold stock), which keeps prices in check.
  6. + 0.2%Add 0.2% for new roads, metro and water lines, weighted by how likely they are to actually finish: Yellow Line RV Road–Bommasandra (opened Aug 2025) (operational, 2025); Satellite Town Ring Road (construction, 2028).
  7. + 0.6%Add 0.6% for this project itself: unfinished homes are worth more once they are complete.
  8. = 9.4%Result: about 9.4% a year, so a home worth ₹32.0 L today would be worth about ₹50.0 L in 5 years. We are 56% confident in the evidence behind this.

Which exit suits you?

For an unfinished flat the answer depends on whether you sell at handover or hold, and whether you spend on interiors. Same price, same loan; only the strategy changes:

StrategyHoldIRR / yrWealth CAGR / yrCash you put inNet rentNet saleApply
Sell at handover, no interiors
Take delivery in 2027-12-31 and sell the bare flat (2 yr hold). Needs builder NOC or registration first; no rent.
2 yrs6.2%4.4%₹7.5 L₹21,572₹13.4 L
Hold bare, rent unfurnished best IRR
Skip interiors; rent 12% lower than a fitted home; sell after 8 yrs with no interiors value.
8 yrs10.9%7.3%₹22.3 L₹4.6 L₹40.9 L
Hold, do interiors, rent & sell fitted selected
Spend ₹1,200/sq ft on interiors, earn full rent, recover ~40% of interiors cost at sale (fading over 10 yrs).
8 yrs7.1%4.9%₹27.4 L₹5.6 L₹41.8 L

IRR and CAGR are per year over the hold shown. A short hold can show a high IRR on a small absolute gain; compare the net-sale column too. Selling before registration usually needs the builder’s transfer NOC and a fee.

Highlights

  • Brigade · Attibele / Anekal / Chandapura · 662 homes on 8.0 acres
  • Under construction: 88% complete, RERA completion 2027-12-31
  • No litigation declared · 0 complaints on this registration

Assumptions editable

Purchase

₹/sq ft
₹ Cr
sq ft
% of base
%
%
%
₹/sq ft

FinancingLoan 75% · cash 25% · EMI ₹21,835/mo

% loan
% p.a.
years
%

Rent & running costs

₹
% p.a.
%
months
months
₹/sq ft/mo
% of rent
% of rent
% of value

Interiors & exit

%
%
years
% p.a. (blank = model)
%
%

Returns over 8 years · with interiors

Cash you put in₹27.4 L
Exit value (yr 8)₹63.4 L
Net sale after loan & costs₹41.8 L
Net rent after opex₹5.6 L
Loan (75% of price)₹25.2 L
EMI / month₹21,835
Year 0: ₹-3.1 L0Year 1: ₹-4.5 L1Year 2: ₹-11.0 L2Year 3: ₹-1.9 L3Year 4: ₹-1.8 L4Year 5: ₹-1.8 L5Year 6: ₹-1.7 L6Year 7: ₹-1.7 L7Year 8: ₹40.2 L8
YearPurchaseLoan inRent (net of vacancy)OpexDebt serviceSale − loanNet cash
Today-5.6 L2.5 L0.0 L0.0 L0.0 L0.0 L-3.1 L
Yr 1-15.1 L11.3 L0.0 L0.0 L-0.7 L0.0 L-4.5 L
Yr 2-21.0 L11.3 L0.5 L-0.3 L-1.7 L0.0 L-11.0 L
Yr 30.0 L0.0 L1.3 L-0.6 L-2.6 L0.0 L-1.9 L
Yr 40.0 L0.0 L1.4 L-0.6 L-2.6 L0.0 L-1.8 L
Yr 50.0 L0.0 L1.5 L-0.6 L-2.6 L0.0 L-1.8 L
Yr 60.0 L0.0 L1.5 L-0.6 L-2.6 L0.0 L-1.7 L
Yr 70.0 L0.0 L1.6 L-0.6 L-2.6 L0.0 L-1.7 L
Yr 80.0 L0.0 L1.7 L-0.7 L-2.6 L41.8 L40.2 L

Pre-tax unless capital-gains tax is set. Rent enters the cash flows once. Net-wealth CAGR = (cash returned incl. sale ÷ cash put in)^(1/years) − 1. IRR uses the dated cash flows.

Score factors

Bars show points added or taken away versus the average analysed Bengaluru project (score 50).

Price vs comparables
−0.3 pts vs avg
this home 5.9/10 · Bengaluru average 6.2 · confidence 35%
₹6,300 psf vs premium comps ₹6,500 (-3%; under-construction should price ~8% below ready). Price is a model estimate, so this factor carries a third of its normal weight until a listed price is observed.
Rental demand & yield
+3.7 pts vs avg
this home 7.8/10 · Bengaluru average 6.0 · confidence 38%
Gross yield 4.3% (₹22 psf/month); locality rental demand 6/10.
Resale liquidity
+0.1 pts vs avg
this home 7.6/10 · Bengaluru average 7.6 · confidence 60%
Locality resale depth 6/10; ticket ₹0.31 Cr narrows the buyer pool; UC resale needs builder NOC; 662-home project gives deep resale comps; RERA sales pace ratio 1.36.
Employment access
−3.7 pts vs avg
this home 3.4/10 · Bengaluru average 5.2 · confidence 85%
Drive times now (Google Maps, 2026-09-16): Electronic City Ph-1 20 min, ORR Bellandur (Ecospace) 39 min, Koramangala (Forum) 49 min, ITPL Whitefield 58 min; 1 of 7 major hubs within 30 min; 4 msf office pipeline (3 yr).
Metro, bus, rail & airport
−3.7 pts vs avg
this home 2.7/10 · Bengaluru average 4.8 · confidence 60%
Yellow Line Bommasandra (5–10 km); no planned station within 2 km; airport ~118 min by road now (Google Maps); .
Schools, hospitals, daily needs
−2.0 pts vs avg
this home 5.0/10 · Bengaluru average 7.0 · confidence 50%
Locality social-infrastructure index (interim, expert-set; POI distances pending Maps integration).
Builder delivery & handover risk
+11.0 pts vs avg
this home 8.1/10 · Bengaluru average 3.7 · confidence 70%
Brigade Group: 250+ projects, on-time 80% (observed); handover 2027-12-31 (RERA); within the RERA timeline, work on schedule (14 pts).
Layout, size, age, amenities, maintenance
+0.2 pts vs avg
this home 7.5/10 · Bengaluru average 7.3 · confidence 55%
83 units/acre; carpet/SBA ~72%; maintenance ~₹4.5 psf/month (assumed); filed construction cost ₹4,175 per sq ft (premium spec).
Water, flooding, noise, infrastructure
−0.6 pts vs avg
this home 5.5/10 · Bengaluru average 5.8 · confidence 50%
Plotted and affordable belt; water via borewells
Legal, title & approvals
+0.6 pts vs avg
this home 7.7/10 · Bengaluru average 7.4 · confidence 55%
RERA registered; litigation: none reported; approvals: Plan APA/CC/207/2022-23 dated 2022-12-06; title: not verified. Due-diligence report lists 1 red flag (−0.8 pts).
Expected price growth (5-yr CAGR model)
−4.0 pts vs avg
this home 5.3/10 · Bengaluru average 6.0 · confidence 56%
Model 5-yr price CAGR 9.4% (range 5.9–12.8%).

Price growth model, year by year

Nominal growth per year. Parts add up; momentum fades, infrastructure is weighted by delivery probability and dated.

ComponentYr 1Yr 2Yr 3Yr 4Yr 5Yr 6Confidence
Bengaluru long-run nominal trend6.06.06.06.06.06.080%
Locality momentum (mean-reverting)2.11.10.60.30.20.145%
Affordability ceiling0.00.00.00.00.00.060%
Employment access & office pipeline2.42.42.42.42.42.455%
Supply–demand balance-1.0-0.8-0.6-0.5-0.4-0.350%
Infrastructure delivery (probability-weighted)0.50.30.10.00.00.055%
Project-specific adjustments1.21.20.40.00.00.050%
Total growth11.2%10.2%9.0%8.3%8.2%8.2%56%

Bengaluru long-run nominal trend: City-wide 2013-25 nominal residential trend ≈ inflation + real income growth.

Locality momentum (mean-reverting): Trailing 3.0-yr locality CAGR 11.9% vs 6.0% trend; 35% carried forward, halving each year.

Affordability ceiling: Ticket at ₹6,300 psf vs city median ₹9,500; buyer pool thins above ₹15k/₹20k psf and after >6pp excess growth.

Employment access & office pipeline: 4 msf office pipeline (3 yr) on 6 msf stock; 30-min jobs index 0.45.

Supply–demand balance: 20 months of unsold inventory; new-launch/absorption ratio 1.28 (from 27 under-construction RERA filings in this locality: 4,714 unsold homes, 510.7 sold per month).

Infrastructure delivery (probability-weighted): Yellow Line RV Road–Bommasandra (opened Aug 2025) (operational, 2025, p=1); Satellite Town Ring Road (construction, 2028, p=0.6)

Project-specific adjustments: Remaining construction risk (12% work left) re-rates toward ready comps by handover (~1.0% over 1.3 yr). Sales pace from RERA filings: 100% of 662 homes booked with 74% of the build timeline elapsed (pace ratio 1.36); fast sellers re-rate, slow sellers discount.

Locality evidence: ₹4,500 (Jun 2023) → ₹6,300 (Jun 2026) = 11.9% p.a. Sources: Platform estimate (interim, not observed).

Financial & legal due diligence

What the public record says

Automated from the Karnataka RERA file PRM/KA/RERA/1251/308/PR/120123/005613 and 3 quarterly filings. Prices and rents are locality estimates, not verified listings. Compiled Sep 2026 from the Karnataka RERA file, company registers, rating agencies, tribunal records and press. Facts only; anything that deserves a written answer before signing is flagged.

Delivery timeline9/10
no extensions, no overdue dates on the RERA file
Legal & complaints9/10
no litigation and no complaints on the RERA file
Money to finish8/10
finance cost is 3% of the registered budget; last quarter withdrew ₹25.26 cr against ₹6.03 cr collected (−1); 100% of homes booked (+1)
Developer strength9/10
ICRA AA/Stable (Brigade Enterprises Ltd)

Meters are rule-based from the RERA file and public ratings (rules shown under each), not opinions.

Registration
PRM/KA/RERA/1251/308/PR/120123/005613 · Brigade Enterprises Ltd
On original date
RegisteredFeb 2023TodaySep 2026Original completionDec 2027
Construction88%
quarterly filing Q1 2026-27 (submitted 2026-07-15)
Homes booked662 / 662
0 still available
Sold vs built100% vs 88%
Sales and construction are broadly in step.
Money through the RERA account
Collected ₹4.49 CrWithdrawn ₹24.32 CrQ3 2025-264.49 Cr24.32 CrCollected ₹52.06 CrWithdrawn ₹15.99 CrQ4 2025-2652.06 Cr15.99 CrCollected ₹6.03 CrWithdrawn ₹25.26 CrQ1 2026-276.03 Cr25.26 Cr
Collected from buyersWithdrawn for construction
Latest milestones
  • Masonry Construction
    0%
  • Plastering inside , outside & Ceiling
    0%
  • Basic work of Water supply, Sanitary and E
    40%
  • Elevation work
    75%
  • Internal and External work including lands
    80%
  • Electrification, Water supply and Sanitary
    85%
No litigation declaredNo complaintsEscrow: KOTAK MAHINDRA BANKJoint-development land
Credit ratings of the people behind it
AAAAAABBBBBBCDinvestment grade ◀▶ speculative gradeICRA AA / Stable ▲ · Brigade Enterprises Ltd · Jul 2025
Complaints & disputes on record
On this project00 open
On the promoter entity43all projects
Court cases declared0no stay recorded
At a glance
On its original RERA date

On its original RERA completion date: 2027-12-31

88% built, 100% booked

88% built per the latest filing; 662/662 homes booked

No complaints on this project

No RERA complaints on this project; 43 on the promoter overall

No litigation declared

No litigation declared in RERA filings

The record, in pictures

RERA file · Registration

Registered project cost ₹431 cr — where it goes
Approvals ₹2.3 cr · 1%Construction & on-site ₹272.4 cr · 63%Finance (bank) ₹12 cr · 3%Other / taxes ₹144.2 cr · 33%
Construction programme as filed (quarterly filing Q1 2026-27 (submitted 2026-07-15))
2024202520262027Earth work and other leveling preparat100%Foundation footing work100%Upto Plinth Level100%Sub-structure flooring98%Retaining wall100%RCC or MS Framed structure98%Masonry Construction0%Plastering inside , outside & Ceiling0%Joinery: Doors, Windows, Ventilators e98%Basic work of Water supply, Sanitary a40%Dadoing, Skirting, Flooring, Tiles wor95%Railing and Grill fixing95%Electrification, Water supply and Sani85%Painting85%Fire prevention and fire fighting fitt85%Weather Proof work90%Elevation work75%Internal and External work including l80%today
Bars are the filed schedule; filled part is reported progress. Red = past its scheduled end and not complete.
No litigation declaredBorrowing declared: NoEscrow at KOTAK MAHINDRA BANK8 recorded land-owner sharesOwners’ association: not formed

Red flags to resolve in writing

1
Legal

Joint-development land: confirm which units fall in the owners’ share.

Questions to put to the developer before you sign

  1. Share the latest CA Form 4 and architect Form 5 with the escrow deposit ratio.
  2. Confirm the price list, floor-rise and other charges for the exact unit.
  3. Which date is contractual — 2027-12-31 — and what is the per-month delay compensation?
  4. Confirm there is no litigation on the land or approvals beyond the RERA declaration.
  5. What is the land owners’ share of built area and is the unit in the developer’s share?
Full record: every filed number, line by line1 sections · 13 items

RERA file · Registration

Registration
PRM/KA/RERA/1251/308/PR/120123/005613 · promoter Brigade Enterprises Ltd (Company) · L85110KA1995PLC019126
Dates
Start 2023-02-01 · original completion 2027-12-31 · no extensions
Progress
88% complete per quarterly filing Q1 2026-27 (submitted 2026-07-15) · 662 of 662 homes booked (0 available)
Registered cost
Total ₹431 cr · construction ₹272 cr · bank principal+interest ₹12.02 cr
Borrowing / mortgage declared
Borrowing: No · mortgage: No
RERA bank account
KOTAK MAHINDRA BANK, Lavelle Road Branch (70% construction account)
Plan sanction
APA/CC/207/2022-23 dated 2022-12-06 · Local Planing Authority
Land & towers
7.96 acres (32,229 sq m) · Cielo at Brigade Valencia 662 homes, 22 floors
Land owners / co-promoters
M/s. Anish Maple Reality and M/s. Veerabhadra Associates (Goa) (30.0%, Sy 52); M/s. Anish Maple Reality and M/s. Veerabhadra Associates (Goa) (30.0%, Sy 54-2); M/s. Anish Maple Reality and M/s. Veerabhadra Associates (Goa) (30.0%, Sy 53); M/s. Anish Maple Reality and M/s. Veerabhadra Associates (Goa) (30.0%, Sy 86); M/s. Anish Maple Reality and M/s. Veerabhadra Associates (Goa) (30.0%, Sy 85-1); M/s. Anish Maple Reality and M/s. Veerabhadra Associates (Goa) (30.0%, Sy 84-2); M/s. Anish Maple Reality and M/s. Veerabhadra Associates (Goa) (30.0%, Sy 84-3); M/s. Anish Maple Reality and M/s. Veerabhadra Associates (Goa) (30.0%, Sy 85-4)
Litigation declared
None declared in filings
K-RERA complaints
0 on this registration (0 open) · 43 on the promoter entity across all its projects
Owners’ association
Not yet formed
Completion applied
19/12/2020

Source: Karnataka RERA project record PRM/KA/RERA/1251/308/PR/120123/005613, fetched 2026-09-15. Figures are the promoter’s own filings.

Sources & caveats2 sources
  • Karnataka RERA project record PRM/KA/RERA/1251/308/PR/120123/005613 (registration file, quarterly updates, complaint register), fetched 2026-09-15
  • PropertyLens locality model (market-level estimates)
  • Karnataka RERA project records PRM/KA/RERA/1251/308/PR/120123/005613 (registration file, quarterly updates, complaint register), fetched Sep 2026.

Caveats. Automated analysis: prices, rents and travel times are estimates until listings and Maps data are verified. RERA figures are the promoter’s own filings. Nothing here is legal, tax or investment advice.

Evidence

Location, jobs & transit3 hubs · metro none nearby
Job hubs nearby
Electronic City 8–12 kmHosur 10 kmBommasandra / Jigani industrial
Measured drive times below
Office space
Existing6 msf
Coming in 3 yrs4 msf
Jobs within 30 min5/10
Getting around
Metro today
Yellow Line Bommasandra (5–10 km)
none within 5 km
Metro planned
No station planned within 2 km
Rail
—
estimate
Airport
118 min by road now · 43.8 km
Google Maps
Buses
7/10 coverage
estimate
Drive times to job hubs
DestinationDrive nowRoad km
Electronic City Ph-120 min6.2
ORR Bellandur (Ecospace)39 min13.6
Koramangala (Forum)49 min17.3
ITPL Whitefield58 min20.6
MG Road (CBD)60 min21.5
Manyata Tech Park77 min28.1
Hebbal (Kirloskar)77 min28
Kempegowda Airport (KIA)118 min43.8

Google Maps driving time with live traffic, measured Sep 2026. Refreshed monthly.

Location used: Google Maps match “”. Bus coverage and planned-station distances are still interim estimates.

Price historylocality 11.9%/yr

No dated project-level price series yet; only the latest observation is on file.

Locality · average ₹/sq ft
Date₹ psfSourceConfidenceKind
Jun 20213,600Platform estimate (interim, not observed)40%derived
Jun 20234,500Platform estimate (interim, not observed)45%derived
Jun 20255,600Platform estimate (interim, not observed)50%derived
Jun 20266,300Platform estimate (interim, not observed)50%derived
Luxury comps₹8,000
Premium comps₹6,500
Mid comps₹5,000
Unsold stock20 months

Model backtest on this locality: 1-yr hold-out (Jun 2025→Jun 2026): predicted ₹6,151 vs actual ₹6,300 (-2.4%). Longer 3-yr hold-out (Jun 2023→Jun 2026): predicted 9.1% p.a. vs actual 11.9% p.a. — the model is deliberately mean-reverting and under-predicted the 2021–26 boom.

Environment, legal & productflood ok · water risk · RERA yes
Flood risklow
Water supplytankers/borewell
Quietok
Roads & drainspatchy

Plotted and affordable belt; water via borewells

Legal & approvals
Registration 005613
RERA PRM/KA/RERA/1251/308/PR/120123/005613
possession Dec 2027
Litigation
none reported
observed
Approvals
Plan APA/CC/207/2022-23 dated 2022-12-06
observed
Title
not verified
assumed
Product
Land7.96 acres
Homes662
Density83/acre
Launched2023
Sources & data gapswhat we know, from where, and what is missing

Automated analysis: unit mix and carpet areas come from the RERA inventory table; prices and rents are locality-model estimates until listings are verified.

FieldValueSource classDateConf.KindConflicting values
AddressSy No’s: 52, 53, 54/1A, 54/2, 84/2, 84/3, 85/1, 85/4 and 86 , Kithiganahalli and Banahalli Village, Attibele Hobli, Anekal TalukKarnataka RERA (number as reported; registry lookup pending)Sep 202680%observed
Land area (acres)7.96Karnataka RERA (number as reported; registry lookup pending)Sep 202680%observed
Total units662Karnataka RERA (number as reported; registry lookup pending)Sep 202680%observed
Launch year2023Karnataka RERA (number as reported; registry lookup pending)Sep 202670%observed
Possession · Registration 0056132027-12-31Karnataka RERA (number as reported; registry lookup pending)Sep 202670%observed
Price psf · 1 BHK · ~490 sq ft (344 carpet)6300Platform estimate (interim, not observed)Sep 202635%assumed
Ticket · 1 BHK · ~490 sq ft (344 carpet)3087000Platform estimate (interim, not observed)Sep 202635%derived
Rent · 1 BHK · ~490 sq ft (344 carpet)11000Platform estimate (interim, not observed)Sep 202635%assumed
Carpet area344Karnataka RERA (number as reported; registry lookup pending)Sep 202660%observed
Builder on-time rate0.8Brigade Group (developer website)Aug 202670%observed
Litigationnone reportedKarnataka RERA (number as reported; registry lookup pending)Sep 202670%observed
ApprovalsPlan APA/CC/207/2022-23 dated 2022-12-06Karnataka RERA (number as reported; registry lookup pending)Sep 202660%observed

Commercial listing portals are shown as “Listing portal (aggregated)”; full provenance is retained internally. Official developer and Karnataka RERA sources are named.

Other projects worth comparing

Same model, same date. Scores are out of 100, where 50 is the average analysed Bengaluru project.

Questions people ask about Cielo at Brigade Valencia

Is Cielo at Brigade Valencia a good investment?

On PropertyLens's evidence-based model Cielo at Brigade Valencia scores 51/100, below the average analysed Bengaluru project (50 = average, 12 points = one standard deviation). The model projects price growth of about 9.4% a year over five years and a net-wealth CAGR of 4.9% after every cost on an 8-year hold with a 75.0% loan. That is research on public filings, not advice; the factor breakdown on this page shows what drives the score.

What is the price per sq ft at Cielo at Brigade Valencia?

About ₹6,300 per sq ft of super built-up area, a model estimate from Attibele / Anekal / Chandapura comparables that you can edit. The 1 BHK home costs about ₹30.9 L before other charges, GST and stamp duty, and ₹41.5 L all-in.

When is Cielo at Brigade Valencia ready for possession?

The RERA registration commits to Dec 2027. Latest filing: 74% of the schedule elapsed, 100% of homes booked.

Is Cielo at Brigade Valencia RERA registered?

Yes. Karnataka RERA registration: PRM/KA/RERA/1251/308/PR/120123/005613. No complaints on this registration and 43 on the promoter across projects at K-RERA as of 2026-09-15.

How reliable is Brigade Group on delivery?

80% of Brigade Group's crawled Bengaluru registrations needed no extension (Listed developer; strong delivery record). 250 registrations analysed. The developer scorecard compares this with every other Bengaluru developer.

What rent can Cielo at Brigade Valencia earn?

About ₹11,000 a month for this home (a model estimate from Attibele / Anekal / Chandapura rents), a gross yield of 4.1% on the all-in cost. Nothing is earned before handover. Rent covers 50% of the EMI at the default loan.

Answers are generated from the filings and the model for this home and change when you edit the assumptions above. See the Brigade Group scorecard and the Attibele / Anekal / Chandapura area page.

Go deeper

Share on WhatsApp